Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf

PDF 155 KB Posted

Attached to
F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB
Solicitation number
W9123621R2003
Issued by

About this file

This document contains a solicitation for a consolidated operations and maintenance hangar at Langley Air Force Base. The solicitation seeks construction of a six-bay high-bay hangar with over 15,000 square meters of space to provide maintenance support for additional F-22A aircraft. The facility is to include hangar bays, administration spaces, shops for propulsion, tools and parts, a wheel and tire shop, egress shop, and restrooms. The selected contractor will demolish an existing 7,400 square meter facility. The project duration is 700 calendar days from notice to proceed, with the contract completion date becoming 565 days if an option for additional work is exercised. Responses to factors 1 and 2 of this bifurcated solicitation from the Department of the Army Corps of Engineers Norfolk District are requested.

View the file

Other files

File Type Posted
W9123621R2003_0016.pdf PDF
W9123621R2003_0015.pdf PDF
W9123621R2003_0014.pdf PDF
W9123621R2003_0013.pdf PDF
W9123621R2003_0012.pdf PDF
Attachment 8 - CLIN Schedule_REVISION 1 on 01.05.2022.pdf PDF
AMENDMENT 0011_21 DEC 21 - Drawings.pdf PDF
Amend 0011_23 09 23_Amended V2.pdf PDF
Amend 0011_07 61 14.00 20_Amended.pdf PDF
W9123621R2003_0011.pdf PDF
Attachment 16 - Construction Security Plan (CSP).pdf PDF
Attachment 17 - Installation Restoration Program (IRP) Background Chem Data.pdf PDF
COMH Amended Drawings_14 DEC 2021.pdf PDF
W9123621R2003_0010.pdf PDF
COMH Amended Specs_14 DEC 2021_Combined.pdf PDF
A.07.23 - Solicitation COMH W9123621R2003 0009.pdf PDF
W9123621R2003_0008.pdf PDF
COMH Tech Amendment 0007 - 01 57 13.00 22_Amended.pdf PDF
COMH Tech Amendment 0007 - AMENDMENT 19 NOV 21 - Drawings.pdf PDF
COMH Tech Amendment 0007 - 07 27 19.01_Amended.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0007.pdf PDF
08 71 00_Amended 006.pdf PDF
W9123621R2003 Amendment 0006.pdf PDF
A.07.20 - Site Visit Sign-in Log - Dtd 20 Oct 2021_1Page.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0005.pdf PDF
Attachment 12 - COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf PDF
Attachment 11 - COMH_RTA_Design Drawings_Part 2 of 3_17MAR21.pdf PDF
Attachment 13 - COMH_RTA_Specifications part 1 of 1_17MAR21.pdf PDF
Attachment 10 - COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf PDF
Attachment 15 - COMH - RTA SID_17MAR21.pdf PDF
Attachment 14 - COMH - RTA FFE_17MAR21.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0004.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0003.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0002.pdf PDF
W9123621R2003 - 0001 - COMH.pdf PDF
Attachment 12 - COMH - Final Design Drawings Part 3 of 3.pdf PDF
Attachment 9 - Langley Environmental Management Special Conditions.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation W9123621R2003 - COMH.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Attachment 13 - COMH Final Design Specifications Part 1 of 1.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 10 - COMH - Final Design Drawings Part 1 of 3.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 11 - COMH - Final Design Drawings Part 2 of 3.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F22 Consolidated Operations and Maintenance Hangar Joint Base Langley-Eustis (JBLE)

W91236-21-R-2003

ATTACHMENT 4

TELEPHONE INTERVIEW QUESTIONNAIRE FORM

(To Be Used by the Government to Check References)

Contractor: Contract No.:

Subcontract No. (if applicable):

POC: Title:

(Name) (Title)

(Agency, Telephone No., Email & Facsimile No.)

If conducting a telephone interview:

“Hello, I am . I am calling in reference to Contract with a company called . My questions will pertain to the contractor’s record of past, which is defined as within the past five years, and current performance. The information that you provide will be used in the awarding of a federal contract. Therefore, it is important that our information be as factual and accurate as possible. A summary of this discussion may be sent to you for your records. The following adjectival ratings shall be used in your response.

Outstanding: Performance meets contractual requirements and exceeds many requirements that benefit the end user. Work was accomplished with few, if any, minor problems for which corrective actions taken by the contractor were highly effective.

Good: Performance meets contractual requirements and exceeds some requirements that benefit the end user. Work was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Acceptable: Performance meets contractual requirements. Work was accomplished with some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal: Performance does not meet some contractual requirements. Serious problems with contractor performance were experienced for which the contractor has either not yet identified corrective actions or the corrective actions taken appear only marginally effective.

Unacceptable: Performance does not meet most contractual requirements. Serious problems with contractor performance were experienced for which the corrective actions were ineffective

DATA QUESTIONS

Contract Type: Period of Performance: .

(i.e., FFP, Cost Plus, etc.)

Total Contract Amount:

Nature and extent of the effort (i.e. scope of the effort performed by the contractor, type of tasks involved, and types of personnel (skills/expertise) utilized):

PERFORMANCE QUESTIONS

A. How was the contractor’s performance in terms of overall technical quality? (Outstanding, Good, Acceptable, Marginal, Unacceptable):

F22 Consolidated Operations and Maintenance Hangar Joint Base Langley-Eustis (JBLE)

W91236-21-R-2003

B. How was the contractor’s performance in terms of its responsiveness to changes in technical direction? (Outstanding, Good, Acceptable, Marginal, Unacceptable):

C. How was the contractor’s performance in terms of effectiveness/thoroughness in planning his operations? (Outstanding, Good, D. How was the contractor’s performance in terms of obtaining and retaining well qualified managers and craftsman?

(Outstanding, Good, Acceptable, Marginal, Unacceptable):

E. How was the contractor’s performance in terms of ensuring his subcontractors provided adequate staffing? (Outstanding, Good, Acceptable, Marginal, Unacceptable):

F. How was the contractor’s performance in terms of meeting milestones/schedules and reporting requirements and its responsiveness to changing schedules and priorities? (Outstanding, Good, Acceptable, Marginal, Unacceptable):

G. How was the contractor’s performance in regard to financial/cost management and reporting? (Outstanding, Good, H. Were there any cost overruns incurred under the contract? (Yes/No)

1. If Yes, were the overruns due to the fault of the contractor? (Yes/No)

2. If Yes, what was the magnitude (% of increase) and cause of the overrun(s)?

I. When Contractor encountered problems, did he provide recommended solutions for them? (Yes/No):

J: Would you choose to work with the contractor again if given the opportunity? (Yes/No):

K. Did the contractor’s quality control organization find and correct most deficiencies? (Yes/No):

L. With respect to the contractor’s performance under this contract, are there any additional comments you wish to make that were not addressed above?

Name of SSEB Member conducting the interview:

ATTACHMENT 4
TELEPHONE INTERVIEW QUESTIONNAIRE FORM

File details come from the government source that posted it. Updated .