Attachment 13 - COMH Final Design Specifications Part 1 of 1.pdf

PDF 40 MB Posted

Attached to
F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB
Solicitation number
W9123621R2003
Issued by

About this file

This document provides details for a federal construction solicitation for a consolidated operations and maintenance hangar at Langley Air Force Base. The solicitation requests the construction of a six-bay high-bay hangar facility to provide maintenance support for additional F-22A aircraft relocated from Tyndall Air Force Base. The project scope includes site work, utilities, pavements, and construction of reinforced concrete foundations, a structural steel frame, concrete masonry unit facade, and standing seam metal roof. The facility is designed to house hangar bays, administration, shops, equipment storage, restrooms, and building systems. Construction must meet seismic and wind codes. Sustainable design principles are required. The performance period is 700 calendar days from notice to proceed. This bifurcated solicitation requests responses for evaluation Factors 1 and 2 initially, with further details provided in the solicitation document. The solicitation was issued by the Department of the Army Corps of Engineers Norfolk District.

View the file

Other files

File Type Posted
W9123621R2003_0016.pdf PDF
W9123621R2003_0015.pdf PDF
W9123621R2003_0014.pdf PDF
W9123621R2003_0013.pdf PDF
W9123621R2003_0012.pdf PDF
Attachment 8 - CLIN Schedule_REVISION 1 on 01.05.2022.pdf PDF
AMENDMENT 0011_21 DEC 21 - Drawings.pdf PDF
Amend 0011_23 09 23_Amended V2.pdf PDF
Amend 0011_07 61 14.00 20_Amended.pdf PDF
W9123621R2003_0011.pdf PDF
Attachment 16 - Construction Security Plan (CSP).pdf PDF
Attachment 17 - Installation Restoration Program (IRP) Background Chem Data.pdf PDF
COMH Amended Drawings_14 DEC 2021.pdf PDF
W9123621R2003_0010.pdf PDF
COMH Amended Specs_14 DEC 2021_Combined.pdf PDF
A.07.23 - Solicitation COMH W9123621R2003 0009.pdf PDF
W9123621R2003_0008.pdf PDF
COMH Tech Amendment 0007 - 01 57 13.00 22_Amended.pdf PDF
COMH Tech Amendment 0007 - AMENDMENT 19 NOV 21 - Drawings.pdf PDF
COMH Tech Amendment 0007 - 07 27 19.01_Amended.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0007.pdf PDF
08 71 00_Amended 006.pdf PDF
W9123621R2003 Amendment 0006.pdf PDF
A.07.20 - Site Visit Sign-in Log - Dtd 20 Oct 2021_1Page.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0005.pdf PDF
Attachment 12 - COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf PDF
Attachment 11 - COMH_RTA_Design Drawings_Part 2 of 3_17MAR21.pdf PDF
Attachment 13 - COMH_RTA_Specifications part 1 of 1_17MAR21.pdf PDF
Attachment 10 - COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf PDF
Attachment 15 - COMH - RTA SID_17MAR21.pdf PDF
Attachment 14 - COMH - RTA FFE_17MAR21.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0004.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0003.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0002.pdf PDF
W9123621R2003 - 0001 - COMH.pdf PDF
Attachment 12 - COMH - Final Design Drawings Part 3 of 3.pdf PDF
Attachment 9 - Langley Environmental Management Special Conditions.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation W9123621R2003 - COMH.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 10 - COMH - Final Design Drawings Part 1 of 3.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 11 - COMH - Final Design Drawings Part 2 of 3.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR

Langley Air Force Base

W91236-XX-X-XXXX

PROJECT TABLE OF CONTENTS Page 1

FINAL SUBMITTAL

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

- APPENDIX TO 00 01 15: LIST OF DRAWINGS

00 22 13.00 20 INCLUDED WITH COST PACKAGE

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

- APPENDIX TO 01 11 00: GOVERNMENT FURNISHED EQUIPMENT LIST

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

- APPENDIX TO 01 33 29: SUSTAINABILITY SCORECARD

01 35 13 SPECIAL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

- APPENDIX 1 TO 01 45 35: SCHEDULE OF SPECIAL INSPECTIONS

- APPENDIX 2 TO 01 45 35: STATEMENT OF SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 13.00 22 EROSION AND SEDIMENT CONTROL

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

- APPENDIX TO 01 57 19: JBLE-LANGLEY ENVIROMENTAL SPECIAL

CONDITIONS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 FACILITY DATA REQUIREMENTS

01 91 00.15 10 TOTAL BUILDING COMMISSIONING

- APPENDIX TO 01 91 00.15 10: CONSTRUCTION PHASE

COMMISSIONING PLAN

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 42 91 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

- APPENDIX TO 02 81 00: HAZARDOUS MATERIALS LIST

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 45 00 PRECAST ARCHITECTURAL CONCRETE

PROJECT TABLE OF CONTENTS Page 2

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 21 29 SPRAY ON ACOUSTICAL INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING

07 71 00 ROOF SPECIALTIES

07 72 00 ROOF ACCESSORIES

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

07 95 00 EXPANSION CONTROL

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 33 13 COILING COUNTER DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 16.10 STEEL SLIDING HANGAR DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 45 23 2-3/4 INCH INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL

SYSTEM

08 56 19 PASS WINDOWS

08 71 00 DOOR HARDWARE

- APPENDIX TO 08 71 00: HARDWARE LIST

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

PROJECT TABLE OF CONTENTS Page 3

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 CEMENT STUCCO

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM

09 68 00 CARPETING

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 26 RETRACTABLE THERMAL CURTAIN

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED)

10 73 16 ALUMINUM CANOPY

10 81 13 BIRD CONTROL DEVICES

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION

12 61 13 UPHOLSTERED AUDIENCE SEATING

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL

22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 15 COMMON PIPING FOR HVAC

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

PROJECT TABLE OF CONTENTS Page 4

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 HVAC CONTROLS CONFIGURATION AND GENERAL REQUIREMENTS

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL

SYSTEMS

23 11 20 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED HVAC CONTROL SYSTEMS

25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED FIRE ALARM CONTROL

SYSTEMS

DIVISION 26 - ELECTRICAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

- APPENDIX TO 26 24 13: ADVANCED METERING READING

SYSTEM (AMRS)

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 13.43 TELEVISION DISTRIBUTION SYSTEM

27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET

COMMUNICATION SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 40 10 AUDIO-VISUAL GENERAL

27 40 90.01 AUDIO-VISUAL PERFORMANCE VERIFICATION

27 41 05 AUDIO-VISUAL EQUIPMENT ENCLOSURES AND TECHNICAL FURNITURE

27 41 06 AUDIO-VISUAL POWER DISTRIBUTION AND MANAGEMENT EQUIPMENT

27 41 10 MICROPHONES, CONFERENCING SYSTEM, AND AUDIO SOURCE

EQUIPMENT

27 41 11 AUTOMATED MIXING, PROCESSING AND AMPLIFICATION EQUIPMENT

27 41 13 REINFORCEMENT AND PROGRAM AUDIO LOUDSPEAKERS

27 41 23 VIDEO DISPLAY EQUIPMENT

27 41 26 PROJECTION SCREENS

27 41 31 AUDIO-VISUAL CONTROL SYSTEMS AND PROGRAMMING

27 41 32 AUDIO-VISUAL NETWORK EQUIPMENT

27 41 40 AUDIO-VISUAL CABLING AND CONNECTORS.

27 51 16 PUBLIC ADDRESS SYSTEMS

PROJECT TABLE OF CONTENTS Page 5

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

- APPENDIX TO 31 00 00: GEOTECHNICAL REPORT

31 05 19 GEOTEXTILE

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 20 BASE COURSE FOR RIGID PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK COAT

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR SITE FACILITIES

14.13

INCLUDING SIGNAGE

CONCRETE PAVING FOR AIRFIELDS AND

OTHER HEAVY DUTY

73.19

PAVEMENTS

COMPRESSION CONCRETE PAVING JOINT

SEALANT

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13.53 ORNAMENTAL FENCE AND GATES

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 30 00 SANITARY SEWERAGE

33 40 00 STORM DRAINAGE UTILITIES

33 46 13 FOUNDATION DRAINAGE

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR W91236-XX-X-XXXX

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are listed in the Appendix at the end of this specification section

1.3 SUPPLEMENTARY DATA

These supplementary data may not be a part of the contract but are included for information.

1.3.1 Boring Logs

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.

Subsurface data, not specified or indicated, have been obtained by the Government at this station. .

1.3.2 Subsurface Data

The soils report is included as part of the solicitation.

-- End of Document --

DOCUMENT 00 01 15 Page 1

SHEET NUMBER SHEET NAME

00. GENERAL

G-001 COVER SHEET

G-002 DRAWING INDEX

G-003 CODE COMPLIANCE SUMMARY

G-004 OCCUPANCY SUMMARY

G-005 CODE COMPLIANCE SITE PLAN

G-007 FIRST FLOOR LIFE SAFETY PLAN

G-008 SECOND FLOOR LIFE SAFETY PLAN

PH101 CONSTRUCTION SEQUENCING PLANS

PH102 CONSTRUCTION SEQUENCING PLANS

PH103 CONSTRUCTION SEQUENCING PLANS

AD101 OVERALL FIRST FLOOR DEMOLITION PLAN

AD102 OVERALL SECOND FLOOR DEMOLITION PLAN

AD103 OVERALL ROOF DEMOLITION PLAN

02. SURVEY / MAPPING

VF001 LEGENDS AND NOTES

VF100 OVERALL EXISTING CONDITIONS

VF101 EXISTING CONDITIONS PLAN

VF102 EXISTING CONDITIONS PLAN

VF103 EXISTING CONDITIONS PLAN

VF104 EXISTING CONDITIONS PLAN

04.CIVIL

C-001 LEGEND AND GENERAL NOTES

C-002 CONSTRUCTION ACCESS PLAN

C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL

C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL

C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN

C-006 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN

C-007 EROSION AND SEDIMENT CONTROL - PHASE 4 PLAN

C-008 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN INITIAL

C-009 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN FINAL

CD001 DEMOLITION LEGEND & NOTES

CD100 EXISTING CONDITIONS - OVERALL

CD101 DEMOLITION PLAN

CD102 DEMOLITION PLAN

CD103 DEMOLITION PLAN

CD104 DEMOLITION PLAN

CS001 SITE LAYOUT LEGEND & CONTROL POINTS

CS101 SITE LAYOUT PLAN

CS102 SITE LAYOUT PLAN

CS103 SITE LAYOUT PLAN

CS104 SITE LAYOUT PLAN

CG001 GRADING LEGEND, STORM SCHEDULES & NOTES

CG101 GRADING & DRAINAGE PLAN

CG102 GRADING PLAN

CG103 GRADING PLAN

CG201 STORM PROFILES

CG202 STORM PROFILES

CG203 STORM PROFILES

CG700 POST DEVELOPMENT DRAINAGE AREA PLAN

CG701 STORMWATER MANAGEMENT CALCULATIONS

00 01 15 APPENDIX - DRAWING LIST

CG702 STORMWATER MANAGEMENT CALCULATIONS

CG703 STORMWATER MANAGEMENT CALCULATIONS

CG704 STORMWATER MANAGEMENT CALCULATIONS

CU001 UTILITY LEGEND, CONTROL POINTS, & SCHEDULES

CU101 UTILITY PLAN

CU102 UTILITY PLAN

CU103 UTILITY PLAN

CU104 UTILITY PLAN

CU201 UTILITY PROFILES

CU202 UTILITY PROFILES

C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-505 EROSION AND SEDIMENT CONTROL DETAILS

C-506 DETAILS

C-507 DETAILS

C-508 DETAILS

C-509 DETAILS

C-510 DETAILS

C-511 DETAILS

C-512 DETAILS

C-513 DETAILS

C-514 DETAILS

C-515 DETAILS

C-516 DETAILS

C-517 DETAILS

C-518 DETAILS

C-519 DETAILS

CP101 APRON AND TOWWAY GEOMETRY PLAN

CP201 APRON AND TOWWAY JOINT LAYOUT PLAN

CP301 APRON AND TOWWAY SPOT ELEVATION PLAN

CP401 APRON AND TOWWAY TYPICAL SECTIONS

CP501 APRON AND TOWWAY JOINT DETAILS

CP502 APRON AND TOWWAY JOINT DETAILS

CM101 APRON AND TOWWAY MARKING PLAN

CM501 APRON AND TOWWAY MARKING DETAILS

05. LANDSCAPE

L-101 LANDSCAPE PLAN

L-102 LANDSCAPE PLAN

L-103 LANDSCAPE PLAN

L-104 LANDSCAPE PLAN

L-105 LANDSCAPE PLAN

L-106 LANDSCAPE PLAN

L-107 LANDSCAPE PLAN

L-501 LANDSCAPE DETAILS

06. STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES

S-002 GENERAL STRUCTURAL NOTES

S-003 LEGEND, ABBREVIATIONS & MISC LOAD INFO

S-010 AREA LOAD PLAN

S-011 ROOF WIND UPLIFT PLAN

SB101 FOUNDATION PLAN - OVERALL

SB101A FOUNDATION PLAN - AREA A

SB101B FOUNDATION PLAN - AREA B

SB101C FOUNDATION PLAN - AREA C

SB101D FOUNDATION PLAN - AREA D

SB102 SLAB PLAN - OVERALL

SB102A SLAB PLAN - AREA A

SB102B SLAB PLAN - AREA B

SB102C SLAB PLAN - AREA C

SB102D SLAB PLAN - AREA D

SF111 SECOND FLOOR AND LOW ROOF FRAMING PLAN - OVERALL

SF111A LOW ROOF FRAMING PLAN - AREA A

SF111B LOW ROOF FRAMING PLAN - AREA B

SF111C SECOND FLOOR FRAMING PLAN - AREA C

SF111D SECOND FLOOR FRAMING PLAN - AREA D

SF121 ROOF FRAMING PLAN - OVERALL

SF121A ROOF FRAMING PLAN - AREA A

SF121B ROOF FRAMING PLAN - AREA B

SF121C ROOF FRAMING PLAN - AREA C

SF121D ROOF FRAMING PLAN - AREA D

S-201 FRAMING ELEVATIONS

S-202 FRAMING ELEVATIONS

S-203 FRAMING ELEVATIONS

S-204 HANGAR TRUSS ELEVATIONS

S-205 HANGER TRUSS ELEVATION AND DETAILS

S-301 BUILDING SECTIONS

S-302 BUILDING SECTIONS

S-311 FOUNDATION SECTIONS

S-321 ROOF FRAMING SECTIONS

S-401 ENLARGED PLANS

S-501 FOUNDATION DETAILS

S-502 FOUNDATION DETAILS

S-503 FOUNDATION DETAILS

S-504 TYP CMU DETAILS

S-505 TYP CMU DETAILS

S-506 MECHANICAL ENCLOSURE DETAILS

S-507 SLAB DETAILS

S-508 METAL STUD WALL DETAILS

S-509 STRUCTURAL SITE DETAILS

S-511 TYPICAL FRAMING DETAILS

S-512 TYPICAL FRAMING DETAILS

S-513 ROOF FRAMING DETAILS

S-514 MISC. FRAMING DETAILS

S-515 TRUSS DETAILS

S-521 FRAMING ELEVATION DETAILS

S-522 FRAMING ELEVATION DETAILS

S-523 FRAMING ELEVATION DETAILS

S-601 REBAR SCHEDULES

S-602 SCHEDULES

S-603 COLUMN SCHEDULE

S-901 3D ISOMETRICS

07. ARCHITECTURAL

A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

A-002 ABA ACCESSIBILITY GUIDELINES

A-003 ABA ACCESS PLAN - FIRST FLOOR

A-004 ABA ACCESS PLAN - SECOND FLOOR

A-005 AIRCRAFT CLEARANCE REQUIREMENT SECTION

A-006 SECURE AREA PLANS

A-007 ACOUSTIC PARTITIONS PLAN - FIRST FLOOR

A-008 ACOUSTIC PARTITIONS PLAN - SECOND FLOOR

A-009 PARTITION TYPES

A-010 PARTITION HEAD CONDITIONS

A-011 PENETRATION DETAILS

A-012 PENETRATION DETAILS

A-013 PENETRATION DETAILS

A-015 EQUIPMENT SCHEDULE

AS101 ARCHITECTURAL SITE PLAN

AS401 ENLARGED ARCHITECTURAL SITE PLAN

AS402 ENLARGED ARCHITECTURAL SITE PLAN

AS501 ENLARGED ARCHITECTURAL SITE PLAN

AS502 ENLARGED ARCHITECTURAL SITE PLAN

A-101 FIRST FLOOR PLAN - OVERALL

A101A FIRST FLOOR PLAN - AREA A

A101B FIRST FLOOR PLAN - AREA B

A101C FIRST FLOOR PLAN - AREA C

A101D FIRST FLOOR PLAN - AREA D

A-102 SECOND FLOOR PLAN - OVERALL

A102A SECOND FLOOR PLAN - AREA A

A102B SECOND FLOOR PLAN - AREA B

A102C SECOND FLOOR PLAN - AREA C

A102D SECOND FLOOR PLAN - AREA D

A-121 ROOF PLAN - OVERALL

A121A ROOF PLAN - AREA A

A121B ROOF PLAN - AREA B

A121C ROOF PLAN - AREA C

A121D ROOF PLAN - AREA D

A-131 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL

A131A FIRST FLOOR REFLECTED CEILING PLAN-AREA A

A131B FIRST FLOOR REFLECTED CEILING PLAN-AREA B

A131C FIRST FLOOR REFLECTED CEILING PLAN-AREA C

A131D FIRST FLOOR REFLECTED CEILING PLAN-AREA D

A-132 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL

A132B SECOND FLOOR REFLECTED CEILING PLAN - AREA B

A132C SECOND FLOOR REFLECTED CEILING PLAN - AREA C

A132D SECOND FLOOR REFLECTED CEILING PLAN - AREA D

A-141 FIRST FLOOR AIR BARRIER PLAN

A-142 SECOND FLOOR AIR BARRIER PLAN

A-143 BUILDING SECTIONS - AIR BARRIER

A-201 BUILDING ELEVATIONS

A-202 BUILDING ELEVATIONS

A-203 BUILDING ELEVATIONS

A-204 BUILDING ELEVATIONS

A-211 PARTIAL BUILDING ELEVATIONS

A-212 PARTIAL BUILDING ELEVATIONS

A-213 PARTIAL BUILDING ELEVATIONS

A-221 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-222 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-223 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-230 PRECAST CONCRETE PROFILES - ELEVATIONS

A-231 PRECAST CONCRETE PROFILES - ELEVATIONS

A-232 PRECAST CONCRETE PROFILES - ELEVATIONS

A-301 BUILDING SECTION

A-302 BUILDING SECTION

A-311 EXTERIOR WALL SECTIONS

A-312 EXTERIOR WALL SECTIONS

A-313 EXTERIOR WALL SECTIONS

A-314 EXTERIOR WALL SECTIONS & DIAGRAMS

A-401 ENLARGED PLANS

A-402 ENLARGED PLANS

A-403 ENLARGED PLANS

A-404 ENLARGED PLANS -AIR SHOWERS

A-410 INTERIOR ELEVATIONS

A-411 INTERIOR ELEVATIONS

A-412 INTERIOR ELEVATIONS

A-413 INTERIOR ELEVATIONS

A-414 INTERIOR ELEVATIONS

A-415 INTERIOR ELEVATIONS

A-421 INTERIOR MILLWORK SECTIONS AND DETAILS

A-451 VERTICAL CIRCULATION - PLANS

A-452 VERTICAL CIRCULATION - SECTIONS

A-453 VERTICAL CIRCULATION - DETAILS

A-461 VERTICAL CIRCULATION - ELEVATOR PLANS

A-462 VERTICAL CIRCULATION - SECTIONS

A-463 VERTICAL CIRCULATION - ELEVATOR DETAILS

A-470 VERTICAL CIRCULATION - ROOF LADDERS

A-501 HANGAR DOOR DETAILS

A-502 HANGAR DOOR DETAILS

A-503 HANGAR DOOR DETAILS

A-504 HANGAR DOOR DETAILS

A-505 PLAN DETAILS

A-506 PLAN DETAILS

A-507 PLAN DETAILS

A-511 CEILING DETAILS

A-521 SECTION DETAILS

A-522 SECTION DETAILS

A-531 ROOF DETAILS

A-532 ROOF DETAILS

A-533 ROOF DETAILS

A-534 ROOF DETAILS

A-535 ROOF DETAILS

A-541 INTERIOR DETAILS

A-542 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN

A-543 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN

A-544 HANGAR SLAB DETAILS

A-545 HANGAR SLAB DETAILS

A-546 HANGAR SLAB DETAILS

A-547 HANGAR SLAB DETAILS

A-548 HANGAR SLAB DETAILS

A-549 HANGAR SLAB DETAILS

A-553 PRECAST CONCRETE PROFILES - DETAILS

A-554 PRECAST CONCRETE PROFILES - DETAILS

A-560 SEISMIC JOINT DETAILS

A-562 EXPANSION JOINTS DETAILS

A-570 CANOPY DETAILS

A-601 DOOR & FRAME TYPES

A-602 DOOR SCHEDULE

A-604 EXTERIOR DOOR DETAILS

A-605 INTERIOR DOOR DETAILS

A-611 WINDOW & FRAME TYPES

A-612 WINDOW & FRAME TYPES

A-613 LOUVER TYPES

A-801 HANGAR MARKINGS PLAN - OVERALL

A-802 ENLARGED HANGAR MARKINGS PLAN

08. INTERIOR DESIGN

I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL

I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A

I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B

I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C

I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D

I-102 SECOND FLOOR INTERIOR FINISH PLAN - OVERALL

I102C SECOND FLOOR INTERIOR FINISH PLAN - AREA C

I102D SECOND FLOOR INTERIOR FINISH PLAN - AREA D

I131A FIRST FLOOR SIGNAGE PLAN - AREA A

I131B FIRST FLOOR SIGNAGE PLAN - AREA B

I131C FIRST FLOOR SIGNAGE PLAN - AREA C

I131D FIRST FLOOR SIGNAGE PLAN - AREA D

I132C SECOND FLOOR SIGNAGE PLAN - AREA C

I132D SECOND FLOOR SIGNAGE PLAN - AREA D

I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES

I-602 TRANSITION DETAILS

I-621 SIGNAGE SCHEDULE

I-622 SIGNAGE SCHEDULE

I-631 SIGNAGE DETAILS

I-632 SIGNAGE DETAILS

I-633 SIGNAGE DETAILS

08. INTERIORS

IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A

IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B

IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C

IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D

IF102 SECOND FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF102C SECOND FLOOR INTERIOR FURNITURE PLAN - AREA C

IF102D SECOND FLOOR INTERIOR FURNITURE PLAN - AREA D

10. FIRE ALARM

FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA102 SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA102A SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA102B SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA102C SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA102D SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA501 FIRE ALARM DETAILS

FA502 FIRE ALARM DETAILS

FA601 FIRE ALARM SEQUENCE OF OPERATIONS

FA701 FIRE ALARM RISER DIAGRAMS

10. FIRE PROTECTION

FX001 FIRE SUPPRESSION GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL

FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A

FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B

FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C

FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D

FX102 SECOND FLOOR FIRE SUPPRESSION PLAN - OVERALL

FX102A SECOND FLOOR FIRE SUPPRESSION PLAN - AREA A

FX102B SECOND FLOOR FIRE SUPPRESSION PLAN - AREA B

FX102C SECOND FLOOR FIRE SUPPRESSION PLAN - AREA C

FX102D SECOND FLOOR FIRE SUPPRESSION PLAN - AREA D

FX401 FIRE PROTECTION ENLARGED PLANS

FX501 FIRE PROTECTION DETAILS

11. PLUMBING

P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

P-101 UNDERFLOOR PLUMBING PLAN - OVERALL

P101A UNDERFLOOR PLUMBING PLAN - AREA A

P101B UNDERFLOOR PLUMBING PLAN - AREA B

P101C UNDERFLOOR PLUMBING PLAN - AREA C

P101D UNDERFLOOR PLUMBING PLAN - AREA D

P-110 FIRST FLOOR PLUMBING PLAN - OVERALL

P110A FIRST FLOOR PLUMBING PLAN - AREA A

P110B FIRST FLOOR PLUMBING PLAN - AREA B

P110C FIRST FLOOR PLUMBING PLAN - AREA C

P110D FIRST FLOOR PLUMBING PLAN - AREA D

P-120 SECOND FLOOR PLUMBING PLAN - OVERALL

P120A SECOND FLOOR PLUMBING PLAN - AREA C

P120B SECOND FLOOR PLUMBING PLAN - AREA D

P-301 ENLARGED PLAN - FIRST FLOOR WOMENS/MEN LOCKER ROOM

P-302 ENLARGED PLAN - SECOND FLOOR WOMENS/MEN LOCKER ROOM

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-701 PLUMBING DIAGRAMS

P-702 PLUMBING DIAGRAMS

P-703 PLUMBING DIAGRAMS

13. MECHANICAL

M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

MS101 MECHANICAL SITE PLAN

MS102 MECHANICAL SITE PLAN

MP101 FIRST FLOOR PIPING PLAN- OVERALL

MP101A FIRST FLOOR PIPING PLAN - AREA A

MP101B FIRST FLOOR PIPING PLAN - AREA B

MP101C FIRST FLOOR PIPING PLAN - AREA C

MP101D FIRST FLOOR PIPING PLAN - AREA D

MP102 SECOND FLOOR PIPING PLAN - OVERALL

MP102C SECOND FLOOR PIPING PLAN - AREA C

MP102D SECOND FLOOR PIPING PLAN - AREA D

MH101 FIRST FLOOR VENTILATION PLAN - OVERALL

MH101A FIRST FLOOR VENTILATION PLAN - AREA A

MH101B FIRST FLOOR VENTILATION PLAN - AREA B

MH101C FIRST FLOOR VENTILATION PLAN - AREA C

MH101D FIRST FLOOR VENTILATION PLAN - AREA D

MH102 SECOND FLOOR VENTILATION PLAN - OVERALL

MH102C SECOND FLOOR VENTILATION PLAN - AREA C

MH102D SECOND FLOOR VENTILATION PLAN - AREA D

M-110 MECHANICAL ROOF PLAN

M-301 FIRST FLOOR ENLARGED MECHANICAL ROOM

M-401 SECTIONS - MECHANICAL

M-402 SECTIONS - AIR HANDLING EQUIPMENT

M-403 SECTIONS - HANGAR BAY

M-501 DETAILS - HEATING

M-502 DETAILS - VENTILATION

M-503 DETAILS - HEATING

M-504 DETAILS - MECHANICAL

M-601 SCHEDULES - HEATING/COOLING

M-602 SCHEDULES - HEATING/COOLING

M-603 SCHEDULES - HEATING/COOLING

M-604 SCHEDULES - HEATING/COOLING

M-701 DIAGRAMS - HEATING/COOLING

M-801 CONTROL SEQUENCES

M-802 CONTROL SEQUENCES

M-803 CONTROL SEQUENCES

M-804 CONTROL SEQUENCES

M-805 CONTROL SEQUENCES

M-806 CONTROL SEQUENCES

M-807 CONTROL SEQUENCES

M-808 CONTROL SEQUENCES

M-809 CONTROL SEQUENCES

M-810 CONTROL SEQUENCES

M-811 CONTROL SEQUENCES

M-812 CONTROL SEQUENCES

14. ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

E-002 ELECTRICAL GENERAL NOTES

E-003 AREA CLASSIFICATIONS PLAN

ED101 DEMOLITION SITE PLAN

ES101 ELECTRICAL SITE PLAN

ES102 ELECTRICAL SITE PLAN

ES501 SITE DETAILS

ES502 SITE DETAILS

ES503 SITE DETAILS

ES701 ELECTRICAL ONE LINE DIAGRAM

ES702 ELECTRICAL ONE LINE DIAGRAM

ES703 ELECTRICAL ONE-LINE DIAGRAM

EL101 FIRST FLOOR LIGHTING PLAN - OVERALL

EL101A FIRST FLOOR LIGHTING PLAN - AREA A

EL101B FIRST FLOOR LIGHTING PLAN - AREA B

EL101C FIRST FLOOR LIGHTING PLAN - AREA C

EL101D FIRST FLOOR LIGHTING PLAN - AREA D

EL102 SECOND FLOOR LIGHTING PLAN - OVERALL

EL102A SECOND FLOOR LIGHTING PLAN - AREA A

EL102B SECOND FLOOR LIGHTING PLAN - AREA B

EL102C SECOND FLOOR LIGHTING PLAN - AREA C

EL102D SECOND FLOOR LIGHTING PLAN - AREA D

EL103 ROOF LIGHTING PLAN - OVERALL

EP101 FIRST FLOOR POWER PLAN - OVERALL

EP101A FIRST FLOOR POWER PLAN - AREA A

EP101B FIRST FLOOR POWER PLAN - AREA B

EP101C FIRST FLOOR POWER PLAN - AREA C

EP101D FIRST FLOOR POWER PLAN - AREA D

EP102A SECOND FLOOR POWER PLAN - AREA A

EP102B SECOND FLOOR POWER PLAN - AREA B

EP102C SECOND FLOOR POWER PLAN - AREA C

EP102D SECOND FLOOR POWER PLAN - AREA D

EP103 ROOF POWER PLAN - OVERALL

EG101 FIRST FLOOR OVERALL GROUNDING PLAN

EG103 LIGHTNING PROTECTION OVERALL PLAN

E-401 ENLARGED ELECTRICAL PLANS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-503 ELECTRICAL DETAILS

E-504 ELECTRICAL DETAILS

E-505 ELECTRICAL DETAILS

E-506 ELECTRICAL DETAILS

E-601 LIGHTING SCHEDULES

E-602 EQUIPMENT CONNECTION SCHEDULES

E-603 EQUIPMENT CONNECTION SCHEDULES

E-604 ELECTRICAL CONNECTION SCHEDULES

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-607 PANEL SCHEDULES

E-608 PANEL SCHEDULES

E-609 PANEL SCHEDULES

E-610 PANEL SCHEDULES

E-611 PANEL SCHEDULES

E-612 PANEL SCHEDULES

E-613 PANEL SCHEDULES

E-701 ELECTRICAL ONE-LINE DIAGRAM

E-702 GROUNDING RISER DIAGRAM

E-703 SWITCHBOARD ELEVATIONS

16. TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TD101 TELECOMMUNICATIONS DEMOLITION SITE PLAN

TS101 TELECOMMUNICATIONS SITE PLAN

TS501 TELECOMMUNICATIONS DETAILS

T-101 FIRST FLOOR TELECOMMUNICATIONS PLAN - OVERALL

T-101A FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A

T-101B FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B

T-101C FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-101D FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-102 SECOND FLOOR TELECOMMUNICATIONS PLAN - OVERALL

T-102C SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-102D SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-103 ROOF TELECOMMUNICATIONS PLAN - OVERALL

T-111 FIRST FLOOR TELECOMMUNICATION DIAMOND STUDY PLAN - OVERALL

T-112 SECOND FLOOR TELECOMMUNICATIONS DIAMOND STUDY PLAN - OVERALL

T-121 FIRST FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL

T-122 SECOND FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL

T-401 ENLARGED TELECOMMUNICATIONS PLANS

T-501 TELECOM SERVICE ENTRANCE ELEVATION

T-502 TELECOM SERVICE ENTERANCE ELEVATION

T-503 TELECOM SERVICE ENTRANCE ELEVATION

T-504 TELECOM SERVICE ENTRANCE ELEVATION

T-505 TELECOMMUNICATIONS DETAILS

T-506 TELECOMMUNICATIONS DETAILS

T-507 TELECOMMUNICATIONS DETAILS

T-508 TELECOMMUNICATIONS DETAILS

T-509 TELECOMMUNICATIONS DETAILS

T-700 FIBER COMMUNICATIONS OSP DIAGRAM

T-701 TELECOMMUNICATIONS RISER DIAGRAM

T-702 TELECOMMUNICATIONS RACK ELEVATIONS

T-703 TELECOMMUNICATIONS RACK ELEVATIONS

T-704 TELECOMMUNICATIONS RACK ELEVATIONS

T-705 CATV RISER DIAGRAM

T-706 TELECOMMUNICATIONS GROUNDING RISER DIAGRAM

X-001 SECURITY SYMBOLS LEGEND AND ABBREVIATIONS

X-002 SECURITY GENERAL NOTES

X-101 FIRST FLOOR SECURITY PLAN - OVERALL

X-101A FIRST FLOOR SECURITY PLAN - AREA A

X-101B FIRST FLOOR SECURITY PLAN - AREA B

X-101C FIRST FLOOR SECURITY PLAN - AREA C

X-101D FIRST FLOOR SECURITY PLAN - AREA D

X-102 SECOND FLOOR SECURITY PLAN - OVERALL

X-102C SECOND FLOOR SECURITY PLAN - AREA C

X-102D SECOND FLOOR SECURITY PLAN - AREA D

X-501 SECURITY DETAILS

X-502 SECURITY DETAILS

X-503 SECURITY DETAILS

X-701 ACCESS CONTROL RISER DIAGRAM

X-702 INTRUSION DETECTION SYSTEM RISER DIAGRAM

X-703 CCTV RISER DIAGRAM

17. AUDIO VISUAL

TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TA101C FIRST FLOOR AUDIO VISUAL PLAN - AREA C

TA101D FIRST FLOOR AUDIO VISUAL PLAN - AREA D

TA102C SECOND FLOOR AUDIO VISUAL PLAN - AREA C

TA102D SECOND FLOOR AUDIO VISUAL PLAN - AREA D

TA201D FIRST FLOOR AUDIO VISUAL RCP - AREA D

TA202C SECOND FLOOR AUDIO VISUAL RCP - AREA C

TA202D SECOND FLOOR AUDIO VISUAL RCP - AREA D

TA400 AUDIO VISUAL ELEVATIONS

TA501 AUDIO VISUAL DETAILS

TA502 AUDIO VISUAL DETAILS

Grand total: 513

DOCUMENT 00 22 13.00 20

SUPPLEMENTARY INSTRUCTIONS TO OFFERORS( INCLUDED WITH COST PACKAGE)

02/14

-- End of Document --

DOCUMENT 00 22 13.00 20 Page 1

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes demolition of building 753 including foundations, pavements, utilities and miscellaneous site features. Construction of the multi-story Consolidated Operations and Maintenance Hangar (COMH), pavements, utilities and incidental related work.

1.1.2 Location

The work is located along the flightline on Danforth Ave at the location of existing building 753 at Langley Air Force Base/Joint Base Langley-Eustis (JBLE), approximately as indicated. The exact location will be shown by the Contracting Officer.

1.2 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.3 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

SECTION 01 11 00 Page 1

1.3.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.4 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

Pursuant to Contract Clause FAR 52.245-1 Government Property, the Government will furnish the following materials and equipment for installation by the Contractor.

The list is appended to this section.

Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.

Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.

1.4.1 Delivery Schedule

Notify the Contracting Officer in writing at least 120 calendar days in advance of the date on which the materials and equipment are required.

Pick up materials and equipment no later than 30 calendar days after such date.

1.4.2 Delivery Location

The materials and equipment are located within 15 miles of the jobsite.

1.5 Locksets

If locksets are installed as a result of this project, the Contractor shall provide cylinders and cores for new locks. Cylinders and cores that the Contractor provides shall have seven-pin tumblers using the A2 system and WB keyway - except for dormitories, which use the A4 system and WC keyway. All cylinders will be from a single manufacturer. All cores will be stamped with a key control symbol in a concealed place on the core.

(For information only - the Best Premium WB Keyway, 7-pin core is part number 1CP7WB2.) The cylinders will be fully compatible with products of the Best Lock Corporation, which have interchangeable cores that are removable by special control keys.

Provide and submit a grand master keying system and a sub-master keying system for the building that is an extension of the existing Langley AFB, JBLE keying system. Best Lock Corporation can key cores and provide keys in accordance with the Langley AFB, JBLE grand master keying system; the base grand master keying system will not be made available to outside contractors. Key the equipment spaces and mechanical rooms separately from the building systems. Key them alike to the existing Langley AFB, JBLE systems for equipment and mechanical space doors. Prior to installing any lock cylinder or cores, the contractor shall coordinate with the Langley AFB, JBLE locksmith to ensure compliance with the grand master keying system and master keying sequence, and that the proposed lock hardware will meet requirements of this specification.

SECTION 01 11 00 Page 2

1.6 Concrete Color

Miami Buff is the predominate color used on JBLE.

1.7 Acquiring a Work Clearance Request

(Air Force Form 103) = Dig Permit; Miss Utility then Form 103.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 3

GOVERNMENT FURNISHED EQUIPMENT (GFE)

# ROOM NO. ROOM NAME / LOCATION DESCRIPTION MANUF / MODEL NO. SIZE POWER REQUIREMENTS HVAC REQUIREMENTS PLUMBING REQUIREMENT NOTES / COMMENTS / REMARKS COUNT GFGI GFCI

1 ROOF ANTENNA UHF ANTENNA SURFACE MOUNTED UHF ANTENNA 1 YES

2 133 TIRE STORAGE BEAD BREAKER 8'X8'x8' YES SHOP AIR 2 YES

3 133 TIRE STORAGE TIRE SKIN RACK 9'X3'X8' N/A N/A N/A 3 YES

4 133 TIRE STORAGE WORK BENCH (IMIS STATION) 15'X3' N/A N/A N/A 1 YES

5 134 HAZMAT STORAGE HAZMAT STORAGE 9'x10' AREA 1 YES

6 134 HAZMAT STORAGE HAZMAT STORAGE 10'x3' SHELVING 1 YES

7 135 WORK SPACE HAZMAT LOCKER 2'x4' INDUSTRIAL FLAMMABLE CABINET 1 YES

8 135 WORK SPACE PARTS WASHER 6'X4' YES 1 YES

9 135 WORK SPACE TIRE CAGE 10'X9' AREA YES REQUIRES NITROGEN, ELECTRICAL 1 YES

10 135 WORK SPACE WHEEL WASHER DEGREASER 6'X8' YES 1 YES

11 135 WORK SPACE WHEEL WASHER 8'x8'x8' YES VENTILATION

REQUIRES WATER FEED AND

DRAIN 1 YES

12 137 LO SUPPORT CONSUMABLE STORAGE 2 YES

13 137 LO SUPPORT HAZMAT LOCKER STORAGE 2 YES

14 137 LO SUPPORT LAZER ETCHER 1 YES

15 137 LO SUPPORT TOOLS STORAGE 1 YES

16 137 LO SUPPORT COMPRESED AIR 3'X3' YES

17 155 LOCKERS/ STORAGE STORAGE CONTAINER INDUSTRIAL STORAGE CONTAINERS 6 YES

18 157 OIL LAB JOAP SPECTOMETERS 32"X25"X72" AREA

INPUT VOLTAGE 110/220 VAC

+/- 10%, SINGLE PHASE,

FREQUENCY 50 OR 60 HZ,

CURRENT 15 A,

PROVIDE ALTERNATE POWER

SOURCE

3-EACH EXTERNAL EXHAUST

VENTS; DEDICATED SEPARATE

HVAC SYSTEM:O

75 DEGREE W/ 20%-60%

HUMIDITY N/A

VENTED TO THE OUTSIDE ENVIRONMENT; UP TO 20

FEET (6 METER) OF STANDARD 4-INCH DIAMETER

FLEXIBLE EXHAUST DUCT IS RECOMMENDED; IN ORDER

TO MAINTAIN AMPLE AIRFLOW, IT IS RECOMMENDED

THAT THE LENGTH OF THIS EXHAUST DUCT NOT EXCEED

20 FEET. FOR GREATER DISTANCES, AN ADDITIONAL FAN

MAY BE REQUIRED TO PROVIDE SUPPLEMENTAL AIR

FLOW. 3 YES

19 158 PRIMARY INSPECTION AREA HAZ SITE 1 YES

20 158 PRIMARY INSPECTION AREA MAG UNIT

10’ X 8’ X 10’ PLUS

POWER CONVERTER

BOX NEXT TO IT

APPROXIMATELY

POWER SOURCE: 230V OR

460V, 50/60 HZ, 3 PHASE

ALTERNATING CURRENT;

COMPRESSED AIR SUPPLY OF 30

TO 100PSIG (60 PSIG NOMINAL).

FLUORESCENT MAGNETIC PARTICLE INSPECTION UNIT (

T.O.33B2-65-1 SECTION II) 1 YES

21 158 PRIMARY INSPECTION AREA PENETRANT LINE 50' L x 8' W

230 VOLT 50/60 HZ SINGLE

PHASE INPUT POWER, AND

FUSED FOR 60 AMPERES

ACCESS TO SEWER LINE OR SUMP

IS REQUIRED; STAINLESS STEEL OR

COPPER PIPES;

SOURCE FOR HOT AND COLD

WATER, WITH PRESSURE NOT TO

EXCEED 40 PSIG;

COMPRESSED AIR SUPPLY OF 30

TO 100PSIG (60 PSIG NOMINAL

FLUORESCENT PENETRANT INSPECTION UNIT (T.O. 33B1-

2-5-41 SECTION I) 1 YES

22 158 PRIMARY INSPECTION AREA POWER CONVERTER BOX 3'Wx3'Dx3.5"H 1 YES

23 158 PRIMARY INSPECTION AREA WORK BENCH 1 YES

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G, RO

1.2 DEFINITIONS

a. Site Security Team (SST): Team of Government representatives responsible for security and inspection of construction activity.

Personnel include the Accrediting Official, Site Security Manager and Construction Surveillance Technician(s).

b. Accrediting Official (AO): US Government employee responsible for all security issues and final security measures acceptance and direction.

c. Site Security Manager (SSM): US Government employee who is on site Point of Contact (POC) for all security matters on the construction site. Responsible for the development and implementation of the Construction Security Plan (CSP) and all coordination with the Accrediting Officer (AO).

d. Construction Surveillance Technician (CST): US Government employees responsible for on-site monitoring of all work activities. CST reports directly to the SSM.

e. Construction Security Plan (CSP): US Government document indicating overarching guidance for all active and passive security measures in effect for this project. The restrictions within this plan is generally, but not necessarily inclusively, outlined within this specification.

1.3 SPECIAL SCHEDULING REQUIREMENTS

a. The Airfieldwill remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

See specification Section 01 35 13 Special Project Procedures for additional information and restrictions.

SECTION 01 14 00 Page 1

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.4.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.1.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.4.2 Working Hours

Regular working hours may consist of a 10 hour period between 7 a.m. and 5:00 p.m., Monday through Friday, and 7 a.m. to 3:30 p.m. on Saturday, excluding Government holidays.

1.4.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 30 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.4.4 Occupied Buildings

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

1.4.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

SECTION 01 14 00 Page 2

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

1.5 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:

All work for this project, including access to the SSA,is under the supervision of the Government and the SST. The Government will facilitate coordination between the Contractor and the SST to communicate schedules, inspections and document control. The SST will provide oversight for all security issues during construction and will ensure the requirements of this specification and the CSP are met.

1.5.1 Construction Monitoring

a. All work activities pertaining to the Secure Area and adjacent general construction will require special monitoring and coordination with the SST. Contractor will cooperate and work closely with the SST to ensure all security requirements are met.

b. CST's will monitor all construction activities. Reasonable accommodations shall be made to allow CST's to access, inspect and witness activities at the discretion of the Government.

c. Construction Contractor's NAS Baseline will provide a detailed construction and commissioning schedule with clear milestones to coordinate inspection requirements as identified by the SST.

d. The Contractor's three week look ahead schedule, provided at each QC meeting, will identify upcoming activities requiring security inspection and coordination.

e. The Government will require 24 hour notification prior to any change in schedule or additional inspection requests. Requests for change will require approval of the SSM prior to occurring.

f. Contractor will establish normal operating hours for construction with regards to a normal 5 day work week as previously outlined.

Any extended hours or weekend work will require coordination and approval with both the Contracting Officer and the SSM.

1.5.2 Construction Material Acquisition

a. Unless noted otherwise, all material will be acquired by the Contractor per the FAR requirements.

All construction materials will be ordered through US companies.

1.5.2.1 Secure Storage Area (SSA)

Contractor will provide an SSA. The SSA will be located within the Construction Laydown Area as indicated in the construction drawings. The designated area must be large enough to accommodate storage, sorting, SECTION 01 14 00 Page 3 testing and inspection of construction materials that are stored on site.

The SSA shall be a fenced, secured area with vehicle and personnel gates that are capable of being locked.

Access to/from and activities within the SSA will be conducted by the contractor with prior approval and under the direct supervision of the SST. All material stored at the SSA will be logged by the contractor and coordinated with the CSP.

1.5.3 Site Security

a. The contractor is responsible for the security of the project, including the laydown area, the SSA and the construction site.

The contractor will be required to provide screened fencing and a locked gate for any area associated with the secured area construction

b. The SST will have 24 hour unrestricted access to the on-site construction offices, laydown area, SSA and construction site to conduct security inspections. Contractor will provide the SST with keys for all locks and locked spaces related to the construction site.

c. Personnel observed working during non-duty hours without prior SST approval will be subject to removal by the SST in coordination with Base Security. Any rework resulting from unauthorized work will be done at no additional cost to the Government.

1.5.4 CONSTRUCTION WORKFORCE

The Workforce will be comprised of US citizens or individuals who have been lawfully admitted for permanent residence as defined in 8 U.S.C 1101(a)(20).

1.5.5 PERSONNEL IDENTIFICATION

The Contractor will be required to provide all persons on site with a project specific identification badge. The badges must be serialized and documented in a control log. At the start of the project, the printed badges and control log will be handed over to the SST personnel on site for distribution and control. The badge must be worn on the person's chest and remain visible at all times. Any person observed on site without appropriate badges will be removed from the project site in coordination with Base Security.

1.5.5.1 BADGING SYSTEM

a. Permanent Site Personnel - General Construction Site

b. U.S. TOP SECRET Personnel - Green site badge with photo

c. U.S. SECRET Personnel - Blue site badge with photo

d. Vetted Local Nationals - Red site badge with photo

e. Cleared Photographer with Camera - Yellow site badge with words "Camera"

SECTION 01 14 00 Page 4

1.5.6 ON-SITE PHOTOGRAPHY

The Contractor will not be allowed to take photographs at any time on this project site. Photographs may be provided by the Government at the AO's discretion.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 5

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

08/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

View Location Map; G, AE

Progress and Completion Pictures; G, AE

SD-04 Samples

Color Boards; G, RO

1.3 COLOR BOARDS FOR AIR FORCE PROJECTS

Submit five sets of color boards within 90 calendar days after Contract Award. Each set of boards must include samples of colors and finishes of interior surfaces, such as walls, floors, and ceilings. Present the samples on 8 by 10-1/2 inches boards (modules) with a maximum spread of 24 by 31-1/2 inches for foldouts. Design modules to fit in a standard loose-leaf, three-ring binder. Where special finishes such as architectural concrete, carpet, or prefinished textured metal panels are required, submit samples not less than 12 inches square with the board.

If more space is needed, more than one board per set may be submitted.

Certify that the color samples have been reviewed in detail, and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated. Submittal of color samples does not relieve the Contractor of the responsibility to submit samples required elsewhere herein.

SECTION 01 30 00 Page 1

1.4 VIEW LOCATION MAP

Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.

1.5 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Include aerial photographs. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.

1.6 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by Virginia law.

1.7 SUPERVISION

1.7.1 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.

1.7.2 Superintendent Qualifications

The project superintendent must have a minimum of 15 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings.