This solicitation is for a consolidated operations and maintenance hangar to be constructed at Joint Base Langley-Eustis in Virginia. The project involves constructing a six-bay high-bay hangar with over 15,000 square meters of space to provide maintenance support for additional F-22A aircraft relocated from Tyndall Air Force Base. The facility will house various maintenance spaces along with administrative areas, a propulsion shop, ready room, break room, tool and parts storage, wheel/tire shop, egress shop, restrooms, and building systems spaces. Site work will include utilities, pavements, security features, and demolition of an existing 7,400 square meter facility. The design must comply with DoD sustainability and antiterrorism criteria. The performance period is 700 calendar days from notice to proceed unless option CLIN 0013 is exercised, extending the period to 565 days. Responses are requested for evaluation Factors 1 and 2 only at this time per the bifurcated solicitation process.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F22 Consolidated Operations and Maintenance Hangar Joint Base Langley-Eustis (JBLE)
W91236-21-R-2003
ATTACHMENT 2
COMPANY SPECIALIZED EXPERIENCE
Provide the following information to show examples of recent and relevant projects your company constructed in accordance with the solicitation requirements.
(a) Type of Facility:
(b) Your Firm’s Name:
(c) Name of Project:
(d) Location of Project:
(e) Owner:
(f) Type of Delivery (Design-Bid-Build or Design-Build):
(g) General Scope of Project:
(h) Your Role (Prime, Joint Venture Partner, Subcontractor, etc.) and Work Your Company Self-Performed:
(i) Dates Construction: Began:____________ Completed:______________ ;
(j) Construction Cost:
(k) Type and Extent of Work You Subcontracted Out:
(l) Were You Terminated or Assessed Liquidated Damages? (If either is “Yes”, attach an Explanation)
(m) Owner’s Point of Contact (POC) for Reference (Name and Company):
(n) Current Telephone Number of Reference POC:
(o) Describe the project in accordance with the submittal requirements as defined under Factor 1 – Specialized Experience, paragraph 5.2
| ATTACHMENT 2 |
| COMPANY SPECIALIZED EXPERIENCE |