W9123621R2003_0012.pdf
PDF 633 KB Posted
- Solicitation number
- W9123621R2003
About this file
This is an amendment to a solicitation for construction services for a consolidated operations and maintenance hangar at Langley Air Force Base in Virginia. The amendment extends the proposal due date for evaluation Factors 3 and 4 to January 19, 2022 at 2:00 PM EST. It provides updated estimates for electrical service from Dominion Virginia Power. It deletes and replaces sections of the solicitation document and attachments. The amendment responds to an inquiry, updates clauses, and provides clarification on contract line items and pricing details. Relevant changes include extending option periods to 365 days for several contract line items, increasing estimated quantities for disposal of unsatisfactory soils, and removing contract line items 0012, 0013, and 0014 in their entirety.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0012 is issued to provide the follow ing:
1. The proposal due date for Factors 3 & 4 is extended to 2:00 PM (EST), 19 January 2022.
2. The estimates for the Dominion Virginia Pow er (DVP) company on CLIN 0003 and CLIN 0010.
3. Delete specification section “00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS”.
4. Revised Attachment 8 - CLIN Schedule.
5. Update Contract Line Items to match the revised Attachment 8.
6. Provide a response to an inquiry received.
7. Provide updates to clauses 52.217-7, 52.211-10 and 252.236-7001.
Contracting POC: Axel Doody 757-201-7712 Axel.F.Doody@usace.army.mil.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621R2003
X 9B. DATED (SEE ITEM 11)
21-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jan-2022
CODE
USACE NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123621R2003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0012
CONTINUATION SHEET:
THIS IS THE FINAL AMENDMENT. THE GOVERNMNET DOES NOT FORSEE ISSUING ANY OTHER
AMENDMENTS.
Amendment 0012 is issued to provide the following:
1. The proposal due date for Factors 3 & 4 is extended to 2:00 PM (EST), 19 January 2022.
Electronic Proposal Submission in DoD SAFE In accordance with FAR 15.203(c), Electronic commerce may be used to issue RFPs and to receive proposals, modifications, and revisions when contracting by negotiation. Proposals will be submitted through DoD Secure Access File Exchange (DoD SAFE) (https://safe.apps.mil/). All proposals must be uploaded into DoD SAFE infrastructure not earlier than 12 January 2022, and not later than (NLT) 19 January 2022, at 2:00 p.m.
(EST).
Request for Upload Code
Offerors will require a unique “request code” to upload proposals into DoD SAFE, which shall be obtained only by email to POC: Axel Doody at Axel.F.Doody@usace.army.mil, and cc: PPMDContracts@usace.army.mil and Katya Oxley Ekaterina.Oxley@usace.army.mil. The email request for the “request code” must be emailed to the POC NLT 19 January 2022, at 12:00 p.m. EST.
The OFFEROR IS SOLELY RESPONSIBLE for ensuring that the entire proposal has been received into DoD SAFE with a timestamp NLT the date and time indicated above.
2. a) In response to ProjNet inquiry ID 9503013, the base fee estimate for the Dominion Virginia Power Company (DVP) is $100,000. Please use this estimate when pricing out CLIN 0003.
b) For CLIN 0010 (Option CLIN), the estimated fee for connection to Switch Q050 by DVP is $23,000. Please use this estimate when pricing out CLIN 0010.
3. DELETE specification section “00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS”
4. DELETE “Attachment 8 – CLIN Schedule” and REPLACE with:
“Attachment 8 – CLIN Schedule_REVISION 1 on 01.05.2022”
5. Update Contract Line Items to match the revised Attachment 8.
6. Provide a response to an inquiry received:
Inquiry - In the above-named solicitation, the Dec. 14th amended project specifications, combined, lists Fuel Resistive Flooring (DIV 09 67 23.18) and Static Control Flooring (DIV 09 62 38) in the index, but does not include a section for this product in the body of the spec. Is this omission intentional? Will this flooring be put out for bid under a different SOL number?
Government Response - The Amendment includes a complete Table of Contents of all specs, regardless of date of issue, to clearly communicate the deletion of specification section “33 46 13 Foundation Drainage”. The amendment includes specification sections of only those sections that were amended (changed). The specification sections referenced in the inquiry, Fuel Resistive Flooring (DIV 09 67 23.18) and Static Control Flooring (DIV 09 62 38), were not amended and thus were not included in the amendment.
7. Provide updates to clauses 52.217-7, 52.211-10 and 252.236-7001
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 12-Jan-2022 02:00 PM to 19-Jan-2022 02:00 PM.
CLIN 0001
The CLIN extended description has changed from:
All work, labor, materials, and equipment required to theConsolidated Operations and Maintenance Hangar (COMH),including all building related construction within the 5’line, complete as prescribed in the construction documentsexcluding work described in CLIN 0002 – CLIN 0014. Source of funding is MILCON.
To:
All work, labor, materials, and equipment required to the Consolidated Operations and Maintenance Hangar (COMH), including all building related construction within the 5’ line, complete as prescribed in the construction documents excluding work described in CLINs 0002-0011. Source of funding is MILCON.
CLIN 0002
All work, labor, materials, and equipment required toconstruct the COMH site improvements, including allconstruction outside of the 5’ line, complete as prescribed in the construction documents excluding work described in CLIN 0001 and CLIN 0003 - CLIN 0014. Source of funding is MILCON.
All work, labor, materials, and equipment required to construct the COMH site improvements, including all construction outside of the 5’ line, complete as prescribed in the construction documents excluding work described in CLIN 0001 and CLINs 0003-0011. Source of funding is MILCON.
CLIN 0003
All work, labor, materials, and equipment required toconstruct electrical service to the new COMH facilityincluding transformer Q050A and medium voltage cabling totransformer by Dominion Energy, as indicated, complete as prescribed in the in the construction documents excluding work described in CLIN 0001 – CLIN 0002 and CLIN 0004 – CLIN 0014. Source of funding is MILCON.
All work, labor, materials, and equipment required to construct electrical service to the new COMH facility including transformer Q051A and medium voltage cabling to transformer by Dominion Energy, complete as prescribed in the in the construction documents excluding work described in CLINs 0001-0002 and CLINs 0004- 0011. Source of funding is MILCON.
CLIN 0004
The CLIN description has changed from Natural Gas Service to COMH Facility to Dispose & Replace Unsatisfactory Soils.
The CLIN extended description has changed from:
All work, labor, materials, and equipment required to construct natural gas service to the new COMH facility by Virginia Natural Gas, including the distribution system to the new facility, the meter, the regulator and all connection fees, complete as prescribed in the in the construction documents excluding work described in CLIN 0001 – CLIN 0003 and CLIN 0005 - CLIN 0014. Source of funding is MILCON.
Provide unit price for all work, labor, materials, and equipment required to dispose and replace any unsatisfactory soils, complete as prescribed in the construction documents, excluding work described in CLINs 0001-0003 and CLINs 0005-0011. Source of funding is MILCON. For bidding purposes Offeror shall assume 350 cubic yards.
The pricing detail quantity has increased by 349.00 from 1.00 to 350.00.
The unit of issue has changed from Job to Cubic Yard.
CLIN 0005
Bid Option 1All work, labor, materials, and equipment required to furnish and install Audio-Visual (AV) Equipment complete as prescribed in the construction documents excluding work described in CLIN 0001 – CLIN 0004 and CLIN 0006 - 0014. Source of funding is NON-MILCON. Option to be exercised within 365 days of contract Notice
To Proceed in accordance with FAR 52.217-7.
Bid Option 1All work, labor, materials, and equipment required to furnish and install Audio-Visual (AV) Equipment complete as prescribed in the construction documents excluding work described in CLINs 0001-0004 and CLINs 0006-0011. Option to be exercised within 365 days of contract Notice to Proceed in accordance with FAR 52.217- 7.Source of funding is NON-MILCON.
CLIN 0006
BID OPTION 2All work, labor, materials, and equipment required to furnish and install Fixtures, Furniture and Equipment (FF&E) complete as prescribed in the construction documents excluding work described in CLIN 0001 – CLIN 0005 and CLIN 0007 - CLIN 0014. Source of funding is NON-MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.
BID OPTION 2All work, labor, materials, and equipment required to furnish and install Fixtures, Furniture and Equipment (FF&E) complete as prescribed in the construction documents excluding work described in CLINs 0001- 0005 and CLINs 0007-0011. Option to be exercised within 365 days of contract Notice to Proceed in accordance with FAR 52.217-7.Source of funding is NON-MILCON.
CLIN 0007
BID OPTION 3All work, labor, materials, and equipment required to construct the High Mast Airfield Lighting, complete as prescribed in the construction documents excluding work described in CLIN 0001 – CLIN 0006 and CLIN 0008 – CLIN 0014. Source of funding is NON-MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.
BID OPTION 3All work, labor, materials, and equipment required to construct the High Mast Airfield Lighting, complete as prescribed in the construction documents excluding work described in CLINs 0001-0006 and CLINs 0008-0011. Option to be exercised within 365 days of contract Notice to Proceed in accordance with FAR 52.217- 7.Source of funding is NON-MILCON.
CLIN 0008
BID OPTION 4Provide unit price for all work, labor, materials, and equipment required to provide the two (2) parking areas (ten (10) diagonal automobile parking spaces) along Danforth Ave, excluding work described in CLIN 0001 – CLIN 0007 and CLIN 0009 - 0014. Source of funding is MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.
BID OPTION 4Provide unit price for all work, labor, materials, and equipment required to provide the two (2) parking areas (ten (10) diagonal automobile parking spaces) along Danforth Ave, excluding work described in CLINs 0001-0007 and CLINs 0009-0011. Option to be exercised within 180 days of contract Notice to Proceed in accordance with FAR 52.217-7.Source of funding is MILCON
CLIN 0009
BID OPTION 5All work, labor, materials, and equipment required to construct electrical infrastructure (concrete pads, manholes, ductwork, etc.) from and including EM85A to Switch Q050, complete as prescribed in the in the construction documents excluding work described CLIN 0001 – 0008 and CLIN 0010 – 0014. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.Source of funding is
MILCON.
BID OPTION 5All work, labor, materials, and equipment required to construct electrical infrastructure (concrete pads, manholes, ductwork, etc.) from and including EM85A to Switch Q050, complete as prescribed in the in the construction documents excluding work described in CLINs 0001-0008 and CLINs 0010-0011. Option to be exercised within 180 days of contract Notice to Proceed in accordance with FAR 52.217-7.Source of funding is
CLIN 0010
BID OPTION 6All work, labor, materials, and equipment required to construct electrical service from and including EM85A to and including connection to Switch Q050 by Dominion Energy, complete as prescribed in the in the construction documents excluding work described CLIN 0001 – 0009 and CLIN 0011 – 0014. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.Source of funding is
BID OPTION 6All work, labor, materials, and equipment by Dominion Energy required to construct electrical service from and including EM85A to and including connection to Switch Q050, complete as prescribed in the in the construction documents excluding work described in CLINs 0001-0009 and CLIN 0011. Option to be exercised within 180 days of contract Notice to Proceed in accordance with FAR 52.217-7.Source of funding is MILCON.
CLIN 0011
BID OPTION 7All work, labor, materials, and equipment required to dispose any other-than-clean soil complete as prescribed in the construction documents, including but not limited to specification section 01 57 19 Temporary Environmental Controls 01 57 19 ATTACHMENT JBLE-Langley EnvironmentalSpecial Conditions para 1.1.2.2, excluding work describedin CLIN 0001 – CLIN 0010 and CLIN 0012 – CLIN 0014. Source of funding is MILCON.
Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.For bidding purposes Offeror shall assume a total quantityof 250 CY.
BID OPTION 7All work, labor, materials, and equipment required to dispose and replace any other-than-clean soil complete as prescribed in the construction documents, including but not limited to specification section 01 57 19 Temporary Environmental Controls 01 57 19 ATTACHMENT JBLE-Langley Environmental Special Conditions para 1.1.2.2, excluding work described in CLINs 0001-0010. Option to be exercised within 180 days of contract Notice to Proceed in accordance with FAR 52.217-7.Source of funding is MILCON.For bidding purposes Offeror shall assume 250 cubic yards.
The pricing detail quantity has increased by 249.00 from 1.00 to 250.00.
The unit of issue has changed from Job to Cubic Yard.
CLIN 0012
The CLIN type priced has been deleted.
The CLIN description has changed from Dispose Unsatisfactory Subgrade Soils to DELETED.
The CLIN extended description has changed from:
BID OPTION 8Provide unit price for all work, labor, materials, and equipment required to dispose unsatisfactory subgrade soils due to failure of proof roll testing and replace with aggregate base complete as prescribed in the construction documents, excluding work described in CLIN 0001 – 0011 and CLIN 0013 - 0014. Source of funding is MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217- 7.For bidding purposes Offeror shall assume 500 cy.Unit Price for each cubic yard (CY)
CLIN 0012 has been removed in its entirety from the solicitation.
The pricing detail quantity 1.00 has been deleted.
The unit of issue Job has been deleted.
The option status has changed from Option to No Status.
The FOB Destination has been deleted.
The PSC code Y1BZ has been deleted.
The PROG code C20 has been deleted.
The NAICS code 236220 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
CLIN 0013
The CLIN description has changed from Decrease Contract Completion Date to DELETED.
BID OPTION 9Provide unit price for all work, labor, materials, and equipment required to decrease contract completion date by 135 calendar days, excluding work described in CLIN 0001– CLIN 0012 and CLIN 0014.
Source of funding is MILCON. Option to be exercised upon initial award in accordance with FAR 52.217-7.
CLIN 0013 has been removed in its entirety from the solicitation.
The pricing detail quantity 1.00 has been deleted.
The unit of issue Job has been deleted.
The option status has changed from Option to No Status.
The FOB Destination has been deleted.
The PSC code Y1BZ has been deleted.
The PROG code C20 has been deleted.
The NAICS code 236220 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
CLIN 0014
The CLIN description has changed from Dispose and Replace Unsatisfactory Soil to DELETED.
The CLIN extended description has changed from:
BID OPTION 10Provide unit price for all work, labor, materials, and equipment required to dispose and replace any unsatisfactory soils which have been removed as uncontrolled fill yet do not meet the requirements for Structural Fill, complete as prescribed in the construction documents, excluding work described in CLIN 0001 - 0013. Source of funding is MILCON. Option to be exercised within 365 days of contract Notice To Proceed in accordance with FAR 52.217-7.For bidding purposes Offeror shall assume 310 cy.Unit Price for each cubic yard (cy).
CLIN 0014 has been removed in its entirety from the solicitation.
The pricing detail quantity 1.00 has been deleted.
The unit of issue Job has been deleted.
The option status has changed from Option to No Status.
The FOB Destination has been deleted.
The PSC code Y1BZ has been deleted.
The PROG code C20 has been deleted.
The NAICS code 236220 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
The following Delivery Schedule item for CLIN 0004 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
700 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK
CATHERINE (KATE) FIELD
803 FRONT STREET
NORFOLK VA 23510-1011
757-225-4053 FOB: Destination
W26GLG
CAGE
700 dys. ANP 350 US ARMY CORPS OF ENGINEERS, NORFOLK
CATHERINE (KATE) FIELD
803 FRONT STREET
NORFOLK VA 23510-1011
757-225-4053
The following Delivery Schedule item for CLIN 0011 has been changed from:
CAGE
700 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK
CATHERINE (KATE) FIELD
803 FRONT STREET
NORFOLK VA 23510-1011
757-225-4053
CAGE
700 dys. ANP 250 US ARMY CORPS OF ENGINEERS, NORFOLK
CATHERINE (KATE) FIELD
803 FRONT STREET
NORFOLK VA 23510-1011
757-225-4053
The following Delivery Schedule for CLIN 0012 has been deleted:
CAGE
700 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK
CATHERINE (KATE) FIELD
803 FRONT STREET
NORFOLK VA 23510-1011
757-225-4053
The following Delivery Schedule for CLIN 0013 has been deleted:
CAGE
565 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK
CATHERINE (KATE) FIELD
803 FRONT STREET
NORFOLK VA 23510-1011
757-225-4053
The following Delivery Schedule for CLIN 0014 has been deleted:
CAGE
700 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK
CATHERINE (KATE) FIELD
803 FRONT STREET
NORFOLK VA 23510-1011
757-225-4053
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The Acceptance/Inspection Schedule for CLIN 0012 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
The Acceptance/Inspection Schedule for CLIN 0013 has been changed from:
Destination Government Destination Government
The Acceptance/Inspection Schedule for CLIN 0014 has been changed from:
Destination Government Destination Government
To:
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 700 calendar days after Notice to Proceed . The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 365 calendar days for CLINS 0005, 0006, 0007, and 180 calendar days for CLINs 0008, 0009, 0010 and 0011 from the Notice to Proceed. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawings and Specifications
1) COMH – Final Design Drawings Part 1 of 3.pdf, dated 01/04/2021, 154 pages
2) COMH – Final Design Drawings Part 2 of 3.pdf, dated 01/04/2021, 158 pages
3) COMH – Final Design Drawings Part 3 of 3.pdf, dated 01/04/2021, 222 pages
4) COMH – Final Design Specifications Part 1 of 1.pdf, dated 01/04/2021, 2900 pages
1) COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf, dated 03/07/2021, 157 pages
2) COMH_RTA_Design Drawings_Part 2 of 3_17MAR21, dated 03/07/2021, 161 pages
3) COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf, dated 03/07/2021, 225 pages
4) COMH_RTA_Specifications part 1 of 1_17MAR21, dated 03/07/2021, 2924 pages
5) COMH - RTA FFE_17MAR21.pdf, dated 03/07/2021, 58 pages
6) COMH - RTA SID_17MAR21, dated 03/07/2021, 32 pages
7) COMH – Section 08 71 00 Door Hardware 02/16 Amendment #0006 24 pages
8) COMH Tech Amendment 1 - AMENDMENT 19 NOV 21 – Drawings 4 pages
9) COMH Tech Amendment 2 - 01 57 13.00 22_Amended 6 pages
10) COMH Tech Amendment 3 - 07 27 19.01_Amended 11 pages
11) COMH Amended Specs_14 DEC 2021_Combined
12) COMH Amended Drawings_14 DEC 2021
13) COMH Amended Drawings_21 DEC 2021
14) COMH Amended Specification 07 61 14. 00 20
15) COMH Amended Specification 23 09 23 V2
16) Langley Environmental Management Special Conditions
17) Construction Security Plan (CSP)
18) Installation Restoration Program (IRP) Background Chem Data
(End of Summary of Changes)
File details come from the government source that posted it. Updated .