This solicitation is for a consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft at Langley Air Force Base. Key details include:
-
The project scope includes construction of a six-bay high-bay hangar with 175,400 square feet, along with associated facilities for staff administration, maintenance shops, equipment storage, restrooms, and building systems. Demolition of an existing 7,400 square meter facility is also included.
-
Facilities will be designed for permanent construction according to DoD criteria and sustainable principles. The project duration is 700 days from notice to proceed, or 565 days if optional CLIN 0013 is exercised.
-
The facility must withstand seismic and wind loads per applicable codes. Mechanical systems include 150 tons of air conditioning. Utilities, site work, security features, and other support work are in scope.
-
This is a bifurcated solicitation requesting responses for evaluation Factors 1 and 2 initially. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Norfolk.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN SUBMITTAL
STRUCTURAL INTERIOR DESIGN - SID
CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR (COMH)
JOINT BASE LANGLEY-EUTIS - HAMPTON, VA
PROJECT NO:
P2 NO:
TABLE OF CONTENTS
TAB 01 - NARRATIVE OF SID OBJECTIVES
TAB 02- INTERIOR COLOR - SAMPLE BOARDS
TAB 03 - INTERIOR FINISH SCHEDULES - LEGENDS
TAB 04 - DRAWINGS
01. Floor Plans
02. Furniture Footprint Plans
03. Interior Signage Plans, Schedules and Details
04. Interior Elevations, Sections. Details
TAB 01 - NARRATIVE OF SID OBJECTIVE
NARRATIVE OF STRUCTURAL
INTERIOR DESIGN OBJECTIVE
CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR (COMH)
JOINT BASE LANGLEY-EUTIS - HAMPTON, VA
The objective is to integrate the user’s functional and aesthetic values that focus on quality materials that are specific and illustrated products. Interior finishes prioritize all codes of health, safety, and welfare of the facility’s users, by exceeding or meeting project’s requirement of durability and ease of maintenance.
A timeless, neutral palette of colors allows accent patterns and colors to come together to promote a healthy and productive environment. This concept will allow the environment’s aesthetics to be ageless while providing the opportunity to re- evaluate and modify the theme and personality of the space when needed or desired. Color and finishes were selected in such a way as to represent an essentially neutral scheme, but pattern, texture and the correct mix of selected colors raise the level of quality and style representative of the building’s function and users.
The interior environment will provide long-term value and performance for all occupants. This binder contains the schedules, samples, and documentation of the interior finish schemes for this 100% submittal.
TAB 02 - INTERIOR COLOR - SAMPLE BOARDS
P - 1
PAINT 01 - GENERAL
P - 5
PAINT 05 - ACCENT
VT-2
VINYL TILE - ACCENT
RB-1 & RB-2
RUBBER BASE
RST-1
RUBBER STAIR TREAD
RSS-1
STAIR STRIP
WOM-2
WALK OFF MAT - AIR
SHOWER
WOM-1
WALK OFF MAT - ENTRY
VT-1
VINYL TILE
CG-1
CORNER GUARD
P - 3
PAINT 03 - DOOR
RT-1
RUBBER TILE
P - 2
PAINT 02 - DOOR FRAMES
P - 6
PAINT 06 - GYP. CEILINGS
SDT-1
STATIC DISSIPATIVE TILE
P - 4
PAINT 04 - ACCENT
CPT-1
CARPET TILE
LVT-1
LUXURY VINYL TILE
PT-1
PORCELAIN TILE - FLOOR
PT-3
PORCELAIN TILE - ACCENT
SSM-1
SOLID SURFACE
PTB-1
PORCELAIN TILE BASE
GR-2
GROUT - BREAK ROOM
PT-2
PORCELAIN TILE - WALLS
PLAM-1
PLASTIC LAMINATE
PT-4
PORCELAIN TILE - ACCENT
SSM-2
SOLID SURFACE - SILLS
GR-1
GROUT - RESTROOMS
EPY-1
EPOXY FLOOR - RESINOUS
EPP-1
EPOXY PAINT - WALLS
CR-1
ACCENT RAIL
TP-1
TOILET PARTITION
WS-1
WINDOW SHADE
ACT-1
ACOUSTICAL CEILING TILE
AWP-1
ACOUSTICAL WALL PANEL
AS-1
AUDITORIUM SEATING WITH
TABLET
TAB 03 - INTERIOR FINISH SCHEDULES - LEGENDS
GENERAL SHEET NOTES
GENERAL MATERIAL FINISH NOTES
1. PAINT ALL WALLS P-1 U.N.O.
2. PAINT ALL EXPOSED STRUCTURE P-6 U.N.O.
3. APPLY HOLLOW METAL DOOR FRAMES TO MATCH ADJACENT WALL COLOR,
UNLESS OTHERWISE NOTED.
4. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR
COMPLETE INSTALLATION OF WALL AND FLOOR TILE.
5. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE. PROVIDE METAL
TRANSITION PIECE AT ALL HORIZONTAL TO VERTICAL TILE APPLICATIONS.
6. ALIGN ALL PORCELAIN TILE FLOOR GROUT JOINTS WITH BASE OR WALL TILE
GROUT JOINTS. MAX GROUT JOINT IS 1/8".
7. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
8. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
9. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE
INSTRUCTIONS AND SPECIFICATIONS OF PAINT MANUFACTURER.
10. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH
PAINT SPRAYER. MATCH ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH
IS NOT ACCEPTABLE.
11. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
12. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO
NOT INSTALL THERMOSTAT IN CENTER OF WALL.
13. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND
DRAINS.
14. PROVIDE CONCRETE SLAB VAPOR TRANSMISSION TESTING FOR VARIOUS
FLOOR FINISH MATERIALS PER THE MANUFACTURERS RECOMMENDED
GUIDELINES. TEST RESULTS SHALL BE REVIEWED AND APPROVED IN ALL
LOCATIONS WHERE MATERIAL IS GOING TO BE INSTALLED.
15. FINISHES ARE SCHEDULED ACCORDING TO PLAN NORTH.
FINISH MATERIAL ABBREVIATIONS
ACT ACOUSTIC CEILING TILE
AWP ACOUSTIC WALL PANEL
CG CORNER GUARD
CON CONCRETE
CPT CARPET TILE
EPP EPOXY PAINT
EPY EPOXY
EXP EXPOSED
GR GROUT
LVT LUXURY VINYL TILE
P PAINT
PLAM PLASTIC LAMINATE
PT PORCELAIN TILE
PTB PORCELAIN TILE BASE
RB RUBBER BASE
RSS RUBBER STAIR STRIP
RST RUBBER STAIR TREAD
RT RUBBER TILE
SC SEALED CONCRETE WITH HARDENER
SDT STATIC DISSIPATIVE TILE
SIGN SIGNAGE
SSM SOLID SURFACE MATERIAL
TP TOILET PARTITION
TS TRANSITION
VT VINYL TILE
WOM WALK OFF MAT
WS WINDOW SHADE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/10/2021 10:24:10 AM
I-601
R O
O M
F
IN
IS
H
S C
H E
D U
L E
L
E G
E N
D A
N D
N O
T E
S
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
INTERIOR FINISH SCHEDULE
ROOM
NO. ROOM NAME
FLOOR FINISH WALL FINISH CEILING
FINISH
CEILING
HEIGHT REMARKSFLOOR BASE NORTH EAST SOUTH WEST
144 MENS RESTROOM PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD
RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS
150 VESTIBULE/ AIR SHOWER SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6/EX
P
9'-0" WOM-2 TO BE PROVIDED AT AIR SHOWERS. SEE
FIRST FLOOR INTERIOR FINISH PLANS.
151 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
152 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -
153 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
154 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
155 LOCKERS/ STORAGE VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"
156 BREAKROOM VT-1 RB-1 P-1/PT-4 P-1 P-1 P-1 ACT-1 9'-0"
157 OIL LAB SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0"
158 PRIMARY INSPECTION AREA SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0"
159 TOOL ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
160 CLASSROOM/BRIEF VT-1 RB-1 P-1 P-5 P-1 P-1 ACT-1 9'-0"
161 ADMIN VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
162 ADMIN VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
200 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
201A CONFERENCE CPT-1 RB-1 P-1 P-5 P-1 P-1 ACT-1 -
201B MECHANICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
202 NURSING/ LACTATION ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
203 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
204 1/192 AMXS CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-1 P-4 ACT-1 9'-0"
205 CONFERENCE/ BRIEFING CPT-1 RB-2 P-1 P-1/P-5/CR-1 P-1 P-1/P-5/CR-1 ACT-1 10'-0" SEE SHEET I102D
206 1/192 AMXS 1ST SGT CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
207 1/192 OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
208 1/192 AMXS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
209 1/192 AMXS CSS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
210 1/192 AMXS CHIEFS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
211 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
211A CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
212 1/192 AMXS WORK ROOM CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
213 1/192 AMXS CC CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
214 149TH S.ENL CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
215 149TH DO CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
216 149TH DSG CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
217 STOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
218 149TH CC CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
219 ELECT SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
220 CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-4 P-1 ACT-1 9'-0"
221 MECH SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
222 ASST. DIR. OF OPERATIONS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
223 OPS CPT-1 RB-2 P-4 P-4 P-1 P-1 ACT-1 9'-0"
224 VEST. PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"
225 MALE RESTROOM /LOCKER PT-1 PTB-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" PROVIDE 5/8" MOLD RESISTANT AND ANTI-MICROBIAL
GWB ON CEILINGS, REFER TO INTERIOR ELEVATIONS
FOR TILE LOCATIONS.
226 VEST. PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"
227 FEMALE RESTROOM /LOCKER PT-1 PTB-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" PROVIDE 5/8" MOLD RESISTANT AND ANTI-MICROBIAL
GWB ON CEILINGS,REFER TO INTERIOR ELEVATIONS
FOR TILE LOCATIONS
228 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -
229 STORAGE VT-1 RB-1 P-1 P-1 P-1 P-1 EXP -
230 HERITAGE/BREAK LVT-1 RB-1 P-1 P-1 P-1/PT-4 P-1 ACT-1 VARIES SEE RCP FOR CEILING HEIGHTS
231 FLIGHT COMMANDER'S OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
232 APO MAN TRAP VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
233 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
234 ADMIN CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
235 BREAK VT-1 RB-1 P-1/PT-4 P-1 P-1 P-4 ACT-1 9'-0"
236 ISSO SUPER CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
237 APO PM CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
238 GSSO SUPER CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
239 GSSO SECURITY OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
240 APO CONFERENCE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
241 ISSO OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
242 APO BRIEFING CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
243 MX/LOGISTICS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
244 APO BRIEFING CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
246 APO CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
247 APO SERVER ROOM SDT-1 RB-1 P-1 P-1 P-1 P-1 EXP -
248 W/C PT-1 PTB-1 PT-2/PT-3/EPP-1 EPP-1 EPP-1 EPP-1 GYP/P-6 9'-0"
249 W/C PT-1 PTB-1 EPP-1 EPP-1 PT-2/PT-3/EPP-1 EPP-1 GYP/P-6 9'-0"
250 APO STORAGE /JAN SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
251 APO ELEC SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
252 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
253 AMXS PLANS & SCHED. CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
254 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
EL01 ELEVATOR VT-1 - - - - - - N/A SEE ELEVATOR MANUFACTURER STANDARDS
S1 STAIRS RT-1, RST-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 VARIES RAILING TO MATCH STAIR TREAD COLOR
S2 STAIRS RT-1, RST-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 VARIES RAILING TO MATCH STAIR TREAD COLOR
INTERIOR FINISH SCHEDULE
ROOM
NO. ROOM NAME
FLOOR FINISH WALL FINISH CEILING
FINISH
CEILING
HEIGHT REMARKSFLOOR BASE NORTH EAST SOUTH WEST
000 MECHANICAL YARD SC-1 - P-1 P-1 P-1 P-1 - N/A
001 ELECTRICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
002 MECHANICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
003 FIRE PUMP ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
004 MECHANICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
005 COMM ENCLOSURE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
100 HANGAR EPY-1 - EPP-1 EPP-1 EPP-1 EPP-1 EXP -
101 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
102 MOBILITY STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
103 COLLATERAL STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
104 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0" WOM-1 TO BE PROVIDED AT ENTRY. SEE FIRST
FLOOR INTERIOR FINISH PLANS.
105 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -
106 LO SUPPORT STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
107 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
108 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
109 LO SUPPORT BREAK AREA SC-1 RB-1 P-1 P-1 P-1 P-4 ACT-1 9'-0"
110 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
112 LO SUPPORT VEST SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
113 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
114 ELECTRICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
115 CONTROL ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6 -
120 VESTIBULE/ AIR SHOWER SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6/EX
P
9'-0" WOM-2 TO BE PROVIDED AT AIR SHOWERS. SEE
FIRST FLOOR INTERIOR FINISH PLANS.
121 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
122 VESTIBULE PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"
123 MALE RESTROOM PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD
RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS
124 LOCKER ROOM PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0" PROVIDE 5/8" MOLD RESISTANT AND ANTI-MICROBIAL
GWB ON CEILINGS
125 MALE SHOWERS PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD
RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS
126 STOR. VT-1 RB-1 P-1 P-1 P-1 P-1 EXP -
127 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -
128 VESTIBULE PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"
129 FEMALE RESTROOM/ LOCKERS PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD
RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS
130 FEMALE SHOWERS PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD
RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS
131 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0" WOM-1 TO BE PROVIDED AT ENTRY. SEE FIRST
FLOOR INTERIOR FINISH PLANS.
132 OPEN OFFICE VT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1 9'-0"
133 TIRE STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
134 HAZMAT STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
135 WORK SPACE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
136 OFFICE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
137 LO SUPPORT SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
138 OFFICE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
139 OFFICE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
140 MOBILITY TOOL AREA SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
141 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0" WOM-1 TO BE PROVIDED AT ENTRY. SEE FIRST
FLOOR INTERIOR FINISH PLANS.
142 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
143 WOMENS RESTROOM PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD
RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS
INTERIOR FINISH LEGEND (BASIS OF DESIGN)
CODE TYPE SPECIFICATION SIZE COMMENTS
ACT-1 ACOUSTICAL CEILING PANEL 09 51 00 24" X 24" 9/16" GRID
AS-1 AUDITORIUM SEATING 12 61 13 SMALL TABLET TABLET:STERLING ASH
AWP-1 ACOUSTIC WALL PANEL 09 84 20 24" X 48" CUSTOM COLOR TO MATCH WALL
CG-1 CORNER GUARD 10 26 00 2" LEG E.S. 16 GUAGE / STAINLESS STEEL
CPT-1 CARPET TILE 09 68 00 50CM X 50CM INSTALLATION - ASHLAR
CR-1 CRASH RAIL 10 26 00 - STAINLESS STEEL
EPP-1 EPOXY PAINT - WALLS 09 90 00 - HANGAR WALLS
EPY-1 EPOXY FLOOR - RESINOUS 09 67 23.16 - HANGAR FLOOR. SEE SHEETS A-801 & A-801 FOR HANGAR FLOOR MARKINGS
GR-1 GROUT 09 30 10 1/8" RESTROOMS
GR-2 GROUT 09 30 10 1/8" BREAK ROOM BACKSPLASH
LVT-1 LUXURY VINYL TILE 09 65 00 7" X 48" RIGID, CLICK FLOOR
P-1 PAINT - GENERAL 09 90 00 -
P-2 PAINT - DOOR FRAMES 09 90 00 -
P-3 PAINT - DOOR 09 90 00 -
P-4 PAINT - ACCENT 09 90 00 -
P-5 PAINT - ACCENT 09 90 00 -
P-6 PAINT - GYP. CEILINGS 09 90 00 - GWB CEILINGS, EXPOSED ADMIN AND HANGAR STRUCTURE
PLAM-1 PLASTIC LAMINATE 06 41 16.00 10 - CASEWORK
PT-1 PORCELAIN TILE FLOOR - RESTROOMS 09 30 10 24" X 36" INSTALL WITH 1/8" GROUT JOINTS
PT-2 PORCELAIN TILE WALLS - RESTROOMS 09 30 10 12" x 24" INSTALL WITH 1/8" GROUT JOINTS
PT-3 PORCELAIN TILE - ACCENT 09 30 10 1" x 3" INSTALL WITH 1/8" GROUT JOINTS
PT-4 PORCELAIN TILE - ACCENT 09 30 10 3" X 12" BACKSPLASH
PTB-1 PORCELAIN TILE BASE 09 30 10 6" H CUT TILE, FINISH SIDE UP, WITH TRIM
RB-1 RUBBER BASE - COVE 09 65 00 4"H FOR RESILIENT TILE & CONCRETE AREAS. SPECIFY IN CONTINUOUS ROLLS.
RB-2 RUBBER BASE - STRAIGHT 09 65 00 4"H FOR CARPET TILE AREAS (IF NEEDED WITH CPT ALTERNATE). SPECIFY IN CONTINUOUS ROLLS.
RSS -1 RUBBER STAIR CARBORUNIDUM STRIP 09 65 00 2.5" STAIR - ANTI-SLIP STRIP PER TREAD
RST-1 RUBBER STAIR TREAD WITH INTEGRATED RISER 09 65 00 48" STAIRS
RT-1 RUBBER TILE 09 65 00 18" X 18" STAIRS
SC-1 SEALED CONCRETE WITH HARDENER 03 30 00 - -
SDT-1 STATIC DISSIPATIVE TILE 09 62 38 12" X 12" SERVER ROOMS
SIGN SIGNAGE 10 14 00
SSM-1 SOLID SURFACE 06 61 16 2CM BREAK ROOM COUNTERTOP AND BACKSPLASH
SSM-2 SOLID SURFACE 06 61 16 1/2" THICK WINDOW SILLS
TP-1 TOILET PARTITION 10 21 13 - ECLIPSE RESTROOM PARTITION
TS-1 TRANSITION - TILE CORNER EDGE TRIM 09 30 10 - TILE WALL - OUTSIDE CORNERS
TS-2 TRANSITION - VT TO CONCRETE 09 30 10 -
TS-3 TRANSITION - PORCELAIN TILE TO VINYL TILE 09 30 10 -
TS-4 TRANSITION - VT TO LVT 09 30 10 -
TS-6 TRANSITION - TILE TO CONCRETE 09 30 10 -
VT-1 VINYL TILE 09 65 00 24" X 24"
VT-2 VINYL TILE - ACCENT 09 65 00 24" X 24"
WOM-1 WALK OFF MAT - ENTRY MOUNTED 12 48 13 -
WOM-2 WALK OFF MAT - INSERT 12 48 13 -
WS-1 WINDOW SHADE 12 24 13 .022 THICK
NOTE: SEE STRUCTURAL INTERIOR DESIGN BINDER FOR FURTHER INFORMATION ON COLOR AND PATTERN.
TAB 04 - DRAWINGS
UP
S2
161160
123129
120121
S1
139 137
122128
FLOOR FINISH LEGEND
EPY-1
PT-1
RT-1, RST-1
SC-1
VT-1
SEE A1/I101D
S E
E A
1/ I1
C
S E
E A
1/ I1
C
S E
E A
1/ I1
A
SEE A1/I101A
SEE A1/I101B
S E
E A
1/ I1
A
SEE A1/I101C
BROOM FINISHED
CONCRETE SLAB ON GRADE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:39 PM
I-101
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
O
V E
R A
L L
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/16" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - OVERALL
N
KEY PLAN
SCALE: = 1'-0"
0 16 3216
1/16"
ROOM NUMBER LEGEND - FIRST FLOOR
ROOM NO. ROOM NAME
000 MECHANICAL YARD
001 ELECTRICAL
002 MECHANICAL
003 FIRE PUMP ROOM
004 MECHANICAL
005 COMM ENCLOSURE
100 HANGAR
101 CORRIDOR
102 MOBILITY STORAGE
103 COLLATERAL STORAGE
104 CORRIDOR
105 JAN
106 LO SUPPORT STORAGE
107 CORRIDOR
108 CORRIDOR
109 LO SUPPORT BREAK AREA
110 CORRIDOR
112 LO SUPPORT VEST
113 CORRIDOR
114 ELECTRICAL
115 CONTROL ROOM
120 VESTIBULE/ AIR SHOWER
121 CORRIDOR
122 VESTIBULE
123 MALE RESTROOM
124 LOCKER ROOM
125 MALE SHOWERS
126 STOR.
127 JAN
128 VESTIBULE
129 FEMALE RESTROOM/ LOCKERS
130 FEMALE SHOWERS
131 CORRIDOR
132 OPEN OFFICE
133 TIRE STORAGE
134 HAZMAT STORAGE
135 WORK SPACE
136 OFFICE
137 LO SUPPORT
138 OFFICE
139 OFFICE
140 MOBILITY TOOL AREA
141 CORRIDOR
142 VESTIBULE
143 WOMENS RESTROOM
144 MENS RESTROOM
150 VESTIBULE/ AIR SHOWER
151 VESTIBULE
152 JAN
153 COMM
154 CORRIDOR
155 LOCKERS/ STORAGE
156 BREAKROOM
157 OIL LAB
158 PRIMARY INSPECTION AREA
159 TOOL ROOM
160 CLASSROOM/BRIEF
161 ADMIN
162 ADMIN
EL01 ELEVATOR
S1 STAIRS
S2 STAIRS
517 SF
COLLATERAL STORAGE
1220 SF
LO SUPPORT STORAGE
124 SF
CORRIDOR
FLOOR FINISH LEGEND
EPY-1
SC-1
HANGAR
SEE A1/I101B
S E
E A
1/ I1
D
S E
E A
1/ I1
D
SEE A1/I101B
CG-1
TS-5
TS-5
TS-5
TS-5
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
3. PAINT ALL WALLS P-1 U.N.O.
4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
19. WINDOW SILLS TO BE SSM-2.
20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
ACCENT WALL LEGEND
ACCENT WALL PAINT LOCATION
WITH PAINT COLOR CODE. SEE
FINISH LEGEND FOR PAINT COLOR
INFORMATION.
P-X US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:10:35 PM
I101A
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A A
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA A N
KEY PLAN
SCALE: = 1'-0"
0 8 168
1/8"
36334 SF
HANGAR
281 SF
MOBILITY STORAGE
72 SF
JAN
183 SF
ELECTRICAL
686 SF
FIRE PUMP ROOM
183 SF
MECHANICAL
142 SF
CORRIDOR
192 SF
CORRIDOR
FLOOR FINISH LEGEND
EPY-1
SC-1
SEE A1/I101A
S E
E A
1/ I1
C
S E
E A
1/ I1
D
COMM
ENCLOSURE
WOM-1
10' - 0" 1' - 4"
8'
1'
CG-1
CG-1
CG-1
TS-5
TS-5
TS-5
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
3. PAINT ALL WALLS P-1 U.N.O.
4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
19. WINDOW SILLS TO BE SSM-2.
20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
ACCENT WALL LEGEND
ACCENT WALL PAINT LOCATION
WITH PAINT COLOR CODE. SEE
FINISH LEGEND FOR PAINT COLOR
INFORMATION.
P-X US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:10:39 PM
I101B
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A B
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA B N
KEY PLAN
SCALE: = 1'-0"
862 SF
TIRE STORAGE
133 391 SF
OPEN OFFICE
333 SF
MALE RESTROOM
56 SF
JAN
101 SF
VESTIBULE/ AIR SHOWER
201 SF
CORRIDOR
475 SF
CORRIDOR
168 SF
OFFICE
238 SF
STAIRS
S1
168 SF
OFFICE
2651 SF
LO SUPPORT
479 SF
MECHANICAL
295 SF
LO SUPPORT BREAK AREA
133 SF
LO SUPPORT VEST
482 SF
MOBILITY TOOL AREA
972 SF
MECHANICAL YARD
71 SF
VESTIBULE
64 SF
VESTIBULE
128 52 SF
STOR.
351 SF
CORRIDOR
165 SF
CORRIDOR
FLOOR FINISH LEGEND
EPY-1
PT-1
RT-1, RST-1
SC-1
VT-1
S E
E A
1/ I1
D
S E
E A
1/ I1
B
SEE A1/I101D
727 SF
LOCKER ROOM
380 SF
FEMALE
RESTROOM/
LOCKERS
36334 SF
HANGAR
WOM-1
9'
7"
1' - 0" 10' - 0"
CG-1
CG-1
PT-5 PT-4
PT-5PT-5 PT-5
CG-1
P-4
TS-2
TS-2
TS-2
TS-2
TS-5
TS-2
TS-2
TS-2
TS-2
TS-2TS-3 TS-3
CG-1
TS-2
TS-5
4" V
.I.
F
4"
6"
V.I.F.
6"
WOM-2
TS-2
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
3. PAINT ALL WALLS P-1 U.N.O.
4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
19. WINDOW SILLS TO BE SSM-2.
20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
ACCENT WALL LEGEND
ACCENT WALL PAINT LOCATION
WITH PAINT COLOR CODE. SEE
FINISH LEGEND FOR PAINT COLOR
INFORMATION.
P-X US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:10:45 PM
I101C
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A C
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA C
N
KEY PLAN
SCALE: = 1'-0"
273 SF
STAIRS
S2
198 SF
ELECTRICAL
366 SF
OIL LAB
487 SF
LOCKERS/ STORAGE
259 SF
TOOL ROOM
273 SF
BREAKROOM
177 SF
ADMIN
161842 SF
CLASSROOM/BRIEF
1373 SF
PRIMARY INSPECTION AREA
139 SF
VESTIBULE
180 SF
MENS RESTROOM
356 SF
HAZMAT STORAGE
676 SF
WORK SPACE
380 SF
FEMALE RESTROOM/ LOCKERS
73 SF
JAN
172 SF
ADMIN
207 SF
COMM
64 SF
VESTIBULE/ AIR SHOWER
181 SF
WOMENS RESTROOM
270 SF
CORRIDOR
727 SF
LOCKER ROOM
117 SF
FEMALE SHOWERS
118 SF
OFFICE
152 SF
MALE SHOWERS
83 SF
CORRIDOR
166 SF
CORRIDOR
192 SF
VESTIBULE
FLOOR FINISH LEGEND
EPY-1
PT-1
RT-1, RST-1
SC-1
VT-1
S E
E A
1/ I1
A
SEE A1/I101C
94 SF
CONTROL ROOM
36334 SF
HANGAR
84 SF
ELEVATOR
EL01
333 SF
MALE RESTROOM
WOM-1
9" 4' - 0"
CG-1
CG-1
CG-1 CG-1
CG-1
CG-1
CG-1
CG-1
P-5
CG-1
P-5P-5
P-4
CG-1
VT-2
VT-22'
2'
2'
2'
2'
2'
2'
2'
4'
2' - 0" 2' - 0"
2' - 0" 4' - 0"
P-4
TS-2
TS-2
TS-2
TS-2 TS-4
TS-2
TS-2
TS-2
TS-2
TS-2
TS-3
TS-3
TS-5
TS-5
6" V.I.F. 6"
4" V
.I.
F
4"
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
3. PAINT ALL WALLS P-1 U.N.O.
4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
19. WINDOW SILLS TO BE SSM-2.
20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
ACCENT WALL LEGEND
ACCENT WALL PAINT LOCATION
WITH PAINT COLOR CODE. SEE
FINISH LEGEND FOR PAINT COLOR
INFORMATION.
P-X US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:10:52 PM
I101D
F
IR
S T
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A D
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR INTERIOR FINISH PLAN - AREA D
N
KEY PLAN
SCALE: = 1'-0"
DN
S2
201A
238237231 235
S1
244225
248249
210 204
229 234
236 241
FLOOR FINISH LEGEND
CPT-1
LVT-1
PT-1
RT-1, RST-1
SC-1
SDT-1
VT-1
OPEN OPEN
SEE A1/I102D
SEE A1/I102C
201B
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:48 PM
I-102
S E
C O
N D
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
O
V E
R A
L L
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/16" = 1'-0"
A1
SECOND FLOOR INTERIOR FINISH PLAN - OVERALL N
KEY PLAN
SCALE: = 1'-0"
0 16 3216
1/16"
ROOM NUMBER LEGEND - SECOND FLOOR
ROOM NO. ROOM NAME
200 VESTIBULE
201A CONFERENCE
201B MECHANICAL
202 NURSING/ LACTATION ROOM
203 CORRIDOR
204 1/192 AMXS CONFERENCE ROOM
205 CONFERENCE/ BRIEFING
206 1/192 AMXS 1ST SGT
207 1/192 OFFICE
208 1/192 AMXS
209 1/192 AMXS CSS
210 1/192 AMXS CHIEFS
211 CORRIDOR
211A CORRIDOR
212 1/192 AMXS WORK ROOM
213 1/192 AMXS CC
214 149TH S.ENL
215 149TH DO
216 149TH DSG
217 STOR
218 149TH CC
219 ELECT
220 CONFERENCE ROOM
221 MECH
222 ASST. DIR. OF OPERATIONS
223 OPS
224 VEST.
225 MALE RESTROOM /LOCKER
226 VEST.
227 FEMALE RESTROOM /LOCKER
228 JAN
229 STORAGE
230 HERITAGE/BREAK
231 FLIGHT COMMANDER'S OFFICE
232 APO MAN TRAP
233 CORRIDOR
234 ADMIN
235 BREAK
236 ISSO SUPER
237 APO PM
238 GSSO SUPER
239 GSSO SECURITY OFFICE
240 APO CONFERENCE
241 ISSO OFFICE
242 APO BRIEFING
243 MX/LOGISTICS
244 APO BRIEFING
246 APO CONFERENCE ROOM
247 APO SERVER ROOM
248 W/C
249 W/C
250 APO STORAGE /JAN
251 APO ELEC
252 CORRIDOR
253 AMXS PLANS & SCHED.
254 COMM
S1 STAIRS
S2 STAIRS
146 SF
149TH CC
301 SF
APO BRIEFING
402 SF
APO CONFERENCE
613 SF
GSSO SECURITY OFFICE
116 SF
GSSO SUPER
116 SF
APO PM
219 SF
FLIGHT COMMANDER'S OFFICE
135 SF
BREAK
124 SF
OPS
61 SF
MECH
239 SF
STAIRS
S1
240 SF
APO BRIEFING
613 SF
MALE RESTROOM /LOCKER
781 SF
HERITAGE/BREAK
386 SF
FEMALE RESTROOM /LOCKER
71 SF
W/C
70 SF
W/C
120 SF
ELECT
847 SF
CORRIDOR
262 SF
CONFERENCE ROOM
142 SF
ASST. DIR. OF OPERATIONS
99 SF
STORAGE
153 SF
ADMIN
60 SF
APO MAN TRAP
119 SF
ISSO SUPER
180 SF
ISSO OFFICE
119 SF
MX/LOGISTICS
105 SF
STOR
93 SF
JAN
45 SF
VEST.
41 SF
VEST.
604 SF
APO CONFERENCE ROOM
71 SF
APO ELEC
FLOOR FINISH LEGEND
CPT-1
LVT-1
PT-1
RT-1, RST-1
SC-1
VT-1
1171 SF
CORRIDOR
SEE A1/I102D
CORRIDOR
211A
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1CG-1
CG-1
P-4
P-4
4' - 0" 4' - 0" 2' - 0"
2'
2'
2'
4'
VT-2
P-4
P-4
VT-2
TS-3
TS-3
TS-3
TS-3
TS-2
TS-2
TS-3
TS-3
TS-3
TS-3
TS-3
TS-3
TS-3
TS-3
TS-3
PT-4
TS-4
TS-3
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
3. PAINT ALL WALLS P-1 U.N.O.
4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
19. WINDOW SILLS TO BE SSM-2.
20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
ACCENT WALL LEGEND
ACCENT WALL PAINT LOCATION
WITH PAINT COLOR CODE. SEE
FINISH LEGEND FOR PAINT COLOR
INFORMATION.
P-X US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:10:58 PM
I102C
S E
C O
N D
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A C
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
SECOND FLOOR INTERIOR FINISH PLAN - AREA C
N
KEY PLAN
SCALE: = 1'-0"
274 SF
STAIRS
S2
368 SF
CONFERENCE
201A
201 SF
APO SERVER ROOM
84 SF
APO STORAGE /JAN
356 SF
AMXS PLANS & SCHED.
146 SF
149TH S.ENL
214 927 SF
CONFERENCE/ BRIEFING
146 SF
149TH DO
655 SF
1/192 AMXS CHIEFS
538 SF
1/192 AMXS CONFERENCE
ROOM
121 SF
1/192 AMXS 1ST SGT
146 SF
1/192 AMXS CC
121 SF
1/192 OFFICE
341 SF
1/192 AMXS WORK ROOM
730 SF
149TH DSG
519 SF
1/192 AMXS CSS
194 SF
VESTIBULE
202 SF
COMM
335 SF
1/192 AMXS
162 SF
NURSING/ LACTATION ROOM
202534 SF
CORRIDOR
120 SF
CORRIDOR
1171 SF
CORRIDOR
FLOOR FINISH LEGEND
CPT-1
PT-1
RT-1, RST-1
SC-1
SDT-1
VT-1
SEE A1/I102C SEE A1/I102C
84 SF
ELEVATOR
EL01
CORRIDOR
CG-1
CG-1
CG-1 CG-1 CG-1
CG-1
CG-1 CG-1
CG-1
CG-1
CG-1CG-1 CG-1
CG-1
CG-1
P-5
P-4
P-5/CR-1
P-5
P-4
P-4
P-1 / CR-1
P-1 / CR-1
P-1 / CR-1
P-1 / CR-1
CG-1
TS-3
TS-3
TS-3
TS-3
TS-3
TS-3
TS-3
TS-3
TS-3
TS-2TS-4
TS-3
TS-2
TS-3
TS-4TS-4
TS-3TS-3TS-3
TS-3
MECHANICAL
201B
GENERAL SHEET NOTES
FINISH PLAN GENERAL NOTES
1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.
2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.
3. PAINT ALL WALLS P-1 U.N.O.
4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.
5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF
WALL AND FLOOR TILE.
6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.
7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.
8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND
SPECIFICATIONS OF PAINT MANUFACTURER.
11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH
ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.
12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT
IN CENTER OF WALL.
14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.
15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.
16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.
17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.
18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.
19. WINDOW SILLS TO BE SSM-2.
20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.
21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.
ACCENT WALL LEGEND
ACCENT WALL PAINT LOCATION
WITH PAINT COLOR CODE. SEE
FINISH LEGEND FOR PAINT COLOR
INFORMATION.
P-X
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:02 PM
I102D
S E
C O
N D
F L
O O
R I
N T
E R
IO
R
F
IN
IS
H
P L
A N
A
R E
A D
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
SECOND FLOOR INTERIOR FINISH PLAN - AREA D N
KEY PLAN
SCALE: = 1'-0"
HANGAR
COLLATERAL
STORAGE
LO SUPPORT
STORAGE
CORRIDOR
CORRIDOR
B 026
B 027
E 068
B 028
B 030
E 073
E 074
I 403
L 420
N 445
M 424M 421M 422M 423
N 461 N 446
M 431
M 435 M 432 M 433 M 434
1'
T Y
P
TYPE "M" HAZARD SIGN PAINTED ON
PAVEMENT (10) LOCATIONS EXTERIOR AND
(10) LOCATIONS INTERIOR EACH SIDE.
S 102
B 055
B 056
U 469
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:06 PM
I131A
F
IR
S T
F L
O O
R S
IG
N
A G
E P
L A
N
A R
E A
A
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR SIGNAGE PLAN - AREA A N
KEY PLAN
SCALE: = 1'-0"
MOBILITY
STORAGE
COLLATERAL
STORAGE
JAN
ELECTRICAL
FIRE PUMP
ROOM
MECHANICAL
CORRIDOR
CORRIDOR
COMM
ENCLOSURE
B 029
E 069
B 030
B 031
B 032
B 033 E 070
B 034
B 041
B 049
B 048
L 094
N 447
M 429 M 428 M 427 M 426
N 448
N 449
J 407
J 419
J 408
N 459
P 464
P 466
P 467
M 440 M 437 M 438 M 439
I 406
TYPE "M" HAZARD SIGN PAINTED ON PAVEMENT (10)
LOCATIONS EXTERIOR AND (10) LOCATIONS INTERIOR
EACH SIDE
O 462
S 103
U 471
M 444
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:10 PM
I131B
F
IR
S T
F L
O O
R S
IG
N
A G
E P
L A
N
A R
E A
B
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR SIGNAGE PLAN - AREA B
N
KEY PLAN
SCALE: = 1'-0"
HAZMAT
STORAGE
TIRE STORAGE
OPEN OFFICE
MALE
RESTROOM
FEMALE
RESTROOM/
LOCKERS
JAN
VESTIBULE/ AIR
SHOWER
CORRIDOR
CORRIDOR
OFFICE
STAIRS
S1
OFFICE
LO SUPPORT
MECHANICAL
LO SUPPORT
BREAK AREA
LO SUPPORT
VEST
LOCKER ROOM
MOBILITY TOOL
AREA
MECHANICAL
YARD
VESTIBULE
VESTIBULE
STOR.
CORRIDOR
CORRIDOR
CORRIDOR
C 057 C 058
C 059
B 007B 008
B 009 B 010C 060
C 061
K 093
B 016 B 017
B 018
B 019B 020
B 021
B 022
J 418
E 067
B 023
B 024
B 025
A 003
G 079
I 401
E 072
B 040
A 005
E 077
I 402
B 046
B 047
M 429
N 449
M 430
N 450
N 453
N 451
N 452
N 457
N 455
N 454
J 409
I 400
B 053
J 410
J 411
I 404
J 412
J 413
J 414
P 465
P 463
M 442 M 441 M 440
TYPE "M" HAZARD SIGN PAINTED ON
PAVEMENT (10) LOCATIONS EXTERIOR AND
(10) LOCATIONS INTERIOR EACH SIDE
Z 108
H 086
B 054
H 087
H 088
H 089 S 100
Q 098 U 470
T 106
H 090
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:15 PM
I131C
F
IR
S T
F L
O O
R S
IG
N
A G
E P
L A
N
A R
E A
C
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR SIGNAGE PLAN - AREA C
N
KEY PLAN
SCALE: = 1'-0"
P F
A 002
A 001
B 006
STAIRS
S2
ELECTRICAL
OIL LAB
LOCKERS/
STORAGE
TOOL ROOM
BREAKROOM
ADMIN
CLASSROOM/BRIEF
PRIMARY
INSPECTION
AREA
VESTIBULE
MENS
RESTROOM
HAZMAT
STORAGE
WORK SPACE
MALE
RESTROOM
JAN
ADMIN
COMM
VESTIBULE/ AIR
SHOWER
WOMENS
RESTROOM
CORRIDOR
FEMALE
SHOWERS
OFFICE
MALE
SHOWERS
CORRIDOR
CORRIDOR
VESTIBULE
ELEVATOR
EL01
CONTROL
ROOM
K 092
C 063 C 062
C 064
C 065
B 011
B 012
B 013
B 014 B 015
B 035
B 036 B 037 B 038
G 246
A 004
B 039
G 080 B 042
B 043
B 044
D 076
B 048
B 050
B 051
E 075
M 423
N 461
N 454
N 456
N 458
M 425
J 415
J 416
J 417
I 405
M 436 M 435
TYPE "M" HAZARD SIGN PAINTED ON
PAVEMENT (10) LOCATIONS EXTERIOR AND
(10) LOCATIONS INTERIOR EACH SIDE
H 082
H 083
H 084
H 085
F 078
Q 097
P 095 P 096
D 066
S 101
U 468
T 104
T 105
R 099
T 107
H 091
N 460
M 443
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:20 PM
I131D
F
IR
S T
F L
O O
R S
IG
N
A G
E P
L A
N
A R
E A
D
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
FIRST FLOOR SIGNAGE PLAN - AREA D N
KEY PLAN
SCALE: = 1'-0"
149TH CC
APO BRIEFING
APO
CONFERENCE
GSSO
SECURITY
OFFICE
GSSO SUPER
APO PM
FLIGHT
COMMANDER'S
OFFICE
BREAK
OPS
MECH
STAIRS
S1
APO BRIEFING
MALE
RESTROOM
/LOCKER
HERITAGE/BREAK
FEMALE
RESTROOM
/LOCKER
W/C
W/C
ELECT
CORRIDOR
CONFERENCE
ROOM
ASST. DIR. OF
OPERATIONS
STORAGE
ADMIN
APO MAN TRAP
ISSO SUPER
ISSO OFFICE
MX/LOGISTICS
STOR
JAN
VEST.
VEST.
APO
CONFERENCE
ROOM
APO ELEC
A 201
A 202
A 203 A 204
A 205
A 206
A 207
A 208
A 209
A 210
A 217
A 200
B 223
B 224
B 225
B 226
B 227
B 228
B 233
B 234
B 235
G 081
A 222
C 241
C 242
H 252
H 253
H 254 H 255
H 256
H 257
H 258
H 259
T 271
Q 267
P 265
P 266
B 237
B 239
T 274
T 275
T 276 T 277
T 270
H 260
H 262
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:24 PM
I132C
S E
C O
N D
F L
O O
R S
IG
N
A G
E P
L A
N
A R
E A
C
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
SECOND FLOOR SIGNAGE PLAN - AREA C
N
KEY PLAN
SCALE: = 1'-0"
STAIRS
S2
CONFERENCE
201A
149TH CC
APO SERVER
ROOM
APO STORAGE
/JAN
AMXS PLANS &
SCHED.
149TH S.ENL
CONFERENCE/
BRIEFING
149TH DO
1/192 AMXS
CHIEFS
1/192 AMXS
CONFERENCE
ROOM
1/192 AMXS 1ST
SGT
1/192 AMXS CC
1/192 OFFICE
1/192 AMXS
WORK ROOM
149TH DSG
1/192 AMXS CSS
VESTIBULE
COMM
1/192 AMXS
NURSING/
LACTATION
ROOM
CORRIDOR
CORRIDOR
CORRIDOR
ELEVATOR
EL01
A 211
A 212
A 213
A 214
A 215
A 220
A 216
A 218 A 219
A 200
A 221
B 229B 230
B 231
B 232
B 236
B 045
G 247
B 052
F 245H 248
H 249
H 250
H 251
H 263
P 264
T 272
Q 268
B 238
C 244 C 243
B 239
T 273
R 269 B 240
MECHANICAL
201B
H 261
SIGNAGE TAG SYMBOL
A 101
TAG NUMBER
SIGN TYPE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:28 PM
I132D
S E
C O
N D
F L
O O
R S
IG
N
A G
E P
L A
N
A R
E A
D
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
SCALE: 1/8" = 1'-0"
A1
SECOND FLOOR SIGNAGE PLAN - AREA D
N
KEY PLAN
SCALE: = 1'-0"
GENERAL SHEET NOTES
GENERAL MATERIAL FINISH NOTES
1. PAINT ALL WALLS P-1 U.N.O.
2. PAINT ALL EXPOSED STRUCTURE P-6 U.N.O.
3. APPLY HOLLOW METAL DOOR FRAMES TO MATCH ADJACENT WALL COLOR,
UNLESS OTHERWISE NOTED.
4. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR
COMPLETE INSTALLATION OF WALL AND FLOOR TILE.
5. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE. PROVIDE METAL
TRANSITION PIECE AT ALL HORIZONTAL TO VERTICAL TILE APPLICATIONS.
6. ALIGN ALL PORCELAIN TILE FLOOR GROUT JOINTS WITH BASE OR WALL TILE
GROUT JOINTS. MAX GROUT JOINT IS 1/8".
7. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.
8. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.
9. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE
INSTRUCTIONS AND SPECIFICATIONS OF PAINT MANUFACTURER.
10. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH
PAINT SPRAYER. MATCH ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH
IS NOT ACCEPTABLE.
11. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.
12. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO
NOT INSTALL THERMOSTAT IN CENTER OF WALL.
13. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND
DRAINS.
14. PROVIDE CONCRETE SLAB VAPOR TRANSMISSION TESTING FOR VARIOUS
FLOOR FINISH MATERIALS PER THE MANUFACTURERS RECOMMENDED
GUIDELINES. TEST RESULTS SHALL BE REVIEWED AND APPROVED IN ALL
LOCATIONS WHERE MATERIAL IS GOING TO BE INSTALLED.
15. FINISHES ARE SCHEDULED ACCORDING TO PLAN NORTH.
FINISH MATERIAL ABBREVIATIONS
ACT ACOUSTIC CEILING TILE
AWP ACOUSTIC WALL PANEL
CG CORNER GUARD
CON CONCRETE
CPT CARPET TILE
EPP EPOXY PAINT
EPY EPOXY
EXP EXPOSED
GR GROUT
LVT LUXURY VINYL TILE
P PAINT
PLAM PLASTIC LAMINATE
PT PORCELAIN TILE
PTB PORCELAIN TILE BASE
RB RUBBER BASE
RSS RUBBER STAIR STRIP
RST RUBBER STAIR TREAD
RT RUBBER TILE
SC SEALED CONCRETE WITH HARDENER
SDT STATIC DISSIPATIVE TILE
SIGN SIGNAGE
SSM SOLID SURFACE MATERIAL
TP TOILET PARTITION
TS TRANSITION
VT VINYL TILE
WOM WALK OFF MAT
WS WINDOW SHADE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
R H
A M
M E
T T
N A
O F
IL
E
N O
B
W -2
-R
-2
BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt
3/15/2021 3:11:50 PM
I-601
R O
O M
F
IN
IS
H
S C
H E
D U
L E
L
E G
E N
D A
N D
N O
T E
S
F Y
F
-2 F
O R
M A
L T
R A
IN
IN
G U
N
IT
F
T U
B
.F O
R E
T
B F
O R
E T
S G
R O
E T
H E
-1
-2
READY TO ADVERTISE
C O
N S
O L
ID
A
T E
D O
P E
R A
T
IO
N S
A N
D M
A
IN
T E
N A
N C
E H
A N
G A
R
C O
M H
INTERIOR FINISH SCHEDULE
ROOM
NO. ROOM NAME
FLOOR FINISH WALL FINISH CEILING
FINISH
CEILING
HEIGHT REMARKSFLOOR BASE NORTH EAST SOUTH WEST
144 MENS RESTROOM PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD
RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS
150 VESTIBULE/ AIR SHOWER SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6/EX
P
9'-0" WOM-2 TO BE PROVIDED AT AIR SHOWERS. SEE
FIRST FLOOR INTERIOR FINISH PLANS.
151 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
152 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -
153 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
154 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
155 LOCKERS/ STORAGE VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"
156 BREAKROOM VT-1 RB-1 P-1/PT-4 P-1 P-1 P-1 ACT-1 9'-0"
157 OIL LAB SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0"
158 PRIMARY INSPECTION AREA SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0"
159 TOOL ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
160 CLASSROOM/BRIEF VT-1 RB-1 P-1 P-5 P-1 P-1 ACT-1 9'-0"
161 ADMIN VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
162 ADMIN VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
200 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
201A CONFERENCE CPT-1 RB-2 P-1 P-5 P-1 P-1 ACT-1 -
201B MECHANICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
202 NURSING/ LACTATION ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
203 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
204 1/192 AMXS CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-1 P-4 ACT-1 9'-0"
205 CONFERENCE/ BRIEFING CPT-1 RB-2 P-1 P-1/P-5/CR-1 P-1 P-1/P-5/CR-1 ACT-1 10'-0" SEE SHEET I102D
206 1/192 AMXS 1ST SGT CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
207 1/192 OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
208 1/192 AMXS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
209 1/192 AMXS CSS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
210 1/192 AMXS CHIEFS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
211 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
211A CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
212 1/192 AMXS WORK ROOM CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
213 1/192 AMXS CC CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
214 149TH S.ENL CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
215 149TH DO CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
216 149TH DSG CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
217 STOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"
218 149TH CC CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
219 ELECT SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -
220 CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-4 P-1 ACT-1 9'-0"
221 MECH SC-1 RB-1 P-1 P-1 P-1 P-1 EXP
222 ASST. DIR. OF OPERATIONS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"
223 OPS CPT-1 RB-2 P-4 P-4 P-1 P-1 ACT-1 9'-0"
224 VEST. PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"
225 MALE RESTROOM /LOCKER PT-1 PTB-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" PROVIDE 5/8" MOLD RESISTANT AND ANTI-MICROBIAL
GWB ON CEILINGS, REFER TO INTERIOR ELEVATIONS
FOR TILE LOCATIONS.
226 VEST. PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"
227 FEMALE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .