W9128A-19-R-0014_Am-0004_Drawings_-_Package_1.pdf

PDF 1 MB Posted

Attached to
Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
Solicitation number
W9128A-19-R-0014
Issued by

About this file

W9128A-19-R-0014 Am-0004 Drawings - Package 1

View the file

Other files

File Type Posted
W9128A-19-R-0014_-_Section_00_22_16,_Attachment_A.docx DOCX document
W9128A-19-R-0014_Am-0007_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0007_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007.pdf PDF
W9128A-19-R-0014_Am-0006.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0005.pdf PDF
W9128A-19-R-0014_Am-0004_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0004.pdf PDF
W9128A-19-R-0014_Am-0003.pdf PDF
W9128A-19-R-0014_Am-0002.pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_1_of_2).pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_2_of_2).pdf PDF
W9128A-19-R-0014_Am-0001.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Request_for_Proposal.pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_11_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_6_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_1_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_5_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_13_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_11_of_14).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_7_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_12_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_9_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_3_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_4_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_10_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_2_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_10_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_2_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_2_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_8_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_2_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_7_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_14_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_6_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_3_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_1_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_9_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_1_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_4_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_1_of_3).pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF DRAWINGS

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

H O

N O

L U

L U D

IS

T R

IC

T

F T S

H A

F T

E R

H A

W A

II

R E

G

IO

N A

L E

N G

IN

E E

R

IN

G C

E N

T E

R

H O

N O

L U

L U E

N G

IN

E E

R D

IS

T R

IC

T

H O

N O

L U

L U

C H

O F

IE

L D B

A R

R A

C K

S

O A

H U

H A

W

II

N

D C

O N

S T

R U

C T C

E N

T R

A L U

T

IL

IT

Y P

L A

T

F

IL

E N

A M

E

1:53:50 PM8/7/2019

c:\pw-work\poh-1\j3ec9mf9\d0244704\18sb04-PKG01_G-002.dgn

J U

N E

RTA

F Y Q

U A

D A R

E P

A

IR

B

L D

G

P T

IO

N A

L V

A L

U E

G-002

C

H E

D U

L E O

F D

R A

W

IN

G S

SHEET ID SHEET TITLE REVISION

G-002

CIVIL

C-002

C-003

C-005

CD101

CS101

CU102

S-553

SCHEDULE OF DRAWINGS

G-001

GENERAL

SHEET ID SHEET TITLE REVISION

%PRODUCTION DATA 4%%PRODUCTION DATA 3%%PRODUCTION DATA 2%

A-001

AD101

AD102

AD103

AD104

AD201

AD301

A-101

A-102

A-103

A-104

A-105

A-106

A-201

A-301

A-302

ARCHITECTURAL

BLDG 131

GENERAL NOTES, ABBREVIATIONS, LEGEND

FIRST AND SECOND FLOOR DEMOLITION PLAN

DEMOLITION EXTERIOR ELEVATIONS

DEMOLITION BUILDING SECTIONS

FIRST FLOOR PLAN - UEPH

FIRST FLOOR PLAN - COF ADMINISTRATION WINGS

EXTERIOR ELEVATIONS

BUILDING SECTIONS

WALL SECTIONS

A-401

A-402

A-403

A-406

A-151

A-251

A-501

A-506

CENTRAL UTILITY PLANT (CUP)

AG602

A-601

A-602

AF601

AG101

AG102

AG103

AG601

AJ101

AI101

S-151

S-551

S-552

LD001

SD102

SD103

SD104

S-102

S-104

S-105

S-106

STRUCTURAL

CENTRAL UTILITY PLANT (CUP)

SD101

FIRE PROTECTION

REVISIONSHEET TITLESHEET ID

CENTRAL UTILITY PLANT (CUP)

BLDG 131

CENTRAL UTILITY PLANT (CUP)

REVISIONSHEET TITLE

BLDG 131

SHEET ID

T-401

T-402

T-403

T-404

T-501

T-502

T-601

T-602

T-603

EL151

CENTRAL UTILITY PLANT (CUP)

T-001

T-002

T-101

T-102

T-103

T-104

BLDG 131

T-151

CENTRAL UTILITY PLANT (CUP)

PLUMBING

MECHANICAL

ELECTRICAL

TELECOMMUNICATIONS

E-001

E-002

E-003

ED101

ED102

ED103

ED104

ED105

ES101

EL101

EL102

EP106

EP107

EP401

EP402

EL103

EL104

EL501

EL502

EL601

EP101

EP151

EP651

EP652

CENTRAL UTILITY PLANT (CUP)

EP406

EP407

EP408

EP501

EP502

EP403

EP404

EP405

EP607

EP608

EP609

EP503

EP601

EP602

P M

K

P M

K

ELECTRICAL ABBREVIATIONS

GENERAL ELECTRICAL NOTES

ELECTRICAL SITE DEMOLITION PLAN

FIRST FLOOR ELECTRICAL DEMOLITION PLAN - ADMINISTRATION WINGS

FIRST FLOOR LIGHTING PLAN - ADMINISTRATION WINGS

FIRST FLOOR LIGHTING PLAN - UEPH

LIGHTING FIXTURE DETAILS - 1

LIGHTING FIXTURE DETAILS - 2

LIGHTING CONTROL DIAGRAMS

FIRST FLOOR POWER PLAN - UEPH

ELECTRICAL DETAILS - 1

ELECTRICAL DETAILS - 2

ELECTRICAL DETAILS - 3

ELECTRICAL PANEL SCHEDULES - 1

ELECTRICAL PANEL SCHEDULES - 2

ELECTRICAL PANEL SCHEDULES - 3

CUP ELECTRICAL SINGLE LINE DIAGRAM

CUP ELECTRICAL PANEL SCHEDULES

GENERAL TELECOMMUNICATIONS NOTES

FIRST FLOOR TELECOMMUNICATIONS PLAN - ADMINISTRATION WINGS

EW101

EW102

ENLARGED ELECTRICAL PLANS - 1 (DWELLING UNITS A & B)

SECOND FLOOR ELECTRICAL DEMOLITION PLAN - UEPH

THIRD FLOOR ELECTRICAL DEMOLITION PLAN - UEPH

SECOND FLOOR LIGHTING PLAN - UEPH

THIRD FLOOR LIGHTING PLAN - UEPH

SECOND FLOOR POWER PLAN - UEPH

THIRD FLOOR POWER PLAN - UEPH

SECOND FLOOR TELECOMMUNICATIONS PLAN - UEPH

THIRD FLOOR TELECOMMUNICATIONS PLAN - UEPH

ENLARGED TELECOMMUNICATIONS PLANS - 1 (DWELLING UNITS A & B)

ENLARGED TELECOMMUNICATIONS PLANS - 2 (EF 130)

ENLARGED TELECOMMUNICATIONS PLANS - 4 (TR 206 & TR 306)

TELECOMMUNICATIONS DETAILS - 1

TELECOMMUNICATIONS DETAILS - 2

ELECTRICAL SYMBOLS AND LEGEND

TELECOMMUNICATIONS SYMBOLS, LEGEND, AND ABBREVIATIONS

CUP TELECOMMUNICATIONS PLAN

THIRD FLOOR DEMOLITION PLAN

B131 / CUP

EP603

SECOND FLOOR PLAN (THIRD SIM) - UEPH

EP605

EP604

ELECTRICAL DEMOLITION PRIMARY SINGLE LINE DIAGRAM

ELECTRICAL DEMOLITION SECONDARY SINGLE LINE DIAGRAM

ELECTRICAL PRIMARY SINGLE LINE DIAGRAM

ELECTRICAL SECONDARY SINGLE LINE DIAGRAM - 1

ELECTRICAL SECONDARY SINGLE LINE DIAGRAM - 2

LANDSCAPE

TREE PROTECTION NOTES

FOUNDATION PLAN - ADMINISTRATION WINGS

ROOF FRAMING PLAN - ADMINISTRATION WINGS

THIRD FLOOR FRAMING PLAN - UEPH

S-001

S-002

S-003

S-004

S-005

S-006

S-007

S-008

S-009 TYPICAL DETAILS

TYPICAL DETAILS

TYPICAL DETAILS

TYPICAL DETAILS

TYPICAL DETAILS

GENERAL NOTES

GENERAL NOTES

GENERAL NOTES

BLDG 131

CIVIL NOTES-1

CIVIL NOTES-2

HAUL ROUTE PLAN

BLDG 131

F-151 s b -P

K G

G -0

.d g n

BLDG 131COVER SHEET, PROJECT VICINITY MAP, AND LOCATION MAP

SECOND FLOOR FRAMING PLAN AND LOWER ROOF FRAMING PLAN - UEPH

INTERIOR FINISH SCHEDULE AND LEGEND

T-503 TELECOMMUNICATIONS DETAILS - 3

PARTIAL FIRST FLOOR ELECTRICAL DEMOLITION PLAN - UEPH

PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN - UEPH

ENLARGED TELECOMMUNICATIONS PLANS - 3 (TR 119 & TR 163)

TELECOMMUNICATIONS GROUNDING SCHEMATIC DIAGRAM

TELECOMMUNICATIONS RISER DIAGRAM

TD101 TELECOMMUNICATIONS SITE DEMOLITION PLAN

CUP POWER PLAN

CUP LIGHTING PLAN

LD101 TREE DISPOSITION PLAN

LD601 TREE SURVEY AND ASSESSMENT

STAIR PLANS AND DETAILS

ENLARGED UNIT FLOOR PLAN AND CEILING PLAN

TYPICAL FIXTURE AND ACCESSORY MOUNTING HEIGHTS

FIRST FLOOR CEILING PLAN - COF ADMINISTRATION WINGS

FIRST FLOOR CEILING PLAN - UEPH

FIRST AND SECOND FLOOR CEILING DEMOLITION PLAN

THIRD FLOOR CEILING DEMOLITION PLAN

DOOR SCHEDULE AND TYPES

WINDOW AND LOUVER SCHEDULE, TYPES AND DETAILS

FIRST FLOOR SIGNAGE PLAN - COF ADMINISTRATION WINGS

FIRST FLOOR SIGNAGE PLAN - UEPH

SECOND FLOOR SIGNAGE PLAN (THIRD SIM) - UEPH

SIGNAGE SCHEDULE AND DETAILS

FIRST AND SECOND FLOOR (THIRD SIM) AIR BARRIER TEST ZONE

AJ301

A-505

SIGNAGE DETAILS

FLOOR PLAN, CEILING PLAN AND ROOF PLAN

EL401

C-001

CG101

CG301 CENTRAL UTILITY PLANT SECTIONS

CU201 WATERLINE PROFILES

CU202

CU203

LP101 LANDSCAPE PLAN

LP102 LANDSCAPE PLAN

ROOF AND MISCELLANEOUS DETAILS

A-502 PARTITION TYPES AND DETAILS

MISCELLANEOUS DETAILS

EXTERIOR ELEVATIONS, BUILDING AND WALL SECTIONS

MILLWORK DETAILS

A-603 DOOR DETAILS

A-504 MISCELLANEOUS DETAILS

ENLARGED RESTROOM FLOOR PLAN, CEILING PLAN AND INTERIOR ELEVATIONS

A-404 INTERIOR ELEVATIONS

FIRST FLOOR FURNITURE PLAN - COF ADMINISTRATION WINGS

SECOND FLOOR CEILING PLAN - UEPH

THIRD FLOOR CEILING PLAN - UEPHA-107

BUILDING SECTION AIR BARRIER TEST ZONES AND DETAILS

LP104

CU501

CU502

CU503

CU504

CS501 SITE DETAILS-1

CS502 SITE DETAILS-2

CS503 SITE DETAILS-3

FX151

FA151

FA651

EP103

EP102

EP104

EP105

FIRST FLOOR POWER PLAN - ADMINISTRATION WING - 1

FIRST FLOOR POWER PLAN - ADMINISTRATION WING - 2

FIRST FLOOR POWER PLAN - ADMINISTRATION WING - 3

FIRST FLOOR POWER PLAN - ADMINISTRATION WING - 4

TS601 TELECOMMUNICATIONS MANHOLE SCHEMATIC DIAGRAM

T-651 CUP TELECOMMUNICATIONS SYSTEM RISER DIAGRAM

A-108 ROOF PLAN

EP606 ELECTRICAL MANHOLE SCHEMATIC DIAGRAM

TS101 TELECOMMUNICATIONS SITE PLAN

EP504

EP505

EP506

ENLARGED ELECTRICAL PLAN AND ELEVATIONS (ELEC 138) POWER PLAN

ENLARGED ELECTRICAL PLAN AND ELEVATIONS (ELEC 125 & ELEC 143) POWER PLAN

ENLARGED ELECTRICAL PLAN AND ELEVATIONS (ELEC 203 & ELEC 303) POWER PLAN

ENLARGED ELECTRICAL PLAN AND ELEVATIONS (EF 130) POWER PLAN

ENLARGED ELECTRICAL PLAN AND ELEVATIONS (TR 108 & TR 151) POWER PLAN

ENLARGED ELECTRICAL PLAN AND ELEVATIONS (TR 206 & TR 306) POWER PLAN

ENLARGED ELECTRICAL PLAN AND ELEVATIONS (MECH 135) POWER PLAN

ELECTRICAL SITE PLAN - 1

ELECTRICAL SITE PLAN - 2ES102

T-506

T-505

T-504 TELECOMMUNICATIONS DETAILS - 4

TELECOMMUNICATIONS DETAILS - 5

TELECOMMUNICATIONS DETAILS - 6

T-508

T-507 TELECOMMUNICATIONS DETAILS - 7

TELECOMMUNICATIONS DETAILS - 8

TELECOMMUNICATIONS DETAILS - 9T-509

T-511

T-510

T-512 TELECOMMUNICATIONS MAINTENANCE HANDHOLE, DUCT FORMATIONS - 2

TELECOMMUNICATIONS MAINTENANCE HANDHOLE, DUCT FORMATIONS - 1

TELECOMMUNICATIONS DETAILS - 10

ENLARGED ELECTRICAL LIGHTING PLANS - 1

A-507 MISCELLANEOUS DETAILS

T-514

T-513

T-515

TELECOMMUNICATIONS MAINTENANCE HOLE DETAILS - 1

TELECOMMUNICATIONS MAINTENANCE HOLE DETAILS - 2

TELECOMMUNICATIONS MAINTENANCE HOLE DETAILS - 3

EY101 FIRST FLOOR INTRUSION DETECTION SYSTEM PLAN - ADMINISTRATION WINGS

INTRUSION DETECTION SYSTEM DETAILSEY501

ELECTRICAL CRAWL SPACE - 1

ELECTRICAL CRAWL SPACE - 2

S-010

SD501

FOUNDATION AND ROOF FRAMING PLAN

FOUNDATION DETAILS

ROOF TRUSS ELEVATION, WIND UPLIFT LOAD DIAGRAM

FRAMING DETAILS

EL503 LIGHTING FIXTURE DETAILS - 3

S-020

S-021

SPECIAL INSPECTION NOTES

SPECIAL INSPECTION NOTES

FOUNDATION DEMOLITION PLAN

FIRST FLOOR FRAMING DEMOLITION PLAN - UEPH

SECOND FLOOR FRAMING DEMOLITION PLAN - UEPH

THIRD FLOOR FRAMING DEMOLITION PLAN - UEPH

SD401 ENLARGED UNIT DEMOLITION PLANS

FOUNDATION PLAN - UEPH

S-401 ENLARGED UNIT PLANS

S-103 FIRST FLOOR FRAMING PLAN - UEPH

EL402 ELECTRICAL MOUNTING DETAIL

T-516 TELECOMMUNICATIONS MISCELLANEOUS DETAILS

CATV RISER DIAGRAM

S-030 TYPICAL DETAILS

FRP DETAILS

SD502

TYPICAL CMU WALL DETAILS

SD511 TYPICAL DEMOLITION SECTIONS AND DETAILS, UEPH

TYPICAL DEMOLITION SECTIONS AND DETAILS, ADMIN

TYPICAL DEMOLITION SECTIONS AND DETAILS, ADMIN

S-101

S-501

S-502

S-510

S-402 PARTIAL ENLARGED SECOND FLOOR AND LOWER ROOF FRAMING PLANS-UEPH

TYPICAL SECTIONS AND DETAILS, ADMIN WINGS

TYPICAL SECTIONS AND DETAILS, ADMIN WINGS

TYPICAL SECTIOSN AND DETAILS, UEPH

S-511 TYPICAL SECTIONS AND DETAILS, UEPH

S-512 TYPICAL SECTIONS AND DETAILS, UEPH

S-513

S-514

S-515

S-516 TYPICAL SECTIOSN AND DETAILS, UEPH

TYPICAL SECTIONS AND DETAILS, UEPH CHASE OPENINGS

TYPICAL SECTIOSN AND DETAILS, UEPH UNIT OPENINGS

TYPICAL SECTIOSN AND DETAILS, UEPH WINDOW OPENINGS

LEGEND AND ABBREVIATIONS

C-004 CIVIL NOTES-3

DEMOLITION, EROSION AND SEDIMENT CONTROL PLAN-1

CD102 DEMOLITION, EROSION AND SEDIMENT CONTROL PLAN-2

CD501 EROSION AND SEDIMENT CONTROL DETAILS

SITE PLAN-1

CS102 SITE PLAN-2

GRADING PLAN-1

CG102 GRADING PLAN-2

UTILITY PLAN-2

UTILITY PLAN-1CU101

FIRELINE PROFILES

CHILLED WATER SUPPLY/RETURN PROFILES

CU204 SEWERLINE PROFILES

WATER DETAILS-1

WATER DETAILS-2

WATER DETAILS-3

SEWER DETAILS-1

CU505 SEWER DETAILS-2

LD602 TREE SURVEY AND ASSESSMENT

LP103 LANDSCAPE PLAN

LANDSCAPE DETAILSLP501

LANDSCAPE PLAN

FIRE ALARM SEQUENCE OF OPERATIONS & RISER DIAGRAM

CUP FIRE ALARM PLAN

CUP FIRE SPRINKLER PLAN

FIRST FLOOR PLAN - LIFE SAFETY

F-104

FD101

FD102

FD103

FD104

FD105

FD106

FD107

F-002

F-101

F-102

F-103

FIRST FLOOR PLAN COF ADMIN WINGS - LIFE SAFETY

FIRST FLOOR PLAN UEPH - LIFE SAFETY

SECOND FLOOR PLAN - LIFE SAFETY

THIRD FLOOR PLAN - LIFE SAFETY

FIRST FLOOR PLAN COF ADMIN WINGS - FIRE SPRINKLER DEMOLITION

FIRST FLOOR PLAN UEPH - FIRE SPRINKLER DEMOLITION

SECOND FLOOR PLAN - FIRE SPRINKLER DEMOLITION

THIRD FLOOR PLAN - FIRE SPRINKLER DEMOLITION

FIRST FLOOR PLAN COF ADMIN WINGS - FIRE ALARM DEMOLITION

FIRST FLOOR PLAN UEPH - FIRE ALARM DEMOLITION

SECOND FLOOR PLAN - FIRE ALARM DEMOLITION

FX102

FX103

FX104

FX501

FA101

FA102

FA103

FA104

FD108

FX101

FA501

THIRD FLOOR PLAN - FIRE ALARM DEMOLITION

FIRE SPRINKLER DETAILS

FIRST FLOOR PLAN COF ADMIN WINGS - FIRE ALARM/MASS NOTIFICATION

FIRST FLOOR PLAN UEPH - FIRE ALARM/MASS NOTIFICATION

SECOND FLOOR PLAN - FIRE ALARM/MASS NOTIFICATION

THIRD FLOOR PLAN - FIRE ALARM/MASS NOTIFICATION

FIRE ALARM/MASS NOTIFICATION DETAILS

F-001 CODE INFORMATION SHEET

FIRE PROTECTION SITE PLAN

F-105 FIRE PROTECTION NOTES AND LEGEND

FIRST FLOOR PLAN COF ADMIN WINGS - FIRE SPRINKLER

FIRST FLOOR PLAN UEPH - FIRE SPRINKLER

SECOND FLOOR PLAN - FIRE SPRINKLER

THIRD FLOOR PLAN - FIRE SPRINKLER

FA601 FIRE ALARM/MASS NOTIFICATION SEQUENCE OF OPERATIONS

FA602

FA603

FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM

FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM

FX401 TYPICAL UNIT PLAN UEPH - FIRE SPRINKLER

PD101

PD102

PD103

PD104

P-101

P-102

P-103

P-105

P-401

P-610

P-001 PLUMBING NOTES AND LEGEND

PS101 PLUMBING SITE PLAN

BUILDING 131 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN

BUILDING 131 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN

BUILDING 131 SECOND FLOOR PLUMBING DEMOLITION PLAN

BUILDING 131 THIRD FLOOR PLUMBING DEMOLITION PLAN

BUILDING 131 PARTIAL FIRST FLOOR PLUMBING PLAN

BUILDING 131 CRAWL SPACE PLUMBING PLAN

BUILDING 131 SECOND FLOOR PLUMBING PLAN

BUILDING 131 THIRD FLOOR PLUMBING PLAN

P-402

BUILDING 131 ENLARGED PLUMBING PLANS

BUILDING 131 ENLARGED PLUMBING PLANS

P-403 BUILDING 131 ENLARGED PLUMBING PLANS

P-404 BUILDING 131 ENLARGED PLUMBING PLANS

P-501 BUILDING 131 PLUMBING DETAILS

P-601 BUILDING 131 FIRST FLOOR SANITARY PIPING DIAGRAM

P-602 BUILDING 131 FIRST FLOOR SANITARY PIPING DIAGRAM

P-603 BUILDING 131 FIRST FLOOR SANITARY PIPING DIAGRAM

P-604 BUILDING 131 SANITARY RISER DIAGRAMS

P-605 BUILDING 131 FIRST FLOOR WATER PIPING DIAGRAM

P-606 BUILDING 131 FIRST FLOOR WATER PIPING DIAGRAM

P-607 BUILDING 131 FIRST FLOOR WATER PIPING DIAGRAM

P-608 BUILDING 131 FIRST FLOOR WATER PIPING DIAGRAM

P-609 BUILDING 131 WATER RISER DIAGRAMS

P-405 BUILDING 131 ENLARGED PLUMBING PLANS

P-406 BUILDING 131 ENLARGED PLUMBING PLANS

P-502 BUILDING 131 PLUMBING DETAILS

BUILDING 131 ATTIC WATER PIPING DIAGRAM

P-612

P-611 BUILDING 131 MECHANICAL ROOM WATER PIPING DIAGRAM

BUILDING 131 PLUMBING SCHEDULES

BUILDING 131 PARTIAL FIRST FLOOR PLUMBING PLAN

P-104

P-503 BUILDING 131 PLUMBING DETAILS

P-613 BUILDING 131 PLUMBING SCHEDULES AND SEQUENCE OF OPERATION

CUP PLUMBING PLAN

CUP SANITARY PIPING DIAGRAM

CUP WATER PIPING DIAGRAM

CUP PLUMBING SCHEDULES

CUP PLUMBING DETAILS

P-151

P-651

P-652

P-661

P-551

MD104

MD105

M-101

M-103

M-104

M-105

M-401

M-501

MD102

MD103

M-151

M-551

BUILDING 131 PARTIAL FIRST FLOOR MECHANICAL DEMOLITION PLAN

BUILDING 131 SECOND FLOOR MECHANICAL DEMOLITION PLAN

BUILDING 131 THIRD FLOOR MECHANICAL DEMOLITION PLAN

M-102

BUILDING 131 ATTIC MECHANICAL DEMOLITION PLAN

BUILDING 131 PARTIAL FIRST FLOOR MECHANICAL PLAN

BUILDING 131 CRAWL SPACE MECHANICAL PLAN

BUILDING 131 SECOND FLOOR MECHANICAL PLAN

BUILDING 131 THIRD FLOOR MECHANICAL PLAN

BUILDING 131 ATTIC MECHANICAL PLAN

CUP MECHANICAL PLAN

M-402

M-403

BUILDING 131 ENLARGED MECHANICAL PLANS

BUILDING 131 ENLARGED MECHANICAL PLANS

BUILDING 131 ENLARGED MECHANICAL PLANS

M-601 BUILDING 131 CHILLED WATER PIPING DIAGRAM

M-611

M-612

BUILDING 131 MECHANICAL SCHEDULES

BUILDING 131 MECHANICAL SCHEDULES

M-661 CUP MECHANICAL SCHEDULES

CUP MECHANICAL DETAILS

M-552 CUP MECHANICAL DETAILS

M-553

M-651 CUP CHILLED WATER AND CONDENSER WATER PIPING DIAGRAM

BUILDING 131 MECHANICAL DETAILS

M-502

BUILDING 131 CONDENSATE DRAIN PIPING DIAGRAM

BUILDING 131 MECHANICAL RISER DIAGRAM

M-602

M-603

BUILDING 131 DDC POINTS LIST AND SEQUENCE OF OPERATIONS

M-554

CUP DDC POINTS LIST

CUP DDC SEQUENCE OF OPERATIONS

M-106

BUILDING 131 PARTIAL FIRST FLOOR MECHANICAL PLAN

BUILDING 131 MECHANICAL SECTION VIEWM-301

BUILDING 131 MECHANICAL SECTION VIEWM-302

M-404 BUILDING 131 ENLARGED MECHANICAL PLANS

M-405 BUILDING 131 ENLARGED MECHANICAL PLANS

M-406 BUILDING 131 ENLARGED MECHANICAL PLANS

M-407 BUILDING 131 ENLARGED MECHANICAL PLANS

M-408 BUILDING 131 ENLARGED MECHANICAL PLANS

M-503 BUILDING 131 VAV AHU AND TERMINAL UNIT SCHEMATIC AND CONTROL DIAGRAMS

M-504

CONTROL DIAGRAMS

BUILDING 131 EXHAUST FAN AND ENERGY RECOVERY VENTILATOR SCHEMATIC AND

M-505 BUILDING 131 MECHANICAL DETAILS

M-506 BUILDING 131 MECHANICAL DETAILS

BUILDING 131 MECHANICAL RISER DIAGRAMM-604

BUILDING 131 OUTSIDE AIR SCHEDULESM-605

CUP MECHANICAL DETAILS

CUP MECHANICAL DETAILS

M-555

M-556

M-662 CUP MECHANICAL SCHEDULES

MECHANICAL NOTES AND LEGEND

MECHANICAL SITE PLAN

BUILDING 131 PARTIAL FIRST FLOOR MECHANICAL DEMOLITION PLAN

MS101

MD101

M-001

ELECTRICAL DETAILS - 4

ELECTRICAL DETAILS - 5

ELECTRICAL DETAILS - 6

EP509

EP508

EP507 ELECTRICAL DETAILS - 7

ELECTRICAL DETAILS - 8

ELECTRICAL DETAILS - 9

A

M E

N D

M E

N T

M

E N

D M

E N

T

J

U L

Y

A

U G

FINISH

GRADE

1" CHAMFER

6" BRASS

COUNTERSUNK PLUG

FLUSH

PAVEMENT

BASE COURSE

12" x 12"

CONC. PAD

6" PIPE (LENGTH

AS REQUIRED)

6" 1/8 BEND

PLUG FOR TERMINAL

LINE CONDITION WYE

FLOW

C

COTG

L

M

A X

18" SQ. x 6" THK

CONC. BLOCK

1" CHAMFER

FINISH

GRADE

BRASS

COUNTERSUNK

HEAD

6" 1/8 BEND

6" CAST IRON BODY

(IPT)

2% MIN. FLOW

6" WYE

6" SEWER LATERAL

PER PLAN

6" CAP

TO SEWER MAIN

C COTG

L

6" 1/8 BEND

6" WYE

6" RISER

M

A X

18" SQ. x 6" THK

CONC. BLOCK

1" CHAMFER

FINISH

GRADE

BRASS

COUNTERSUNK

HEAD

4" 1/8 BEND

6" CAST IRON BODY

(IPT)

2% MIN. FLOW

6" x 6" x 4" WYE

4" SEWER LATERAL

PER PLAN

6" CAP

TO SEWER MAIN

C COTG

L

6" 1/8 BEND

6" WYE

6" RISER

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

%PRODUCTION DATA 1%

%PRODUCTION DATA 2% %PRODUCTION DATA 3% %PRODUCTION DATA 4%

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P

E

N G

I N

E E

R S

R E

G I O

N A

L

E

N G

I N

E E

R I N

G

C

E N

T E

R

H O

N O

L U

L U

G

I N

E E

R

D

I S

T R

I C

T

H O

N O

L U

L U

H

I

H O

N O

L U

U

S

T R

I C

T

A

F T

E R

H

A W

A I I

W A

D

J U

U

O P

T I O

N

U

O P

T I O

N

A N

S I

X

F Y

Q

U A

P

A

B

D

G

D

C

O N

S T

R U

N

T R

A L

U

T I L I T

I E

S

P

L A

N

S C

H O

F I E

B

R

R A

C K

S

O

A H

U

H

A W

A I I

RTA

R

S A

N T

O

R R

B

R O

W N

R R

B

R O

W N

This drawing was prepared by me or under my direct supervision.

EXP. DATE 4/30/2020

A M

S E

W E

R

D

E T

A I L S

CU505

NOT TO SCALE

CLEANOUT TO GRADE (COTG) DETAIL

A7

1'-0" 1'-0"

4" AC PAVEMENT

EXIST. AC

PAVEMENT

EXIST. BASE COURSE

C O

V E

R

V A

R I E

S

M I N

F

W

T

E R

M I N

F

W

E R

P I P

E

O D

3'-0"

COMPACTED

SAND FILL

PIPE LINE

COMPACTED

BACKFILL

ELECTRONIC

BALL MARKER FOR

WATER LINE

PRIME COAT

6" BASE COURSE OR

MATCHING EXISTING,

WHICHEVER IS GREATER

SAW CUT &

PROVIDE

TACK COAT

SAW CUT &

PROVIDE

TACK COAT

C O

V E

R

V A

R I E

S

M I N

F

T

E R

H

T

E R

M I N

F

W

E R

COMPACTED

SAND FILL

PIPE LINE

COMPACTED

BACKFILL

BASE COURSE,

MATCH EXIST

CONC. PAVEMENT,

MATCH EXIST

EXIST. CONC.

PAVEMENT AND

BASE COURSE

SAW CUT (TYP)

3'-0"

3'-0"

C O

V E

R

V A

R I E

S

M I N

F

T

E R

H

T

E R

M I N

F

W

E R

P I P

E

O D

COMPACTED

SAND FILL

COMPACTED

BACKFILL

SOD AND TOP SOIL

P I P

E

O D

8" MIN. 8" MIN.

8"

MIN.

8"

MIN.

8"MIN. 8"MIN.

NOT TO SCALE

TYPICAL TRENCH DETAIL

D1

SECTION - UNDER PAVEMENT SECTION - CONCRETE PAVED AREA SECTION - UNDER GRASSED AREA

C O

V E

R

V

A R

I E

S

M I N

COMPACTED

SAND FILL

PIPE LINE WITH

INSULATION

JACKET

COMPACTED

BACKFILL

BASE COURSE,

MATCH EXIST

CONC. PAVEMENT,

MATCH EXIST

EXIST. CONC.

PAVEMENT AND

BASE COURSE

SAW CUT (TYP)

3'-0"

P I P

E

O D

8" MIN. 8" MIN.

CONCRETE PAVED AREA UNDER GRASSED AREA

8" MIN.

SECTION - CHWS/R LINE

SOD AND TOP SOIL

NOT TO SCALE

CLEANOUT TO GRADE DROP (COTG) DETAILS

A1

CU502

A7

1. FOR ELECTRONIC BALL MARKER TO WATER LINE DETAIL, SEE

2. PROVIDE ROOT BARRIER ON THE FOLLOWING SEWERLINES.

SEE LANDSCAPE DWGS. FOR ROOT BARRIER DETAIL.

2.1. SEWERLINE "A" STA. 1+75 TO STA. 3+14

2.2. SEWERLINE "A-1"

2.3. SEWERLINE "A-2"

2.4. SEWERLINE "C"

NOTE:

4'-6"

P I P

E

O D

18" 18"

CW4 CW4 HW2CW CW

SECTION - CHWS/R AND HW LINE

ELECTRONIC

BALL MARKER FOR

WATER LINE

ELECTRONIC

BALL MARKER FOR

WATER LINE

PIPE LINE

4" SEWER LATERAL 6" SEWER LATERAL

PKG01_G-002
M - FY18 Quad A Repair Bldg 131 and Construct Central Utility Plant, AM-0001 Drawings
M-105
M-302
M-401
M-402
M-407
M-501
M-502
M-503
M-504
M-601
M-603
M-604
M-605
M-611
M-612
M-555
M-661
M-662
AMENDMENT-18sb04-131_EP107
AMENDMENT-18sb04-131_EP401
AMENDMENT-18sb04-131_EP603
AMENDMENT-18sb04-131_EP604
AMENDEMENT-18sb04-131_EP607
AMENDMENT-18sb04-CUP_EP151
AMENDMENT-18sb04-CUP_EP651
AMENDMENT-18sb04-CUP_EP652
18sb04-Quad-A_PKG-1_7AUG2019.pdf
PKG-1_BLDGS-131-and-CUP
GENERAL
G-002 - SCHEDULE OF DRAWINGS
W9128A18D0003CU505.pdf
Sheets and Views
CU505
ps

File details come from the government source that posted it.