W9123621R2003_0010.pdf
PDF 764 KB Posted
- Solicitation number
- W9123621R2003
About this file
This document is an amendment to a federal solicitation for construction services. The solicitation is for a six-bay high-bay consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft at Langley Air Force Base. The amendment updates drawings and specifications, wage determinations, security and background check documents, and contract specialist contact information. It also provides the proposal response date of January 12, 2022 at 2:00 PM EST for pricing and small business participation plan factors. Electronic proposals must be submitted through DoD SAFE using a request code obtained from the contract specialist by the specified date and time.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W9123621R2003 is amended as follow s:
1. Draw ings and specif ications are updated.
2. Wage determination is updated.
3. Construction security plan is provided.
4. Installation restoration program background check document is provided.
5. Contract specialist information is updated.
6. Proposal response due date and time is provided in accordance w ith amendment 0008.
Please see the continuation pages for the full amendment breakout.
Contracting POC: Axel Doody 757-201-7712 Axel.F.Doody@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621R2003
X 9B. DATED (SEE ITEM 11)
21-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Dec-2021
CODE
USACE NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123621R2003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0010
Amendment 0010 is issued to provide the following:
1. Changes to drawings and specifications (Refer to Continuation page and attachments)
2. Wage Determination updated on 12 November 2021 (refer to continuation pages)
3. Provide Construction Security Plan (Refer to Attachment 16)
4. Provide Installation Restoration Program Background check document (Refer to Attachment 17)
5. Update Contract Specialist information
6. Proposal response date for Factors 3 and 4
1. CONTRACT DRAWINGS
The following Drawing sheets are revised and accompany this amendment. Delete the existing associated drawing and add the following:
CIVIL: CS103, CS104
STRUCTURAL: S-205, S-505, S-509, S-511, S-514, S-515, S-521, S-522, S-523
ARCHITECTURE: A101C, A101D, A102C, A102D, A132C, A-141, A-201, A-202, A-203, A-311, A-312, A-313, A-402, A-403, A-412, A-413, A-504, A-521, A-522, A-602, A-611
INTERIORS: I101C, I-601, I-602
FIRE PROTECTON: FX102
MECHANICAL: MP102C, M-502
AV: TA202C
SPECIFICATION PROJECT TABLE OF CONTENTS
The following specification is deleted in its entirety:
33 46 13 – FOUNDATION DRAINAGE
The following specifications are revised and accompany this amendment. Delete the existing associated section and add the following:
00 00 00 TABLE OF CONTENTS 14 DEC 21
01 14 00 WORK RESTRICTIONS 14 DEC 21
01 35 26 GOVERNMENT SAFETY REQUIREMENTS 14 DEC 21
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 14 DEC 21
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS 14 DEC 21
02 42 91 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS 14 DEC 21
03 45 00 PRECAST ARCHITECTURAL CONCRETE 14 DEC 21
05 12 00 STRUCTURAL STEEL 14 DEC 21
08 33 13 COILING COUNTER DOORS 14 DEC 21
08 45 23 2-3/4 INCH INSULATED TRANSLUCENT FIBERGLASS, SANDWICH PANEL SYSTEM
14 DEC 21
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES 07 DEC 21
10 26 00 WALL AND DOOR PROTECTION 14 DEC 21
10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED) 14 DEC 21
10 81 13 BIRD CONTROL DEVICES 14 DEC 21
12 24 13 ROLLER WINDOW SHADES 14 DEC 21
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 14 DEC 21
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS 07 DEC 21
2. Updated Wage Determination is added on the continuation pages.
3. SPECIFICATION Section 01 14 00 WORK RESTRICTIONS Attachment 16 “Construction Security Plan (CSP)” accompanying this amendment.
4. SPECIFICATION Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS Attachment 17 “Installation Restoration Program (IRP) Background Chem Data" accompanying this amendment.
5. Updated Contract Specialist Information For all contracting inquiries please contact Axel Doody.
Email: Axel.F.Doody@usace.army.mil Phone: 757-201-7712
6. Proposal Response Date for Factors 3 and 4 As stated in amendment 0008, responses to Factor 3, Small Business Participation Plan, and Factor 4, Price, are due no later than 2:00 PM Eastern Standard Time (EST) 12 January 2022. No other submissions, or proposal revisions will be allowed at that time.
Electronic Proposal Submission in DoD SAFE In accordance with FAR 15.203(c), Electronic commerce may be used to issue RFPs and to receive proposals, modifications, and revisions when contracting by negotiation. Proposals will be submitted through DoD Secure Access File Exchange (DoD SAFE) (https://safe.apps.mil/). All proposals must be uploaded into DoD SAFE infrastructure not earlier than 3 January 2022, and not later than (NLT) 12 January 2022, at 2:00 p.m. (EST).
Request for Upload Code
Offerors will require a unique “request code” to upload proposals into DoD SAFE, which shall be obtained only by email to POC: Axel Doody at Axel.F.Doody@usace.army.mil, and cc: PPMDContracts@usace.army.mil and Katya Oxley Ekaterina.Oxley@usace.army.mil. The email request for the “request code” must be emailed to the POC NLT 12 January 2022, at 12:00 p.m. EST.
The OFFEROR IS SOLELY RESPONSIBLE for ensuring that the entire proposal has been received into DoD SAFE with a timestamp NLT the date and time indicated above.
PLEASE NOTE:
The Government anticipates issuing one more amendment to incorporate ProjNet responses into the solicitation and to provide an amendmened specification in response to ProjNet Inquiry 9517512.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 15-Dec-2021 02:00 PM to 12-Jan-2022 02:00 PM.
The required performance has changed from:
F22 Consolidated Operations and Maintenance Hanger (COMH), at Langley AFB in Hampton, VAa. This acquisition is an unrestricted procurement using a Bifurcatied Solicitation and Best Value Tradeoff criteria under FAR Part 15b. NAICS Code is 236220. Business Size standard is 39.5 Million, PSC Y1BZ.c. Time and due date of Electronic Proposals is listed in Block 13 below and in Section 00 21 00 Instructions to Offerors.d. COntract Specialist POC: Bryan Butler, bryan.j.butler@usace.army.mile. Offerors will not be reimbursed for any effort or porposals costs resulting from this solicitation.
To: F22 Consolidated Operations and Maintenance Hanger (COMH), at Langley AFB in Hampton, VAa. This acquisition is an unrestricted procurement using a Bifurcatied Solicitation and Best Value Tradeoff criteria under FAR Part 15b. NAICS Code is 236220. Business Size standard is 39.5 Million, PSC Y1BZ.c. Time and due date of Electronic Proposals is listed in Block 13 below and in Section 00 21 00 Instructions to Offerors.d. Contract Specialist POC: Axel Doody email: Axel.F.Doody@usace.army.mil e. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation..
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawings and Specifications
1) COMH – Final Design Drawings Part 1 of 3.pdf, dated 01/04/2021, 154 pages
2) COMH – Final Design Drawings Part 2 of 3.pdf, dated 01/04/2021, 158 pages
3) COMH – Final Design Drawings Part 3 of 3.pdf, dated 01/04/2021, 222 pages
4) COMH – Final Design Specifications Part 1 of 1.pdf, dated 01/04/2021, 2900 pages
1) COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf, dated 03/07/2021, 157 pages
2) COMH_RTA_Design Drawings_Part 2 of 3_17MAR21, dated 03/07/2021, 161 pages
3) COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf, dated 03/07/2021, 225 pages
4) COMH_RTA_Specifications part 1 of 1_17MAR21, dated 03/07/2021, 2924 pages
5) COMH - RTA FFE_17MAR21.pdf, dated 03/07/2021, 58 pages
6) COMH - RTA SID_17MAR21, dated 03/07/2021, 32 pages
7) COMH – Section 08 71 00 Door Hardware 02/16 Amendment #0006 24 pages
8) COMH Tech Amendment 1 - AMENDMENT 19 NOV 21 – Drawings 4 pages
9) COMH Tech Amendment 2 - 01 57 13.00 22_Amended 6 pages
10) COMH Tech Amendment 3 - 07 27 19.01_Amended 11 pages
11) COMH Amended Specs_14 DEC 2021_Combined
12) COMH Amended Drawings_14 DEC 2021
(End of clause)
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
WAGE DETERMINATION
General Decision Number: VA20210022 11/12/2021
Superseded General Decision Number: VA20200022
State: Virginia
Construction Type: Building
County: Hampton* County in Virginia.
* INDEPENDENT CITY
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 05/07/2021 3 05/28/2021 4 09/17/2021 5 11/05/2021 6 11/12/2021
ASBE0024-006 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 39.27 18.67+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BOIL0045-003 01/01/2021
Rates Fringes
BOILERMAKER......................$ 42.62 24.81
BRVA0008-001 02/01/2018
Rates Fringes
BRICKLAYER.......................$ 20.59 8.13
* ELEC1340-001 12/01/2020
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 29.00 2.5%+14.59
ELEV0052-005 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 44.14 35.825+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.
ENGI0147-019 11/01/2013
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 28.30 8.69%+8.15 Cranes under 90 tons........$ 27.38 8.69%+8.15
IRON0079-012 05/01/2021
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 26.63 16.67
IRON0079-013 05/01/2021
Rates Fringes
IRONWORKER, RIGGER...............$ 26.63 16.67
PLUM0110-008 11/01/2021
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature
Controls Installations)..........$ 30.77 17.43
PLUMBER..........................$ 30.77 17.43
SUVA2013-037 01/11/2016
Rates Fringes
CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 18.50 0.00
CAULKER..........................$ 18.49 1.33
CEMENT MASON/CONCRETE FINISHER...$ 17.48 0.00
GLAZIER..........................$ 19.36 4.68
IRONWORKER, REINFORCING..........$ 27.18 4.13
LABORER: Mason Tender - Brick...$ 13.48 3.27
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12
LABORER: Pipelayer..............$ 12.40 1.96
LABORER: Common or General, Including Demolition.............$ 12.14 1.60
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 20.69 1.35
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 18.07 3.50
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88
PAINTER (Brush and Roller).......$ 16.87 0.00
PAINTER: Spray..................$ 18.10 5.43
ROOFER...........................$ 18.40 2.31
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.24 2.80
SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 15.50 0.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .