This solicitation is for the construction of a six-bay high-bay consolidated operations and maintenance hangar at Langley Air Force Base to provide maintenance support for additional F-22A aircraft from Tyndall Air Force Base. The facility will include hangar bays, staff administration, a propulsion shop, ready room, break room, tools/parts support, aircraft maintenance equipment storage, wheel/tire shop, egress shop, restrooms, showers, lockers, and building systems support. The project scope also includes site improvements, pavements, detection/protection features, security enhancements, utilities, and other supporting work to deliver a complete and useable facility. The facility design must meet seismic and wind requirements outlined in applicable codes and design guides. Responses to the bifurcated solicitation are requested at this time for Factors 1 and 2, with the Department of the Army Corps of Engineers Engineering District Norfolk listed as the issuing agency. The project duration is 700 calendar days from notice to proceed unless CLIN 0013 is exercised, then the completion date is 565 days from notice to proceed.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR
Langley Air Force Base
W91236-21-R-2003
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
- APPENDIX TO 00 01 15: LIST OF DRAWINGS
00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
- APPENDIX TO 01 11 00: GOVERNMENT FURNISHED EQUIPMENT LIST
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
- APPENDIX TO 01 33 29: SUSTAINABILITY SCORECARD
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
- APPENDIX 1 TO 01 45 35: SCHEDULE OF SPECIAL INSPECTIONS
- APPENDIX 2 TO 01 45 35: STATEMENT OF SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 13.00 22 EROSION AND SEDIMENT CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
- APPENDIX TO 01 57 19: JBLE-LANGLEY ENVIROMENTAL SPECIAL
CONDITIONS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
- APPENDIX TO 01 91 00.15 10: CONSTRUCTION PHASE
COMMISSIONING PLAN
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 42 91 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
- APPENDIX TO 02 81 00: HAZARDOUS MATERIALS LIST
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
PROJECT TABLE OF CONTENTS Page 2
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER FOR AIR TIGHTNESS SYSTEM
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 21 29 SPRAY ON ACOUSTICAL INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
07 71 00 ROOF SPECIALTIES
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 45 23 2-3/4 INCH INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL
SYSTEM
08 56 19 PASS WINDOWS
08 71 00 DOOR HARDWARE
- APPENDIX TO 08 71 00: HARDWARE LIST
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 26 RETRACTABLE THERMAL CURTAIN
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED)
10 73 16 ALUMINUM CANOPY
10 81 13 BIRD CONTROL DEVICES
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
12 61 13 UPHOLSTERED AUDIENCE SEATING
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
PROJECT TABLE OF CONTENTS Page 4
23 09 00 HVAC CONTROLS CONFIGURATION AND GENERAL REQUIREMENTS
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL
SYSTEMS
23 11 20 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED HVAC CONTROL SYSTEMS
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED FIRE ALARM
CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
- APPENDIX TO 26 24 13: ADVANCED METERING READING SYSTEM
(AMRS)
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 TELEVISION DISTRIBUTION SYSTEM
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 40 10 AUDIO-VISUAL GENERAL
27 40 90.01 AUDIO-VISUAL PERFORMANCE VERIFICATION
27 41 05 AUDIO-VISUAL EQUIPMENT ENCLOSURES AND TECHNICAL FURNITURE
27 41 06 AUDIO-VISUAL POWER DISTRIBUTION AND MANAGEMENT EQUIPMENT
27 41 10 MICROPHONES, CONFERENCING SYSTEM, AND AUDIO SOURCE
EQUIPMENT
27 41 11 AUTOMATED MIXING, PROCESSING AND AMPLIFICATION EQUIPMENT
27 41 13 REINFORCEMENT AND PROGRAM AUDIO LOUDSPEAKERS
27 41 23 VIDEO DISPLAY EQUIPMENT
27 41 26 PROJECTION SCREENS
27 41 31 AUDIO-VISUAL CONTROL SYSTEMS AND PROGRAMMING
27 41 32 AUDIO-VISUAL NETWORK EQUIPMENT
27 41 40 AUDIO-VISUAL CABLING AND CONNECTORS.
27 51 16 PUBLIC ADDRESS SYSTEMS
PROJECT TABLE OF CONTENTS Page 5
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
- APPENDIX TO 31 00 00: GEOTECHNICAL REPORT
31 05 19 GEOTEXTILE
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE FOR RIGID PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK COAT
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR SITE FACILITIES
14.13
INCLUDING SIGNAGE
CONCRETE PAVING FOR AIRFIELDS AND
OTHER HEAVY DUTY
73.19
PAVEMENTS
COMPRESSION CONCRETE PAVING JOINT
SEALANT
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 ORNAMENTAL FENCE AND GATES
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 05 PUMPED WASTE DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 46 13 FOUNDATION DRAINAGE
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR W91236-21-R-2003
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are listed in the Appendix at the end of this specification section
1.3 SUPPLEMENTARY DATA
These supplementary data may not be a part of the contract but are included for information.
1.3.1 Boring Logs
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
Subsurface data, not specified or indicated, have been obtained by the Government at this station. .
1.3.2 Subsurface Data
The soils report is included as part of the solicitation.
-- End of Document --
DOCUMENT 00 01 15 Page 1
SHEET NUMBER SHEET NAME
00. GENERAL
G-001 COVER SHEET
G-002 DRAWING INDEX
G-003 DRAWING INDEX
G-004 CODE COMPLIANCE SUMMARY
G-005 OCCUPANCY SUMMARY
G-006 CODE COMPLIANCE SITE PLAN
G-007 FIRST FLOOR LIFE SAFETY PLAN
G-008 SECOND FLOOR LIFE SAFETY PLAN
PH101 CONSTRUCTION SEQUENCING PLANS
PH102 CONSTRUCTION SEQUENCING PLANS
PH103 CONSTRUCTION SEQUENCING PLANS
AD101 OVERALL FIRST FLOOR DEMOLITION PLAN
AD102 OVERALL SECOND FLOOR DEMOLITION PLAN
AD103 OVERALL ROOF DEMOLITION PLAN
02. SURVEY / MAPPING
VF001 LEGENDS AND NOTES
VF100 OVERALL EXISTING CONDITIONS
VF101 EXISTING CONDITIONS
VF102 EXISTING CONDITIONS
VF103 EXISTING CONDITIONS
VF104 EXISTING CONDITIONS
04.CIVIL
C-001 LEGEND AND GENERAL NOTES
C-002 CONSTRUCTION ACCESS PLAN
C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL
C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL
C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN
C-006 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN
C-007 EROSION AND SEDIMENT CONTROL - PHASE 4 PLAN
C-008 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN INITIAL
C-009 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN FINAL
CD001 DEMOLITION LEGEND & NOTES
CD100 EXISTING CONDITIONS - OVERALL
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CD103 DEMOLITION PLAN
CD104 DEMOLITION PLAN
CD701 COMH DEMOLITION PHOTOGRAPH PLAN
CD702 COMH DEMOLITION PHOTOGRAPHS
CS001 SITE LAYOUT LEGEND & CONTROL POINTS
CS101 SITE LAYOUT PLAN
CS102 SITE LAYOUT PLAN
CS103 SITE LAYOUT PLAN
CS104 SITE LAYOUT PLAN
CG001 GRADING LEGEND, STORM SCHEDULES & NOTES
CG101 GRADING & DRAINAGE PLAN
CG102 GRADING & DRAINAGE PLAN
CG103 GRADING & DRAINAGE PLAN
CG104 GRADING & DRAINAGE PLAN
CG201 STORM PROFILES
CG202 STORM PROFILES
CG203 STORM PROFILES
CG700 POST DEVELOPMENT DRAINAGE AREA PLAN
CG701 STORMWATER MANAGEMENT CALCULATIONS
00 01 15 APPENDIX - DRAWING LIST
CG702 STORMWATER MANAGEMENT CALCULATIONS
CG703 STORMWATER MANAGEMENT CALCULATIONS
CG704 STORMWATER MANAGEMENT CALCULATIONS
CU001 UTILITY LEGEND, CONTROL POINTS, & SCHEDULES
CU101 UTILITY PLAN
CU102 UTILITY PLAN
CU103 UTILITY PLAN
CU104 UTILITY PLAN
CU201 UTILITY PROFILES
CU202 UTILITY PROFILES
C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-505 EROSION AND SEDIMENT CONTROL DETAILS
C-506 DETAILS
C-507 DETAILS
C-508 DETAILS
C-509 DETAILS
C-510 DETAILS
C-511 DETAILS
C-512 DETAILS
C-513 DETAILS
C-514 DETAILS
C-515 DETAILS
C-516 DETAILS
C-517 DETAILS
C-518 DETAILS
C-519 DETAILS
CP101 APRON GEOMETRY PLAN
CP201 APRON JOINT LAYOUT PLAN
CP301 APRON SPOT ELEVATION PLAN
CP401 APRON TYPICAL SECTIONS
CP501 APRON JOINT DETAILS
CP502 APRON JOINT DETAILS
CP503 APRON JOINT DETAILS
CM101 APRON MARKING PLAN
CM501 APRON MARKING DETAILS
05. LANDSCAPE
L-101 LANDSCAPE PLAN
L-102 LANDSCAPE PLAN
L-103 LANDSCAPE PLAN
L-104 LANDSCAPE PLAN
L-105 LANDSCAPE PLAN
L-106 LANDSCAPE PLAN
L-107 LANDSCAPE PLAN
L-501 LANDSCAPE DETAILS
06. STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 LEGEND AND ABBREVIATIONS
S-010 AREA LOAD PLAN
S-011 ROOF WIND UPLIFT PLAN
SB101 FOUNDATION PLAN - OVERALL
SB101A FOUNDATION PLAN - AREA A
SB101B FOUNDATION PLAN - AREA B
SB101C FOUNDATION PLAN - AREA C
SB101D FOUNDATION PLAN - AREA D
SB102 SLAB PLAN - OVERALL
SB102A SLAB PLAN - AREA A
SB102B SLAB PLAN - AREA B
SB102C SLAB PLAN - AREA C
SB102D SLAB PLAN - AREA D
SF111 SECOND FLOOR AND LOW ROOF FRAMING PLAN - OVERALL
SF111A LOW ROOF FRAMING PLAN - AREA A
SF111B LOW ROOF FRAMING PLAN - AREA B
SF111C SECOND FLOOR FRAMING PLAN - AREA C
SF111D SECOND FLOOR FRAMING PLAN - AREA D
SF121 ROOF FRAMING PLAN - OVERALL
SF121A ROOF FRAMING PLAN - AREA A
SF121B ROOF FRAMING PLAN - AREA B
SF121C ROOF FRAMING PLAN - AREA C
SF121D ROOF FRAMING PLAN - AREA D
S-201 FRAMING ELEVATIONS
S-202 FRAMING ELEVATIONS
S-203 FRAMING ELEVATIONS
S-204 HANGAR TRUSS ELEVATIONS
S-205 HANGER TRUSS ELEVATION AND DETAILS
S-301 BUILDING SECTIONS
S-302 BUILDING SECTIONS
S-303 WALL SECTIONS
S-311 FOUNDATION SECTIONS
S-321 ROOF FRAMING SECTIONS
S-401 ENLARGED PLANS
S-501 FOUNDATION DETAILS
S-502 FOUNDATION DETAILS
S-503 TYPICAL HANGAR SLAB DETAILS
S-504 TYP CMU DETAILS
S-505 TYP CMU DETAILS
S-506 MECHANICAL ENCLOSURE DETAILS
S-507 SLAB DETAILS
S-508 METAL STUD WALL DETAILS
S-509 STRUCTURAL SITE DETAILS
S-510 CMU DETAILS
S-511 TYPICAL FRAMING DETAILS
S-512 TYPICAL FRAMING DETAILS
S-513 ROOF FRAMING DETAILS
S-514 MISC. FRAMING DETAILS
S-515 TRUSS DETAILS
S-516 ELEVATOR SHAFT SECTIONS AND DETAILS
S-521 FRAMING ELEVATION DETAILS SHEET 1
S-522 FRAMING ELEVATION DETAILS SHEET 2
S-523 FRAMING ELEVATION DETAILS SHEET 3
S-601 REBAR SCHEDULES
S-602 SCHEDULES
S-603 COLUMN SCHEDULE
S-901 3D ISOMETRICS
07. ARCHITECTURAL
A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
A-002 ABA ACCESSIBILITY GUIDELINES
A-003 ABA ACCESS PLAN - FIRST FLOOR
A-004 ABA ACCESS PLAN - SECOND FLOOR
A-005 AIRCRAFT CLEARANCE REQUIREMENT SECTION
A-006 SECURE AREA PLANS
A-007 ACOUSTIC PARTITIONS PLAN - FIRST FLOOR
A-008 ACOUSTIC PARTITIONS PLAN - SECOND FLOOR
A-009 PARTITION TYPES
A-010 PARTITION HEAD CONDITIONS
A-011 PENETRATION DETAILS
A-012 PENETRATION DETAILS
A-013 PENETRATION DETAILS
A-015 EQUIPMENT SCHEDULE
AS101 ARCHITECTURAL SITE PLAN
AS401 ENLARGED ARCHITECTURAL SITE PLAN
AS402 ARCHITECTURAL SITE DETAILS
AS501 ENLARGED MECHANICAL YARD DETAILS
AS502 ENLARGED DUMPSTER ENCLOSURE DETAILS
A-101 FIRST FLOOR PLAN - OVERALL
A101A FIRST FLOOR PLAN - AREA A
A101B FIRST FLOOR PLAN - AREA B
A101C FIRST FLOOR PLAN - AREA C
A101D FIRST FLOOR PLAN - AREA D
A-102 SECOND FLOOR PLAN - OVERALL
A102A SECOND FLOOR PLAN - AREA A
A102B SECOND FLOOR PLAN - AREA B
A102C SECOND FLOOR PLAN - AREA C
A102D SECOND FLOOR PLAN - AREA D
A-121 ROOF PLAN - OVERALL
A121A ROOF PLAN - AREA A
A121B ROOF PLAN - AREA B
A121C ROOF PLAN - AREA C
A121D ROOF PLAN - AREA D
A-131 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL
A131A FIRST FLOOR REFLECTED CEILING PLAN-AREA A
A131B FIRST FLOOR REFLECTED CEILING PLAN-AREA B
A131C FIRST FLOOR REFLECTED CEILING PLAN-AREA C
A131D FIRST FLOOR REFLECTED CEILING PLAN-AREA D
A-132 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL
A132A SECOND FLOOR REFLECTED CEILING PLAN - AREA A
A132B SECOND FLOOR REFLECTED CEILING PLAN - AREA B
A132C SECOND FLOOR REFLECTED CEILING PLAN - AREA C
A132D SECOND FLOOR REFLECTED CEILING PLAN - AREA D
A-141 FIRST FLOOR AIR BARRIER PLAN
A-142 SECOND FLOOR AIR BARRIER PLAN
A-143 BUILDING SECTIONS - AIR BARRIER
A-201 BUILDING ELEVATIONS
A-202 BUILDING ELEVATIONS
A-203 BUILDING ELEVATIONS
A-204 BUILDING ELEVATIONS
A-211 PARTIAL BUILDING ELEVATIONS
A-212 PARTIAL BUILDING ELEVATIONS
A-213 PARTIAL BUILDING ELEVATIONS
A-221 EXPANSION JOINTS LAYOUT - ELEVATIONS
A-222 EXPANSION JOINTS LAYOUT - ELEVATIONS
A-223 EXPANSION JOINTS LAYOUT - ELEVATIONS
A-230 PRECAST CONCRETE PROFILES - ELEVATIONS
A-231 PRECAST CONCRETE PROFILES - ELEVATIONS
A-232 PRECAST CONCRETE PROFILES - ELEVATIONS
A-301 BUILDING SECTION
A-302 BUILDING SECTION
A-311 EXTERIOR WALL SECTIONS
A-312 EXTERIOR WALL SECTIONS
A-313 EXTERIOR WALL SECTIONS
A-314 EXTERIOR WALL SECTIONS & DIAGRAMS
A-401 ENLARGED PLANS
A-402 ENLARGED PLANS
A-403 ENLARGED PLANS
A-404 ENLARGED PLANS -AIR SHOWERS
A-410 INTERIOR ELEVATIONS
A-411 INTERIOR ELEVATIONS
A-412 INTERIOR ELEVATIONS
A-413 INTERIOR ELEVATIONS
A-414 INTERIOR ELEVATIONS
A-415 INTERIOR ELEVATIONS
A-421 INTERIOR MILLWORK SECTIONS AND DETAILS
A-451 VERTICAL CIRCULATION - PLANS
A-452 VERTICAL CIRCULATION - SECTIONS
A-453 VERTICAL CIRCULATION - DETAILS
A-461 VERTICAL CIRCULATION - ELEVATOR PLANS
A-462 VERTICAL CIRCULATION - SECTIONS
A-463 VERTICAL CIRCULATION - ELEVATOR DETAILS
A-470 VERTICAL CIRCULATION - ROOF LADDERS
A-501 HANGAR DOOR DETAILS
A-502 HANGAR DOOR DETAILS
A-503 HANGAR DOOR DETAILS
A-504 HANGAR DOOR DETAILS
A-505 PLAN DETAILS
A-506 PLAN DETAILS
A-507 PLAN DETAILS
A-511 CEILING DETAILS
A-521 SECTION DETAILS
A-522 SECTION DETAILS
A-531 ROOF DETAILS
A-532 ROOF DETAILS
A-533 ROOF DETAILS
A-534 ROOF DETAILS
A-535 ROOF DETAILS
A-536 ROOF DETAILS
A-537 ROOF DETAILS
A-541 INTERIOR DETAILS
A-542 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN
A-543 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN
A-544 HANGAR SLAB DETAILS
A-545 HANGAR SLAB DETAILS
A-546 HANGAR SLAB DETAILS
A-547 HANGAR SLAB DETAILS
A-548 HANGAR SLAB DETAILS
A-549 HANGAR SLAB DETAILS
A-553 PRECAST CONCRETE PROFILES - DETAILS
A-554 PRECAST CONCRETE PROFILES - DETAILS
A-560 SEISMIC JOINT DETAILS
A-562 EXPANSION JOINTS DETAILS
A-570 CANOPY DETAILS
A-601 DOOR & FRAME TYPES
A-602 DOOR SCHEDULE
A-603 EXTERIOR DOOR DETAILS
A-604 EXTERIOR DOOR DETAILS
A-605 INTERIOR DOOR DETAILS
A-611 WINDOW & FRAME TYPES
A-612 WINDOW & FRAME TYPES
A-613 LOUVER TYPES
A-614 WINDOW DETAILS
A-615 WINDOW DETAILS
A-616 IMP DETAILS
A-617 IMP DETAILS
A-801 HANGAR MARKINGS PLAN - OVERALL
A-802 ENLARGED HANGAR MARKINGS PLAN
08. INTERIOR DESIGN
I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL
I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A
I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B
I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C
I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D
I-102 SECOND FLOOR INTERIOR FINISH PLAN - OVERALL
I102C SECOND FLOOR INTERIOR FINISH PLAN - AREA C
I102D SECOND FLOOR INTERIOR FINISH PLAN - AREA D
I131A FIRST FLOOR SIGNAGE PLAN - AREA A
I131B FIRST FLOOR SIGNAGE PLAN - AREA B
I131C FIRST FLOOR SIGNAGE PLAN - AREA C
I131D FIRST FLOOR SIGNAGE PLAN - AREA D
I132C SECOND FLOOR SIGNAGE PLAN - AREA C
I132D SECOND FLOOR SIGNAGE PLAN - AREA D
I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES
I-602 TRANSITION DETAILS
I-621 SIGNAGE SCHEDULE
I-622 SIGNAGE SCHEDULE
I-631 SIGNAGE DETAILS
I-632 SIGNAGE DETAILS
I-633 SIGNAGE DETAILS
08. INTERIORS
IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL
IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A
IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B
IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C
IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D
IF102 SECOND FLOOR INTERIOR FURNITURE PLAN - OVERALL
IF102C SECOND FLOOR INTERIOR FURNITURE PLAN - AREA C
IF102D SECOND FLOOR INTERIOR FURNITURE PLAN - AREA D
10. FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL
FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A
FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B
FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C
FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D
FA102 SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL
FA102A SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A
FA102B SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B
FA102C SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C
FA102D SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D
FA501 FIRE ALARM DETAILS
FA502 FIRE ALARM DETAILS
FA601 FIRE ALARM SEQUENCE OF OPERATIONS
FA701 FIRE ALARM RISER DIAGRAMS
10. FIRE PROTECTION
FX001 FIRE SUPPRESSION GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL
FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A
FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B
FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C
FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D
FX102 SECOND FLOOR FIRE SUPPRESSION PLAN - OVERALL
FX102A SECOND FLOOR FIRE SUPPRESSION PLAN - AREA A
FX102B SECOND FLOOR FIRE SUPPRESSION PLAN - AREA B
FX102C SECOND FLOOR FIRE SUPPRESSION PLAN - AREA C
FX102D SECOND FLOOR FIRE SUPPRESSION PLAN - AREA D
FX401 FIRE PROTECTION ENLARGED PLANS
FX501 FIRE PROTECTION DETAILS
11. PLUMBING
P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
P-101 UNDERFLOOR PLUMBING PLAN - OVERALL
P101A UNDERFLOOR PLUMBING PLAN - AREA A
P101B UNDERFLOOR PLUMBING PLAN - AREA B
P101C UNDERFLOOR PLUMBING PLAN - AREA C
P101D UNDERFLOOR PLUMBING PLAN - AREA D
P-110 FIRST FLOOR PLUMBING PLAN - OVERALL
P110A FIRST FLOOR PLUMBING PLAN - AREA A
P110B FIRST FLOOR PLUMBING PLAN - AREA B
P110C FIRST FLOOR PLUMBING PLAN - AREA C
P110D FIRST FLOOR PLUMBING PLAN - AREA D
P-120 SECOND FLOOR PLUMBING PLAN - OVERALL
P120A SECOND FLOOR PLUMBING PLAN - AREA C
P120B SECOND FLOOR PLUMBING PLAN - AREA D
P-401 ENLARGED PLAN - FIRST FLOOR WOMENS/MEN LOCKER ROOM
P-402 ENLARGED PLAN - SECOND FLOOR WOMENS/MEN LOCKER ROOM
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-701 PLUMBING DIAGRAMS
P-702 PLUMBING DIAGRAMS
P-703 PLUMBING DIAGRAMS
13. MECHANICAL
M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
MS101 MECHANICAL SITE PLAN
MS102 MECHANICAL SITE PLAN
MP101 FIRST FLOOR PIPING PLAN- OVERALL
MP101A FIRST FLOOR PIPING PLAN - AREA A
MP101B FIRST FLOOR PIPING PLAN - AREA B
MP101C FIRST FLOOR PIPING PLAN - AREA C
MP101D FIRST FLOOR PIPING PLAN - AREA D
MP102 SECOND FLOOR PIPING PLAN - OVERALL
MP102C SECOND FLOOR PIPING PLAN - AREA C
MP102D SECOND FLOOR PIPING PLAN - AREA D
MH101 FIRST FLOOR VENTILATION PLAN - OVERALL
MH101A FIRST FLOOR VENTILATION PLAN - AREA A
MH101B FIRST FLOOR VENTILATION PLAN - AREA B
MH101C FIRST FLOOR VENTILATION PLAN - AREA C
MH101D FIRST FLOOR VENTILATION PLAN - AREA D
MH102 SECOND FLOOR VENTILATION PLAN - OVERALL
MH102C SECOND FLOOR VENTILATION PLAN - AREA C
MH102D SECOND FLOOR VENTILATION PLAN - AREA D
M-110 MECHANICAL ROOF PLAN
M-301 SECTIONS - MECHANICAL
M-302 SECTIONS - AIR HANDLING EQUIPMENT
M-303 SECTIONS - HANGAR BAY
M-401 FIRST FLOOR ENLARGED MECHANICAL ROOM
M-501 DETAILS - HEATING
M-502 DETAILS - VENTILATION
M-503 DETAILS - HEATING
M-504 DETAILS - MECHANICAL
M-601 SCHEDULES - HEATING/COOLING
M-602 SCHEDULES - HEATING/COOLING
M-603 SCHEDULES - HEATING/COOLING
M-604 SCHEDULES - HEATING/COOLING
M-701 DIAGRAMS - HEATING/COOLING
M-801 CONTROL SEQUENCES
M-802 CONTROL SEQUENCES
M-803 CONTROL SEQUENCES
M-804 CONTROL SEQUENCES
M-805 CONTROL SEQUENCES
M-806 CONTROL SEQUENCES
M-807 CONTROL SEQUENCES
M-808 CONTROL SEQUENCES
M-809 CONTROL SEQUENCES
M-810 CONTROL SEQUENCES
M-811 CONTROL SEQUENCES
M-812 CONTROL SEQUENCES
14. ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
E-002 ELECTRICAL GENERAL NOTES
E-003 AREA CLASSIFICATIONS PLAN
ED101 DEMOLITION SITE PLAN
ED102 DEMOLITION SITE PLAN
ES101 ELECTRICAL SITE PLAN
ES102 ELECTRICAL SITE PLAN
ES501 SITE DETAILS
ES502 SITE DETAILS
ES503 SITE DETAILS
ES701 ELECTRICAL ONE LINE DIAGRAM
ES702 ELECTRICAL ONE LINE DIAGRAM
ES703 ELECTRICAL ONE-LINE DIAGRAM
EL101 FIRST FLOOR LIGHTING PLAN - OVERALL
EL101A FIRST FLOOR LIGHTING PLAN - AREA A
EL101B FIRST FLOOR LIGHTING PLAN - AREA B
EL101C FIRST FLOOR LIGHTING PLAN - AREA C
EL101D FIRST FLOOR LIGHTING PLAN - AREA D
EL102 SECOND FLOOR LIGHTING PLAN - OVERALL
EL102A SECOND FLOOR LIGHTING PLAN - AREA A
EL102B SECOND FLOOR LIGHTING PLAN - AREA B
EL102C SECOND FLOOR LIGHTING PLAN - AREA C
EL102D SECOND FLOOR LIGHTING PLAN - AREA D
EL103 ROOF LIGHTING PLAN - OVERALL
EP101 FIRST FLOOR POWER PLAN - OVERALL
EP101A FIRST FLOOR POWER PLAN - AREA A
EP101B FIRST FLOOR POWER PLAN - AREA B
EP101C FIRST FLOOR POWER PLAN - AREA C
EP101D FIRST FLOOR POWER PLAN - AREA D
EP102 SECOND FLOOR POWER PLAN - OVERALL
EP102A SECOND FLOOR POWER PLAN - AREA A
EP102B SECOND FLOOR POWER PLAN - AREA B
EP102C SECOND FLOOR POWER PLAN - AREA C
EP102D SECOND FLOOR POWER PLAN - AREA D
EP103 ROOF POWER PLAN - OVERALL
EG101 FIRST FLOOR OVERALL GROUNDING PLAN
EG103 LIGHTNING PROTECTION OVERALL PLAN
E-401 ENLARGED ELECTRICAL PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-505 ELECTRICAL DETAILS
E-506 ELECTRICAL DETAILS
E-601 LIGHTING SCHEDULES
E-602 EQUIPMENT CONNECTION SCHEDULES
E-603 EQUIPMENT CONNECTION SCHEDULES
E-604 ELECTRICAL CONNECTION SCHEDULES
E-605 PANEL SCHEDULES
E-606 PANEL SCHEDULES
E-607 PANEL SCHEDULES
E-608 PANEL SCHEDULES
E-609 PANEL SCHEDULES
E-610 PANEL SCHEDULES
E-611 PANEL SCHEDULES
E-612 PANEL SCHEDULES
E-613 PANEL SCHEDULES
E-701 ELECTRICAL ONE-LINE DIAGRAM
E-702 GROUNDING RISER DIAGRAM
E-703 SWITCHBOARD ELEVATIONS
16. TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
TD101 TELECOMMUNICATIONS DEMOLITION SITE PLAN
TS101 TELECOMMUNICATIONS SITE PLAN
TS501 TELECOMMUNICATIONS DETAILS
T-101 FIRST FLOOR TELECOMMUNICATIONS PLAN - OVERALL
T-101A FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A
T-101B FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B
T-101C FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C
T-101D FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA D
T-102 SECOND FLOOR TELECOMMUNICATIONS PLAN - OVERALL
T-102A SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA A
T-102B SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA B
T-102C SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA C
T-102D SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA D
T-103 ROOF TELECOMMUNICATIONS PLAN - OVERALL
T-111 FIRST FLOOR TELECOMMUNICATION DIAMOND STUDY PLAN - OVERALL
T-112 SECOND FLOOR TELECOMMUNICATIONS DIAMOND STUDY PLAN - OVERALL
T-121 FIRST FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL
T-122 SECOND FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL
T-401 ENLARGED TELECOMMUNICATIONS PLANS
T-501 TELECOM SERVICE ENTRANCE ELEVATION
T-502 TELECOM SERVICE ENTERANCE ELEVATION
T-503 TELECOM SERVICE ENTRANCE ELEVATION
T-504 TELECOM SERVICE ENTRANCE ELEVATION
T-505 TELECOMMUNICATIONS DETAILS
T-506 TELECOMMUNICATIONS DETAILS
T-507 TELECOMMUNICATIONS DETAILS
T-508 TELECOMMUNICATIONS DETAILS
T-509 TELECOMMUNICATIONS DETAILS
T-700 FIBER COMMUNICATIONS OSP DIAGRAM
T-701 TELECOMMUNICATIONS RISER DIAGRAM
T-702 TELECOMMUNICATIONS RACK ELEVATIONS
T-703 TELECOMMUNICATIONS RACK ELEVATIONS
T-704 TELECOMMUNICATIONS RACK ELEVATIONS
T-705 RISER DIAGRAMS
T-706 TELECOMMUNICATIONS GROUNDING RISER DIAGRAM
X-001 SECURITY SYMBOLS LEGEND AND ABBREVIATIONS
X-101 FIRST FLOOR SECURITY PLAN - OVERALL
X-101A FIRST FLOOR SECURITY PLAN - AREA A
X-101B FIRST FLOOR SECURITY PLAN - AREA B
X-101C FIRST FLOOR SECURITY PLAN - AREA C
X-101D FIRST FLOOR SECURITY PLAN - AREA D
X-102 SECOND FLOOR SECURITY PLAN - OVERALL
X-102C SECOND FLOOR SECURITY PLAN - AREA C
X-102D SECOND FLOOR SECURITY PLAN - AREA D
X-501 SECURITY DETAILS
X-502 SECURITY DETAILS
X-503 SECURITY DETAILS
X-701 ACCESS CONTROL AND AIR SHOWER RISER DIAGRAM
X-702 INTRUSION DETECTION SYSTEM RISER DIAGRAM
X-703 CCTV RISER DIAGRAM
17. AUDIO VISUAL
TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
TA101C FIRST FLOOR AUDIO VISUAL PLAN - AREA C
TA101D FIRST FLOOR AUDIO VISUAL PLAN - AREA D
TA102C SECOND FLOOR AUDIO VISUAL PLAN - AREA C
TA102D SECOND FLOOR AUDIO VISUAL PLAN - AREA D
TA201D FIRST FLOOR AUDIO VISUAL RCP - AREA D
TA202C SECOND FLOOR AUDIO VISUAL RCP - AREA C
TA202D SECOND FLOOR AUDIO VISUAL RCP - AREA D
TA400 AUDIO VISUAL ELEVATIONS
TA501 AUDIO VISUAL DETAILS
TA502 AUDIO VISUAL DETAILS
TA601 AUDIO VISUAL SIGNAL FLOWS
TA602 AUDIO VISUAL SIGNAL FLOWS
TA603 AUDIO VISUAL SIGNAL FLOWS
TA604 AUDIO VISUAL SIGNAL FLOWS
TA605 AUDIO VISUAL SIGNAL FLOWS
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
OFFEROR’S NAME:
CONTRACT LINE ITEM SCHEDULE
CLIN Description Unit Unit Amount
Base Proposal
0001 All work, labor, materials, and equipment required to the Consolidated Operations and Maintenance Hangar (COMH), including all building related construction within the 5’ line, complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
LS
0002 All work, labor, materials, and equipment required to construct the COMH site improvements, including all construction outside of the 5’ line, complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
0003 All work, labor, materials, and equipment required to construct electrical service to the new COMH facility including transformer Q051A and medium voltage cabling to transformer by Dominion Energy, complete as prescribed in the in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
0004 All work, labor, materials, and equipment required to construct natural gas service to the new COMH facility by Virginia Natural Gas, including the distribution system to the new facility, the meter, the regulator and all connection fees, complete as prescribed in the in the construction documents excluding work described in all other CLINs. Source of funding is MILCON.
0005 Provide unit price for all work, labor, materials, and equipment required to dispose and replace any unsatisfactory soils, complete as prescribed in the construction documents, excluding work described in all other CLINs. Source of funding is MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217- 7.
For bidding purposes Offeror shall assume 350 cy.
Unit Price for each cubic yard (cy).
cy
Total Base LS
CLIN Description Unit Unit Amount
0006 Bid Option 1 All work, labor, materials, and equipment required to furnish and install Audio-Visual (AV) Equipment complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is NON- MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.
0007 BID OPTION 2
All work, labor, materials, and equipment required to furnish and install Fixtures, Furniture and Equipment (FF&E) complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is NON-MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.
0008 BID OPTION 3
All work, labor, materials, and equipment required to construct the High Mast Airfield Lighting, complete as prescribed in the construction documents excluding work described in all other CLINs. Source of funding is NON- MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.
0009 BID OPTION 4
Provide unit price for all work, labor, materials, and equipment required to provide the two (2) parking areas (ten
(10) diagonal automobile parking spaces) along Danforth Ave, excluding work described in all other CLINs. Source of funding is MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217- 7.
0010 BID OPTION 5
All work, labor, materials, and equipment required to construct electrical infrastructure (concrete pads, manholes, ductwork, etc.) from and including EM85A to Switch Q050, complete as prescribed in the in the construction documents excluding work described in all other CLINs.
Source of funding is MILCON.
0011 BID OPTION 6
All work, labor, materials, and equipment by Dominion Energy required to construct electrical service from and including EM85A to and including connection to Switch Q050, complete as prescribed in the in the construction documents excluding work described in all other CLINs. Source of funding is
MILCON.
CLIN Description Unit Unit Amount
0012 BID OPTION 7
All work, labor, materials, and equipment required to dispose and replace any other-than-clean soil complete as prescribed in the construction documents, including but not limited to specification section 01 57 19 Temporary Environmental Controls 01 57 19 ATTACHMENT JBLE-Langley Environmental Special Conditions para 1.1.2.2, excluding work described in all other CLINs. Source of funding is MILCON. Option to be exercised within 180 days of contract Notice To Proceed in accordance with FAR 52.217-7.
For bidding purposes Offeror shall assume 1 lot equals 250CY and a total quantity of 1 Lot.
Unit Price for each Lot
Lot
0013 BID OPTION 8
Provide unit price for all work, labor, materials, and equipment required to decrease period of performance (PoP) by 135 calendar days, excluding work described in all other CLINs. Source of funding is MILCON. Option to be exercised upon initial award in accordance with FAR 52.217-7.
TOTAL (BASE PLUS OPTIONS) LS
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes demolition of building 753 including foundations, pavements, utilities and miscellaneous site features. Construction of the multi-story Consolidated Operations and Maintenance Hangar (COMH), pavements, utilities and incidental related work.
1.1.2 Location
The work is located along the flightline on Danforth Ave at the location of existing building 753 at Langley Air Force Base/Joint Base Langley-Eustis (JBLE), approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.3 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.
Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
SECTION 01 11 00 Page 1
1.3.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.4 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Pursuant to Contract Clause FAR 52.245-1 Government Property, the Government will furnish the following materials and equipment for installation by the Contractor.
The list is appended to this section.
Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.
Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.
1.4.1 Delivery Schedule
Notify the Contracting Officer in writing at least 120 calendar days in advance of the date on which the materials and equipment are required.
Pick up materials and equipment no later than 30 calendar days after such date.
1.4.2 Delivery Location
The materials and equipment are located within 15 miles of the jobsite.
1.5 OPEN COMPETITION OF PRODUCTS
During design products are identified and validated to meet the necessary technical requirements of the project, and are indicated as "Basis of Design" within the design documents. This does not limit the provision of the products as other products that meet the stated technical requirements are also acceptable. Products listed herein are not intended to be proprietary unless specifically indicated. Alternate products will be evaluated and accepted on the basis of compliance with the salient and performance characteristics of this specification.
1.6 CONCRETE COLOR
Miami Buff is the predominate color used on JBLE.
1.7 ACQUIRING A WORK CLEARANCE REQUEST
(Air Force Form 103) = Dig Permit; Miss Utility then Form 103.
SECTION 01 11 00 Page 2
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
GOVERNMENT FURNISHED EQUIPMENT (GFE)
# ROOM NO. ROOM NAME / LOCATION DESCRIPTION MANUF / MODEL NO. SIZE POWER REQUIREMENTS HVAC REQUIREMENTS PLUMBING REQUIREMENT NOTES / COMMENTS / REMARKS COUNT GFGI GFCI
1 ROOF ANTENNA UHF ANTENNA SURFACE MOUNTED UHF ANTENNA 1 YES
2 133 TIRE STORAGE BEAD BREAKER 8'X8'x8' YES SHOP AIR 2 YES
3 133 TIRE STORAGE TIRE SKIN RACK 9'X3'X8' N/A N/A N/A 3 YES
4 133 TIRE STORAGE WORK BENCH (IMIS STATION) 15'X3' N/A N/A N/A 1 YES
5 134 HAZMAT STORAGE HAZMAT STORAGE 9'x10' AREA 1 YES
6 134 HAZMAT STORAGE HAZMAT STORAGE 10'x3' SHELVING 1 YES
7 135 WORK SPACE HAZMAT LOCKER 2'x4' INDUSTRIAL FLAMMABLE CABINET 1 YES
8 135 WORK SPACE PARTS WASHER 6'X4' YES 1 YES
9 135 WORK SPACE TIRE CAGE 10'X9' AREA YES REQUIRES NITROGEN, ELECTRICAL 1 YES
10 135 WORK SPACE WHEEL WASHER DEGREASER 6'X8' YES 1 YES
11 135 WORK SPACE WHEEL WASHER 8'x8'x8' YES VENTILATION
REQUIRES WATER FEED AND
DRAIN 1 YES
12 137 LO SUPPORT CONSUMABLE STORAGE 2 YES
13 137 LO SUPPORT HAZMAT LOCKER STORAGE 2 YES
14 137 LO SUPPORT LAZER ETCHER 1 YES
15 137 LO SUPPORT TOOLS STORAGE 1 YES
16 137 LO SUPPORT COMPRESED AIR 3'X3' YES
17 155 LOCKERS/ STORAGE STORAGE CONTAINER INDUSTRIAL STORAGE CONTAINERS 6 YES
18 157 OIL LAB JOAP SPECTOMETERS 32"X25"X72" AREA
INPUT VOLTAGE 110/220 VAC
+/- 10%, SINGLE PHASE,
FREQUENCY 50 OR 60 HZ,
CURRENT 15 A,
PROVIDE ALTERNATE POWER
SOURCE
3-EACH EXTERNAL EXHAUST
VENTS; DEDICATED SEPARATE
HVAC SYSTEM:O
75 DEGREE W/ 20%-60%
HUMIDITY N/A
VENTED TO THE OUTSIDE ENVIRONMENT; UP TO 20
FEET (6 METER) OF STANDARD 4-INCH DIAMETER
FLEXIBLE EXHAUST DUCT IS RECOMMENDED; IN ORDER
TO MAINTAIN AMPLE AIRFLOW, IT IS RECOMMENDED
THAT THE LENGTH OF THIS EXHAUST DUCT NOT EXCEED
20 FEET. FOR GREATER DISTANCES, AN ADDITIONAL FAN
MAY BE REQUIRED TO PROVIDE SUPPLEMENTAL AIR
FLOW. 3 YES
19 158 PRIMARY INSPECTION AREA HAZ SITE 1 YES
20 158 PRIMARY INSPECTION AREA MAG UNIT
10’ X 8’ X 10’ PLUS
POWER CONVERTER
BOX NEXT TO IT
APPROXIMATELY
POWER SOURCE: 230V OR
460V, 50/60 HZ, 3 PHASE
ALTERNATING CURRENT;
COMPRESSED AIR SUPPLY OF 30
TO 100PSIG (60 PSIG NOMINAL).
FLUORESCENT MAGNETIC PARTICLE INSPECTION UNIT (
T.O.33B2-65-1 SECTION II) 1 YES
21 158 PRIMARY INSPECTION AREA PENETRANT LINE 50' L x 8' W
230 VOLT 50/60 HZ SINGLE
PHASE INPUT POWER, AND
FUSED FOR 60 AMPERES
ACCESS TO SEWER LINE OR SUMP
IS REQUIRED; STAINLESS STEEL OR
COPPER PIPES;
SOURCE FOR HOT AND COLD
WATER, WITH PRESSURE NOT TO
EXCEED 40 PSIG;
COMPRESSED AIR SUPPLY OF 30
TO 100PSIG (60 PSIG NOMINAL
FLUORESCENT PENETRANT INSPECTION UNIT (T.O. 33B1-
2-5-41 SECTION I) 1 YES
22 158 PRIMARY INSPECTION AREA POWER CONVERTER BOX 3'Wx3'Dx3.5"H 1 YES
23 158 PRIMARY INSPECTION AREA WORK BENCH 1 YES
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
"G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G, RO
1.2 DEFINITIONS
a. Site Security Team (SST): Team of Government representatives responsible for security and inspection of construction activity.
Personnel include the Accrediting Official, Site Security Manager and Construction Surveillance Technician(s).
b. Accrediting Official (AO): US Government employee responsible for all security issues and final security measures acceptance and direction.
c. Site Security Manager (SSM): US Government employee who is on site Point of Contact (POC) for all security matters on the construction site. Responsible for the development and implementation of the Construction Security Plan (CSP) and all coordination with the Accrediting Officer (AO).
d. Construction Surveillance Technician (CST): US Government employees responsible for on-site monitoring of all work activities. CST reports directly to the SSM.
e. Construction Security Plan (CSP): US Government document indicating overarching guidance for all active and passive security measures in effect for this project. The restrictions within this plan is generally, but not necessarily inclusively, outlined within this specification.
1.3 SPECIAL SCHEDULING REQUIREMENTS
a. The Airfieldwill remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
See specification Section 01 35 13 Special Project Procedures for additional information and restrictions.
SECTION 01 14 00 Page 1
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
1.4.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.4.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.4.2 Working Hours
Regular working hours may consist of a 10 hour period between 7 a.m. and 5:00 p.m., Monday through Friday, and 7 a.m. to 3:30 p.m. on Saturday, excluding Government holidays.
1.4.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 30 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.4.4 Occupied Buildings
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
1.4.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
SECTION 01 14 00 Page 2
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
1.5 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:
All work for this project, including access to the SSA,is under the supervision of the Government and the SST. The Government will facilitate coordination between the Contractor and the SST to communicate schedules, inspections and document control. The SST will provide oversight for all security issues during construction and will ensure the requirements of this specification and the CSP are met.
1.5.1 Construction Monitoring
a. All work activities pertaining to the Secure Area and adjacent general construction will require special monitoring and coordination with the SST. Contractor will cooperate and work closely with the SST to ensure all security requirements are met.
b. CST's will monitor all construction activities. Reasonable accommodations shall be made to allow CST's to access, inspect and witness activities at the discretion of the Government.
c. Construction Contractor's NAS Baseline will provide a detailed construction and commissioning schedule with clear milestones to coordinate inspection requirements as identified by the SST.
d. The Contractor's three week look ahead schedule, provided at each QC meeting, will identify upcoming activities requiring security inspection and coordination.
e. The Government will require 24 hour notification prior to any change in schedule or additional inspection requests. Requests for change will require approval of the SSM prior to occurring.
f. Contractor will establish normal operating hours for construction with regards to a normal 5 day work week as previously outlined.
Any extended hours or weekend work will require coordination and approval with both the Contracting Officer and the SSM.
1.5.2 Construction Material Acquisition
a. Unless noted otherwise, all material will be acquired by the Contractor per the FAR requirements.
All construction materials will be ordered through US companies.
1.5.2.1 Secure Storage Area (SSA)
Contractor will provide an SSA. The SSA will be located within the Construction Laydown Area as indicated in the construction drawings. The designated area must be large enough to accommodate storage, sorting, SECTION 01 14 00 Page 3 testing and inspection of construction materials that are stored on site.
The SSA shall be a fenced, secured area with vehicle and personnel gates that are capable of being locked.
Access to/from and activities within the SSA will be conducted by the contractor with prior approval and under the direct supervision of the SST. All material stored at the SSA will be logged by the contractor and coordinated with the CSP.
1.5.3 Site Security
a. The contractor is responsible for the security of the project, including the laydown area, the SSA and the construction site.
The contractor will be required to provide screened fencing and a locked gate for any area associated with the secured area construction
b. The SST will have 24 hour unrestricted access to the on-site construction offices, laydown area, SSA and construction site to conduct security inspections. Contractor will provide the SST with keys for all locks and locked spaces related to the construction site.
c. Personnel observed working during non-duty hours without prior SST approval will be subject to removal by the SST in coordination with Base Security. Any rework resulting from unauthorized work will be done at no additional cost to the Government.
1.5.4 CONSTRUCTION WORKFORCE
The Workforce will be comprised of US citizens or individuals who have been lawfully admitted for permanent residence as defined in 8 U.S.C 1101(a)(20).
1.5.5 PERSONNEL IDENTIFICATION
The Contractor will be required to provide all persons on site with a project specific identification badge. The badges must be serialized and documented in a control log.