About this file

W9128A-19-R-0014 Am-0001

View the file

Other files

File Type Posted
W9128A-19-R-0014_-_Section_00_22_16,_Attachment_A.docx DOCX document
W9128A-19-R-0014_Am-0007_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0007_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007.pdf PDF
W9128A-19-R-0014_Am-0006.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0005.pdf PDF
W9128A-19-R-0014_Am-0004_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0004.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0003.pdf PDF
W9128A-19-R-0014_Am-0002.pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_1_of_2).pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_2_of_2).pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Request_for_Proposal.pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_11_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_6_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_1_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_5_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_13_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_11_of_14).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_7_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_12_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_9_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_3_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_4_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_10_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_2_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_10_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_2_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_2_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_8_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_2_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_7_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_14_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_6_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_3_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_1_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_9_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_1_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_4_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_1_of_3).pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PN94631 Repair Building 131 and Construction Central Utility Plant, Schofield Barracks, Oahu, Haw aii and PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Haw aii

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A19R0014

X 9B. DATED (SEE ITEM 11)

29-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

Am-0001

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Aug-2019

CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 252 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9128A19R0014 Am-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0001)” is shown on each revised page.

a. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks.

Section 00 22 16 – Page 11 Section 00 22 16, Attachment A – Page 1

b. NEW SECTIONS. The following are new pages to the solicitation.

Section 00 22 16, Attachment D – Map to Building 252, Fort Shafter

Package 1: FY18 Quad A Repair Bldg. 131 and Construct Central Utility Plant

Submittal Register Section 13 48 00 Seismic Bracing dor Miscellaneous Equipment Section 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems Section 26 12 19.10 Three-Phase Pad-Mounted Transformers Section 28 31 76 Interior Fire Alarm and Mass Notification System

Package 2: FY18 Quad A Repair Bldg. 130 and 132

Table of Contents Submittal Register Section 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems

c. DELETED SECTIONS. The following sections have been deleted from the solicitation in its entirety.

Package 1: FY18 Quad A Repair Bldg. 131 and Construct Central Utility Plant

Submittal Register Section 13 48 00 Seismic Bracing dor Miscellaneous Equipment Section 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems Section 26 12 19.10 Three-Phase Pad-Mounted Transformers Section 28 31 76 Interior Fire Alarm and Mass Notification System

Package 2: FY18 Quad A Repair Bldg. 130 and 132

Table of Contents Submittal Register Section 02 09 20 Exposure Assessment for Workers Exposed to Lead-Containing Paint Section 02 09 30 Exposed Assessment for Workers Exposed to Rodent Droppping Section 02 41 00 Demolition Section 02 85 00 Mold Remediation Section 03 01 00 Rehabilitation of Concrete Section 03 30 00 Cast-In-Place Concrete Section 03 42 13.00 10 Plant-Precast Concrete Products for Below Grade Construction Section 04 20 00 Unit Masonry Section 05 12 00 Structural Steel Section 05 50 13 Miscellaneous Metal Fabrications Section 05 52 00 Metal Railings Section 06 10 00 Rough Carpentry Section 06 20 00 Finish Carpentry Section 06 61 16 Solid Surfacing Fabrications Section 07 05 23 Pressure Testing an Air Barrier System for Air Tightness Section 07 21 16 Mineral Fiber Blanket Insulation Section 07 24 00 Exterior Insulation and Finish Systems

Section 07 27 10.00 10 Building Air Barrier System Section 07 27 26 Fluid-Applied Membrane Air Barriers Section 07 60 00 Flashing and Sheet Metal Section 07 84 00 Firestopping Section 07 92 00 Joint Sealants Section 08 11 13 Steel Doors and Frames Section 08 11 16 Aluminum Doors and Frames Section 08 14 00 Wood Doors Section 08 31 00 Access Door and Frames Section 08 34 73 Sound Control Door Assemblies Section 08 41 13 Aluminum-Framed Entrances and Storefronts Section 08 51 13 Aluminum Windows Section 08 81 00 Glazing Section 08 91 00 Metal Wall and Door Louvers Section 09 22 00 Supports for Gypsum Board Section 09 29 00 Gypsum Board Section 09 51 00 Acoutical Ceilings Section 09 62 38 Static-Control Flooring Section 09 65 00 Resilient Flooring Section 09 90 00 Paints and Coatings Section 10 11 00 Visual Display Units Section 10 14 00.10 Exterior Signage Section 10 14 00.20 Interior Signage Section 10 26 00 Wall Protection Section 10 51 13 Metal Lockers Section 11 31 13 Electric Kitchen Equipment Section 12 21 00 Window Blinds Section 13 48 00 Seismic Bracing for Miscellaneous Equipment Section 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection Section 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems Section 23 03 00.00 20 Basic Mechanical Materials and Methods Section 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment Section 23 05 48.19 Seismic Bracing for HVAC Section 23 05 93 Testing, Adjusting, and Balancing for HVAC Section 23 07 00 Thermal Insulation for Mechanical Systems Section 23 09 13 Instrumentation and Control Devices for HVAC Section 23 11 25 Facility Gas Piping Section 23 37 13.00 40 Diffusers, Registers, and Grills Section 25 05 11.01 Cybersecurity for Facility-Related Fire Control Systems Section 26 00 00.00 20 Basic Electrical Materials and Methods Section 26 05 48.00 10 Seismic Protection for Electrical Equipment Section 26 08 00 Apparatus Inspection and Testing Section 27 05 14.00 10 Cable Television Premises Distribution System Section 28 31 76 Interior Fire Alarm and Mass Notification System Section 31 23 00.00 20 Excavation and Fill Section 31 31 16.13 Chemical Termite Control Section 31 31 16.19 Termite Control Barriers Section 31 32 11 Soil Surface Erosion Control Section 32 05 33 Landscape Establishment Section 32 11 23 Aggregate Base Courses Section 32 12 13 Bituminous Tack and Prime Coats Section 32 12 16 Hot-Mix Asphalt (HMA) for Roads Section 32 16 19 Concrete Curbs, Gutters and Sidewalks Section 32 17 23 Pavement Markings Section 32 92 19 Seeding

Section 32 93 00 Exterior Plants Section 32 96 00 Transplanting Exterior Plants Section 33 11 00 Water Utility Distribution Piping Section 33 30 00 Sanitary Sewerage Section 33 61 14 Exterior Buried Preinsulated Water Section 33 82 00 Telecommunications Outside Plant (OSP)

2. CHANGES TO DRAWINGS.

a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued

Package 1: FY18 Quad A Repair Bldg. 131 and Construct Central Utility Plant

Sheet ID Mark Revision Date G-002 1 07/26/19 M-105 1 07/26/19 M-302 1 07/26/19 M-401 1 07/26/19 M-402 1 07/26/19 M-407 1 07/26/19 M-501 1 07/26/19 M-502 1 07/26/19 M-503 1 07/26/19 M-504 1 07/26/19 M-601 1 07/26/19 M-603 1 07/26/19 M-604 1 07/26/19 M-605 1 07/26/19 M-611 1 07/26/19 M-612 1 07/26/19 M-555 1 07/26/19 M-661 1 07/26/19 M-662 1 07/26/19

EP107 1 07/26/19

EP151 1 07/26/19

EP401 1 07/26/19

EP603 1 07/26/19

EP604 1 07/26/19

EP607 1 07/26/19

EP651 1 07/26/19

EP652 1 07/26/19

Package 2: FY18 Quad A Repair Bldg. 130 and 132

Sheet ID Mark Revision Date G-002 1 07/26/19 G-003 1 07/26/19 M-106 1 07/26/19 M-302 1 07/26/19 M-411 1 07/26/19 M-501 1 07/26/19 M-502 1 07/26/19 M-504 1 07/26/19 M-507 1 07/26/19 M-601 1 07/26/19 M-603 1 07/26/19 M-604 1 07/26/19

M-605 1 07/26/19 M-606 1 07/26/19 M-611 1 07/26/19 M-613 1 07/26/19 M-157 1 07/26/19 M-159 1 07/26/19 M-551 1 07/26/19 M-552 1 07/26/19 M-651 1 07/26/19 M-653 1 07/26/19 M-654 1 07/26/19 M-661 1 07/26/19 E-101 1 07/26/19 E-102 1 07/26/19 E-105 1 07/26/19 E-402 1 07/26/19 E-701 1 07/26/19 E-703 1 07/26/19 E-704 1 07/26/19 E-153 1 07/26/19 E-452 1 07/26/19 E-453 1 07/26/19 E-751 1 07/26/19 T-103 1 07/26/19 T-402 1 07/26/19 T-151 1 07/26/19

W9128A-19-R-0014

Section 00 22 16 – Page 11 (Am-0001)

Fee Determining Officials; and the Defense Contract Management Agency, and any other sources not provided by the Offeror.

f. Additionally, for each of the contracts submitted under Factor 1, the Offeror (if other than a small business concern) shall provide the final or most recent Individual Subcontracting Report (or SF 294 if the report was prior to October 2005) prepared for submission through the Electronic Subcontracting Reporting System (eSRS) for Government contracts. For non-government contracts, the Offeror shall provide planned subcontracting goals and actual subcontracted dollars in terms of total contract dollars for Small Business (SB) [including Alaska Native Corporations (ANC) and Indian tribes], Small Disadvantaged Business (SDB) (including ANC and Indian tribes), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), Veteran-Owned Small Business (VOSB), and Service-Disabled Veteran-Owned Small Business

(SDVOSB).

g. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

h. Verification. The Government reserves the right to verify the experience record of cited contracts or other recent and relevant contracts not submitted by the Offerors by reviewing Past Performance Information Retrieval System (PPIRS), or other Government appraisal systems, or by contacting owner or references. The Government may verify any or all cited references and supplied information. An Offeror will be afforded the opportunity to reply to or explain adverse past performance information which the Offeror has not previously had an opportunity to address.

6.1.1 Joint Venture Submission Requirements

Offerors submitting a proposal as a Joint Venture (JV) shall obtain a DUNS number and be registered in SAM.gov as the offering Joint Venture. If the Offeror is a Joint Venture (JV) and it does not have the SAM Representations and Certifications as a JV, all members of the JV must separately complete the SAM Representations and Certification. The Offeror must provide a maximum of five (5) “recent” and “relevant” contracts performed by the JV that reflect the JV’s ability to perform the work required in this solicitation as required by paragraph 5.1.1, Submission Requirements.

a. If the Offeror is a Joint Venture (JV) and the JV does not have experience working as a JV, the members of the JV may submit experience on behalf of the Offeror. The JV may submit no more than five (5) contracts, but each respective JV member must submit at least one (1) contract under Factors 1 and 2.

b. In addition to the submission requirement for Factor 1, Experience, the Joint Venture shall provide a brief narrative (not to exceed 1 single-sided page) stating the roles that each member of the Joint Venture will perform on this project. The attached “Experience Information” (see Attachment A) form and PPQ-0 (see Attachment B) shall be used by the Joint Venture or the JV members. The JV and/or JV members shall explain how it is structured.

6.2 Evaluation Criteria

a. Past Performance Evaluation includes two aspects that results in the assessment of the Offeror’s probability of performing requirements stated in the Request for Proposal (RFP) based on the Offeror’s demonstrated performance on recent, and relevant contracts. (For the purpose of this solicitation, a recent contract is defined as at least 80% complete or turned over within the last five (5) years of the issuance of this solicitation.)

b. First, an Offeror’s past performance will be evaluated to determine how relevant a recent contract is to the requirements of the RFP. The relevancy determination will be based on the submitted contracts for Factor 1 - Experience, Evaluation Criteria (paragraph 5.1.2).

Section 00 22 16 – Attachment A – Page 1 (Am-0001)

Attachment A

EXPERIENCE INFORMATION

(To be completed by Contractor)

If the Offeror is in a Joint Venture, identify which contractor in the Joint Venture Completed the contract.

1. Contractor: Name:

Address:

DUNS:

CAGE Code:

2. Contract /Task Order(TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Award Amount:

4. Contract/TO /PO Status: Period of Performance:

Original Completion Date: Percent Complete: ______%

Actual Completion Date (with time extensions):

Award Date: Final Contract Price: Percent of work performed by Prime:

Contract Title and Location (city, state):

Type of Contract (Design-Build, Design-Bid-Build, Work Plan Construct, Firm Fixed-Price, Cost Plus, etc.):

Contract Description-- to include the role of the contractor on the contract and specific responsibilities of the contractor in performance of the effort:

Type / scope of work performed by the Offeror:

Type / scope of work performed by Subcontractors:

Quality Awards, Letters of Appreciation, etc.

7. Project Owner or Project Manager for the Client – provide:

Name:

Address:

Telephone Number and E-mail:

Section 00 22 16 – Attachment D: Map to Building 252, Fort Shafter (Am-0001)

Entrance to Fort Shafter is through Buckner Gate.

Due to heightened security, please have the following items available to provide to the guard:

1) Valid Drivers License;

2) Vehicle Registration;

3) Certificate of Insurance; and

4) Current State of Hawaii Safety Inspection.

All passengers must have a current photo ID.

Individuals renting a car will need to provide:

1) Valid Drivers License; and

2) Rental Car Agreement.

Please allow sufficient time to be allowed on post and to find parking (at least 1 hour).

File details come from the government source that posted it.