W9128A-19-R-0014_Drawings_-_Package_1_(Part_3_of_11).pdf
PDF 9 MB Posted
- Attached to
- Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
- Solicitation number
- W9128A-19-R-0014
About this file
W9128A-19-R-0014 Drawings - Package 1 (Part 3 of 11)
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
H
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W A
II
R E
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
I
C H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
N
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
T
F
IL
E N
A M
E
12:49:40 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
LIGHT GAUGE STEEL CONSTRUCTION AND CONNECTIONS – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.2, 1705.11.2, 1705.11.3, UFC 4 023 03
TASK INSPECTION
TYPE
DESCRIPTION
1. TRUSSES SPANNING 60-
FEET OR GREATER
WHERE/IF APPLIES
PERFORM VERIFY THAT TEMPORARY AND PERMANENT TRUSS
RESTRAINT/BRACING IS INSTALLED IN ACCORDANCE WITH
APPROVED TRUSS SUBMITTAL PACKAGE.
OBSERVE VERIFY PROPER WELDING OPERATIONS, SCREW
ATTACHMENT, BOLTING, ANCHORING AND OTHER
FASTENING OF COMPONENTS WITHIN THE PROGRESSIVE
COLLAPSE RESISTING SYSTEM, INCLUDING HORIZONTAL TIE
FORCE ELEMENTS, VERTICAL TIE FORCE ELEMENTS AND
BRIDGING ELEMENTS (UFC 4 023 03).
COLD-FORMED STEEL
(PROGRESSIVE
COLLAPSE RESISTING
SYSTEM WHERE/IF
APPLIES)
4.
LIGHT GAUGE STEEL FRAMING AND/OR LIGHT GAUGE TRUSSES
CONSTRUCTION SPECIAL INSPECTION
2. OBSERVE VISUALLY INSPECT ALL WELDS COMPOSING PART OF THE
MAIN WIND OR SEISMIC FORCE RESISTING SYSTEM,
INCLUDING SHEARWALLS, BRACES, COLLECTORS (DRAG
STRUTS), AND HOLD-DOWNS.
WELDED CONNECTIONS
(SEISMIC AND/OR WIND
RESISTING SYSTEM)
3. VISUALLY INSPECT ALL SCREW ATTACHMENT, BOLTING,
ANCHORING AND OTHER FASTENING OF COMPONENTS
WITHIN THE MAIN WIND OR SEISMIC FORCE RESISTING
SYSTEM, INCLUDING ROOF DECK, ROOF FRAMING, EXTERIOR
WALL COVERING, WALL TO ROOF/FLOOR CONNECTIONS,
BRACES, COLLECTORS (DRAG STRUTS) AND HOLD-DOWNS.
CONNECTIONS (SEISMIC
AND/OR WIND RESISTING
SYSTEM)
OBSERVE
STEEL INSPECTION PRIOR TO WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: TABLE C-N5.4-1
TASK INSPECTION
TYPE
DESCRIPTION
1. VERIFY THAT THE
WELDING PROCEDURES
SPECIFICATION (WPS) IS
AVAILABLE
PERFORM
THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL
MAINTAIN A SYSTEM BY WHICH A WELDER WHO HAS WELDED
A JOINT OR MEMBER CAN BE IDENTIFIED. STAMPS, IF USED,
SHALL BE THE LOW-STRESS TYPE.
WELDER IDENTIFICATION
SYSTEM
4.
STEEL – WELDING SECTION
2. VERIFY MANUFACTURER
CERTIFICATIONS FOR
WELDING CONSUMABLES
ARE AVAILABLE
3. TYPE AND GRADE.VERIFY MATERIAL
IDENTIFICATION
PERFORM
- JOINT PREPARATION
- DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE,
BEVEL)
- CLEANLINESS (CONDITION OF STEEL SURFACES
- TACKING (TACK WELD QUALITY AND LOCATION)
- BACKING TYPE AND FIT (IF APPLICABLE)
FIT-UP OF GROOVE
WELDS (INCLUDING
JOINT GEOMETRY)
5. OBSERVE
PERFORM
PERFORM
CONFIGURATION AND
FINISH OF ACCESS HOLES
6. OBSERVE
- DIMENSIONS (ALIGNMENT, GAPS AT ROOT)
- CLEANLINESS (CONDITION OF STEEL SURFACES)
- TACKING (TACK WELD QUALITY AND LOCATION)
FIT-UP OF FILLET WELDS7. OBSERVE
STEEL INSPECTION DURING WELDING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: TABLE C-N5.4-2
TASK INSPECTION
TYPE
DESCRIPTION
WELDING BY WELDERS, WELDING OPERATORS, AND TACK
WELDERS WHO ARE QUALIFIED IN CONFORMANCE WITH
REQUIREMENTS.
USE OF QUALIFIED
WELDERS
8. PERFORM
- PACKAGING
- ELECTRODE ATMOSPHERIC EXPOSURE CONTROL
CONTROL AND HANDLING
OF WELDING
CONSUMABLES
9. OBSERVE
NO WELDING OVER
CRACKED TACK WELDS
10. OBSERVE
ENVIRONMENTAL
CONDITIONS
11. OBSERVE - WIND SPEED WITHIN LIMITS
- PRECIPITATION AND TEMPERATURE
WELDING PROCEDURES
SPECIFICATION
FOLLOWED
12. OBSERVE - SETTINGS ON WELDING EQUIPMENT
- TRAVEL SPEED
- SELECTED WELDING MATERIALS
- SHIELDING GAS TYPE/FLOW RATE
- PREHEAT APPLIED
- INTERPASS TEMPERATURE MAINTAINED (MIN./MAX.)
- PROPER POSITION (F, V, H, OH)
- INTERMIX OF FILLER METALS AVOIDED
WELDING TECHNIQUES13. OBSERVE - INTERPASS AND FINAL CLEANING
- EACH PASS WITHIN PROFILE LIMITATIONS
- EACH PASS MEETS QUALITY REQUIREMENTS
WELDS CLEANED14. OBSERVE
SIZE, LENGTH, AND
LOCATION OF ALL WELDS
15. PERFORM SIZE, LENGTH, AND LOCATION OF ALL WELDS CONFORM TO
THE REQUIREMENTS OF THE DETAIL DRAWINGS.
WELDS MEET VISUAL
ACCEPTANCE CRITERIA
16. PERFORM
AND
DOCUMENT
- CRACK PROHIBITION
- WELD/BASE-METAL FUSION
- CRATER CROSS SECTION
- WELD PROFILES
- WELD SIZE
- UNDERCUT
- POROSITY
ARC STRIKES17. PERFORM
K-AREA18. WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES
OR STIFFENERS HAS BEEN PERFORMED IN THE K-AREA,
VISUALLY INSPECT THE WEB K-AREA FOR CRACKS.
19.REPAIR ACTIVITIES
20.
PERFORM
AND
DOCUMENT
DOCUMENT
ACCEPTANCE OR
REJECTION OF WELDED
JOINT OR MEMBER
PERFORM
PERFORM
SPECIAL INSPECTION SCHEDULES, CONT
OTHER STEEL INSPECTIONS – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 341-10: TABLES J8-1 & J10-1
TASK INSPECTION
TYPE
DESCRIPTION
1. ANCHOR RODS AND
OTHER EMBEDMENTS
SUPPORTING
STRUCTURAL STEEL
PERFORM VERIFY THE DIAMETER, GRADE, TYPE, AND LENGTH OF THE
ANCHOR ROD OR EMBEDDED ITEM, AND THE EXTENT OR
DEPTH OF EMBEDMENT PRIOR TO PLACEMENT OF
CONCRETE.
STEEL - OTHER INSPECTIONS SPECIAL INSPECTION
2. OBSERVE VERIFY COMPLIANCE WITH THE DETAILS SHOWN ON THE
CONSTRUCTION DOCUMENTS, SUCH AS BRACES,
STIFFENERS, MEMBER LOCATIONS AND PROPER
APPLICATION OF JOINT DETAILS AT EACH CONNECTION.
FABRICATED STEEL OR
ERECTED STEEL FRAME
STEEL INSPECTION TASKS PRIOR TO BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: TABLE C-N5.6-1
TASK INSPECTION TYPE
1. MANUFACTURE’S CERTIFICATIONS AVAILABLE FOR FASTENER MATERIALS PERFORM
2. FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS OBSERVE
3. PROPER FASTENERS SELECTED FOR JOINT DETAIL (GRADE, TYPE, BOLT LENGTH IF
THREADS ARE TO BE EXCLUDED FROM SHEAR PLANE)
OBSERVE
6. PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS, AND OTHER FASTENER
COMPONENTS
OBSERVE
7. FASTENER ASSEMBLIES OF SUITABLE CONDITION, PLACED IN ALL HOLES AND
WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED
OBSERVE
8. JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO PRETENSIONING
OPERATION
OBSERVE
9. FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING OBSERVE
STEEL INSPECTION TASKS AFTER BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: TABLE C-N5.6-3
TASK INSPECTION TYPE
11.DOCUMENT ACCEPTANCE OR REJECTION OF ALL BOLTED CONNECTIONS DOCUMENT
STEEL – BOLTING SECTION
4. PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL OBSERVE
5. CONNECTING ELEMENTS, INCLUDING APPROPRIATE FAYING SURFACE CONDITION
AND HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS
OBSERVE
10.BOLTS ARE PRETENSIONED IN ACCORDANCE WITH RCSC SPECIFICATION,
PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE
EDGES
STEEL INSPECTION TASKS DURING BOLTING – VERIFY THE FOLLOWING ARE IN COMPLIANCE
IBC 1705.2.1, AISC 360-10: TABLE C-N5.6-2
TASK INSPECTION TYPE
OBSERVE
INSPECTION DEFINITIONS:
PERFORM THESE TASKS FOR EACH WELD, FASTENER OR BOLTED CONNECTION, AND
NOTED VERIFICATION.
OBSERVE THESE ITEMS RANDOMLY DURING THE COURSE OF EACH WORK DAY TO
INSURE THAT APPLICABLE REQUIREMENTS ARE BEING MET. OPERATIONS NEED NOT
BE DELAYED PENDING THESE INSPECTIONS AT CONTRACTOR’S RISK.
DOCUMENT, WITH A REPORT, THAT THE WORK HAS BEEN PERFORMED IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS. THIS IS IN ADDITION TO ANY
OTHER REPORTS REQUIRED IN THE SPECIAL INSPECTIONS GUIDE SPECIFICATION.
CONSTANT MONITORING OF IDENTIFIED TASKS BY A SPECIAL INSPECTOR OVER THE
DURATION OF PERFORMANCE OF SAID TASKS.
PERFORM:
OBSERVE:
DOCUMENT:
CONTINUOUS:
P T
IO
N A
L V
A L
U E s b -B
S -0
.d g n
U T
H E
R
B H
J
S-021
P
E C
IA
L I
N S
P E
C T
IO
N N
O T
E S
B131/CUP
D M
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:43 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
MINIMUM METAL DECK SECTION
PROPERTIES
I
(IN. )
THICKNESS
(GAGE)
DECK
TYPE
ROOF 20 0.231
-S
(IN. )
+S
(IN. )
COMPOSITE
0.230 NO0.237
NOTES:
1. PROVIDE INTERLOCKING METAL ROOF DECK
FOR SCREW FASTENED SIDELAP
ATTACHMENTS.
METAL DECK NOTES:
1. METAL DECK AND ACCESSORIES SHALL BE FORMED FROM STEEL
SHEETS CONFORMING TO ASTM 653 SQ GRADE 33 MINIMUM YIELD
STRENGTH 38 KSI WITH G60 GALVANIZED COATING.
2. MINIMUM BEARING OF DECKING ON SUPPORTS SHALL BE 2 INCHES.
3. DECK SHALL BE CONTINUOUS OVER 2 SPANS MINIMUM AND OVER 3
SPANS WHERE PERMITS.
SUPPORT
CONNECTION
TRUSS
SUPPORT
PERIMETER
SUPPORT
PARALLEL TO
DECK
SIDE SEAM
CONNECTION
DECK FASTENING SCHEDULE
DECK
PERPENDICULAR
# PER
SHEET
CONNECTIONDECK TYPE
ROOF
#12
SCREWS
DECK
PARALLEL
SPACINGCONNECTION
SIDELAP
ATTACHMENT
CONNECTION SPACING
#10
SCREWS
12"
NOTES:
1.
#12
SCREWS
6"2 1/2 "3 1/2 "
/2
36"
A1
METAL DECK FASTENING DETAIL
NOT TO SCALE
C1
METAL ROOF DECK PROFILE
NOT TO SCALE
SHEET
36" WIDE
SHEET
36" WIDE
SCREWS SHALL BE SDI RECOGNIZED SCREWS.
OF 5/16" AND THICKNESS OF 0.05".
ACCORDANCE WITH ASTM C1513 WITH A MINIMUM WASHER DIAMETER
#10 SCREWS SHALL BE SELF-DRILL, SELF-TAPPING SCREWS IN
2.
6"
F1
SECTION
1 1/2" = 1'-0" F3
SECTION
1 1/2" = 1'-0" F6
SECTION
1 1/2" = 1'-0"
(4) 5/8" Ø THREADED
ROD DRILL & EPOXY
INTO CMU WALL, TYP
CLOF L6 x 6
3/16"
L6 x 6
3-SIDES
L4 x 4 DIAG
CLOF L4 x 4
3/16"
TYP
WORKPOINT
F6
S-010
L4 x 4 BEYOND
F3
S-010
L6 x 6
L4 x 4
3/16"
TYP
3/8" THICK
STEEL PLATE
(2) 5/8" Ø A325-N
BOLT
3/8" THICK
STEEL PLATE
OUTLINE
OF ANGLE
CLOF ANGLE
EMBED
6" MIN
2'-0" MAX
2" M
IN
/2
M
IN
/2
/2
3"1/2"
1 1/2" 1 1/2"
8"2", TYP
600S162 - BOTTOM
CHORD
(2) 5/8" Ø A307
BOLT SPACED
3" APART
L4 x 4 x 3/16" x 6"
LONG CLIP
BOTTOM OF
TRUSS
NOTE:
PROVIDE L4 x 4 CLIP AT PIPE SUPPORTS
SEE MECH DWGS FOR PIPE LOCATIONS
C8
SECTION
1 1/2" = 1'-0"
P T
IO
N A
L V
A L
U E s b -B
S -0
.d
E
R
B H
S-030
BLDG CUP
T Y
P
IC
A L D
E T
A
IL
S
D M
LAP
SHEETS
2" MIN
LAP DECK
SHEETS
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:44 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
TO REMAIN
(E) FOOTING
TO REMAIN, TYP
(E) CMU WALL
TO BE REMOVED
(E) CMU SILL
TYP
TO REMAIN,
STAIR WELL
(E) CONC
TYP
TO BE REMOVED,
(E) CMU WALL
DEMOLITION NOTES LEGEND
SEE ARCH DWGS
REMOVE (E) WINDOW,
SLAB-ON-GRADE
REMOVE (E) CONC
TO REMAIN, TYP
(E) STEEL COLUMN
TO REMAIN,TYP
(E) STEEL COLUMN
(E) METAL DECK
CMU WALL, DO NOT DAMAGE
REMOVE (E) FULL-HEIGHT
TYP
TO BE REMOVED,
(E) CMU WALL
ARM'S VAULT
(E) CMU WALL FOR
PARTIALLY DEMO
SLAB-ON-GRADE
REMOVE (E) CONC
SLAB-ON-GRADE
REMOVE (E) CONC
ARM'S VAULT
(E) CMU WALL FOR
PARTIALLY DEMO
4. SEE MECHANICAL DRAWINGS FOR PLUMBING LOCATIONS.
3. FOR ADDITIONAL DEMOLITION NOTES, SEE S001.
SAFETY DWGS.
2. FOR FIRE LINE WALL PENETRATIONS, SEE FIRE PROTECTION/LIFE
1. FOR FLOOR PENETRATIONS , SEE MECH, ELEC & ARCH DWGS.
SLAB-ON-GRADE
REMOVE (E) 4" CONC
SD501
SD501
1/16"=1'-0" A1
FOUNDATION DEMOLITION PLAN
A1
A8
SD502
A1
A6
SD501
A8
SD502
SD501
A1
A8
SD502
SD501
A1
SLAB-ON-GRADE
REMOVE (E) CONC
INDICATES EXISTING FOOTING TO REMAIN
PARTIALLY-GROUTED CMU WALL TO REMAIN
INDICATES EXISTING FULL - HEIGHT
BE REMOVED. COORDINATE WITH NEW WORK.
INDICATES EXISTING CMU WALL AND CONC SLAB TO
P T
IO
N A
L V
A L
U E s b -B
S
D .d
T
H E
R
B H
J A
SD10132'8'0 16'
F
IR
S T F
L O
O R D
E M
O L
IT
IO
N P
L
BLDG 131
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
A
B
C
D
E
A1
SD401
PLAN
NORTH
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:46 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
TO REMAIN, TYP
(E) CMU WALL
SOLID PLANK TO REMAIN
(E) PRESTRESSED
TYP
TO BE REMOVED,
(E) CMU WALL
DEMOLITION NOTES LEGEND
TYP
TO BE REMOVED,
(E) CMU WALL
4. SEE MECHANICAL DRAWINGS FOR PLUMBING LOCATIONS.
3. FOR ADDITIONAL DEMOLITION NOTES, SEE S001.
SAFETY DWGS.
2. FOR FIRE LINE WALL PENETRATIONS, SEE FIRE PROTECTION/LIFE
1. FOR FLOOR PENETRATIONS , SEE MECH, ELEC & ARCH DWGS.
1/16"=1'-0" A1
FIRST FLOOR FRAMING DEMOLITION PLAN - UEPH
PARTIALLY-GROUTED CMU WALL TO REMAIN
INDICATES EXISTING FULL - HEIGHT
BE REMOVED.
INDICATES EXISTING CMU WALL AND CONC SLAB TO
OPEN TO BELOW
SEE ARCH DWGS AND
AND (E) SILL BELOW,
REMOVE (E) WINDOW
A4
SD511
P T
IO
N A
L V
A L
U E s b -B
S
D .d
T
H E
R
B H
J
SD10232'8'0 16'
BLDG 131
IR
S T F
L O
O R D
E M
O L
IT
IO
N P
L A
N U
E P
H
D M
A6
SD401
PLAN
NORTH
C
D
E
B
6 7 8 9 10 11 12 13 14 15 16
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:48 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
(E) CMU WALL
TO REMAIN, TYP
(E) PRESTRESSED
SOLID PLANK TO REMAIN
DEMOLITION NOTES LEGEND
REMOVE (E)
6" CMU NON-
STRUCTURAL WALL,
TYP
1. FOR FLOOR PENETRATIONS, SEE MECH, ELEC, AND ARCH DWGS.
2. FOR FIRE LINE WALL PENETRATIONS, SEE FIRE PROTECTION/LIFE
SAFETY DWGS.
3. FOR ADDITIONAL DEMOLITION NOTES, SEE S001.
FULL HEIGHT (E) CMU
WALL TO BE REMOVED,
TYP
F1
SD501
F1
SD501
REMOVE (E) WINDOW
AND (E) SILL BELOW,
SEE ARCH DWGS AND A4
SD511
REMOVE (E) C6 X FLAT
BEAM AND L2 X 2 BRACING
TYPICAL AT ALL CMU/CONC
INFILL LOCATIONS, SEE S-101
REMOVE (E) C6 X FLAT
BEAM AND L2 X 2 BRACING
TYPICAL AT ALL CMU/CONC
INFILL LOCATIONS, SEE S-101
INDICATES EXISTING CMU WALL AND CONC SLAB TO
BE REMOVED. COORDINATE WITH NEW WORK.
INDICATES EXISTING FULL - HEIGHT
PARTIALLY-GROUTED CMU WALL TO REMAIN
E8
SD502
D1
SD511
OH
E8
SD502
D1
P T
IO
N A
L V
A L
U E s b -B
S
D .d
T
H E
R
B H
J
SD10332'8'0 16'
C O
N D F
L O
O R F
R A
M
IN
G D
E M
O L
IT
IO
N P
L A
N U
E P
H
1/16"=1'-0" A1
SECOND FLOOR FRAMING DEMOLITION PLAN - UEPH BLDG 131
D M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
A
B
C
D
E
A6
SD401
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:50 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
(E) CMU WALL
TO REMAIN, TYP
(E) CMU WALL
TO BE REMOVED,
TYP
(E) PRESTRESSED
SOLID PLANK TO REMAIN
DEMOLITION NOTES LEGEND
INDICATES EXISTING CMU WALL TO
BE REMOVED.
INDICATES EXISTING FULL - HEIGHT
PARTIALLY-GROUTED CMU WALL TO REMAIN
REMOVE (E)
6" CMU NON-
STRUCTURAL WALL,
TYP
1. FOR FLOOR PENETRATIONS, SEE MECH, ELEC, & ARCH DWGS.
2. FOR FIRE LINE WALL PENETRATIONS, SEE FIRE PROTECTION/LIFE
SAFETY DWGS.
3. FOR ADDITIONAL DEMOLITION NOTES, SEE S001.
A4
SD511
REMOVE (E) WINDOW
AND (E) SILL BELOW,
SEE ARCH DWGS AND
P T
IO
N A
L V
A L
U E s b -B
S
D .d
T
H E
R
B H
J
SD10432'8'0 16'
IR
D F
L O
O R F
R A
M
IN
G D
E M
O L
IT
IO
N P
L A
N U
E P
H
1/16"=1'-0" A1
THIRD FLOOR FRAMING DEMOLITION PLAN - UEPH BLDG 131
D M
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
B
C
D
E
A6
SD401
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:52 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
A1
ENLARGED DEMOLITION FOUNDATION PLAN
1/4"=1'-0"
A6
ENLARGED DEMOLITION FLOOR FRAMING PLAN
1/4"=1'-0"
P T
IO
N A
L V
A L
U E s b -B
S
D .d
T H E
R
T H E
R
SD401
BLDG 131
E N
L A
R G
E D U
N
IT
D
E M
O L
IT
IO
N F
L O
O R P
L A
N
D M
GRID GRID
GRID
GRID
GRID
GRID
GRID GRID
GRID
GRID
GRID
GRID
DEMOLITION NOTES
3. FOR ADDITIONAL DEMOLITION NOTES, SEE S001.
SAFETY DWGS.
PROTECTION/LIFE
2. FOR FIRE LINE WALL PENETRATIONS, SEE FIRE
ARCH DWGS.
1. FOR FLOOR PENETRATIONS SE LOCATION, SEE MECH &
LEGEND
INDICATES EXISTING FOOTING TO REMAIN
PARTIALLY-GROUTED CMU WALL TO REMAIN
INDICATES EXISTING FULL - HEIGHT
BE REMOVED.
INDICATES EXISTING CMU WALL TO
A1
SD511
F1
SD511
A1
SD511
A1
SD511
F1
SD511
A1
SD511
A1
SD511
A1
SD511
A1
SD511
A1
SD511
F4
SD511
F4
SD511
F4
SD511
F4
SD511
A4
SD511 SD511
A4OH
SD511
A4
SD511
A4OH
SCALE: 1/4"=1'-0"
0 4' 8'2'
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:53 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
(E) CMU WALL
DOWEL @ 48"O.C.
PRESERVE (E) #4
SLAB-ON-GRADE
REMOVE (E) 4" CONC
GRADE
FINISH
CONCRETE SILL
DEMOLISH (E)
(E) CMU WALL
(E) CMU WALL
REMOVE
M
IN
EXIST CMU WALL
A8
SECTION AT WALL DEMO
3/4" = 1'-0"A1
SECTION
3/4" = 1'-0"
A4
SECTION AT CMU INFILL
NOT TO SCALE
EXIST TRUSS
EXIST STEEL BEAM
REMOVE EXIST L2X2 BRACING
REMOVE EXIST C6 X FLAT
FLOOR
FINISH
GRADE
FINISH
(E) CMU WALL
PIPING/CONDUIT. SEE
MECH/ELEC DWG.
SEE C1/S-009 FOR
PENETRATION
DETAIL
SEE A1/SD501
NOTE:
CONTRACTOR SHALL BE
RESPONSIBLE FOR
MAINTAINING ALL TRENCH
SLOPES BY SHORING AS
REQUIRED
E4
SECTION AT WALL PENETRATION
3/4" = 1'-0"
F1
SECTION
3/4" = 1'-0"
GRADE
FINISH
FLOOR
FINISH
FLOOR
FINISH
SHORE FRAMING
AS REQUIRED
A6
SECTION AT NEW DOOR
NOT TO SCALE
GRADE
FINISH
(E) CMU WALL
FLOOR
FINISH
A6
S-007
REBAR PER
PATCH EXPOSED
CMU WALL
DEMOLISH (E)
TOP OF FLOOR
(E) 8" CMU WALL
MAINTAIN (E) REBAR
WHERE OCCURS
(E) TRUSS,
AS REQUIRED
SHORE TRUSS
CMU WALL
P T
IO
N A
L V
A L
U E s b -B
S
D .d
E
R
B H
J A
SD501
BLDG 131
D E
T A
IL
S
A D
M
IN
T Y
P
IC
A L D
E M
O L
IT
IO
N S
E C
T
IO
N S A
N D
D M
F9 NOT TO SCALE
WALL ELEVATION - ADMIN
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:56 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
A8
SECTION
3/4" = 1'-0"
GRADE
FINISH
V
R
IF
Y
(E) CMU WALL
REMOVE
TO REMAIN
EXIST CMU WALL
3'-0" MIN
COORD WITH A1
S-503
E8
SECTION
3/4" = 1'-0"
TEMP SHORE
PRESERVE EXIST
LEDGER ANGLE
EXIST METAL
ROOFING
EXIST Z-PURLINS
CMU WALL
DEMOLISH EXIST
P T
IO
N A
L V
A L
U E s b -B
S
D .d
E
R
B H
J A
SD502
BLDG 131
D E
T A
IL
S
A D
M
IN
T Y
P
IC
A L D
E M
O L
IT
IO
N S
E C
T
IO
N S A
N D
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:57 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
E8
SECTION
3/4" = 1'-0"
DEMOLISH 6" CMU
PRESERVE (E) #4
TOP BAR @ 32" O.C.
(E) CONC TOPPING
(E) PRESTRESSED
PLANK
UEPH SECOND
AND THIRD FLOOR
UEPH FIRST FLOOR
TEMP SHORING
TEMP SHORING
DEMOLISH 6" CMU
PRESERVE (E)
VERT #4 @ 24" O.C.
PRESERVE (E)
BOND BEAM
(E) CONC TOPPING
(E) PRESTRESSED
PLANK
NOTE: SEE A9
S-512
UEPH FIRST FLOOR
(E) CONC TOPPING
OVER PRESTRESSED
PLANK
(E) 8" CMU WALL
TOP OF FLOOR
(E) 6" CMU WALL
(E) CONCRETE
BEAM
(E) 6" CMU
WALL
A1
(TYP INTERIOR AT CRAWL SPACE)
WALL ELEVATION
1/2"=1'-0" A4
NEW WINDOW ELEVATION - UEPH
1/2"=1'-0"
E8
SD511
DEMOLISH 8" CMU WALL
DEMOLISH (E)6"
CMU WALL
FINISH GRADE, WHERE
OCCURS
D1
CONCRETE TOPPING DEMO SECTION
1/2"=1'-0"
(E) CMU WALL
DEMOLTION PORTION OF (E)
CONC TOPPING. DO NOT DAMAGE
(E) PRESTRESSED PLANK
(E) CONC TOPPING
OVER PRESTRESSED
PLANK
TOPPING
THICKNESS
TOP OF FLOOR
MAINTAIN (E) REBAR,
24" MIN
(E) CONC TOPPING
OVER PRESTRESSED
PLANK
(E) 8" CMU WALL
(E) CONC TOPPING
OVER PRESTRESSED
PLANK
BOT OF CEILING
TOP OF FLOOR
MAINTAIN (E) REBAR,
24" MIN
F1
WALL ELEVATION (TYP INTERIOR)
1/2"=1'-0" F4
WALL ELEVATION
1/2"=1'-0"
E8
SD511
E8
P T
IO
N A
L V
A L
U E s b -B
S
D .d
E
R
B H
J A
SD511
BLDG 131
D E
T A
IL
S
U E
P H
T Y
P
IC
A L D
E M
O L
IT
IO
N S
E C
T
IO
N S A
N D
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:49:59 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
NON STRUCTURAL
STUD WALL,
SEE ARCH DWGS
LEGEND
REFERENCE DRAWINGS:
SLAB ON GRADE NOTES:
CJ
CJ
CJ
CJ
5" CONC SLAB ON-GRADE
W/ #4 AT 12" EA WAY 5" CONC SLAB
ON-GRADE
W/ #4 AT 12"
EA WAY
6" THICK CONC
SLAB-ON-GRADE
W/ #4 @ 8" E.W.
6" THICK CONC
SLAB-ON-GRADE
W/ #4 @ 8" E.W.
A4
S-501
A1
S-503
A4
S-503
A6
S-501
WF-2
8" THK REINF CONC
WALL, SEE A1/S-503
WF-2
EXPANSION JOINT,
SEE C8/S-008
7-5/8" THK REINF CONC
WALL, SIM TO A1/S-503
8" THK REINF CONC
WALL, SEE A1/S-503
7-5/8" THK REINF CONC
WALL, SIM TO A1/S-503
EXPANSION JOINT,
SEE C8/S-008
(E) FOOTING,
LEAVE IN PLACE
E7
S-501
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES ARMS VAULT S.O.G.
INDICATES 5" CONC S.O.G.
8" CMU
INFILL WALL
WF-1
WF-1
W F -1
W F -1
WF-2
WF-2
WF-2
WF-4
W F -3
W F -3
WF-4
WF-4
WF-2
WF-2
WF-2
WF-1
WF-1
W F -1
W F -1
8" CMU
INFILL WALL
INDICATES DEPRESSED SLAB,
SEE ARCHITECTURAL DRAWINGS
6" CONC
CURB
6" CONC
CURB
A1
S-501
S-510
A1
A1
S-510
SB501
A6 OH
MECH EQUIPMENT,
SEE MECH DWG.
EQUIPMENT PAD,
SEE A1/S-005
EQUIPMENT PAD,
SEE A1/S-005
MECH EQUIPMENT,
SEE MECH DWG.
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
W F
-3WF-4
BOOTWASH
SEE CIVIL DWGS
BOOTWASH
SEE CIVIL DWGS
A8
S-501 TYP
8" CMU
INFILL WALL
SEE
S-516
D4
A8
S-501 TYP
8" CMU
INFILL WALL
SEE
S-516
D4
A7
S-503
DNDN
STAIR ON GRADE,
SEE ARCH AND
S-006
A6
STAIR ON GRADE,
SEE ARCH AND
S-006
A6
S-501
C4
(E) STEEL COLUMN
SEE TYP
S-501
C4
(E) STEEL COLUMN
SEE TYP
S-501
C4
(E) STEEL COLUMN
SEE TYP
S-501
C4
(E) STEEL COLUMN
SEE TYP
E7
S-501
S-501
C4
(E) STEEL COLUMN
SEE TYP
S-501
C4
(E) STEEL COLUMN
SEE TYP
S-501
C4
(E) STEEL COLUMN
SEE TYP
S-501
C4
(E) STEEL COLUMN
SEE TYP
CONCRETE
SIDEWALK, SEE
CIVIL DWGS
CONCRETE
SIDEWALK, SEE
CIVIL DWGS
CONCRETE
SIDEWALK, SEE
CIVIL DWGS
CONCRETE
SIDEWALK, SEE
CIVIL DWGS
CONCRETE
SIDEWALK, SEE
CIVIL DWGS
CONCRETE
SIDEWALK, SEE
CIVIL DWGS
CONCRETE
SIDEWALK, SEE
CIVIL DWGS
CONCRETE
SIDEWALK, SEE
CIVIL DWGS
A1
S-510
TRANSFORMER ON
PAD. SEE ELEC
DWG AND A1/S-005
TRANSFORMER ON
PAD. SEE ELEC
DWG AND A1/S-005
S-510
A1
A9
S-510
TRANSFORMER
ON PAD. SEE
ELEC DWG
AND A1/S-005
(E) CONCRETE
SLAB-ON-GRADE, TYP
(E) CONCRETE
SLAB-ON-GRADE,
TYP
1. TYPICAL CONC SOG DETAILS S-005 AND S-006
2. TYPICAL CONC WALL DETAILS S-007
3. TYPICAL CMU WALL DETAILS S-008
1. THICKNESS OF SLAB-ON-GRADE SHOWN ARE MINIMUM
AND SHALL BE MAINTAINED AT ALL SLOPED AND
DEPRESSED AREAS.
2. FOR FLOOR ELEVATIONS, DEPRESSED SLABS
LOCATIONS, SLOPES TO DRAIN AND EQUIPMENT PAD
AND CURB LOCATIONS, SEE ARCHITECTURAL,
ELECTRICAL, AND MECHANICAL DRAWINGS.
3. SLABS SHALL BE POURED WITH A MINIMUM
TWENTY ONE (21) DAYS LAPSED TIME BETWEEN
ADJACENT POURS.
4. FOR EXTERIOR CONCRETE SLAB-ON-GRADE SEE
ARCHITECTURAL AND CIVIL DRAWINGS.
5. TRENCH WORK SIZE AND LOCATION SHALL BE
COORDINATED WITH ARCHITECTURAL, MECHANICAL,
PLUMBING, ELECTRICAL, AND TELECOM DRAWINGS.
CONTRACTOR SHALL SUBMIT TRENCHING PLANS
TO THE CONTRACTING OFFICER FOR APPROVAL
PRIOR TO DEMOLITION.
6.PROVIDE CHEMICAL TREATMENT IN ACCORDANCE WITH
PECIFICATION SECTION 31 31 16.13
7.PROVIDE PHYSICAL TERMITE BARRIER IN ACCORDANCE
WITH SPECIFICATION SECTION 31 31 16.19
8.FOR WALL PENETRATIONS SEE ARCHITECTURAL,
FIRE PROTECTION, PLUMBING, MECHANICAL,
ELECTRICAL, AND TELECOM DRAWINGS. SEE
DETAILS ON S-008 AND S-009.
INDICATES CHANGES IN TOP OF
SLAB ELEVATION OR DEPRESSION.
SEE ARCHITECTURAL
A3
S-516
CONC HEADER,
SEE
A3
S-516
CONC HEADER,
SEE
MECH UNIT,
SEE MECH
DWGS
P T
IO
N A
L V
A L
U E s b -B
S -1
.d
T
H E
R
B H
S-101
O
U N
D A
T
IO
N P
L A
N A
D M
IN
IS
T R
A T
IO
N W
IN
G
S
1/8"=1'-0" A1
FOUNDATION PLAN - ADMINISTRATION WEST WING
1/8"=1'-0"
FOUNDATION PLAN - ADMINISTRATION EAST WING
A6
BLDG 131
D M
1 3 4 5 6 18 19 21
A
B
C
D
E
0 8'4' 16'
SCALE: 1/8"=1'-0"
PLAN
NORTH
E
A
211661
KEY PLAN
A1
S-512
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:01 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
LEGENDREFERENCE DRAWINGS: FRAMING NOTES:
A5
S-510
A1
S-510
S-514
A1
INDICATES 5" CONC S.O.G.
S-511
A7
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
TYP
S-510
A5
S-510
A5
A5
S-510
HOT WATER
STORAGE
TANK, SEE
PLUMB DWGS.
EQUIPMENT
PAD, SEE
A1/S-005
INDICATES CHANGES IN TOP OF
SLAB ELEVATION OR DEPRESSION.
SEE ARCHITECTURAL
1. TYPICAL CONC SOG DETAILS S-005 AND S-006
2. TYPICAL CONC WALL DETAILS S-007
3. TYPICAL CMU WALL DETAILS S-008
1.THICKNESS OF SLAB-ON-GRADE SHOWN ARE MINIMUM AND
SHALL BE MAINTAINED AT ALL SLOPED AND DEPRESSED AREAS.
2.FOR FLOOR ELEVATIONS, DEPRESSED SLABS LOCATIONS SLOPES
TO DRAIN AND EQUIPMENT PAD AND CURB LOCATIONS, SEE
ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS.
3.SLABS SHALL BE POURED WITH A MINIMUM TWENTY ONE (21)
DAYS LAPSED TIME BETWEEN ADJACENT POURS.
4. FOR EXTERIOR CONCRETE SLAB-ON-GRADE SEE ARCHITECTURAL
AND CIVIL DRAWINGS.
5.PROVIDE CHEMICAL TREATMENT IN ACCORDANCE WITH
SPECIFICATION SECTION 31 31 16.13.
6.PROVIDE PHYSICAL TERMITE BARRIER IN ACCORDANCE WITH
SPECIFICATION SECTION 31 31 16.19.
7.FOR BALANCE OF INFORMATION NOT SHOWN ON STRUCTURAL
DRAWINGS, (DIMENSIONS, SLOPES, ELEVATIONS, ETC.)
SEE ARCHITECTURAL DRAWINGS.
8.FOR WALL PENETRATIONS SEE ARCHITECTURAL, FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM DRAWINGS.
SEE DETAILS ON S-008 AND S-009.
CRAWL SPACE
FINISH GRADE, TYP.
(E) CONCRETE
SLAB-ON-GRADE
P T
IO
N A
L V
A L
U E s b -B
S -1
.d
T
H E
R
B H
J A
S-102
BLDG 131
1/8"=1'-0" A1
FOUNDATION PLAN - UEPH
F O
U N
D A
T
IO
N P
L A
N U
E P
H
D M
5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
0 8'4' 16'
SCALE: 1/8"=1'-0"
PLAN
NORTH
E
A
211661
KEY PLAN
S-401
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:03 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
LEGENDREFERENCE DRAWINGS: FRAMING NOTES:
FULL-HEIGHT CONC INFILL WALL W/
#4 AT 16" EA WAY, TYP
FP-01
CONC SLAB
INFILL
FP-01
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
INDICATES FRP REINFORCED
(E) PRESTRESSED PLANK, SEE
SLAB SCHEDULE A1/S-010
OPEN TO BELOW
A1
S-511
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
FP-01
S-511
A7
1. TYPICAL CONC WALL DETAILS S-007
2. TYPICAL CMU WALL DETAILS S-008
1.EXIST FLOOR PENETRATIONS NOT SHOWN. CONTRACTOR TO REPAIR
FLOOR PENETRATION PER TYPICAL REPAIR DETAIL E1/S-009.
2.THE CONTRACTOR SHALL REMOVE ANY EXISTING PLASTER AND
ARCHITECTURAL COVERING PRIOR TO INSTALLING NEW FRP MATERIAL.
3.FOR BALANCE OF INFORMATION NOT SHOWN ON STRUCTURAL
DRAWINGS, (DIMENSIONS, SLOPES, ELEVATIONS, ETC.)
SEE ARCHITECTURAL DRAWINGS.
4.FOR WALL PENETRATIONS SEE ARCHITECTURAL, FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM DRAWINGS.
SEE DETAILS ON S-008 AND S-009.
TYPICAL UNIT (E) PRESTRESSED
PLANK AND CONC
TOPPING, TYP
P T
IO
N A
L V
A L
U E s b -B
S -1
.d
T
H E
R
B H
J A
S-1031/8"=1'-0" A1
FIRST FLOOR FRAMING PLAN - UEPH
F
IR
S T F
L O
O R F
R A
M
IN
G P
L A
N U
E P
H
BLDG 131
D M
5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
0 8'4' 16'
SCALE: 1/8"=1'-0"
PLAN
NORTH
E
A
211661
KEY PLAN
A6
S-401
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:06 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
(E) W4 X 13 (E) W4 X 13
LEGEND
(E) CRIPPLE
POST
(E) CRIPPLE
POST
6" THICK CONC
SUSPENDED ARMS
VAULT SLAB W/ #5
AT 6" EA WAY BLW
6" THICK CONC
SUSPENDED ARMS
VAULT SLAB W/ #5
AT 6" EA WAY BLW
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
INDICATES NEW CONC
SUSPENDED SLAB
ROOF FRAMING NOTES
(E) TRUSS
(E) TRUSS
(E) TRUSS
R O
O F R
ID
G E
TYP
MAX
10-0"
TYPICAL ENTIRE
ADMIN ROOF
MAX
10-0"
MAX
10-0"
SECONDARY
BLKG
SECONDARY
BLKG
SECONDARY
BLKG
SECONDARY
BLKG
1.SEE MECHANICAL DRAWINGS FOR LOCATIONS OF
EQUIPMENT AND DUCTS. SEE S-502 FOR MECHANICAL
EQUIPMENT SUPPORT FRAMING. CONTRACTOR
SHALL COORDINATE SUPPORT FRAMING LOCATION
WITH MECHANICAL EQUIPMENT AND DUCTS.
2.FOR BALANCE OF INFORMATION NOT SHOWN ON
STRUCTURAL DRAWINGS, (DIMENSIONS, SLOPES,
ELEVATIONS, ETC.) SEE ARCHITECTURAL
DRAWINGS.
3.FOR WALL PENETRATIONS SEE ARCHITECTURAL,
FIRE PROTECTION, PLUMBING, MECHANICAL,
ELECTRICAL, AND TELECOM DRAWINGS. SEE
DETAILS ON S-008 AND S-009.
SECONDARY
BLKG, TYP
PRIMARY BLKG:
L3-1/2X3-1/2X1/4
P T
IO
N A
L V
A L
U E s b -B
S -1
.d
T
H E
R
B H
O F F
R A
M
IN
G P
L A
N A
D M
IN
IS
T R
A T
IO
N W
IN
G
S
1/8"=1'-0" A1
1/8"=1'-0" A6
ROOF FRAMING PLAN - ADMINISTRATION WEST WING ROOF FRAMING PLAN - ADMINISTRATION EAST WING S-104
BLDG 131
D M
1 3 4 5 6 18 19 21
A
B
C
D
E
0 8'4' 16'
SCALE: 1/8"=1'-0"
PLAN
NORTH
E
A
211661
KEY PLAN
F4
S-501
E8
C1
S-503
S-503
C4
S-503
S-502
A6
LEGENDREFERENCE DRAWINGS: FRAMING NOTES:
A8
S-515
(E) 5 1/2"
CONC SLAB
(E) 5 1/2"
CONC SLAB
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
M A
T C
H L
IN
E S
E E S
H E
E T S -1
F
O R C
O N
T
W x B
L W
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
PRESTRESSED PLANK
PENETRATION, SEE
C3/S-009 AND MECH
DWGS
8" CONC INFILL,
SEE A1/S-515, SIM
8" CONC INFILL,
SEE A1/S-515, SIM
TYPICAL UNIT (E) PRESTRESSED
PLANK AND CONC.
TOPPING, TYP
1.EXIST FLOOR PENETRATIONS NOT SHOWN. CONTRACTOR TO REPAIR
FLOOR PENETRATION PER TYPICAL REPAIR DETAIL E1/S-009.
2.THE CONTRACTOR SHALL REMOVE ANY EXISTING PLASTER AND
ARCHITECTURAL COVERING PRIOR TO INSTALLING NEW FRP MATERIAL.
3.FOR BALANCE OF INFORMATION NOT SHOWN ON STRUCTURAL
DRAWINGS, (DIMENSIONS, SLOPES, ELEVATIONS, ETC.)
SEE ARCHITECTURAL DRAWINGS.
4.FOR WALL PENETRATIONS SEE ARCHITECTURAL, FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM DRAWINGS.
SEE DETAILS ON S-008 AND S-009.
1. TYPICAL CONC WALL DETAILS S-007
2. TYPICAL CMU WALL DETAILS S-008
A3
S-516
CONC HEADER,
SEE
A3
S-516
CONC HEADER,
SEE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:09 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
S-105
P T
IO
N A
L V
A L
U E
T
H E
R
B H
J A
S E
C O
N D F
L O
O R F
R A
M
IN
G P
L A
N A
N D L
O W
E R R
O O
F
F R
A M
IN
G P
L A
N U
E P
H
1/8"=1'-0" A1
SECOND FLOOR FRAMING PLAN AND LOWER ROOF FRAMING PLAN - UEPH BLDG 131
s b -B
S -1
.d g n
D M
5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
0 8'4' 16'
SCALE: 1/8"=1'-0"
PLAN
NORTH
E
A
211661
KEY PLAN
A6
S-401
S-512
A1
A1
S-402
A5
S-402
LEGENDREFERENCE DRAWINGS: FRAMING NOTES:
MECHANICAL PAD,
SEE A1/S-005
MECH EQUIP
SEE MECH
DWGS
S-515
A8
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
INDICATES FRP REINFORCED
(E) PRESTRESSED PLANK, SEE
SLAB SCHEDULE A1/S-010
FP-01FP-01
FP-01
FULL-HEIGHT CONC INFILL WALL, TYP
(E) 5 1/2"
CONC SLAB
(E) 5 1/2"
CONC SLAB
A1
S-513 S-513
A6
S-513
D6
S-513
D1 S-515
A8
S-511
D1
S-511
D4
S-511
D7
PRESTRESSED
PLANK PENETRATION,
SEE C3/S-009 AND
MECH DWGS
PRESTRESSED PLANK
PENETRATION, SEE
C3/S-009 AND MECH
DWGS
8" CONC INFILL,
SEE A1/S-515, SIM
8" CONC INFILL,
SEE A1/S-515, SIM
1.EXIST FLOOR PENETRATIONS NOT SHOWN. CONTRACTOR TO REPAIR
FLOOR PENETRATION PER TYPICAL REPAIR DETAIL E1/S-009.
2.THE CONTRACTOR SHALL REMOVE ANY EXISTING PLASTER AND
ARCHITECTURAL COVERING PRIOR TO INSTALLING NEW FRP MATERIAL.
3.FOR BALANCE OF INFORMATION NOT SHOWN ON STRUCTURAL
DRAWINGS, (DIMENSIONS, SLOPES, ELEVATIONS, ETC.)
SEE ARCHITECTURAL DRAWINGS.
4.FOR WALL PENETRATIONS SEE ARCHITECTURAL, FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM DRAWINGS.
SEE DETAILS ON S-008 AND S-009.
1. TYPICAL CONC WALL DETAILS S-007
2. TYPICAL CMU WALL DETAILS S-008
TYPICAL UNIT (E) PRESTRESSED
PLANK AND CONC.
TOPPING, TYP
A3
S-516
CONC HEADER,
SEE
A3
S-516
CONC HEADER,
SEE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:11 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
S-106
P T
IO
N A
L V
A L
U E
T
H E
R
B H
J A
T H
IR
D F
L O
O R F
R A
M
IN
G P
L A
N U
E P
1/8"=1'-0"
THIRD FLOOR FRAMING PLAN - UEPH BLDG 131
s b -B
S -1
.d g n
D M
5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
0 8'4' 16'
SCALE: 1/8"=1'-0"
PLAN
NORTH
E
A
211661
KEY PLAN
A6
S-401
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:13 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
LEGENDREFERENCE DRAWINGS: ROOF FRAMING NOTES:
(E) Z PURLINS
AT 4'-0", TYP
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
(E
T R
U S
S
ROOF RIDGE
TYPICAL ENTIRE
UEPH ROOF
A6
S-502
M A
X
M A
X
M A
X
A9
S-502
(E) CMU WALL
S-515
F1
MECH EQUIP
BELOW, SEE
MECH DWG
W10x12
F7
TYP
S-515 W10x12
BLKG
W10x12
F1
S-515
SIM
PRIMARY BLOCKING
PRIMARY BLOCKING
PRIMARY BLOCKING
PRIMARY BLOCKING
L5x5x5/16 TYP
MAX,
10'-0"
TYP
MAX,
10'-0"
TYP
MAX,
10'-0"
PRIMARY BLOCKING
PRIMARY BLOCKING
PRIMARY BLOCKING
SECONDARY BLOCKING
L3-1/2x3-1/2x1/4
S E
C O
N D
A R
Y B
L K
S E
C O
N D
A R
Y B
L K
S E
C O
N D
A R
Y B
L K
S E
C O
N D
A R
Y B
L K
PRIMARY BLOCKING
S E
C O
N D
A R
Y
B L
O C
K
IN
G
S E
C O
N D
A R
Y
B L
O C
K
IN
G S
E C
O N
D A
R Y
B L
O C
K
IN
G
S E
C O
N D
A R
Y
B L
O C
K
IN
G
S E
C O
N D
A R
Y
B L
O C
K
IN
G
S E
C O
N D
A R
Y
B L
O C
K
IN
G
S E
C O
N D
A R
Y
B L
O C
K
IN
G
TYP
MAX,
10'-0"
TYP
MAX,
10'-0"
TYP
MAX,
10'-0"
M A
X
M A
X
M A
X
M A
X
PRIMARY BLOCKING
PRIMARY BLOCKING
S E
C O
N D
A R
Y B
L K
S E
C O
N D
A R
Y B
L K
M A
X
TYP
MAX,
10'-0"
TYP
MAX,
10'-0"
TYP
MAX,
10'-0"
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
1. TYPICAL CONC WALL DETAILS S-007
2. TYPICAL CMU WALL DETAILS S-008
1.SEE MECHANICAL DRAWINGS FOR LOCATIONS OF EQUIPMENT AND
DUCTS. SEE S-502 FOR MECHANICAL EQUIPMENT SUPPORT FRAMING.
CONTRACTOR SHALL COORDINATE SUPPORT FRAMING LOCATION
WITH MECHANICAL EQUIPMENT.
2.FOR BALANCE OF INFORMATION NOT SHOWN ON STRUCTURAL
DRAWINGS, (DIMENSIONS, SLOPES, ELEVATIONS, ETC.)
SEE ARCHITECTURAL DRAWINGS.
3.FOR WALL PENETRATIONS SEE ARCHITECTURAL, FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM DRAWINGS.
SEE DETAILS ON S-008 AND S-009.
S E
C O
N D
A R
Y
B L
O C
K
IN
G
IN
P T
IO
N A
L V
A L
U E s b -B
S -1
.d
B H
1/16"=1'-0"
ROOF FRAMING PLAN - UEPH
S-107
R O
O F F
R A
M
IN
G P
L A
N U
E P
H
BLDG 131
D M
5 6 7 8 9 10 11 12 13 14 15 16 17
B
C
D
E
0 8'4' 16'
SCALE: 1/8"=1'-0"
PLAN
NORTH
E
A
211661
KEY PLAN
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:16 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
OH
S E
E A
R C
H O
P E
N
IN
G
OH
A1
ENLARGED UNIT FOUNDATION PLAN
1/4"=1'-0"
A6
ENLARGED UNIT FRAMING PLAN
1/4"=1'-0"
M
IN
1. EXIST FLOOR PENETRATIONS NOT SHOWN. CONTRACTOR
TO REPAIR FLOOR PENETRATION PER TYPICAL REPAIR
DETAIL E1/S-009.
2. FOR BALANCE OF INFORMATION NOT SHOWN ON
STRUCTURAL DRAWINGS, (DIMENSIONS, SLOPES,
ELEVATIONS, ETC.) SEE ARCHITECTURAL DRAWINGS.
3. FOR WALL PENETRATIONS SEE ARCHITECTURAL, FIRE
PROTECTION,PLUMBING, MECHANICAL, ELECTRICAL, AND
TELECOM DRAWINGS. SEE DETAILS ON S-008 AND S-009.
P T
IO
N A
L V
A L
U E s b -B
S -4
.d
E R
E R
S-401
E N
L A
R G
E D T
Y P
IC
A L U
N
IT
F
L O
O R P
L A
N
BLDG 131
GRID GRID
GRID
GRID
GRID
GRID
GRID GRID
GRID
GRID
GRID
GRID
LEGEND
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
SLAB ON GRADE NOTES:
REFERENCE DRAWINGS:
1. TYPICAL CONC SOG DETAILS SEE S-005 & S-006
2. TYPICAL CONC WALL DETAILS, SEE S-007
3. TYPICAL CMU WALL DETAILS SEE S-008
E1
S-512
E1
S-512
F1
S-514
E1
S-512
E1
S-512
F1
S-514
A1
S-515
A1
S-515
A1
S-515
A1
S-515
A1
S-514
A1
S-514
A1
S-514
A1
S-514
6" CONC
INFILL WALL
6" CONC
INFILL WALL
6" CONC
INFILL WALL
6" CONC
INFILL WALL
6" CONC
INFILL WALL
6" CONC
INFILL WALL
8" CMU
INFILL WALL
6" CONC
INFILL WALL
A8
S-515
D1
S-515
CONCRETE HEADER,
SEE
A1
S-514
A1
S-514
A1
S-514
A1
S-514
F1
S-510
ELECTRICAL CONDUIT
SUPPORT, SEE
ELEC/TELECOM DWGS
F4
S-510
WATER CLOSET
SUPPORT, SEE
WATER CLOSET
SUPPORT, SEE F4
S-510
(E) PEN INFILL,
SEE E1/S-009, TYP
SCALE: 1/4"=1'-0"
0 4' 8'2'
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:22 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
LEGENDREFERENCE DRAWINGS: FRAMING NOTES:
FP-01
A1
LOWER ROOF FRAMING PLAN - UEPH WEST
PARTIAL ENLARGED SECOND FLOOR AND
1/4"=1'-0" A5
LOWER ROOF FRAMING PLAN - UEPH EAST
PARTIAL ENLARGED SECOND FLOOR AND
1/4"=1'-0"
FP-02
FP-02
FP-03
FP-03
FP-02
FP-03
FP-01
FP-02
FP-03
FP-02
FP-02
FP-03
FP-03
A1
S-516 C1
S-516
F1
S-516
F4
S-516
#5x2'-0" AT 2'-0", CENTERED OVER
WALL BELOW
DEMO AND REPLACE
CONCRETE TOPPING
#5x2'-0" AT 2'-0"
#5x2'-0" AT 2'-0", CENTERED OVER
WALL BELOW
#5x2'-0" AT 2'-0"
W x B
E L
O W
F4
S-516
F1
S-516
CONTRACTION
JOINT, SEE
S-516
F6
S-516
C1
SIM
CONTRACTION
JOINT, SEE
S-516
F6
S-516
F6
CONTRACTION
JOINT, SEE
F1
S-516
F1
S-516
G8
S-516
S-516
E8
INDICATES (E) CMU WALL TO
BE REMAIN
INDICATES NEW CMU WALL
INDICATES NEW CONC WALL
INDICATES NON-STRUCTURAL
WALL SEE ARCH
INDICATES FRP REINFORCED
(E) PRESTRESSED PLANK, SEE
SLAB SCHEDULE A1/S-010
INDICATES NEW CONC TOPPING
1. TYPICAL CONC WALL DETAILS S-007
2. TYPICAL CMU WALL DETAILS S-008
1. EXIST FLOOR PENETRATIONS NOT SHOWN. CONTRACTOR TO REPAIR
FLOOR PENETRATION PER TYPICAL REPAIR DETAIL E1/S-009.
2. THE CONTRACTOR SHALL REMOVE ANY EXISTING PLASTER AND
ARCHITECTURAL COVERING PRIOR TO INSTALLING NEW FRP MATERIAL.
3. FOR BALANCE OF INFORMATION NOT SHOWN ON STRUCTURAL
DRAWINGS, (DIMENSIONS, SLOPES, ELEVATIONS, ETC.)
SEE ARCHITECTURAL DRAWINGS.
4. FOR WALL PENETRATIONS SEE ARCHITECTURAL, FIRE PROTECTION,
PLUMBING, MECHANICAL, ELECTRICAL, AND TELECOM DRAWINGS.
SEE DETAILS ON S-008 AND S-009.
(E) PRESTRESSED
PLANK AND CONC.
TOPPING, TYP
EDGE OF EXISTING
PRESTRESSED PLANK
EDGE OF EXISTING
PRESTRESSED PLANK
(E) PRESTRESSED
PLANK AND CONC.
TOPPING, TYP
T O
P P
IN
G
T H
IC
K N
E S
S /2 V
IF
P P
IN
G
T H
IC
K N
E S
S
/2 V
IF
FP-01
P P
IN
G
T H
IC
K N
E S
S
/2 V
IF
T O
P P
IN
G
T H
IC
K N
E S
S /2 V
IF
(E) 5 1/2" CONC
SLAB
(E) 5 1/2" CONC
SLAB
P T
IO
N A
L V
A L
U E s b -B
S -4
.d
E R
E R
S-402
BLDG 131
R O
O F F
R A
M
IN
G P
L A
N S U
E P
H W
E S
T A
N D E
A S
T
P A
R T
IA
L E
N L
A R
G E
D S
E C
O N
D F
L O
O R A
N D L
O W
E R
D M
5 6
D
D
D
E
16 17
SCALE: 1/4"=1'-0"
0 4' 8'2'
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:23 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
M
IN
M
IN
8" CMU WALL
REBAR, STD HOOK
CMU WALL HORIZ
O.C., TYP.
ENDS AND @ 48"
HEADED STUD 6" FROM
1/2"DIA, 4" LONG
CONCRETE INFILL 7
M
IN
M
IN
(E)TS 4"x4"x1/4"
END OF WALL
INTERIOR
PLAN
END
#5 VERT BAR, TYP
TYP
1/4"
SEE DETAIL "A"
AND AT 2'-0" MAX.,
CONC BOND BEAM
6" FROM EA END OF
STEEL ASSEMBLY
1-1/2" GAP
2 - #4 xCONT
BOND BEAM
12" CONC
CMU INFILL WALL
DETAIL "A"
STEEL PLATE
3/8"x3" BENT 8 /2
2 1/2"
ROOFING
EXIST METAL
TRUSS
EXIST
Z-PURLINS
EXIST
STEEL ASSEMBLY
EPOXY AT EA
ROD DRILL AND
5/8" DIA THREADED
HOLE
SLOTTED
VERT LONG
M
IN
/2
2 - #4 xCONT
TRUSS CHORD
BOT OF EXIST
EXIST STEEL BEAM
2-#4xCONT
CONC BOND BEAM
2-#4xCONT
EACH (E) FRAME
HEADED STUD AT
1/2" DIA, 4" LONG
CMU INFILL WALL
M
IN
BEAM AND @ 24" O.C.
FROM ENDS OF EXIST
HEADED STUD 12"
1/2" DIA, 6" LONG
TRUSS CHORD
BOT OF EXIST
EXIST TRUSS
SLAB-ON-GRADE
EXIST CONC
EXIST CMU WALL
M
IN
OF VERT WALL REINF
SIZE AND SPACING
DOWEL TO MATCH
SLAB-ON-GRADE
EXIST CONC
TYP
AT 18" EA SIDE,
EPOXY DOWELS
#4 DRILL AND
4 - #4 xCONT
AT 12"
#4x
DOWEL AT 12", EA SIDE
#4 DRILL AND EPOXY
w/ #4 AT 12"
SLAB-ON-GRADE
5"CONC
SEE PLAN
NEW WALL,
-3 /4
1'-6" xCONT
WF-2,
#4 AT EACH TREAD,
EMBEDDED 4" WITH EPOXY
#4 AT 12" O.C., EMBEDDED
2" WITH EPOXY
2" WITH EPOXY
#4 AT EACH TREAD,
EMBEDDED 4" WITH EPOXY
CONT #4
(E) 4" S.O.G.
6" CONCRETE
WALLS, TYP
ROUGHEN SURFACE W/
1/4" AMPLITUDE, TYP
NOTE: PROVIDE 1/2" THICK
EXPANSION JOINT FILLER AT
INTERFACE WITH EXISTING
CMU WALL
IN
F
IL
L W
A L L
C
W
L L
E X
IS
T C
M U
EMBED, TYP
6" MIN
SEE S-009
CMU INFILL WALL,
GRADE
FINISH
OF VERT WALL REINF
SIZE AND SPACING
DOWELS TO MATCH
DRILL AND EPOXY
(E)CMU WALL
(E)SLAB
EPOXY DOWEL AT 12"
#4 DRILL AND
#4
CONT
2'-0" MIN
48 DIA OR
LAP SPLICE
OF VERT WALL REINF
SIZE AND SPACING
DOWELS TO MATCH
DRILL AND EPOXY
SEE S-009
CMU INFILL WALL,
4" EMBED
-3 /4
4" EMBED
9" 1'-9" 12"
28"
4'-8"
4" EMBED18"
M
B E
D
M
IN
#4 AT 12" O.C.,
EMBEDDED
/2
6"
3"
S-005
F8
OF NOTES, SEE
FOR REMAINDER
S-005
F8SEE
OF NOTES,
FOR REMAINDER
OF NOTES, SEE
FOR REMAINDER
S-005
F8
EXIST STEEL BEAM
CONTINUE BAR
OVER PIER
2-#5
2'-0"
4"4"
2'-0"
E7
WALL SECTION - ADMIN
1/2"=1'-0"
TOP OF FLOOR
CMU WALL
HORIZ REINF.
(2) #4 CONT
#4 @ 18"
#5 @ 16"
#4 @ 24"
6" EMBED
(2) #5
VERT, TYP
2'-0"
#4 VERT
8" 8"
AT NEW CMU WALL AT PIER AT EXIST CMU WALL
HEADED STUD ON
BOTH SIDES OF
EXISTING BEAM
END
#4 @ 12" MAX
SOLID GROUT CMU
WALL WHERE
UNGROUTED
WALL OCCURS
PRIOR TO
INSTALLING
DOWELS
1/2" DIA, 6"
LONG
HEADED
STUD @
2'-0" O.C.
P T
IO
N A
L V
A L
U E s b -B
S -5
.d
E
R
B H
Y
P
IC
A L S
E C
T
IO
N S A
N D D
E T
A
IL
S
A D
M
IN
W
IN
G
S
S-501
BLDG 131
D M
C4 3/4" = 1'-0"
SECTION
F4 3/4" = 1'=0"
SECTION
F1 3/4" = 1'=0"
SECTION
M
IN
D
IA
O
R
L A
P S
P L
IC
E
WF-2 SECTION
WALL AT STAIRS
SECTION SECTION AT CMU INFILL SECTION AT CMU INFILL
3/4" = 1'-0"3/4" = 1'-0"
3/4" = 1'-0"
NOT TO SCALE
C1
A1 A4 A6 A8
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
A N
S I
D
F Y Q
U A
D A R
E P
A
IR
B
L D
G
N O
L U
L U D
IS
T R
IC
T
F T S
H A
F T
E R
H A
W
G
IO
N A
L E
N G
IN
E E
R
IN
G C
E N
T E
R
H O
N O
L U
L U E
N G
IN
E E
R D
IS
T R
IC
T
H O
N O
L U
L U
H
O F
IE
L D B
A R
R A
C K
S
O A
H U
H A
W
D C
O N
S T
R U
C T C
E N
T R
A L U
T
IL
IT
Y P
L A
E N
A M
E
12:50:26 PM7/15/2019
pw:\\COE-POHPWP08FTS.poh.ds.usace.army.mil:coe-pohpwp08fts.poh.ds.usace.army.mil\Documents\Military\02 SB\Projects\2018\18sb04 - FY19 OMA REPAIR QUAD A, BLDG 131 AND CENTRAL UTILITY PLANT, SB\02 Engineering Design\02 Plans and Specs\CAD_BIM\CADFiles\E-Str
J U
N E
RTA
A1
TYPICAL EXISTING ADMIN WING TRUSS ELEVATION, 40' SPAN
SCALE: 3/16"=1'-0"
D1
B131 UEPH TRUSS
SCALE: 3/16"=1'-0"
A6
TYPICAL HANGER SECTION
SCALE: 3"=1'-0"
D9
SECTION
SCALE: 3"=1'-0"
D9
S-502
1 1/2 "1 1/2 " 2 5/8 "
/2
/2
3"
1/2 " MAX
M A
X V
A R
IE
S -1 /2
M
IN
D6
SECTION
SCALE: 3"=1'-0"
/2
D9
S-502
1 1/2 " 1 1/2 "2 5/8 "
/2
/2
1/2 " MAX
A9
SECTION AT WALL
HANGER
SCALE: 3"=1'-0"
P T
IO
N A
L V
A L
U E s b -B
S -5
.d
E
R
B H
P
IC
A L S
E C
T
IO
N S A
N D D
E T
A
IL
S
A D
M
IN
W
IN
G
S
S-502
BLDG 131
D M
NOTE:
TO VERIFY FIELD CONDITION.
FOR REFERENCE ONLY. CONTRACTOR
TRUSS ELEVATIONS ARE PROVIDED
E B
EXIST TRUSS TOP CHORD
3/8" THK PLATE
SLOTTED HOLES
CENTERED IN LONG
2- 5/8" DIA A307 BOLTS,
EXIST ROOFING
EXIST TRUSS TOP CHORD
1/4"
1/4"
1/4" 2"
2"
WHERE OCCURS
ADJACENT FRAMING
3/8" THK PLATE
4" AT ADMIN WINGS, 6" AT UEPH
EXIST PURLINS AT 4'-0" O.C.
1/4"
1/4"
2"
2"1/4"
1/4"
EXIST LEDGER
WALL
EXIST CMU/CONC
3/8" THK PLATE
SEE PLAN
SECONDARY BLOCKING,
BOLTS, SEE A6 THIS SHEET
SEE PLAN
PRIMARY BLOCKING,
TOP CORD
EXIST TRUSS
SIM
WHERE OCCURS
BLOCKING,
SECONDARY
PRIMARY BLKG
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.