Attachment 10 - COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf

PDF 44 MB Posted

Attached to
F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB
Solicitation number
W9123621R2003
Issued by

About this file

This solicitation is for a six-bay high-bay consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft from Tyndall Air Force Base at Langley AFB. The facility will include hangar bays, staff administration, a propulsion shop, ready room, break room, tools/parts support, aircraft maintenance equipment storage, wheel/tire shop, egress shop, restrooms, showers, lockers, and building systems support. The project scope includes utilities, site improvements, pavements, detection/protection features, security enhancements, and other supporting work to make a complete and usable facility, which must withstand seismic and wind effects per applicable codes and design guides. The facility will be designed as permanent construction according to DoD criteria for general building requirements and sustainable principles. This project will also comply with DoD minimum antiterrorism requirements. Responses to the bifurcated solicitation are requested at this time for evaluation Factors 1 and 2 only, with a project duration of 700 calendar days from notice to proceed unless CLIN 0013 is exercised to shorten the period to 565 days.

View the file

Other files

File Type Posted
W9123621R2003_0016.pdf PDF
W9123621R2003_0015.pdf PDF
W9123621R2003_0014.pdf PDF
W9123621R2003_0013.pdf PDF
W9123621R2003_0012.pdf PDF
Attachment 8 - CLIN Schedule_REVISION 1 on 01.05.2022.pdf PDF
AMENDMENT 0011_21 DEC 21 - Drawings.pdf PDF
Amend 0011_23 09 23_Amended V2.pdf PDF
Amend 0011_07 61 14.00 20_Amended.pdf PDF
W9123621R2003_0011.pdf PDF
Attachment 16 - Construction Security Plan (CSP).pdf PDF
Attachment 17 - Installation Restoration Program (IRP) Background Chem Data.pdf PDF
COMH Amended Drawings_14 DEC 2021.pdf PDF
W9123621R2003_0010.pdf PDF
COMH Amended Specs_14 DEC 2021_Combined.pdf PDF
A.07.23 - Solicitation COMH W9123621R2003 0009.pdf PDF
W9123621R2003_0008.pdf PDF
COMH Tech Amendment 0007 - 01 57 13.00 22_Amended.pdf PDF
COMH Tech Amendment 0007 - AMENDMENT 19 NOV 21 - Drawings.pdf PDF
COMH Tech Amendment 0007 - 07 27 19.01_Amended.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0007.pdf PDF
08 71 00_Amended 006.pdf PDF
W9123621R2003 Amendment 0006.pdf PDF
A.07.20 - Site Visit Sign-in Log - Dtd 20 Oct 2021_1Page.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0005.pdf PDF
Attachment 12 - COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf PDF
Attachment 11 - COMH_RTA_Design Drawings_Part 2 of 3_17MAR21.pdf PDF
Attachment 13 - COMH_RTA_Specifications part 1 of 1_17MAR21.pdf PDF
Attachment 15 - COMH - RTA SID_17MAR21.pdf PDF
Attachment 14 - COMH - RTA FFE_17MAR21.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0004.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0003.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0002.pdf PDF
W9123621R2003 - 0001 - COMH.pdf PDF
Attachment 12 - COMH - Final Design Drawings Part 3 of 3.pdf PDF
Attachment 9 - Langley Environmental Management Special Conditions.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation W9123621R2003 - COMH.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Attachment 13 - COMH Final Design Specifications Part 1 of 1.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 10 - COMH - Final Design Drawings Part 1 of 3.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 11 - COMH - Final Design Drawings Part 2 of 3.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_G_R19.rvt

3/15/2021 8:55:08 AM

G-001

C O

V E

R S

H E

E T

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

D

S

T A

P L E

S

D S

T A

P L E

S

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

03-17-2021

FY19 F-22 FORMAL TRAINING UNIT (FTU)

CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR

(COMH)

PROJECT LOCATION

N

PROJECT LOCATION MAP

PROJECT VICINITY MAP

HAMPTON

NEWPORT NEWS

JOINT BASE LANGLEY - EUSTIS (JBLE)

READY TO ADVERTISE

OPEN COMPETITION OF PRODUCTS

DURING DESIGN PRODUCTS ARE IDENTIFIED AND VALIDATED TO MEET THE NECESSARY

TECHNICAL REQUIREMENTS OF THE PROJECT, AND ARE INDICATED AS "BASIS OF DESIGN"

WITHIN THE DESIGN DOCUMENTS. THIS DOES NOT LIMIT THE PROVISION OF THE PRODUCTS

AS OTHER PRODUCTS THAT MEET THE STATED TECHNICAL REQUIREMENTS ARE ALSO

ACCEPTABLE. PRODUCTS LISTED HEREIN ARE NOT INTENDED TO BE PROPRIETARY UNLESS

SPECIFICALLY INDICATED. ALTERNATE PRODUCTS WILL BE EVALUATED AND MAY BE ACCEPTED

ON THE BASIS OF COMPLIANCE WITH THE SALIENT AND PERFORMANCE CHARACTERISTICS

OF THE SPECIFICATIONS.

W91236-21-R-20232003

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_G_R19.rvt

3/15/2021 8:55:20 AM

G-002

D R

A W

IN

G

I N

D E

X

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

D

S

T A

P L E

S

D S

T A

P L E

S

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SHEET INDEX 1 of 2

SHEET NUMBER SHEET NAME

08. INTERIOR DESIGN

I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL

I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A

I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B

I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C

I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D

I-102 SECOND FLOOR INTERIOR FINISH PLAN - OVERALL

I102C SECOND FLOOR INTERIOR FINISH PLAN - AREA C

I102D SECOND FLOOR INTERIOR FINISH PLAN - AREA D

I131A FIRST FLOOR SIGNAGE PLAN - AREA A

I131B FIRST FLOOR SIGNAGE PLAN - AREA B

I131C FIRST FLOOR SIGNAGE PLAN - AREA C

I131D FIRST FLOOR SIGNAGE PLAN - AREA D

I132C SECOND FLOOR SIGNAGE PLAN - AREA C

I132D SECOND FLOOR SIGNAGE PLAN - AREA D

I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES

I-602 TRANSITION DETAILS

I-621 SIGNAGE SCHEDULE

I-622 SIGNAGE SCHEDULE

I-631 SIGNAGE DETAILS

I-632 SIGNAGE DETAILS

I-633 SIGNAGE DETAILS

08. INTERIORS

IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A

IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B

IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C

IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D

IF102 SECOND FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF102C SECOND FLOOR INTERIOR FURNITURE PLAN - AREA C

IF102D SECOND FLOOR INTERIOR FURNITURE PLAN - AREA D

SHEET INDEX 1 of 2

SHEET NUMBER SHEET NAME

A132A SECOND FLOOR REFLECTED CEILING PLAN - AREA A

A132B SECOND FLOOR REFLECTED CEILING PLAN - AREA B

A132C SECOND FLOOR REFLECTED CEILING PLAN - AREA C

A132D SECOND FLOOR REFLECTED CEILING PLAN - AREA D

A-141 FIRST FLOOR AIR BARRIER PLAN

A-142 SECOND FLOOR AIR BARRIER PLAN

A-143 BUILDING SECTIONS - AIR BARRIER

A-201 BUILDING ELEVATIONS

A-202 BUILDING ELEVATIONS

A-203 BUILDING ELEVATIONS

A-204 BUILDING ELEVATIONS

A-211 PARTIAL BUILDING ELEVATIONS

A-212 PARTIAL BUILDING ELEVATIONS

A-213 PARTIAL BUILDING ELEVATIONS

A-221 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-222 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-223 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-230 PRECAST CONCRETE PROFILES - ELEVATIONS

A-231 PRECAST CONCRETE PROFILES - ELEVATIONS

A-232 PRECAST CONCRETE PROFILES - ELEVATIONS

A-301 BUILDING SECTION

A-302 BUILDING SECTION

A-311 EXTERIOR WALL SECTIONS

A-312 EXTERIOR WALL SECTIONS

A-313 EXTERIOR WALL SECTIONS

A-314 EXTERIOR WALL SECTIONS & DIAGRAMS

A-401 ENLARGED PLANS

A-402 ENLARGED PLANS

A-403 ENLARGED PLANS

A-404 ENLARGED PLANS -AIR SHOWERS

A-410 INTERIOR ELEVATIONS

A-411 INTERIOR ELEVATIONS

A-412 INTERIOR ELEVATIONS

A-413 INTERIOR ELEVATIONS

A-414 INTERIOR ELEVATIONS

A-415 INTERIOR ELEVATIONS

A-421 INTERIOR MILLWORK SECTIONS AND DETAILS

A-451 VERTICAL CIRCULATION - PLANS

A-452 VERTICAL CIRCULATION - SECTIONS

A-453 VERTICAL CIRCULATION - DETAILS

A-461 VERTICAL CIRCULATION - ELEVATOR PLANS

A-462 VERTICAL CIRCULATION - SECTIONS

A-463 VERTICAL CIRCULATION - ELEVATOR DETAILS

A-470 VERTICAL CIRCULATION - ROOF LADDERS

A-501 HANGAR DOOR DETAILS

A-502 HANGAR DOOR DETAILS

A-503 HANGAR DOOR DETAILS

A-504 HANGAR DOOR DETAILS

A-505 PLAN DETAILS

A-506 PLAN DETAILS

A-507 PLAN DETAILS

A-511 CEILING DETAILS

A-521 SECTION DETAILS

A-522 SECTION DETAILS

A-531 ROOF DETAILS

A-532 ROOF DETAILS

A-533 ROOF DETAILS

A-534 ROOF DETAILS

A-535 ROOF DETAILS

A-536 ROOF DETAILS

A-537 ROOF DETAILS

A-541 INTERIOR DETAILS

A-542 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN

A-543 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN

A-544 HANGAR SLAB DETAILS

A-545 HANGAR SLAB DETAILS

A-546 HANGAR SLAB DETAILS

A-547 HANGAR SLAB DETAILS

A-548 HANGAR SLAB DETAILS

A-549 HANGAR SLAB DETAILS

A-553 PRECAST CONCRETE PROFILES - DETAILS

A-554 PRECAST CONCRETE PROFILES - DETAILS

A-560 SEISMIC JOINT DETAILS

A-562 EXPANSION JOINTS DETAILS

A-570 CANOPY DETAILS

A-601 DOOR & FRAME TYPES

A-602 DOOR SCHEDULE

A-603 EXTERIOR DOOR DETAILS

A-604 EXTERIOR DOOR DETAILS

A-605 INTERIOR DOOR DETAILS

A-611 WINDOW & FRAME TYPES

A-612 WINDOW & FRAME TYPES

A-613 LOUVER TYPES

A-614 WINDOW DETAILS

A-615 WINDOW DETAILS

A-616 IMP DETAILS

A-617 IMP DETAILS

A-801 HANGAR MARKINGS PLAN - OVERALL

A-802 ENLARGED HANGAR MARKINGS PLAN

SHEET INDEX 1 of 2

SHEET NUMBER SHEET NAME

06. STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES

S-002 GENERAL STRUCTURAL NOTES

S-003 LEGEND AND ABBREVIATIONS

S-010 AREA LOAD PLAN

S-011 ROOF WIND UPLIFT PLAN

SB101 FOUNDATION PLAN - OVERALL

SB101A FOUNDATION PLAN - AREA A

SB101B FOUNDATION PLAN - AREA B

SB101C FOUNDATION PLAN - AREA C

SB101D FOUNDATION PLAN - AREA D

SB102 SLAB PLAN - OVERALL

SB102A SLAB PLAN - AREA A

SB102B SLAB PLAN - AREA B

SB102C SLAB PLAN - AREA C

SB102D SLAB PLAN - AREA D

SF111 SECOND FLOOR AND LOW ROOF FRAMING PLAN - OVERALL

SF111A LOW ROOF FRAMING PLAN - AREA A

SF111B LOW ROOF FRAMING PLAN - AREA B

SF111C SECOND FLOOR FRAMING PLAN - AREA C

SF111D SECOND FLOOR FRAMING PLAN - AREA D

SF121 ROOF FRAMING PLAN - OVERALL

SF121A ROOF FRAMING PLAN - AREA A

SF121B ROOF FRAMING PLAN - AREA B

SF121C ROOF FRAMING PLAN - AREA C

SF121D ROOF FRAMING PLAN - AREA D

S-201 FRAMING ELEVATIONS

S-202 FRAMING ELEVATIONS

S-203 FRAMING ELEVATIONS

S-204 HANGAR TRUSS ELEVATIONS

S-205 HANGAR TRUSS ELEVATION AND DETAILS

S-301 BUILDING SECTIONS

S-302 BUILDING SECTIONS

S-303 WALL SECTIONS

S-311 FOUNDATION SECTIONS

S-321 ROOF FRAMING SECTIONS

S-401 ENLARGED PLANS

S-501 FOUNDATION DETAILS

S-502 FOUNDATION DETAILS

S-503 TYPICAL HANGAR SLAB DETAILS

S-504 TYP CMU DETAILS

S-505 TYP CMU DETAILS

S-506 MECHANICAL ENCLOSURE DETAILS

S-507 SLAB DETAILS

S-508 METAL STUD WALL DETAILS

S-509 STRUCTURAL SITE DETAILS

S-510 CMU DETAILS

S-511 TYPICAL FRAMING DETAILS

S-512 TYPICAL FRAMING DETAILS

S-513 ROOF FRAMING DETAILS

S-514 MISC. FRAMING DETAILS

S-515 TRUSS DETAILS

S-516 ELEVATOR SHAFT SECTIONS AND DETAILS

S-521 FRAMING ELEVATION DETAILS SHEET 1

S-522 FRAMING ELEVATION DETAILS SHEET 2

S-523 FRAMING ELEVATION DETAILS SHEET 3

S-601 REBAR SCHEDULES

S-602 SCHEDULES

S-603 COLUMN SCHEDULE

S-901 3D ISOMETRICS

07. ARCHITECTURAL

A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

A-002 ABA ACCESSIBILITY GUIDELINES

A-003 ABA ACCESS PLAN - FIRST FLOOR

A-004 ABA ACCESS PLAN - SECOND FLOOR

A-005 AIRCRAFT CLEARANCE REQUIREMENT SECTION

A-006 SECURE AREA PLANS

A-007 ACOUSTIC PARTITIONS PLAN - FIRST FLOOR

A-008 ACOUSTIC PARTITIONS PLAN - SECOND FLOOR

A-009 PARTITION TYPES

A-010 PARTITION HEAD CONDITIONS

A-011 PENETRATION DETAILS

A-012 PENETRATION DETAILS

A-013 PENETRATION DETAILS

A-015 EQUIPMENT SCHEDULE

AS101 ARCHITECTURAL SITE PLAN

AS401 ENLARGED ARCHITECTURAL SITE PLAN

AS402 ARCHITECTURAL SITE DETAILS

AS501 ENLARGED MECHANICAL YARD DETAILS

AS502 ENLARGED DUMPSTER ENCLOSURE DETAILS

A-101 FIRST FLOOR PLAN - OVERALL

A101A FIRST FLOOR PLAN - AREA A

A101B FIRST FLOOR PLAN - AREA B

A101C FIRST FLOOR PLAN - AREA C

A101D FIRST FLOOR PLAN - AREA D

A-102 SECOND FLOOR PLAN - OVERALL

A102A SECOND FLOOR PLAN - AREA A

A102B SECOND FLOOR PLAN - AREA B

A102C SECOND FLOOR PLAN - AREA C

A102D SECOND FLOOR PLAN - AREA D

A-121 ROOF PLAN - OVERALL

A121A ROOF PLAN - AREA A

A121B ROOF PLAN - AREA B

A121C ROOF PLAN - AREA C

A121D ROOF PLAN - AREA D

A-131 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL

A131A FIRST FLOOR REFLECTED CEILING PLAN-AREA A

A131B FIRST FLOOR REFLECTED CEILING PLAN-AREA B

A131C FIRST FLOOR REFLECTED CEILING PLAN-AREA C

A131D FIRST FLOOR REFLECTED CEILING PLAN-AREA D

A-132 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL

SHEET INDEX 1 of 2

SHEET NUMBER SHEET NAME

00. GENERAL

G-001 COVER SHEET

G-002 DRAWING INDEX

G-003 DRAWING INDEX

G-004 CODE COMPLIANCE SUMMARY

G-005 OCCUPANCY SUMMARY

G-006 CODE COMPLIANCE SITE PLAN

G-007 FIRST FLOOR LIFE SAFETY PLAN

G-008 SECOND FLOOR LIFE SAFETY PLAN

PH101 CONSTRUCTION SEQUENCING PLANS

PH102 CONSTRUCTION SEQUENCING PLANS

PH103 CONSTRUCTION SEQUENCING PLANS

AD101 OVERALL FIRST FLOOR DEMOLITION PLAN

AD102 OVERALL SECOND FLOOR DEMOLITION PLAN

AD103 OVERALL ROOF DEMOLITION PLAN

02. SURVEY / MAPPING

VF001 LEGENDS AND NOTES

VF100 OVERALL EXISTING CONDITIONS

VF101 EXISTING CONDITIONS

VF102 EXISTING CONDITIONS

VF103 EXISTING CONDITIONS

VF104 EXISTING CONDITIONS

04.CIVIL

C-001 LEGEND AND GENERAL NOTES

C-002 CONSTRUCTION ACCESS PLAN

C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL

C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL

C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN

C-006 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN

C-007 EROSION AND SEDIMENT CONTROL - PHASE 4 PLAN

C-008 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN INITIAL

C-009 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN FINAL

CD001 DEMOLITION LEGEND & NOTES

CD100 EXISTING CONDITIONS - OVERALL

CD101 DEMOLITION PLAN

CD102 DEMOLITION PLAN

CD103 DEMOLITION PLAN

CD104 DEMOLITION PLAN

CD701 COMH DEMOLITION PHOTOGRAPH PLAN

CD702 COMH DEMOLITION PHOTOGRAPHS

CS001 SITE LAYOUT LEGEND & CONTROL POINTS

CS101 SITE LAYOUT PLAN

CS102 SITE LAYOUT PLAN

CS103 SITE LAYOUT PLAN

CS104 SITE LAYOUT PLAN

CG001 GRADING LEGEND, STORM SCHEDULES & NOTES

CG101 GRADING & DRAINAGE PLAN

CG102 GRADING & DRAINAGE PLAN

CG103 GRADING & DRAINAGE PLAN

CG104 GRADING & DRAINAGE PLAN

CG201 STORM PROFILES

CG202 STORM PROFILES

CG203 STORM PROFILES

CG700 POST DEVELOPMENT DRAINAGE AREA PLAN

CG701 STORMWATER MANAGEMENT CALCULATIONS

CG702 STORMWATER MANAGEMENT CALCULATIONS

CG703 STORMWATER MANAGEMENT CALCULATIONS

CG704 STORMWATER MANAGEMENT CALCULATIONS

CU001 UTILITY LEGEND, CONTROL POINTS, & SCHEDULES

CU101 UTILITY PLAN

CU102 UTILITY PLAN

CU103 UTILITY PLAN

CU104 UTILITY PLAN

CU201 UTILITY PROFILES

CU202 UTILITY PROFILES

C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-505 EROSION AND SEDIMENT CONTROL DETAILS

C-506 DETAILS

C-507 DETAILS

C-508 DETAILS

C-509 DETAILS

C-510 DETAILS

C-511 DETAILS

C-512 DETAILS

C-513 DETAILS

C-514 DETAILS

C-515 DETAILS

C-516 DETAILS

C-517 DETAILS

C-518 DETAILS

C-519 DETAILS

CP101 APRON GEOMETRY PLAN

CP201 APRON JOINT LAYOUT PLAN

CP301 APRON SPOT ELEVATION PLAN

CP401 APRON TYPICAL SECTIONS

CP501 APRON JOINT DETAILS

CP502 APRON JOINT DETAILS

CP503 APRON JOINT DETAILS

CM101 APRON MARKING PLAN

CM501 APRON MARKING DETAILS

05. LANDSCAPE

L-101 LANDSCAPE PLAN

L-102 LANDSCAPE PLAN

L-103 LANDSCAPE PLAN

L-104 LANDSCAPE PLAN

L-105 LANDSCAPE PLAN

L-106 LANDSCAPE PLAN

L-107 LANDSCAPE PLAN

L-501 LANDSCAPE DETAILS

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_G_R19.rvt

3/15/2021 8:55:23 AM

G-003

D R

A W

IN

G

I N

D E

X

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

D

S

T A

P L E

S

D S

T A

P L E

S

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SHEET INDEX 2 of 2

SHEET NUMBER SHEET NAME

X-001 SECURITY SYMBOLS LEGEND AND ABBREVIATIONS

X-101 FIRST FLOOR SECURITY PLAN - OVERALL

X-101A FIRST FLOOR SECURITY PLAN - AREA A

X-101B FIRST FLOOR SECURITY PLAN - AREA B

X-101C FIRST FLOOR SECURITY PLAN - AREA C

X-101D FIRST FLOOR SECURITY PLAN - AREA D

X-102 SECOND FLOOR SECURITY PLAN - OVERALL

X-102C SECOND FLOOR SECURITY PLAN - AREA C

X-102D SECOND FLOOR SECURITY PLAN - AREA D

X-501 SECURITY DETAILS

X-502 SECURITY DETAILS

X-503 SECURITY DETAILS

X-701 ACCESS CONTROL AND AIR SHOWER RISER DIAGRAM

X-702 INTRUSION DETECTION SYSTEM RISER DIAGRAM

X-703 CCTV RISER DIAGRAM

17. AUDIO VISUAL

TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TA101C FIRST FLOOR AUDIO VISUAL PLAN - AREA C

TA101D FIRST FLOOR AUDIO VISUAL PLAN - AREA D

TA102C SECOND FLOOR AUDIO VISUAL PLAN - AREA C

TA102D SECOND FLOOR AUDIO VISUAL PLAN - AREA D

TA201D FIRST FLOOR AUDIO VISUAL RCP - AREA D

TA202C SECOND FLOOR AUDIO VISUAL RCP - AREA C

TA202D SECOND FLOOR AUDIO VISUAL RCP - AREA D

TA400 AUDIO VISUAL ELEVATIONS

TA501 AUDIO VISUAL DETAILS

TA502 AUDIO VISUAL DETAILS

TA601 AUDIO VISUAL SIGNAL FLOWS

TA602 AUDIO VISUAL SIGNAL FLOWS

TA603 AUDIO VISUAL SIGNAL FLOWS

TA604 AUDIO VISUAL SIGNAL FLOWS

TA605 AUDIO VISUAL SIGNAL FLOWS

SHEET INDEX 2 of 2

SHEET NUMBER SHEET NAME

14. ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

E-002 ELECTRICAL GENERAL NOTES

E-003 AREA CLASSIFICATIONS PLAN

ED101 DEMOLITION SITE PLAN

ED102 DEMOLITION SITE PLAN

ES101 ELECTRICAL SITE PLAN

ES102 ELECTRICAL SITE PLAN

ES501 SITE DETAILS

ES502 SITE DETAILS

ES503 SITE DETAILS

ES701 ELECTRICAL ONE LINE DIAGRAM

ES702 ELECTRICAL ONE LINE DIAGRAM

ES703 ELECTRICAL ONE-LINE DIAGRAM

EL101 FIRST FLOOR LIGHTING PLAN - OVERALL

EL101A FIRST FLOOR LIGHTING PLAN - AREA A

EL101B FIRST FLOOR LIGHTING PLAN - AREA B

EL101C FIRST FLOOR LIGHTING PLAN - AREA C

EL101D FIRST FLOOR LIGHTING PLAN - AREA D

EL102 SECOND FLOOR LIGHTING PLAN - OVERALL

EL102A SECOND FLOOR LIGHTING PLAN - AREA A

EL102B SECOND FLOOR LIGHTING PLAN - AREA B

EL102C SECOND FLOOR LIGHTING PLAN - AREA C

EL102D SECOND FLOOR LIGHTING PLAN - AREA D

EL103 ROOF LIGHTING PLAN - OVERALL

EP101 FIRST FLOOR POWER PLAN - OVERALL

EP101A FIRST FLOOR POWER PLAN - AREA A

EP101B FIRST FLOOR POWER PLAN - AREA B

EP101C FIRST FLOOR POWER PLAN - AREA C

EP101D FIRST FLOOR POWER PLAN - AREA D

EP102 SECOND FLOOR POWER PLAN - OVERALL

EP102A SECOND FLOOR POWER PLAN - AREA A

EP102B SECOND FLOOR POWER PLAN - AREA B

EP102C SECOND FLOOR POWER PLAN - AREA C

EP102D SECOND FLOOR POWER PLAN - AREA D

EP103 ROOF POWER PLAN - OVERALL

EG101 FIRST FLOOR OVERALL GROUNDING PLAN

EG103 LIGHTNING PROTECTION OVERALL PLAN

E-401 ENLARGED ELECTRICAL PLANS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-503 ELECTRICAL DETAILS

E-504 ELECTRICAL DETAILS

E-505 ELECTRICAL DETAILS

E-506 ELECTRICAL DETAILS

E-601 LIGHTING SCHEDULES

E-602 EQUIPMENT CONNECTION SCHEDULES

E-603 EQUIPMENT CONNECTION SCHEDULES

E-604 ELECTRICAL CONNECTION SCHEDULES

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-607 PANEL SCHEDULES

E-608 PANEL SCHEDULES

E-609 PANEL SCHEDULES

E-610 PANEL SCHEDULES

E-611 PANEL SCHEDULES

E-612 PANEL SCHEDULES

E-613 PANEL SCHEDULES

E-701 ELECTRICAL ONE-LINE DIAGRAM

E-702 GROUNDING RISER DIAGRAM

E-703 SWITCHBOARD ELEVATIONS

16. TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TD101 TELECOMMUNICATIONS DEMOLITION SITE PLAN

TS101 TELECOMMUNICATIONS SITE PLAN

TS501 TELECOMMUNICATIONS DETAILS

T-101 FIRST FLOOR TELECOMMUNICATIONS PLAN - OVERALL

T-101A FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A

T-101B FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B

T-101C FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-101D FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-102 SECOND FLOOR TELECOMMUNICATIONS PLAN - OVERALL

T-102A SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA A

T-102B SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA B

T-102C SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-102D SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-103 ROOF TELECOMMUNICATIONS PLAN - OVERALL

T-111 FIRST FLOOR TELECOMMUNICATION DIAMOND STUDY PLAN - OVERALL

T-112 SECOND FLOOR TELECOMMUNICATIONS DIAMOND STUDY PLAN - OVERALL

T-121 FIRST FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL

T-122 SECOND FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL

T-401 ENLARGED TELECOMMUNICATIONS PLANS

T-501 TELECOM SERVICE ENTRANCE ELEVATION

T-502 TELECOM SERVICE ENTERANCE ELEVATION

T-503 TELECOM SERVICE ENTRANCE ELEVATION

T-504 TELECOM SERVICE ENTRANCE ELEVATION

T-505 TELECOMMUNICATIONS DETAILS

T-506 TELECOMMUNICATIONS DETAILS

T-507 TELECOMMUNICATIONS DETAILS

T-508 TELECOMMUNICATIONS DETAILS

T-509 TELECOMMUNICATIONS DETAILS

T-700 FIBER COMMUNICATIONS OSP DIAGRAM

T-701 TELECOMMUNICATIONS RISER DIAGRAM

T-702 TELECOMMUNICATIONS RACK ELEVATIONS

T-703 TELECOMMUNICATIONS RACK ELEVATIONS

T-704 TELECOMMUNICATIONS RACK ELEVATIONS

T-705 RISER DIAGRAMS

T-706 TELECOMMUNICATIONS GROUNDING RISER DIAGRAM

SHEET INDEX 2 of 2

SHEET NUMBER SHEET NAME

10. FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA102 SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA102A SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA102B SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA102C SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA102D SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA501 FIRE ALARM DETAILS

FA502 FIRE ALARM DETAILS

FA601 FIRE ALARM SEQUENCE OF OPERATIONS

FA701 FIRE ALARM RISER DIAGRAMS

10. FIRE PROTECTION

FX001 FIRE SUPPRESSION GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL

FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A

FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B

FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C

FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D

FX102 SECOND FLOOR FIRE SUPPRESSION PLAN - OVERALL

FX102A SECOND FLOOR FIRE SUPPRESSION PLAN - AREA A

FX102B SECOND FLOOR FIRE SUPPRESSION PLAN - AREA B

FX102C SECOND FLOOR FIRE SUPPRESSION PLAN - AREA C

FX102D SECOND FLOOR FIRE SUPPRESSION PLAN - AREA D

FX401 FIRE PROTECTION ENLARGED PLANS

FX501 FIRE PROTECTION DETAILS

11. PLUMBING

P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

P-101 UNDERFLOOR PLUMBING PLAN - OVERALL

P101A UNDERFLOOR PLUMBING PLAN - AREA A

P101B UNDERFLOOR PLUMBING PLAN - AREA B

P101C UNDERFLOOR PLUMBING PLAN - AREA C

P101D UNDERFLOOR PLUMBING PLAN - AREA D

P-110 FIRST FLOOR PLUMBING PLAN - OVERALL

P110A FIRST FLOOR PLUMBING PLAN - AREA A

P110B FIRST FLOOR PLUMBING PLAN - AREA B

P110C FIRST FLOOR PLUMBING PLAN - AREA C

P110D FIRST FLOOR PLUMBING PLAN - AREA D

P-120 SECOND FLOOR PLUMBING PLAN - OVERALL

P120A SECOND FLOOR PLUMBING PLAN - AREA C

P120B SECOND FLOOR PLUMBING PLAN - AREA D

P-401 ENLARGED PLAN - FIRST FLOOR WOMENS/MEN LOCKER ROOM

P-402 ENLARGED PLAN - SECOND FLOOR WOMENS/MEN LOCKER ROOM

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-701 PLUMBING DIAGRAMS

P-702 PLUMBING DIAGRAMS

P-703 PLUMBING DIAGRAMS

13. MECHANICAL

M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

MS101 MECHANICAL SITE PLAN

MS102 MECHANICAL SITE PLAN

MP101 FIRST FLOOR PIPING PLAN- OVERALL

MP101A FIRST FLOOR PIPING PLAN - AREA A

MP101B FIRST FLOOR PIPING PLAN - AREA B

MP101C FIRST FLOOR PIPING PLAN - AREA C

MP101D FIRST FLOOR PIPING PLAN - AREA D

MP102 SECOND FLOOR PIPING PLAN - OVERALL

MP102C SECOND FLOOR PIPING PLAN - AREA C

MP102D SECOND FLOOR PIPING PLAN - AREA D

MH101 FIRST FLOOR VENTILATION PLAN - OVERALL

MH101A FIRST FLOOR VENTILATION PLAN - AREA A

MH101B FIRST FLOOR VENTILATION PLAN - AREA B

MH101C FIRST FLOOR VENTILATION PLAN - AREA C

MH101D FIRST FLOOR VENTILATION PLAN - AREA D

MH102 SECOND FLOOR VENTILATION PLAN - OVERALL

MH102C SECOND FLOOR VENTILATION PLAN - AREA C

MH102D SECOND FLOOR VENTILATION PLAN - AREA D

M-110 MECHANICAL ROOF PLAN

M-301 SECTIONS - MECHANICAL

M-302 SECTIONS - AIR HANDLING EQUIPMENT

M-303 SECTIONS - HANGAR BAY

M-401 FIRST FLOOR ENLARGED MECHANICAL ROOM

M-501 DETAILS - HEATING

M-502 DETAILS - VENTILATION

M-503 DETAILS - HEATING

M-504 DETAILS - MECHANICAL

M-601 SCHEDULES - HEATING/COOLING

M-602 SCHEDULES - HEATING/COOLING

M-603 SCHEDULES - HEATING/COOLING

M-604 SCHEDULES - HEATING/COOLING

M-701 DIAGRAMS - HEATING/COOLING

M-801 CONTROL SEQUENCES

M-802 CONTROL SEQUENCES

M-803 CONTROL SEQUENCES

M-804 CONTROL SEQUENCES

M-805 CONTROL SEQUENCES

M-806 CONTROL SEQUENCES

M-807 CONTROL SEQUENCES

M-808 CONTROL SEQUENCES

M-809 CONTROL SEQUENCES

M-810 CONTROL SEQUENCES

M-811 CONTROL SEQUENCES

M-812 CONTROL SEQUENCES

CONSTRUCTION SEQUENCE LEGEND

SEQUENCING PLAN LEGEND & SHEET NOTES

SEQUENCE 1 - RELOCATE CDDAR TO 753. DEMOLISH PORTION OF APRON

BETWEEN 753/752 IMPACT TO WEST ACCESS OF 752 / RETAINING WALL

CONSTRUCTION / NEW SERVICE ROADWAY

GENERAL SEQUENCING NOTES

CULTURAL DISCOVERY STATEMENT:

THE AE TEAM FOR THE F22 FTU PROJECT HAS NO KNOWLEDGE OF ANY CULTURAL DISCOVERY. HOWEVER IF THE CONTRACTOR ENCOUNTERS ANY CULTURAL DISCOVERY WITHIN THE LIMITS OF THE PROJECT, THEY

ARE TO STOP WORK IN THAT IMMEDIATE AREA AND NOTIFY THE CONTRACTING OFFICER. THE

CONTRACTING OFFICE WILL REVIEW THE CONDITION AND PROVIDE DIRECTION TO THE CONTRACTOR ON

HOW TO PROCEED.

SEQUENCING PLAN TO BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO STARTING WORK.

SEQUENCE 2 - APRON DEMOLITION / SITE FILL / NEW APRON TIE-IN TO

FLIGHT LINE

SEQUENCE 3 - RELOCATED CDDAR BACK TO 752. 753 DEMOLITION SCOPE

THESE DIAGRAMS WERE REVIEWED WITH THE STAKEHOLDERS ON 7/9/20 AND ON 9/29/20 AND AGAIN ON 10/7/20 WITH AIRFIELD MANAGERS, ALL CONFIRMING THE INITIAL ASSUMPTIONS AS PRESENTED.

GOVERNMENT HAS CAREFULLY EXAMINED THE PHASING OR SEQUENCING PRESENTED IN THE PAGES PH101, PH102 AND PH103 AND THE IMPACTS TO VARIOUS OPERATIONS. CONTRACTOR SHALL PROVIDE THE ACCREDITING OFFICER AND STAKEHOLDERS AN ADDITIONAL OPPORTUNITIES TO FURTHER DEVELOP

SECURED FENCE LINE, UTILITY SERVICES OF THIS SCOPE.

THE SECURITY FENCE WILL BE REQUIRED TO MOVE AT EACH PHASE TO PROTECT THE INTEGRITY OF THE FLIGHT LINE ACCESS. MAINTAIN VEHICLE ACCESS FROM BUILDING 752 TO FLIGHT LINE AT ALL TIMES.

THE FOLLOWING SUMMARY CORRELATES WITH CIVIL DEQ SUBMISSION 10/19/20.

PHASE 1 SEQUENCE NOTES:

OWNER TO RELOCATE CDDAR EQUIPMENT TO BUILDING 753. WEST BAYS OF BUILDING 752 WILL HAVE LIMITED ACCESS WHILE DEMOLITION OF EXISTING ASPHALT IS REMOVED. A NEW ROAD WAY IS CONSTRUCTED PARALLEL TO THE NORTH/SOUTH AXIS ALONG THE WEST SIDE OF 752. NEW RETAINING WALL WILL SERVE TO OFFSET THE RAISED FINISHED FLOOR GRADING OF THE NEW WORK. THE FILL WILL BE BACK FILLED TO THE RETAINING WALL AND COMPACTED. REINFORCED SOIL STRUCTURES ROUTINELY SPECIFY THAT ALL SOILS BE COMPACTED TO 95% OF THE MAXIMUM DENSITY DETERMINED BY ASTM D698 -

STANDARD PROCTOR DENSITY FOR CONFORMANCE WITH THE DESIGN.

PHASE 2 SEQUENCE NOTES:

OWNER WILL RELOCATE CDDAR EQUIPMENT BACK TO BUILDING 752 UPON COMPLETION OF ROADWAY AND RETAINING WALL. PRIOR TO CONTINUANCE OF REMAINING APRON DEMOLITION UP TO BUILDING 753.

SITEWORK WILL BE PREPPED TO ENABLE LARGE EQUIPMENT TO SERVICE FROM THE EAST SIDE OF 753.

PHASE 3 SEQUENCE NOTES:

THE SCOPE OF DEMOLITION INCLUDES THE ENTIRE BUILDING AND IS DEFINED UNDER SEPARATE SHEETS WITHIN THIS SET OF CONSTRUCTION DOCUMENTS. DEMOLITION SITE WORK INCLUDES REMOVAL OF FOUNDATIONS, SUPER STRUCTURE, EXISTING SIDEWALKS, WORKING AROUND UNDERGROUND UTILITIES, AND REGRADING WITH SITE LOADED FILL. COORDINATION OF ITEMS, IF ANY, WHICH ARE TO BE SALVAGED, PROTECTED AND/OR STORED SHALL BE IDENTIFIED IN THE ARCHITECTURAL DEMOLITION SHEETS.

COORDINATE OF HAUL OFF ROUTES AND LAY DOWN AREAS PER CIVIL SCOPE. DEBRIS PILES SHALL BE

FURTHER DEVELOPED WITH INPUT FROM BASE OFFICIALS.

FIRE WATER PUMP STATION 758 WILL BE DEMOLISHED IN THIS SCOPE. BASE ENGINEERS HAVE PROVIDED DIRECTION THAT NO BUILDINGS DOWNSTREAM TO THE FACILITY WILL BE EFFECTED. IF ALTERNATIVE SUPPLY FOR FIRE SYSTEMS ARE NECESSARY, IT SHALL BE PERFORMED OUTSIDE THE SCOPE OF THIS WORK. TERMINATION OF ANY GIS UNDERGROUND LINES SHALL BE CAPPED IN ACCORDANCE WITH BASE

STANDARD OR BUILDING CODE, WHICHEVER STANDARD IS MORE RESTRICTIVE.

PHASE 4 SEQUENCE NOTES:

CONSTRUCTION OF A NEW 76,000 SQFT (APPROXIMATELY) HANGAR SUPPORTING SIX F22A RAPTORS PER

THE SCOPE OF THESE CONSTRUCTION DOCUMENTS ALSO REFERENCED TO AS CONSOLIDATED

OPERATIONS AND MAINTENANCE HANGAR, OR COMH. PREP AND CARE SHALL BE COORDINATED TO LIMIT IMPACT TO ADJACENT SQUADRON OPERATIONS DURING CONSTRUCTION. THIS PHASE SHALL INCLUDE THE CUTTING AND PATCHING OF DANFORTH FOR UTILITY CONNECTIONS. REBUILDING OF ADJACENT APRON

FOOTPRINT OF BOTH WEST AND EAST SIDES IS APART OF THIS SCOPE.

PHASE 5 SEQUENCE NOTES:

TO LIMIT IMPACT TO 789, AND ITS OPERATIONS, THE LAST SEQUENCE SHALL BE SUBPHASED TO MAINTAIN TOWWAY ACCESS FROM 789 TO THE FLIGHTLINE. THIS SEQUENCE MAY INCLUDE REMOVAL OF EAST POV PARKING AREA. THIS SEQUENCE ALSO INCLUDES COORDINATED DEMOLITION OF THE EXISTING ASPHALT ROAD, SUPPORTING APRON RETAINING WALL AND THE APRON PAVEMENT. NEW FILL AND NEW PCC SLAB TO BE TIED IN AT THE UFC PERCENTAGE. ANGLED PARKING ON DANFORTH AVE SHALL BE INCLUDED AS A BID OPTION. SEE AIRFIELDS PLANS FOR COORDINATION AND SCOPE REQUIREMENTS. SECTIONAL REPLACEMENT OF APRON PAVEMENT IS PRIORITY TO MAINTAIN SERVICE AND ACCESS TO FLIGHTLINE

WHICH MAY REQUIRE ALTERATIONS TO THIS PLAN. PHASING SEQUENCE ASSUMES GOVERNMENT-

PROVIDED WING WALKERS DURING CONSTRUCTION TO REDUCE WINGTIP CLEARANCES TO 10 FEET.

CONTRACTOR AND CONTRACTING OFFICER TO COORDINATE FINAL PHASING. PHASES 4 AND 5 HAVE THE POTENTIAL TO AFFECT LOGISTICAL OPERATIONS OF HANGAR 789. IN ORDER TO REDUCE IMPACT, A MEETING TO DETERMINE THE CONSTRUCTION SEQUENCE WILL ESTABLISH A FINAL COURSE OF ACTION.

SEQUENCE 5 - 789 EAST ACCESS IMPACT / APRON AND

RETAINING WALL DEMOLITION / NEW APRON EAST AND WEST

SEQUENCE 4 - NEW BUILDING CONSTRUCTION

SECURE BOUNDARY

GENERAL NOTES

1. SAFETY: CONSTRUCTION ACTIVITIES AND THE COMPLETED CONSTRUCTION OF THE PROJECT SHALL COMPLY WITH ALL APPLICABLE SUBPARTS OF THE CURRENT OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) REGULATIONS 29, CODE OF FEDERAL REGULATIONS (CFR) 1910 AND 1926, AND THE CURRENT

VERSION OF THE EM-385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL.

2. PREVENT DAMAGE: COORDINATE ALL WORK WITH WEATHER CONDITIONS AND TEMPORARY MEASURES TO ENSURE THAT STRUCTURES TO REMAIN ARE NOT AFFECTED BY WEATHER CONDITIONS AND REMAIN

WATER TIGHT AT ALL TIMES.

3. REFER TO APPENDIX OF SPEC SECTION 02 41 00 - DEMOLITION "RECORD DRAWINGS" FOR AS-BUILT

CONDITIONS TO ASSIST IN DETERMINING SCOPE OF WORK.

4. CONTRACTOR REQUIRED TO COMPLETE FULL SURVEY PRIOR TO START OF ANY DEMOLITION WORK.

5. DETERMINE ROAD AND SIDEWALK CLOSURE REQUIREMENTS PRIOR TO DEMOLITION WORK.

COORDINATE WITH USAF/USACE.

6. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

EXISTING BUILDING

EXISTING BUILDING

E FLIGHT LINE ROAD

DANFORTH AVE

OWNER SHALL RELOCATE

CDDAR EQUIPMENT TO

VACATED BLDG 753 PRIOR TO

BEGINNING WORK ON PHASE

MAINTAIN 22'-0" MINIMUM ACCESS TO

FLIGHT LINE FOR CDDAR EQUIPMENT

AT ALL TIMES

EXISTING BUILDING

MAINTAIN 22'-0" MINIMUM ACCESS TO

FLIGHT LINE FOR CDDAR EQUIPMENT

AT ALL TIMES

DEMOLISH PORTION

OF APRON ASPHALT,

REFER CIVIL

DRAWINGS FOR

EXTENTS

+/- 54' - 0"

SECURE BOUNDARY,

TYP.

22' - 0"

MAINTAIN SIDEWALK OPEN TO PEDESTRIAN TRAFFIC

SECURE

BOUNDARY, TYP.

22' - 0"

EXISTING BUILDING

EXISTING BUILDING

E FLIGHT LINE ROAD

DANFORTH AVE

OWNER TO RELOCATE

CDDAR EQUIPMENT BACK

TO BLDG 752 AFTER

COMPLETION OF NEW

AIRFIELD ACCESS ROAD

MAINTAIN ACCESS TO FLIGHT LINE

FOR CDDAR EQUIPMENT AT ALL TIMES

EXISTING BUILDING

CONSTRUCT NEW

SECURED AIRFIELD

ACCESS SERVICE ROAD

AND RETAINING WALL

DEMOLISH REMAINING

PORTION OF APRON

ASPHALT UP TO

BUILDING 753

SECURE

BOUNDARY, TYP.

PROVIDE TEMPORARY ROAD DETOUR

AROUND WORK AREA ALONG FLIGHT

LINE ROAD. COORDINATE WITH

COMMANDING OFFICER TO MAINTAIN

REQUIRED ACCESS TO ADJACENT

BUILDINGS AND APRONS.

SECURE GATE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/16/2021 9:07:46 AM

PH101

C O

N S

T R

U C

T

IO

N S

E Q

U E

N C

IN

G

P L

A N

S

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

S

P

A P

K E

S P

A P

K E

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/64" = 1'-0"

D1

CONSTRUCTION SEQUENCING PLAN - PHASE 1

SCALE: 1/64" = 1'-0"

A1

CONSTRUCTION SEQUENCING PLAN - PHASE 2

SCALE: = 1'-0"

0 64 12864

1/64"

N

NOTE: THE SECURED BOUNDARY AND PHASING

LIMITS ARE SHOWN DIAGRAMMATICALLY AS

REFERENCE ONLY. THE LOCATION SHALL BE

COORDINATED WITH ALL DISCIPLINES HAVING

RESPONSIBILITY. THE CONTRACTING OFFICER

SHALL HAVE THE FINAL RESPONSIBILITY PER THE

SCOPE CONSIDERING AND DEFINED BY THIS

SCOPE OF WORK.

2"

10" HEF

10" FIRE

DN

EXISTING BUILDING

EXISTING BUILDING

E FLIGHT LINE ROAD

DANFORTH AVE

SECURE BOUNDARY, TYP.

PROVIDE TEMPORARY ROAD DETOUR

AROUND WORK AREA ALONG FLIGHT

LINE ROAD. COORDINATE WITH

COMMANDING OFFICER TO MAINTAIN

REQUIRED ACCESS TO ADJACENT

BUILDINGS AND APRONS.

AREA OF ROAD PATCH FOR

UTILITIES CONNECTIONS,

REFER CIVIL DRAWINGS FOR

DETAILS

CONSTRUCTION SEQUENCE LEGEND

SEQUENCING PLAN LEGEND & SHEET NOTES

SEQUENCE 1 - RELOCATE CDDAR TO 753. DEMOLISH PORTION OF APRON

BETWEEN 753/752 IMPACT TO WEST ACCESS OF 752 / RETAINING WALL

CONSTRUCTION / NEW SERVICE ROADWAY

GENERAL SEQUENCING NOTES

CULTURAL DISCOVERY STATEMENT:

THE AE TEAM FOR THE F22 FTU PROJECT HAS NO KNOWLEDGE OF ANY CULTURAL DISCOVERY. HOWEVER IF THE CONTRACTOR ENCOUNTERS ANY CULTURAL DISCOVERY WITHIN THE LIMITS OF THE PROJECT, THEY

ARE TO STOP WORK IN THAT IMMEDIATE AREA AND NOTIFY THE CONTRACTING OFFICER. THE

CONTRACTING OFFICE WILL REVIEW THE CONDITION AND PROVIDE DIRECTION TO THE CONTRACTOR ON

HOW TO PROCEED.

SEQUENCING PLAN TO BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO STARTING WORK.

SEQUENCE 2 - APRON DEMOLITION / SITE FILL / NEW APRON TIE-IN TO

FLIGHT LINE

SEQUENCE 3 - RELOCATED CDDAR BACK TO 752. 753 DEMOLITION SCOPE

THESE DIAGRAMS WERE REVIEWED WITH THE STAKEHOLDERS ON 7/9/20 AND ON 9/29/20 AND AGAIN ON 10/7/20 WITH AIRFIELD MANAGERS, ALL CONFIRMING THE INITIAL ASSUMPTIONS AS PRESENTED.

GOVERNMENT HAS CAREFULLY EXAMINED THE PHASING OR SEQUENCING PRESENTED IN THE PAGES PH101, PH102 AND PH103 AND THE IMPACTS TO VARIOUS OPERATIONS. CONTRACTOR SHALL PROVIDE THE ACCREDITING OFFICER AND STAKEHOLDERS AN ADDITIONAL OPPORTUNITIES TO FURTHER DEVELOP

SECURED FENCE LINE, UTILITY SERVICES OF THIS SCOPE.

THE SECURITY FENCE WILL BE REQUIRED TO MOVE AT EACH PHASE TO PROTECT THE INTEGRITY OF THE FLIGHT LINE ACCESS. MAINTAIN VEHICLE ACCESS FROM BUILDING 752 TO FLIGHT LINE AT ALL TIMES.

THE FOLLOWING SUMMARY CORRELATES WITH CIVIL DEQ SUBMISSION 10/19/20.

PHASE 1 SEQUENCE NOTES:

OWNER TO RELOCATE CDDAR EQUIPMENT TO BUILDING 753. WEST BAYS OF BUILDING 752 WILL HAVE LIMITED ACCESS WHILE DEMOLITION OF EXISTING ASPHALT IS REMOVED. A NEW ROAD WAY IS CONSTRUCTED PARALLEL TO THE NORTH/SOUTH AXIS ALONG THE WEST SIDE OF 752. NEW RETAINING WALL WILL SERVE TO OFFSET THE RAISED FINISHED FLOOR GRADING OF THE NEW WORK. THE FILL WILL BE BACK FILLED TO THE RETAINING WALL AND COMPACTED. REINFORCED SOIL STRUCTURES ROUTINELY SPECIFY THAT ALL SOILS BE COMPACTED TO 95% OF THE MAXIMUM DENSITY DETERMINED BY ASTM D698 -

STANDARD PROCTOR DENSITY FOR CONFORMANCE WITH THE DESIGN.

PHASE 2 SEQUENCE NOTES:

OWNER WILL RELOCATE CDDAR EQUIPMENT BACK TO BUILDING 752 UPON COMPLETION OF ROADWAY AND RETAINING WALL. PRIOR TO CONTINUANCE OF REMAINING APRON DEMOLITION UP TO BUILDING 753.

SITEWORK WILL BE PREPPED TO ENABLE LARGE EQUIPMENT TO SERVICE FROM THE EAST SIDE OF 753.

PHASE 3 SEQUENCE NOTES:

THE SCOPE OF DEMOLITION INCLUDES THE ENTIRE BUILDING AND IS DEFINED UNDER SEPARATE SHEETS WITHIN THIS SET OF CONSTRUCTION DOCUMENTS. DEMOLITION SITE WORK INCLUDES REMOVAL OF FOUNDATIONS, SUPER STRUCTURE, EXISTING SIDEWALKS, WORKING AROUND UNDERGROUND UTILITIES, AND REGRADING WITH SITE LOADED FILL. COORDINATION OF ITEMS, IF ANY, WHICH ARE TO BE SALVAGED, PROTECTED AND/OR STORED SHALL BE IDENTIFIED IN THE ARCHITECTURAL DEMOLITION SHEETS.

COORDINATE OF HAUL OFF ROUTES AND LAY DOWN AREAS PER CIVIL SCOPE. DEBRIS PILES SHALL BE

FURTHER DEVELOPED WITH INPUT FROM BASE OFFICIALS.

FIRE WATER PUMP STATION 758 WILL BE DEMOLISHED IN THIS SCOPE. BASE ENGINEERS HAVE PROVIDED DIRECTION THAT NO BUILDINGS DOWNSTREAM TO THE FACILITY WILL BE EFFECTED. IF ALTERNATIVE SUPPLY FOR FIRE SYSTEMS ARE NECESSARY, IT SHALL BE PERFORMED OUTSIDE THE SCOPE OF THIS WORK. TERMINATION OF ANY GIS UNDERGROUND LINES SHALL BE CAPPED IN ACCORDANCE WITH BASE

STANDARD OR BUILDING CODE, WHICHEVER STANDARD IS MORE RESTRICTIVE.

PHASE 4 SEQUENCE NOTES:

CONSTRUCTION OF A NEW 76,000 SQFT (APPROXIMATELY) HANGAR SUPPORTING SIX F22A RAPTORS PER

THE SCOPE OF THESE CONSTRUCTION DOCUMENTS ALSO REFERENCED TO AS CONSOLIDATED

OPERATIONS AND MAINTENANCE HANGAR, OR COMH. PREP AND CARE SHALL BE COORDINATED TO LIMIT IMPACT TO ADJACENT SQUADRON OPERATIONS DURING CONSTRUCTION. THIS PHASE SHALL INCLUDE THE CUTTING AND PATCHING OF DANFORTH FOR UTILITY CONNECTIONS. REBUILDING OF ADJACENT APRON

FOOTPRINT OF BOTH WEST AND EAST SIDES IS APART OF THIS SCOPE.

PHASE 5 SEQUENCE NOTES:

TO LIMIT IMPACT TO 789, AND ITS OPERATIONS, THE LAST SEQUENCE SHALL BE SUBPHASED TO MAINTAIN TOWWAY ACCESS FROM 789 TO THE FLIGHTLINE. THIS SEQUENCE MAY INCLUDE REMOVAL OF EAST POV PARKING AREA. THIS SEQUENCE ALSO INCLUDES COORDINATED DEMOLITION OF THE EXISTING ASPHALT ROAD, SUPPORTING APRON RETAINING WALL AND THE APRON PAVEMENT. NEW FILL AND NEW PCC SLAB TO BE TIED IN AT THE UFC PERCENTAGE. ANGLED PARKING ON DANFORTH AVE SHALL BE INCLUDED AS A BID OPTION. SEE AIRFIELDS PLANS FOR COORDINATION AND SCOPE REQUIREMENTS. SECTIONAL REPLACEMENT OF APRON PAVEMENT IS PRIORITY TO MAINTAIN SERVICE AND ACCESS TO FLIGHTLINE

WHICH MAY REQUIRE ALTERATIONS TO THIS PLAN. PHASING SEQUENCE ASSUMES GOVERNMENT-

PROVIDED WING WALKERS DURING CONSTRUCTION TO REDUCE WINGTIP CLEARANCES TO 10 FEET.

CONTRACTOR AND CONTRACTING OFFICER TO COORDINATE FINAL PHASING. PHASES 4 AND 5 HAVE THE POTENTIAL TO AFFECT LOGISTICAL OPERATIONS OF HANGAR 789. IN ORDER TO REDUCE IMPACT, A MEETING TO DETERMINE THE CONSTRUCTION SEQUENCE WILL ESTABLISH A FINAL COURSE OF ACTION.

SEQUENCE 5 - 789 EAST ACCESS IMPACT / APRON AND

RETAINING WALL DEMOLITION / NEW APRON EAST AND WEST

SEQUENCE 4 - NEW BUILDING CONSTRUCTION

SECURE BOUNDARY

GENERAL NOTES

1. SAFETY: CONSTRUCTION ACTIVITIES AND THE COMPLETED CONSTRUCTION OF THE PROJECT SHALL COMPLY WITH ALL APPLICABLE SUBPARTS OF THE CURRENT OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) REGULATIONS 29, CODE OF FEDERAL REGULATIONS (CFR) 1910 AND 1926, AND THE CURRENT

VERSION OF THE EM-385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL.

2. PREVENT DAMAGE: COORDINATE ALL WORK WITH WEATHER CONDITIONS AND TEMPORARY MEASURES TO ENSURE THAT STRUCTURES TO REMAIN ARE NOT AFFECTED BY WEATHER CONDITIONS AND REMAIN

WATER TIGHT AT ALL TIMES.

3. REFER TO APPENDIX OF SPEC SECTION 02 41 00 - DEMOLITION "RECORD DRAWINGS" FOR AS-BUILT

CONDITIONS TO ASSIST IN DETERMINING SCOPE OF WORK.

4. CONTRACTOR REQUIRED TO COMPLETE FULL SURVEY PRIOR TO START OF ANY DEMOLITION WORK.

5. DETERMINE ROAD AND SIDEWALK CLOSURE REQUIREMENTS PRIOR TO DEMOLITION WORK.

COORDINATE WITH USAF/USACE.

6. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

EXISTING BUILDING

EXISTING BUILDING

E FLIGHT LINE ROAD

DANFORTH AVE

EXISTING BUILDING

PROTECT EXISTING DUCT

BANK DURING DEMOLITION

IN THIS GENERAL VICINITY

SECURE BOUNDARY, TYP.

PROVIDE TEMPORARY ROAD DETOUR

AROUND WORK AREA ALONG FLIGHT

LINE ROAD. COORDINATE WITH

COMMANDING OFFICER TO MAINTAIN

REQUIRED ACCESS TO ADJACENT

BUILDINGS AND APRONS.

FENCE AND GATE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/16/2021 9:07:48 AM

PH102

C O

N S

T R

U C

T

IO

N S

E Q

U E

N C

IN

G

P L

A N

S

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

S

P

A P

K E

S P

A P

K E

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/64" = 1'-0"

A1

CONSTRUCTION SEQUENCING PLAN - PHASE 4

SCALE: 1/64" = 1'-0"

D1

CONSTRUCTION SEQUENCING PLAN - PHASE 3

SCALE: = 1'-0"

0 64 12864

1/64"

N

NOTE: THE SECURED BOUNDARY AND PHASING

LIMITS ARE SHOWN DIAGRAMMATICALLY AS

REFERENCE ONLY. THE LOCATION SHALL BE

COORDINATED WITH ALL DISCIPLINES HAVING

RESPONSIBILITY. THE CONTRACTING OFFICER

SHALL HAVE THE FINAL RESPONSIBILITY PER THE

SCOPE CONSIDERING AND DEFINED BY THIS

SCOPE OF WORK.

2"

10" HEF

10" FIRE

DN

CONSTRUCTION SEQUENCE LEGEND

SEQUENCING PLAN LEGEND & SHEET NOTES

SEQUENCE 1 - RELOCATE CDDAR TO 753. DEMOLISH PORTION OF APRON

BETWEEN 753/752 IMPACT TO WEST ACCESS OF 752 / RETAINING WALL

CONSTRUCTION / NEW SERVICE ROADWAY

GENERAL SEQUENCING NOTES

CULTURAL DISCOVERY STATEMENT:

THE AE TEAM FOR THE F22 FTU PROJECT HAS NO KNOWLEDGE OF ANY CULTURAL DISCOVERY. HOWEVER IF THE CONTRACTOR ENCOUNTERS ANY CULTURAL DISCOVERY WITHIN THE LIMITS OF THE PROJECT, THEY

ARE TO STOP WORK IN THAT IMMEDIATE AREA AND NOTIFY THE CONTRACTING OFFICER. THE

CONTRACTING OFFICE WILL REVIEW THE CONDITION AND PROVIDE DIRECTION TO THE CONTRACTOR ON

HOW TO PROCEED.

SEQUENCING PLAN TO BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO STARTING WORK.

SEQUENCE 2 - APRON DEMOLITION / SITE FILL / NEW APRON TIE-IN TO

FLIGHT LINE

SEQUENCE 3 - RELOCATED CDDAR BACK TO 752. 753 DEMOLITION SCOPE

THESE DIAGRAMS WERE REVIEWED WITH THE STAKEHOLDERS ON 7/9/20 AND ON 9/29/20 AND AGAIN ON 10/7/20 WITH AIRFIELD MANAGERS, ALL CONFIRMING THE INITIAL ASSUMPTIONS AS PRESENTED.

GOVERNMENT HAS CAREFULLY EXAMINED THE PHASING OR SEQUENCING PRESENTED IN THE PAGES PH101, PH102 AND PH103 AND THE IMPACTS TO VARIOUS OPERATIONS. CONTRACTOR SHALL PROVIDE THE ACCREDITING OFFICER AND STAKEHOLDERS AN ADDITIONAL OPPORTUNITIES TO FURTHER DEVELOP

SECURED FENCE LINE, UTILITY SERVICES OF THIS SCOPE.

THE SECURITY FENCE WILL BE REQUIRED TO MOVE AT EACH PHASE TO PROTECT THE INTEGRITY OF THE FLIGHT LINE ACCESS. MAINTAIN VEHICLE ACCESS FROM BUILDING 752 TO FLIGHT LINE AT ALL TIMES.

THE FOLLOWING SUMMARY CORRELATES WITH CIVIL DEQ SUBMISSION 10/19/20.

PHASE 1 SEQUENCE NOTES:

OWNER TO RELOCATE CDDAR EQUIPMENT TO BUILDING 753. WEST BAYS OF BUILDING 752 WILL HAVE LIMITED ACCESS WHILE DEMOLITION OF EXISTING ASPHALT IS REMOVED. A NEW ROAD WAY IS CONSTRUCTED PARALLEL TO THE NORTH/SOUTH AXIS ALONG THE WEST SIDE OF 752. NEW RETAINING WALL WILL SERVE TO OFFSET THE RAISED FINISHED FLOOR GRADING OF THE NEW WORK. THE FILL WILL BE BACK FILLED TO THE RETAINING WALL AND COMPACTED. REINFORCED SOIL STRUCTURES ROUTINELY SPECIFY THAT ALL SOILS BE COMPACTED TO 95% OF THE MAXIMUM DENSITY DETERMINED BY ASTM D698 -

STANDARD PROCTOR DENSITY FOR CONFORMANCE WITH THE DESIGN.

PHASE 2 SEQUENCE NOTES:

OWNER WILL RELOCATE CDDAR EQUIPMENT BACK TO BUILDING 752 UPON COMPLETION OF ROADWAY AND RETAINING WALL. PRIOR TO CONTINUANCE OF REMAINING APRON DEMOLITION UP TO BUILDING 753.

SITEWORK WILL BE PREPPED TO ENABLE LARGE EQUIPMENT TO SERVICE FROM THE EAST SIDE OF 753.

PHASE 3 SEQUENCE NOTES:

THE SCOPE OF DEMOLITION INCLUDES THE ENTIRE BUILDING AND IS DEFINED UNDER SEPARATE SHEETS WITHIN THIS SET OF CONSTRUCTION DOCUMENTS. DEMOLITION SITE WORK INCLUDES REMOVAL OF FOUNDATIONS, SUPER STRUCTURE, EXISTING SIDEWALKS, WORKING AROUND UNDERGROUND UTILITIES, AND REGRADING WITH SITE LOADED FILL. COORDINATION OF ITEMS, IF ANY, WHICH ARE TO BE SALVAGED, PROTECTED AND/OR STORED SHALL BE IDENTIFIED IN THE ARCHITECTURAL DEMOLITION SHEETS.

COORDINATE OF HAUL OFF ROUTES AND LAY DOWN AREAS PER CIVIL SCOPE. DEBRIS PILES SHALL BE

FURTHER DEVELOPED WITH INPUT FROM BASE OFFICIALS.

FIRE WATER PUMP STATION 758 WILL BE DEMOLISHED IN THIS SCOPE. BASE ENGINEERS HAVE PROVIDED DIRECTION THAT NO BUILDINGS DOWNSTREAM TO THE FACILITY WILL BE EFFECTED. IF ALTERNATIVE SUPPLY FOR FIRE SYSTEMS ARE NECESSARY, IT SHALL BE PERFORMED OUTSIDE THE SCOPE OF THIS WORK. TERMINATION OF ANY GIS UNDERGROUND LINES SHALL BE CAPPED IN ACCORDANCE WITH BASE

STANDARD OR BUILDING CODE, WHICHEVER STANDARD IS MORE RESTRICTIVE.

PHASE 4 SEQUENCE NOTES:

CONSTRUCTION OF A NEW 76,000 SQFT (APPROXIMATELY) HANGAR SUPPORTING SIX F22A RAPTORS PER

THE SCOPE OF THESE CONSTRUCTION DOCUMENTS ALSO REFERENCED TO AS CONSOLIDATED

OPERATIONS AND MAINTENANCE HANGAR, OR COMH. PREP AND CARE SHALL BE COORDINATED TO LIMIT IMPACT TO ADJACENT SQUADRON OPERATIONS DURING CONSTRUCTION. THIS PHASE SHALL INCLUDE THE CUTTING AND PATCHING OF DANFORTH FOR UTILITY CONNECTIONS. REBUILDING OF ADJACENT APRON

FOOTPRINT OF BOTH WEST AND EAST SIDES IS APART OF THIS SCOPE.

PHASE 5 SEQUENCE NOTES:

TO LIMIT IMPACT TO 789, AND ITS OPERATIONS, THE LAST SEQUENCE SHALL BE SUBPHASED TO MAINTAIN TOWWAY ACCESS FROM 789 TO THE FLIGHTLINE. THIS SEQUENCE MAY INCLUDE REMOVAL OF EAST POV PARKING AREA. THIS SEQUENCE ALSO INCLUDES COORDINATED DEMOLITION OF THE EXISTING ASPHALT ROAD, SUPPORTING APRON RETAINING WALL AND THE APRON PAVEMENT. NEW FILL AND NEW PCC SLAB TO BE TIED IN AT THE UFC PERCENTAGE. ANGLED PARKING ON DANFORTH AVE SHALL BE INCLUDED AS A BID OPTION. SEE AIRFIELDS PLANS FOR COORDINATION AND SCOPE REQUIREMENTS. SECTIONAL REPLACEMENT OF APRON PAVEMENT IS PRIORITY TO MAINTAIN SERVICE AND ACCESS TO FLIGHTLINE

WHICH MAY REQUIRE ALTERATIONS TO THIS PLAN. PHASING SEQUENCE ASSUMES GOVERNMENT-

PROVIDED WING WALKERS DURING CONSTRUCTION TO REDUCE WINGTIP CLEARANCES TO 10 FEET.

CONTRACTOR AND CONTRACTING OFFICER TO COORDINATE FINAL PHASING. PHASES 4 AND 5 HAVE THE POTENTIAL TO AFFECT LOGISTICAL OPERATIONS OF HANGAR 789. IN ORDER TO REDUCE IMPACT, A MEETING TO DETERMINE THE CONSTRUCTION SEQUENCE WILL ESTABLISH A FINAL COURSE OF ACTION.

SEQUENCE 5 - 789 EAST ACCESS IMPACT / APRON AND

RETAINING WALL DEMOLITION / NEW APRON EAST AND WEST

SEQUENCE 4 - NEW BUILDING CONSTRUCTION

SECURE BOUNDARY

GENERAL NOTES

1. SAFETY: CONSTRUCTION ACTIVITIES AND THE COMPLETED CONSTRUCTION OF THE PROJECT SHALL COMPLY WITH ALL APPLICABLE SUBPARTS OF THE CURRENT OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) REGULATIONS 29, CODE OF FEDERAL REGULATIONS (CFR) 1910 AND 1926, AND THE CURRENT

VERSION OF THE EM-385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL.

2. PREVENT DAMAGE: COORDINATE ALL WORK WITH WEATHER CONDITIONS AND TEMPORARY MEASURES TO ENSURE THAT STRUCTURES TO REMAIN ARE NOT AFFECTED BY WEATHER CONDITIONS AND REMAIN

WATER TIGHT AT ALL TIMES.

3. REFER TO APPENDIX OF SPEC SECTION 02 41 00 - DEMOLITION "RECORD DRAWINGS" FOR AS-BUILT

CONDITIONS TO ASSIST IN DETERMINING SCOPE OF WORK.

4. CONTRACTOR REQUIRED TO COMPLETE FULL SURVEY PRIOR TO START OF ANY DEMOLITION WORK.

5. DETERMINE ROAD AND SIDEWALK CLOSURE REQUIREMENTS PRIOR TO DEMOLITION WORK.

COORDINATE WITH USAF/USACE.

6. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

EXISTING BUILDING

EXISTING BUILDING

E FLIGHT LINE ROAD

DANFORTH AVE

MAINTAIN AIRCRAFT ACCESS TO

FLIGHT LINE FROM BUILDING 789

AT ALL TIMES, EXCEPT DURING

5C-3

5C-1

5C-2

5C-4

5C-3

SECURE BOUNDARY, TYP.

5D

SECURE BOUNDARY, TYP.

5A

5B

PROVIDE TEMPORARY ROAD DETOUR

AROUND WORK AREA ALONG FLIGHT

LIGHT ROAD. COORDINATE WITH

COMMANDING OFFICER TO MAINTAIN

REQUIRED ACCESS TO ADJACENT

BUILDINGS AND APRONS.

8' - 0" TYP.

6"

6"

BARRICADE NOTES:

1. THE ENTIRE AREA OF ORANGE AND WHITE STRIPES SHALL BE REFLECTIVE WITH SMOOTH SURFACE TYPE REFLECTIVE SHEETING.

2. FLASHING RED CAUTION LIGHTS SHALL BE BATTERY OR SOLAR OPERATED AND SHALL MAINTAIN SUCH INTENSITY SO AS TO BE

READILY IDENTIFIED FROM DISTANCES OF AT LEAST 200 FEET DURING DARKNESS.

3. IF FLAGS ARE USED ON BARRICADE, FLAGS SHALL ALTERNATE ORANGE AND WHITE FROM ONE BARRICADE TO THE NEXT. INSTALL

FLAG AND STAFF TO ENSURE THAT THE FLAG WILL REMAIN EXTENDED AT ALL TIMES.

4. INSTALLED BARRICADES SHALL BE FILLED WITH WATER AFTER PLACEMENT. DURING SUB-FREEZING TEMPERATURES, BARRICADES

SHALL BE FILLED WITH POTASSIUM ACETATE OR CALCIUM CHLORIDE

5. BARRICADES SHALL BE INSTALLED AT THE LOCATIONS SHOWN ON THE PLANS OR AS DIRECTED BY THE CONTRACTING OFFICER AND

AS REQUIRED BY THE CONTRACTOR TO PROTECT THE WORK AREA. THE PHASE DURING WHICH EACH BARRICADE IS TO REMAIN IN PLACE IS INDICATED BY THE PHASING DRAWINGS. BARRICADES SHALL BE INSTALLED AT THE BEGINNING OF EACH PHASE AND SHALL REMAIN IN PLACE THROUGHOUT THE PHASE. IF THE CONTRACTOR MUST TEMPORARILY REMOVE ANY OF THE BARRICADES (TO ALLOW CONSTRUCTION TRAFFIC TO TRAVEL INTO OR OUT OF THE CONSTRUCTION AREA, OR TO COMPLETE CONSTRUCTION AT THE PHASE BOUNDARY), THE CONTRACTOR SHALL PROVIDE A FLAGMAN TO PREVENT AIRCRAFT OR VEHICLE TRAFFIC FROM INADVERTENTLY TRAVELING INTO THE CONSTRUCTION AREA UNTIL THE BARRICADE IS REPLACED AT ITS ORIGINAL POSITION.

6. LOW PROFILE BARRICADES SHALL CONFORM TO UFC 3-260-04, SECTION 8-6. BARRICADE SEGMENTS MAY BE LOCKED CONTINUALLY OR OPTIONALLY SPACED WITH A 4' MAX. GAP, UNLESS OTHERWISE SPECIFIED BY THE CONTRACTING OFFICER. INTERNAL WATER BALLAST SHALL PROVIDE ADEQUATE STABILIZATION TO PREVENT MOVEMENT FROM JET OR PROP BLAST.

7. ALL BARRICADES SHALL DELINEATE THE AREA TO BE PROTECTED AND THE BARRICADE LINE SHALL EXTEND TO THE EDGES OF

PAVEMENT OR AS DIRECTED BY THE CONTRACTING OFFICER.

8. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTENANCE OF BARRICADES INCLUDING LIGHTS DURING CONSTRUCTION.

ALL LIGHTS SHALL BE KEPT IN OPERABLE CONDITION. BARRICADES OR COMPONENTS SHALL BE REPLACED WHEN EXHIBITING SIGNS

OF DAMAGE OR DETERIORATION.

8' - 0" TYP. 4' - 0" MAX. 8' - 0" TYP.

1. TEMPORARY TRANSITIONS SHALL BE PROVIDED AS NECESSARY IN ORDER TO

MAINTAIN AIRCRAFT ACCESS TO EXISTING HANGAR BAYS DUE TO ELEVATION

DIFFERENCES BETWEEN NEW AND EXISTING PAVEMENTS.

2. THE LENGTH OF TEMPORARY ASPHALT TRANSITION VARIES. EXTEND TRANSITION

FROM PROPOSED CONCRETE TO EXISTING CONCRETE AT A 3% SLOPE.

EXISTING CONCRETE

PAVEMENT

TEMPORARY ASPHALT

TRANSITION (3% SLOPE)

NEW CONCRETE PAVEMENT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/16/2021 9:07:53 AM

PH103

C O

N S

T R

U C

T

IO

N S

E Q

U E

N C

IN

G

P L

A N

S

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

S

P

A P

K E

S P

A P

K E

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/64" = 1'-0"

D1

CONSTRUCTION SEQUENCING PLAN - PHASE 5

SCALE: = 1'-0"

0 64 12864

1/64"

N

SCALE: 1 1/2" = 1'-0"

A1

LOW PROFILE BARRICADE DETAIL

SCALE: 1/2" = 1'-0"

C1

LOW PROFILE BARRICADE INSTALLATION SPACING

SCALE: 1/2" = 1'-0"

C6

TEMPORARY TRANSITION DETAIL

SCALE: = 1'-0"

0 2 42

1/2"

SCALE: = 1'-0"3"

NOTE: THE SECURED BOUNDARY AND PHASING

LIMITS ARE SHOWN DIAGRAMMATICALLY AS

REFERENCE ONLY. THE LOCATION SHALL BE

COORDINATED WITH ALL DISCIPLINES HAVING

RESPONSIBILITY. THE CONTRACTING OFFICER

SHALL HAVE THE FINAL RESPONSIBILITY PER THE

SCOPE CONSIDERING AND DEFINED BY THIS

SCOPE OF WORK.

PARTITION LEGEND

DEMOLITION PLAN LEGEND & SHEET NOTES

EXISTING CONSTRUCTION TO BE DEMOLISHED

AN E.I.S. HAS NOT BEEN PROVIDED TO THE DESIGN TEAM AS OF THE FINAL DESIGN

DELIVERABLE. THE POTENTIAL FOR LEECHING AND CONTAMINATED DEBRIS IS LIKELY FOR

SITE STOCK PILING PRIOR TO HAUL OFF. COORDINATE WITH CONTRACTING OFFICE AND

DEMOLITION CONTRACTOR TO FURTHER CLARIFY HAZMAT REPORT PROVIDED BY OTIE.

CULTURAL DISCOVERY STATEMENT:

THE A/E TEAM FOR THE F22 FTU PROJECT HAS NO KNOWLEDGE OF ANY CULTURAL

DISCOVERY. HOWEVER IF THE CONTRACTOR ENCOUNTERS ANY CULTURAL DISCOVERY

WITHIN THE LIMITS OF THE PROJECT, THEY ARE TO STOP WORK IN THAT IMMEDIATE AREA

AND NOTIFY THE CONTRACTING OFFICER. THE CONTRACTING OFFICE WILL REVIEW THE

CONDITION AND PROVIDE DIRECTION TO THE CONTRACTOR ON HOW TO PROCEED.

FIRE WATER PUMP STARTION 758 STATEMENT:

THE A/E TEAM HAS DETERMINED WITH THE ASSISTANCE OF BASE PERSONNEL THAT THIS

BUILDING IS SERVED FROM B748 AND SUPPORTS HANGAR 753 WHICH IS IN THIS SCOPE TO

BE DEMOLISHED IN ITS ENTIRETY. THE A/E TEAM HAS NO FURTHER EXPECTATION THAT ANY

OTHER BUILDINGS WILL BE IMPACTED BY THE TERMINATION OF THE GIS LINES

UNDERGROUND AND THE DEMOLITION OF 758 FIRE WATER PUMP STATION.

A. VERIFY FIELD CONDITIONS AND DIMENSIONS FOR ACCURACY TO CONFIRM THAT DEMOLITION

WORK CAN BE PERFORMED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. NOTIFY

CONTRACTING OFFICER OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE

INTENDED SCOPE OF WORK REFLECTED ON THE DRAWINGS PRIOR TO INITIATING DEMOLITION.

B. OSHA GUIDELINES MUST BE FOLLOWED ALONG WITH BASE PROCEDURES FOR HAZARDOUS

MATERIAL ABATEMENT, DEMOLITION AND HAUL OFF. PROTECTION OF WORKERS SHALL BE IN

COMPLIANCE WITH STATE OR FEDERAL REGULATIONS WHICHEVER IS MORE STRINGENT.

C. DO NOT SCALE DRAWINGS. THESE DRAWINGS ARE DIAGRAMMATIC AND DENOTE INTENT.

QUESTIONS OR DISCREPANCIES REGARDING DIMENSIONS SHALL BE BROUGHT TO THE

ATTENTION OF THE CONTRACTING OFFICER BEFORE PROCEEDING. ALL QUESTIONS SHALL BE

SUBMITTED IN THE FORM OF AN RFI (REQUEST FOR INFORMATION) BY THE CONTRACTOR.

D. COORDINATE WITH CIVIL FOR SITE DEMOLITION EXTENTS OR PORTIONS OF WORK NOT

CLEARLY IDENTIFIED IN THESE DRAWINGS.

E. COORDINATE WITH BASE TO VERIFY ALL SYSTEMS AND UTILITY LINES BOTH ABOVE AND BELOW

GRADE, PRIOR TO DEMOLITION. USE LOCAL, APPROVED BASE SUBCONSULTANTS TO MARK

AND IDENTIFY ALL UNDERGROUND SERVICES. THE CONTRACTORS SHALL SCHEDULE

COORDINATION MEETINGS ON SITE WITH BASE STAKEHOLDERS TO FORM UNDERSTANDING OF

THE ENTIRE SITE AND DEMOLITION SCOPE.

F. THE CONTRACTING OFFICER RESERVES THE RIGHT TO SALVAGE ANY EQUIPMENT OR

MATERIALS. A FINAL REMOVAL DATE WILL BE AGREED UPON PRIOR TO CONTRACTOR

COMMENCING WORK. ANY ITEMS REMAINING…