About this file

W9128A-19-R-0014 Am-0004

View the file

Other files

File Type Posted
W9128A-19-R-0014_-_Section_00_22_16,_Attachment_A.docx DOCX document
W9128A-19-R-0014_Am-0007_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0007_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0007.pdf PDF
W9128A-19-R-0014_Am-0006.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0006_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0005.pdf PDF
W9128A-19-R-0014_Am-0004_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0004_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0003.pdf PDF
W9128A-19-R-0014_Am-0002.pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_1.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_1_of_2).pdf PDF
W9128A-19-R-0014_Am-0001_Specifications_-_Package_2.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_2_(Part_2_of_2).pdf PDF
W9128A-19-R-0014_Am-0001.pdf PDF
W9128A-19-R-0014_Am-0001_Drawings_-_Package_1.pdf PDF
W9128A-19-R-0014_Request_for_Proposal.pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_11_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_6_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_1_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_5_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_13_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_11_of_14).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_3_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_7_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_12_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_9_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_3_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_4_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_10_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_2_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_10_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_2_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_2_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_8_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_2_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_7_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_14_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_6_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_3_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_1_(Part_1_of_3).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_9_of_11).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_2_(Part_1_of_14).pdf PDF
W9128A-19-R-0014_Drawings_-_Package_1_(Part_4_of_11).pdf PDF
W9128A-19-R-0014_Specifications_-_Package_2_(Part_1_of_3).pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PN94631 Repair Building 131 and Construction Central Utility Plant, Schofield Barracks, Oahu, Haw aii and PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Haw aii

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9128A19R0014

X 9B. DATED (SEE ITEM 11)

29-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

Am-0004

5. PROJECT NO.(If applicable)

6. ISSUED BY CODE

CECT - CONTRACTING DIVISION

USACE, HONOLULU DISTRICT

BLDG 252 (CECT-POH)

FT. SHAFTER HI 96858-5440

W9128A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

09-Aug-2019

3. EFFECTIVE DATE

W9128A19R0014 Am-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications. The revision mark “(Am-0004)” is shown on each revised page.

a. NEW SECTIONS. The following are new pages to the solicitation.

Section 00 60 00, Attachment B – Requests for Information (#4)

b. REVISED SECTIONS. The following are revised pages to the solicitation. Changes are marked in “*” asterisks and bolded.

Package 1: FY18 Quad A Repair Bldg. 131 and Construct Central Utility Plant

Section 26 20 00 – Page 2, 22

2. CHANGES TO DRAWINGS.

a. REVISED DRAWINGS. The following revised drawings replace like-numbered drawings and are issued

Package 1: FY18 Quad A Repair Bldg. 131 and Construct Central Utility Plant

Sheet ID Mark Revision Date G-002 4 08/07/19

CU505 4 08/07/19

Package 2: FY18 Quad A Repair Bldg. 130 and 132

Sheet ID Mark Revision Date G-002 4 08/07/19 G-003 4 08/07/19

CU101 4 08/07/19

CU204 4 08/07/19

CU505 4 08/07/19

T-551 4 08/07/19

3. The proposal due date and time remain unchanged.

PN94631 Repair Building 131 and Central Utility Plant, Schofield Barracks, Oahu, Hawaii PN95082/95265 Repair Buildings 130 and 132, Schofield Barracks, Oahu, Hawaii

RFI # Date References Question Government Response 4 8/6/19 Requesting the addition of FAR clause 52.208-9 to Solicitation Number W9128A-19-

R-0014. The addition of this FAR clause adds the Mandatory purchase requirements for AbilityOne products to your specifications.

The AbilityOne Program is supported and recognized by the Federal Government as a long-standing purchase priority per FAR 8.704(b). The AbilityOne Commission MEMORANDUM FOR THE RECORD, (link to full MEMORANDUM is below) clarifies the statutory requirement for Federal agencies, and that the products identified are mandatory when appropriated funds are used in construction and architectural-engineering services projects under FAR Part 36.

Defense Acquisition University also recommends including FAR clause 52.208-9 for these types of contracts.

In summary, we are requesting you add:

* FAR clause 52.208-9 to Solicitation Number W9128A-19-R-0014 per FAR 8.704(b)

* FAR Part 8.005; clause 52.208-9

Including the FAR Part 8.005; clause 52.208-9 Contractor Use of Mandatory Sources of Supply and Services and referencing the applicable sections in your solicitation will direct the General Contractor to provide SKILCRAFT products from the AbilityOne Procurement List Notice that meet the specifications for the sections as listed below amendment text:

***Far 52.208-9: The following specification sections/categories include AbilityOne Procurement List products which meet the general design specifications for government construction. Pricing and Availability may be obtained by contacting the NIB, 501(c)3 qualified, nonprofit agencies below:

08 71 00 (Door Hardware) AbilityOne PL# 20150054 BHMA/ANSI certified Grade 1 Mortise Locks, Cylindrical Locks, Exit Devices, and Closers Contact: SKILCRAFT.ASP@VisionCorps.net

10 14 00 (Sign; Exit Signs) AbilityOne PL# 20150061 Photo-luminescent Signs, Photo-luminescent railing and stair safety strips Contact: SKILCRAFT.ASP@CincyBlind.org

10 10 00 (Whiteboards) AbilityOne PL# 2008001 Magnetic porcelain enamel dry erase and cork board Contact contactcenter@seattlelh.org

12 48 12 (Floor Mats) AbilityOne PL# 20100007 Abrasive Floor mats Contact info@ibmilwaukee.com

General phone contact: 855-NIB-SPEC (855-652-7732)

***Including the clause does not require a separate CLIN for door hardware. Just as a "Justification and Approval" specifies material and equipment in a building’s construction plan (without additional CLINs), the AbilityOne Procurement List (PL #20150054) is considered as a long-term and viable JA for construction and renovation.

FAR Clause 52.208-9 is not applicable to construction solicitations.

Section 00 60 00, Attachment B (Am‐0004)

File details come from the government source that posted it.