W9128A-19-R-0014_Am-0006.pdf
PDF 929 KB Posted
- Attached to
- Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
- Solicitation number
- W9128A-19-R-0014
About this file
W9128A-19-R-0014 Am-0006
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PN94631 Repair Building 131 and Construction Central Utility Plant, Schofield Barracks, Oahu, Haw aii and PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Haw aii
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A19R0014
X 9B. DATED (SEE ITEM 11)
29-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
Am-0006
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Aug-2019
CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9128A19R0014 Am-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0006)” is shown on each revised page.
a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks.
Standard Form 1442 – Page 1
b. NEW SECTIONS. The following are new pages to the solicitation.
Section 00 60 00, Attachment B – Requests for Information (#7 through 12)
2. CHANGES TO DRAWINGS.
a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued
Package 1: FY18 Quad A Repair Bldg. 131 and Construct Central Utility Plant
Sheet ID Mark Revision Date G-002 6 08/13/19
. A-403 6 08/13/19 A-404 6 08/13/19 A-506 6 08/13/19
AF601 6 08/13/19
Package 2: FY18 Quad A Repair Bldg. 130 and 132
Sheet ID Mark Revision Date G-002 6 08/13/19 A-404 6 08/13/19 A-405 6 08/13/19 A-506 6 08/13/19 A-152 6 08/13/19 A-251 6 08/13/19
3. The proposal due date is EXTENDED (see SF1442, Page 1, Block 13A).
PN94631 Repair Building 131 and Construct Central Utility Plant, Schofield Barracks, Oahu, Hawaii and PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Hawaii
COLIN K WAKI 808-835-4393
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Jul-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______7 calendar days and complete it within ________ 720 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 29 Aug 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CECT - CONTRACTING DIVISION
USACE, HONOLULU DISTRICT
BLDG 252 (CECT-POH)
FT. SHAFTER HI 96858-5440
W9128A
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX: TEL: TEL: FAX:
W9128A19R0014 2
(Am-0006)
PN94631 Repair Building 131 and Central Utility Plant, Schofield Barracks, Oahu, Hawaii PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Hawaii
RFI # References Question Government Response 7 Plans show some backsplashes on counters are 2”. Should this be standard throughout?
No, see plan details for various backsplash heights.
8 AF601 The finish schedule on sheet AF601 calls out for Rubber at 18.125"x 18.125" on stairs S03/S06. Please provide detail if this material covers the treads, risers, and landing.
See Package 1, Section 09 65 00 'Resilient Flooring', Paragraph 2.6 'Stair Treads, Riser and Stringers', per the original solicitation, for S03 & S06 finish material product.
See Package 1, Section 09 65 00 'Resilient Flooring', Paragraph. 3.9 'Placing Stair Treads, Riser and Stringers', per the original solicitation, for S03 & S06 material installation.
9 AF601 Per Building 131 and 130, sheet AF601 calls out for Rubber on stairs S03/S06.
However, there is no floor type for stairwell S04/S05. Please confirm what material will be installed for stairs S04/S05.
See Package 1, Sheet AF601, per Am-0006.
10 A-152, A-602 Per Building 132, sheet A-152 shows window type “NN”. However, there is no window type “NN” reflected in the window schedule on sheet A-602. Please provide detail.
See Package 2, Sheet A-152, per Am-0006, 'STAIR S02 & S04' for window number.
See Package 2, Sheet A-602, per the original solicitation, for window details.
11 A-251/D1D & D1B, A-
Per Building 132, Sheet A-251, details D1B and D1D shows pe-finished aluminum windows. Please confirm type and size for these called out windows. Since these windows are close to the stairwell, please confirm if they will be fire rated.
See Package 2, Sheet A-152, per Am-0006, 'CORR 201 & 301' for window number.
See Package 2, Sheet A-602, 'Window Schedule' for window details, and 'Window Types' for window fire rating, per the original solicitation.
12 A-404/A1, A-403/A1 Per Building 131, Sheet A-404/A1 says Refrigerator (GFCI). However, sheet A-403, note A1 says Refrigerator (GFGI). This same contradiction can be found in Package 2 for Buildings 130 & 132. Please confirm who will be installing all Refrigerators in Building(s) 130, 131, and 132.
See Package 1 AND Package 2, Sheet A-404, Keynote A1, per Am-0006.
Section 00 60 00, Attachment B (Am‐0006)