W9128A-19-R-0014_Specifications_-_Package_1_(Part_2_of_3).pdf

PDF 9 MB Posted

Attached to
Quad A, Building 131 and Central Utility Plant (CUP), and Buildings 130 and 132, Schofield Barracks, Hawaii
Solicitation number
W9128A-19-R-0014
Issued by

About this file

W9128A-19-R-0014 Specifications - Package 1 (Part 2 of 3)

View the file

Other files

File Type Posted
W9128A-19-R-0014_-_Section_00_22_16,_Attachment_A.docx DOCX document
W9128A-19-R-0014_Am-0007_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0007_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007.pdf PDF
W9128A-19-R-0014_Am-0006.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0005.pdf PDF
W9128A-19-R-0014_Am-0004_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0004.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0003.pdf PDF
W9128A-19-R-0014_Am-0002.pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_1_of_2).pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_2_of_2).pdf PDF
W9128A-19-R-0014_Am-0001.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Request_for_Proposal.pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_11_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_6_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_1_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_5_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_13_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_11_of_14).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_7_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_12_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_9_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_3_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_4_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_10_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_2_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_10_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_2_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_8_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_2_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_7_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_14_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_6_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_3_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_1_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_9_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_1_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_4_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_1_of_3).pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02 09 30

EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO RODENT DROPPING
02 09 30 - EXPOSURE ASSESSMENT FOR WORKERS EXPOSED TO RODENT DROPPING
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Industrial Hygienist IH:
1.2.2 Industrial Hygiene Technician IHT:
1.3 Quality ASSURANCE
1.3.1 Medical Examinations
1.3.2 IH Responsibilities
1.3.3 IHT Responsibilities
1.3.4 Training
1.3.5 Respiratory Protection Program
1.3.6 Pre-Construction Conference
1.4 SUBMITTALS
1.5 REMOVAL
1.6 QUALIFICATIONS OF IH
1.7 CLEANUP WORK PLAN
1.8 EQUIPMENT
1.8.1 Respirators
1.8.2 Special Protective Clothing
1.8.3 Hygiene Facilities
1.8.4 Change Area
1.8.5 Hand Washing Facilities
PART 2 PRODUCTS Not applicable
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Control Area Requirements
3.1.2 Protection of Existing Work to Remain
3.1.3 Boundary Requirements
3.1.4 Furnishings
3.1.5 Personnel Protection
3.1.6 Warning Signs
3.2 CLEANUP AND DISPOSAL
3.2.1 Cleanup
3.2.2 Certification
3.2.3 Disposal
02 41 00
DEMOLITION
02 41 00 - DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Demolition Plan
1.2.2 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Weather Protection
1.3.3 Trees
1.3.4 Utility Service
1.3.5 Facilities
1.4 BURNING
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Hawaii Requirements
1.6.2 Dust and Debris Control
1.7 PROTECTION
1.7.1 Traffic Control Signs
1.7.2 Protection of Personnel
1.8 RELOCATIONS
1.9 EXISTING CONDITIONS
PART 2 PRODUCTS
2.1 FILL MATERIAL
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Structures
3.1.2 Utilities and Related Equipment
3.1.2.1 General Requirements
3.1.2.2 Disconnecting Existing Utilities
3.1.3 Chain Link Fencing
3.1.4 Paving and Slabs
3.1.5 Roofing
3.1.6 Masonry
3.1.7 Concrete
3.1.8 Structural Steel
3.1.9 Miscellaneous Metal
3.1.10 Carpentry
3.1.11 Carpet
3.1.12 Acoustic Ceiling Tile
3.1.13 Patching
3.1.14 Air Conditioning Equipment
3.1.15 Locksets on Swinging Doors
3.1.16 Mechanical Equipment and Fixtures
3.1.16.1 Preparation for Storage
3.1.16.2 Piping
3.1.16.3 Ducts
3.1.16.4 Fixtures, Motors and Machines
3.1.17 Electrical Equipment and Fixtures
3.1.17.1 Fixtures
3.1.17.2 Electrical Devices
3.1.17.3 Wiring Ducts or Troughs
3.1.17.4 Conduit and Miscellaneous Items
3.2 CONCURRENT EARTH-MOVING OPERATIONS
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
3.3.2 Reuse of Materials and Equipment
3.3.3 Disposal of Ozone Depleting Substance ODS
3.3.3.1 Special Instructions
3.3.4 Transportation Guidance
3.3.5 Unsalvageable and Non-Recyclable Material
3.4 CLEANUP
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
3.5.2 Burning on Government Property
3.5.3 Removal to Spoil Areas on Government Property
3.5.4 Removal from Government Property

3.6 REUSE OF SALVAGED ITEMS

02 85 00
MOLD REMEDIATION
02 85 00 - MOLD REMEDIATION
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 AIHA
1.2.2 AIHA EMLAP
1.2.3 AFU
1.2.4 Categories of Water
1.2.5 Certified Industrial Hygienist CIH
1.2.6 Complete Interior Building Demolition Complete Gut
1.2.7 Containment
1.2.7.1 Source Containment
1.2.7.2 Unoccupied Building Containment
1.2.7.3 Cleaning Containment
1.2.8 Decontamination Unit Airlock
1.2.9 Dehumidifier
1.2.10 Disinfectants or Biocide Sanitizing Solutions
1.2.11 EPA
1.2.12 Fungal Growth Structures
1.2.13 Fungicidal Agents, EPA
1.2.14 HEPA Filter
1.2.15 HVAC
1.2.16 Industrial Hygienist IH
1.2.17 Microbial Remediation Supervisor
1.2.18 Non-Porous Material
1.2.19 Occupied Spaces Areas
1.2.20 Personal Protective Equipment PPE
1.2.21 Poly
1.2.22 Porous Material
1.2.23 Pressure Differential Measuring Instrument
1.2.24 Semi-porous Material
1.2.25 Ventilation System Mold Remediator Qualifications VSMR
1.2.26 Work Area
1.3 REQUIREMENTS
1.3.1 Description of Work
1.4 SUBMITTALS
1.4.1 Preconstruction Submittals
1.4.1.1 Preliminary Visual Assessment Report
1.4.1.2 Microbial Remediation Plan
1.4.1.3 Respiratory Protection Program
1.4.1.4 Worker Records
1.4.1.5 Certified Industrial Hygienist CIHIndustrial Hygienist IH
1.4.1.6 Microbial Remediation Supervisor Qualifications
1.4.2 Product Data
1.4.3 IH Daily Reports
1.4.4 Submittals at Completion of Remediation Work
1.5 RECORD KEEPING
1.5.1 Daily Project Log
PART 2 PRODUCTS
2.1 DISINFECTANTS, BIOCIDES, SANITIZING SOLUTIONS AND FUNGICIDAL AGENTS,
2.2 HAZARD COMMUNICATION
PART 3 EXECUTION
3.1 EQUIPMENT
3.1.1 Respirators

File details come from the government source that posted it.