This solicitation is for a consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft at Langley Air Force Base. Key details include:

  • The project scope includes construction of a six-bay high-bay hangar with 175,400 square feet, along with associated facilities for staff administration, maintenance shops, equipment storage, restrooms, and building systems. Demolition of an existing 7,400 square meter facility is also included.

  • Facilities will be designed for permanent construction according to DoD criteria and sustainable principles. The project duration is 700 days from notice to proceed, or 565 days if optional CLIN 0013 is exercised.

  • The facility must withstand seismic and wind loads per applicable codes. Mechanical systems include 150 tons of air conditioning. Utilities, site work, security features, and other support work are in scope.

  • This is a bifurcated solicitation requesting responses for evaluation Factors 1 and 2 initially. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Norfolk.

View the file

Other files

File Type Posted
W9123621R2003_0016.pdf PDF
W9123621R2003_0015.pdf PDF
W9123621R2003_0014.pdf PDF
W9123621R2003_0013.pdf PDF
W9123621R2003_0012.pdf PDF
Attachment 8 - CLIN Schedule_REVISION 1 on 01.05.2022.pdf PDF
AMENDMENT 0011_21 DEC 21 - Drawings.pdf PDF
Amend 0011_23 09 23_Amended V2.pdf PDF
Amend 0011_07 61 14.00 20_Amended.pdf PDF
W9123621R2003_0011.pdf PDF
Attachment 16 - Construction Security Plan (CSP).pdf PDF
Attachment 17 - Installation Restoration Program (IRP) Background Chem Data.pdf PDF
COMH Amended Drawings_14 DEC 2021.pdf PDF
W9123621R2003_0010.pdf PDF
COMH Amended Specs_14 DEC 2021_Combined.pdf PDF
A.07.23 - Solicitation COMH W9123621R2003 0009.pdf PDF
W9123621R2003_0008.pdf PDF
COMH Tech Amendment 0007 - 01 57 13.00 22_Amended.pdf PDF
COMH Tech Amendment 0007 - AMENDMENT 19 NOV 21 - Drawings.pdf PDF
COMH Tech Amendment 0007 - 07 27 19.01_Amended.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0007.pdf PDF
08 71 00_Amended 006.pdf PDF
W9123621R2003 Amendment 0006.pdf PDF
A.07.20 - Site Visit Sign-in Log - Dtd 20 Oct 2021_1Page.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0005.pdf PDF
Attachment 12 - COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf PDF
Attachment 11 - COMH_RTA_Design Drawings_Part 2 of 3_17MAR21.pdf PDF
Attachment 13 - COMH_RTA_Specifications part 1 of 1_17MAR21.pdf PDF
Attachment 10 - COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf PDF
Attachment 14 - COMH - RTA FFE_17MAR21.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0004.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0003.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0002.pdf PDF
W9123621R2003 - 0001 - COMH.pdf PDF
Attachment 12 - COMH - Final Design Drawings Part 3 of 3.pdf PDF
Attachment 9 - Langley Environmental Management Special Conditions.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation W9123621R2003 - COMH.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Attachment 13 - COMH Final Design Specifications Part 1 of 1.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 10 - COMH - Final Design Drawings Part 1 of 3.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 11 - COMH - Final Design Drawings Part 2 of 3.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN SUBMITTAL

STRUCTURAL INTERIOR DESIGN - SID

CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR (COMH)

JOINT BASE LANGLEY-EUTIS - HAMPTON, VA

PROJECT NO:

P2 NO:

TABLE OF CONTENTS

TAB 01 - NARRATIVE OF SID OBJECTIVES

TAB 02- INTERIOR COLOR - SAMPLE BOARDS

TAB 03 - INTERIOR FINISH SCHEDULES - LEGENDS

TAB 04 - DRAWINGS

01. Floor Plans

02. Furniture Footprint Plans

03. Interior Signage Plans, Schedules and Details

04. Interior Elevations, Sections. Details

TAB 01 - NARRATIVE OF SID OBJECTIVE

NARRATIVE OF STRUCTURAL

INTERIOR DESIGN OBJECTIVE

CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR (COMH)

JOINT BASE LANGLEY-EUTIS - HAMPTON, VA

The objective is to integrate the user’s functional and aesthetic values that focus on quality materials that are specific and illustrated products. Interior finishes prioritize all codes of health, safety, and welfare of the facility’s users, by exceeding or meeting project’s requirement of durability and ease of maintenance.

A timeless, neutral palette of colors allows accent patterns and colors to come together to promote a healthy and productive environment. This concept will allow the environment’s aesthetics to be ageless while providing the opportunity to re- evaluate and modify the theme and personality of the space when needed or desired. Color and finishes were selected in such a way as to represent an essentially neutral scheme, but pattern, texture and the correct mix of selected colors raise the level of quality and style representative of the building’s function and users.

The interior environment will provide long-term value and performance for all occupants. This binder contains the schedules, samples, and documentation of the interior finish schemes for this 100% submittal.

TAB 02 - INTERIOR COLOR - SAMPLE BOARDS

P - 1

PAINT 01 - GENERAL

P - 5

PAINT 05 - ACCENT

VT-2

VINYL TILE - ACCENT

RB-1 & RB-2

RUBBER BASE

RST-1

RUBBER STAIR TREAD

RSS-1

STAIR STRIP

WOM-2

WALK OFF MAT - AIR

SHOWER

WOM-1

WALK OFF MAT - ENTRY

VT-1

VINYL TILE

CG-1

CORNER GUARD

P - 3

PAINT 03 - DOOR

RT-1

RUBBER TILE

P - 2

PAINT 02 - DOOR FRAMES

P - 6

PAINT 06 - GYP. CEILINGS

SDT-1

STATIC DISSIPATIVE TILE

P - 4

PAINT 04 - ACCENT

CPT-1

CARPET TILE

LVT-1

LUXURY VINYL TILE

PT-1

PORCELAIN TILE - FLOOR

PT-3

PORCELAIN TILE - ACCENT

SSM-1

SOLID SURFACE

PTB-1

PORCELAIN TILE BASE

GR-2

GROUT - BREAK ROOM

PT-2

PORCELAIN TILE - WALLS

PLAM-1

PLASTIC LAMINATE

PT-4

PORCELAIN TILE - ACCENT

SSM-2

SOLID SURFACE - SILLS

GR-1

GROUT - RESTROOMS

EPY-1

EPOXY FLOOR - RESINOUS

EPP-1

EPOXY PAINT - WALLS

CR-1

ACCENT RAIL

TP-1

TOILET PARTITION

WS-1

WINDOW SHADE

ACT-1

ACOUSTICAL CEILING TILE

AWP-1

ACOUSTICAL WALL PANEL

AS-1

AUDITORIUM SEATING WITH

TABLET

TAB 03 - INTERIOR FINISH SCHEDULES - LEGENDS

GENERAL SHEET NOTES

GENERAL MATERIAL FINISH NOTES

1. PAINT ALL WALLS P-1 U.N.O.

2. PAINT ALL EXPOSED STRUCTURE P-6 U.N.O.

3. APPLY HOLLOW METAL DOOR FRAMES TO MATCH ADJACENT WALL COLOR,

UNLESS OTHERWISE NOTED.

4. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR

COMPLETE INSTALLATION OF WALL AND FLOOR TILE.

5. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE. PROVIDE METAL

TRANSITION PIECE AT ALL HORIZONTAL TO VERTICAL TILE APPLICATIONS.

6. ALIGN ALL PORCELAIN TILE FLOOR GROUT JOINTS WITH BASE OR WALL TILE

GROUT JOINTS. MAX GROUT JOINT IS 1/8".

7. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

8. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

9. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE

INSTRUCTIONS AND SPECIFICATIONS OF PAINT MANUFACTURER.

10. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH

PAINT SPRAYER. MATCH ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH

IS NOT ACCEPTABLE.

11. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

12. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO

NOT INSTALL THERMOSTAT IN CENTER OF WALL.

13. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND

DRAINS.

14. PROVIDE CONCRETE SLAB VAPOR TRANSMISSION TESTING FOR VARIOUS

FLOOR FINISH MATERIALS PER THE MANUFACTURERS RECOMMENDED

GUIDELINES. TEST RESULTS SHALL BE REVIEWED AND APPROVED IN ALL

LOCATIONS WHERE MATERIAL IS GOING TO BE INSTALLED.

15. FINISHES ARE SCHEDULED ACCORDING TO PLAN NORTH.

FINISH MATERIAL ABBREVIATIONS

ACT ACOUSTIC CEILING TILE

AWP ACOUSTIC WALL PANEL

CG CORNER GUARD

CON CONCRETE

CPT CARPET TILE

EPP EPOXY PAINT

EPY EPOXY

EXP EXPOSED

GR GROUT

LVT LUXURY VINYL TILE

P PAINT

PLAM PLASTIC LAMINATE

PT PORCELAIN TILE

PTB PORCELAIN TILE BASE

RB RUBBER BASE

RSS RUBBER STAIR STRIP

RST RUBBER STAIR TREAD

RT RUBBER TILE

SC SEALED CONCRETE WITH HARDENER

SDT STATIC DISSIPATIVE TILE

SIGN SIGNAGE

SSM SOLID SURFACE MATERIAL

TP TOILET PARTITION

TS TRANSITION

VT VINYL TILE

WOM WALK OFF MAT

WS WINDOW SHADE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/10/2021 10:24:10 AM

I-601

R O

O M

F

IN

IS

H

S C

H E

D U

L E

L

E G

E N

D A

N D

N O

T E

S

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

INTERIOR FINISH SCHEDULE

ROOM

NO. ROOM NAME

FLOOR FINISH WALL FINISH CEILING

FINISH

CEILING

HEIGHT REMARKSFLOOR BASE NORTH EAST SOUTH WEST

144 MENS RESTROOM PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD

RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS

150 VESTIBULE/ AIR SHOWER SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6/EX

P

9'-0" WOM-2 TO BE PROVIDED AT AIR SHOWERS. SEE

FIRST FLOOR INTERIOR FINISH PLANS.

151 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

152 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -

153 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

154 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

155 LOCKERS/ STORAGE VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"

156 BREAKROOM VT-1 RB-1 P-1/PT-4 P-1 P-1 P-1 ACT-1 9'-0"

157 OIL LAB SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0"

158 PRIMARY INSPECTION AREA SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0"

159 TOOL ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

160 CLASSROOM/BRIEF VT-1 RB-1 P-1 P-5 P-1 P-1 ACT-1 9'-0"

161 ADMIN VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

162 ADMIN VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

200 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

201A CONFERENCE CPT-1 RB-1 P-1 P-5 P-1 P-1 ACT-1 -

201B MECHANICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

202 NURSING/ LACTATION ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

203 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

204 1/192 AMXS CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-1 P-4 ACT-1 9'-0"

205 CONFERENCE/ BRIEFING CPT-1 RB-2 P-1 P-1/P-5/CR-1 P-1 P-1/P-5/CR-1 ACT-1 10'-0" SEE SHEET I102D

206 1/192 AMXS 1ST SGT CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

207 1/192 OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

208 1/192 AMXS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

209 1/192 AMXS CSS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

210 1/192 AMXS CHIEFS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

211 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

211A CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

212 1/192 AMXS WORK ROOM CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

213 1/192 AMXS CC CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

214 149TH S.ENL CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

215 149TH DO CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

216 149TH DSG CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

217 STOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

218 149TH CC CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

219 ELECT SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

220 CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-4 P-1 ACT-1 9'-0"

221 MECH SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

222 ASST. DIR. OF OPERATIONS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

223 OPS CPT-1 RB-2 P-4 P-4 P-1 P-1 ACT-1 9'-0"

224 VEST. PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"

225 MALE RESTROOM /LOCKER PT-1 PTB-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" PROVIDE 5/8" MOLD RESISTANT AND ANTI-MICROBIAL

GWB ON CEILINGS, REFER TO INTERIOR ELEVATIONS

FOR TILE LOCATIONS.

226 VEST. PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"

227 FEMALE RESTROOM /LOCKER PT-1 PTB-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" PROVIDE 5/8" MOLD RESISTANT AND ANTI-MICROBIAL

GWB ON CEILINGS,REFER TO INTERIOR ELEVATIONS

FOR TILE LOCATIONS

228 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -

229 STORAGE VT-1 RB-1 P-1 P-1 P-1 P-1 EXP -

230 HERITAGE/BREAK LVT-1 RB-1 P-1 P-1 P-1/PT-4 P-1 ACT-1 VARIES SEE RCP FOR CEILING HEIGHTS

231 FLIGHT COMMANDER'S OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

232 APO MAN TRAP VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

233 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

234 ADMIN CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

235 BREAK VT-1 RB-1 P-1/PT-4 P-1 P-1 P-4 ACT-1 9'-0"

236 ISSO SUPER CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

237 APO PM CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

238 GSSO SUPER CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

239 GSSO SECURITY OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

240 APO CONFERENCE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

241 ISSO OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

242 APO BRIEFING CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

243 MX/LOGISTICS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

244 APO BRIEFING CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

246 APO CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

247 APO SERVER ROOM SDT-1 RB-1 P-1 P-1 P-1 P-1 EXP -

248 W/C PT-1 PTB-1 PT-2/PT-3/EPP-1 EPP-1 EPP-1 EPP-1 GYP/P-6 9'-0"

249 W/C PT-1 PTB-1 EPP-1 EPP-1 PT-2/PT-3/EPP-1 EPP-1 GYP/P-6 9'-0"

250 APO STORAGE /JAN SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

251 APO ELEC SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

252 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

253 AMXS PLANS & SCHED. CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

254 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

EL01 ELEVATOR VT-1 - - - - - - N/A SEE ELEVATOR MANUFACTURER STANDARDS

S1 STAIRS RT-1, RST-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 VARIES RAILING TO MATCH STAIR TREAD COLOR

S2 STAIRS RT-1, RST-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 VARIES RAILING TO MATCH STAIR TREAD COLOR

INTERIOR FINISH SCHEDULE

ROOM

NO. ROOM NAME

FLOOR FINISH WALL FINISH CEILING

FINISH

CEILING

HEIGHT REMARKSFLOOR BASE NORTH EAST SOUTH WEST

000 MECHANICAL YARD SC-1 - P-1 P-1 P-1 P-1 - N/A

001 ELECTRICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

002 MECHANICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

003 FIRE PUMP ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

004 MECHANICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

005 COMM ENCLOSURE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

100 HANGAR EPY-1 - EPP-1 EPP-1 EPP-1 EPP-1 EXP -

101 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

102 MOBILITY STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

103 COLLATERAL STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

104 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0" WOM-1 TO BE PROVIDED AT ENTRY. SEE FIRST

FLOOR INTERIOR FINISH PLANS.

105 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -

106 LO SUPPORT STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

107 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

108 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

109 LO SUPPORT BREAK AREA SC-1 RB-1 P-1 P-1 P-1 P-4 ACT-1 9'-0"

110 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

112 LO SUPPORT VEST SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

113 CORRIDOR SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

114 ELECTRICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

115 CONTROL ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6 -

120 VESTIBULE/ AIR SHOWER SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6/EX

P

9'-0" WOM-2 TO BE PROVIDED AT AIR SHOWERS. SEE

FIRST FLOOR INTERIOR FINISH PLANS.

121 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

122 VESTIBULE PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"

123 MALE RESTROOM PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD

RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS

124 LOCKER ROOM PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0" PROVIDE 5/8" MOLD RESISTANT AND ANTI-MICROBIAL

GWB ON CEILINGS

125 MALE SHOWERS PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD

RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS

126 STOR. VT-1 RB-1 P-1 P-1 P-1 P-1 EXP -

127 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -

128 VESTIBULE PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"

129 FEMALE RESTROOM/ LOCKERS PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD

RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS

130 FEMALE SHOWERS PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD

RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS

131 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0" WOM-1 TO BE PROVIDED AT ENTRY. SEE FIRST

FLOOR INTERIOR FINISH PLANS.

132 OPEN OFFICE VT-1 RB-1 P-1 P-1 P-4 P-1 ACT-1 9'-0"

133 TIRE STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

134 HAZMAT STORAGE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

135 WORK SPACE SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

136 OFFICE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

137 LO SUPPORT SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

138 OFFICE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

139 OFFICE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

140 MOBILITY TOOL AREA SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

141 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0" WOM-1 TO BE PROVIDED AT ENTRY. SEE FIRST

FLOOR INTERIOR FINISH PLANS.

142 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

143 WOMENS RESTROOM PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD

RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS

INTERIOR FINISH LEGEND (BASIS OF DESIGN)

CODE TYPE SPECIFICATION SIZE COMMENTS

ACT-1 ACOUSTICAL CEILING PANEL 09 51 00 24" X 24" 9/16" GRID

AS-1 AUDITORIUM SEATING 12 61 13 SMALL TABLET TABLET:STERLING ASH

AWP-1 ACOUSTIC WALL PANEL 09 84 20 24" X 48" CUSTOM COLOR TO MATCH WALL

CG-1 CORNER GUARD 10 26 00 2" LEG E.S. 16 GUAGE / STAINLESS STEEL

CPT-1 CARPET TILE 09 68 00 50CM X 50CM INSTALLATION - ASHLAR

CR-1 CRASH RAIL 10 26 00 - STAINLESS STEEL

EPP-1 EPOXY PAINT - WALLS 09 90 00 - HANGAR WALLS

EPY-1 EPOXY FLOOR - RESINOUS 09 67 23.16 - HANGAR FLOOR. SEE SHEETS A-801 & A-801 FOR HANGAR FLOOR MARKINGS

GR-1 GROUT 09 30 10 1/8" RESTROOMS

GR-2 GROUT 09 30 10 1/8" BREAK ROOM BACKSPLASH

LVT-1 LUXURY VINYL TILE 09 65 00 7" X 48" RIGID, CLICK FLOOR

P-1 PAINT - GENERAL 09 90 00 -

P-2 PAINT - DOOR FRAMES 09 90 00 -

P-3 PAINT - DOOR 09 90 00 -

P-4 PAINT - ACCENT 09 90 00 -

P-5 PAINT - ACCENT 09 90 00 -

P-6 PAINT - GYP. CEILINGS 09 90 00 - GWB CEILINGS, EXPOSED ADMIN AND HANGAR STRUCTURE

PLAM-1 PLASTIC LAMINATE 06 41 16.00 10 - CASEWORK

PT-1 PORCELAIN TILE FLOOR - RESTROOMS 09 30 10 24" X 36" INSTALL WITH 1/8" GROUT JOINTS

PT-2 PORCELAIN TILE WALLS - RESTROOMS 09 30 10 12" x 24" INSTALL WITH 1/8" GROUT JOINTS

PT-3 PORCELAIN TILE - ACCENT 09 30 10 1" x 3" INSTALL WITH 1/8" GROUT JOINTS

PT-4 PORCELAIN TILE - ACCENT 09 30 10 3" X 12" BACKSPLASH

PTB-1 PORCELAIN TILE BASE 09 30 10 6" H CUT TILE, FINISH SIDE UP, WITH TRIM

RB-1 RUBBER BASE - COVE 09 65 00 4"H FOR RESILIENT TILE & CONCRETE AREAS. SPECIFY IN CONTINUOUS ROLLS.

RB-2 RUBBER BASE - STRAIGHT 09 65 00 4"H FOR CARPET TILE AREAS (IF NEEDED WITH CPT ALTERNATE). SPECIFY IN CONTINUOUS ROLLS.

RSS -1 RUBBER STAIR CARBORUNIDUM STRIP 09 65 00 2.5" STAIR - ANTI-SLIP STRIP PER TREAD

RST-1 RUBBER STAIR TREAD WITH INTEGRATED RISER 09 65 00 48" STAIRS

RT-1 RUBBER TILE 09 65 00 18" X 18" STAIRS

SC-1 SEALED CONCRETE WITH HARDENER 03 30 00 - -

SDT-1 STATIC DISSIPATIVE TILE 09 62 38 12" X 12" SERVER ROOMS

SIGN SIGNAGE 10 14 00

SSM-1 SOLID SURFACE 06 61 16 2CM BREAK ROOM COUNTERTOP AND BACKSPLASH

SSM-2 SOLID SURFACE 06 61 16 1/2" THICK WINDOW SILLS

TP-1 TOILET PARTITION 10 21 13 - ECLIPSE RESTROOM PARTITION

TS-1 TRANSITION - TILE CORNER EDGE TRIM 09 30 10 - TILE WALL - OUTSIDE CORNERS

TS-2 TRANSITION - VT TO CONCRETE 09 30 10 -

TS-3 TRANSITION - PORCELAIN TILE TO VINYL TILE 09 30 10 -

TS-4 TRANSITION - VT TO LVT 09 30 10 -

TS-6 TRANSITION - TILE TO CONCRETE 09 30 10 -

VT-1 VINYL TILE 09 65 00 24" X 24"

VT-2 VINYL TILE - ACCENT 09 65 00 24" X 24"

WOM-1 WALK OFF MAT - ENTRY MOUNTED 12 48 13 -

WOM-2 WALK OFF MAT - INSERT 12 48 13 -

WS-1 WINDOW SHADE 12 24 13 .022 THICK

NOTE: SEE STRUCTURAL INTERIOR DESIGN BINDER FOR FURTHER INFORMATION ON COLOR AND PATTERN.

TAB 04 - DRAWINGS

UP

S2

161160

123129

120121

S1

139 137

122128

FLOOR FINISH LEGEND

EPY-1

PT-1

RT-1, RST-1

SC-1

VT-1

SEE A1/I101D

S E

E A

1/ I1

C

S E

E A

1/ I1

C

S E

E A

1/ I1

A

SEE A1/I101A

SEE A1/I101B

S E

E A

1/ I1

A

SEE A1/I101C

BROOM FINISHED

CONCRETE SLAB ON GRADE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:39 PM

I-101

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

O

V E

R A

L L

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/16" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - OVERALL

N

KEY PLAN

SCALE: = 1'-0"

0 16 3216

1/16"

ROOM NUMBER LEGEND - FIRST FLOOR

ROOM NO. ROOM NAME

000 MECHANICAL YARD

001 ELECTRICAL

002 MECHANICAL

003 FIRE PUMP ROOM

004 MECHANICAL

005 COMM ENCLOSURE

100 HANGAR

101 CORRIDOR

102 MOBILITY STORAGE

103 COLLATERAL STORAGE

104 CORRIDOR

105 JAN

106 LO SUPPORT STORAGE

107 CORRIDOR

108 CORRIDOR

109 LO SUPPORT BREAK AREA

110 CORRIDOR

112 LO SUPPORT VEST

113 CORRIDOR

114 ELECTRICAL

115 CONTROL ROOM

120 VESTIBULE/ AIR SHOWER

121 CORRIDOR

122 VESTIBULE

123 MALE RESTROOM

124 LOCKER ROOM

125 MALE SHOWERS

126 STOR.

127 JAN

128 VESTIBULE

129 FEMALE RESTROOM/ LOCKERS

130 FEMALE SHOWERS

131 CORRIDOR

132 OPEN OFFICE

133 TIRE STORAGE

134 HAZMAT STORAGE

135 WORK SPACE

136 OFFICE

137 LO SUPPORT

138 OFFICE

139 OFFICE

140 MOBILITY TOOL AREA

141 CORRIDOR

142 VESTIBULE

143 WOMENS RESTROOM

144 MENS RESTROOM

150 VESTIBULE/ AIR SHOWER

151 VESTIBULE

152 JAN

153 COMM

154 CORRIDOR

155 LOCKERS/ STORAGE

156 BREAKROOM

157 OIL LAB

158 PRIMARY INSPECTION AREA

159 TOOL ROOM

160 CLASSROOM/BRIEF

161 ADMIN

162 ADMIN

EL01 ELEVATOR

S1 STAIRS

S2 STAIRS

517 SF

COLLATERAL STORAGE

1220 SF

LO SUPPORT STORAGE

124 SF

CORRIDOR

FLOOR FINISH LEGEND

EPY-1

SC-1

HANGAR

SEE A1/I101B

S E

E A

1/ I1

D

S E

E A

1/ I1

D

SEE A1/I101B

CG-1

TS-5

TS-5

TS-5

TS-5

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

3. PAINT ALL WALLS P-1 U.N.O.

4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

19. WINDOW SILLS TO BE SSM-2.

20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

ACCENT WALL LEGEND

ACCENT WALL PAINT LOCATION

WITH PAINT COLOR CODE. SEE

FINISH LEGEND FOR PAINT COLOR

INFORMATION.

P-X US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:10:35 PM

I101A

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A A

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA A N

KEY PLAN

SCALE: = 1'-0"

0 8 168

1/8"

36334 SF

HANGAR

281 SF

MOBILITY STORAGE

72 SF

JAN

183 SF

ELECTRICAL

686 SF

FIRE PUMP ROOM

183 SF

MECHANICAL

142 SF

CORRIDOR

192 SF

CORRIDOR

FLOOR FINISH LEGEND

EPY-1

SC-1

SEE A1/I101A

S E

E A

1/ I1

C

S E

E A

1/ I1

D

COMM

ENCLOSURE

WOM-1

10' - 0" 1' - 4"

8'

1'

CG-1

CG-1

CG-1

TS-5

TS-5

TS-5

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

3. PAINT ALL WALLS P-1 U.N.O.

4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

19. WINDOW SILLS TO BE SSM-2.

20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

ACCENT WALL LEGEND

ACCENT WALL PAINT LOCATION

WITH PAINT COLOR CODE. SEE

FINISH LEGEND FOR PAINT COLOR

INFORMATION.

P-X US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:10:39 PM

I101B

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A B

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA B N

KEY PLAN

SCALE: = 1'-0"

862 SF

TIRE STORAGE

133 391 SF

OPEN OFFICE

333 SF

MALE RESTROOM

56 SF

JAN

101 SF

VESTIBULE/ AIR SHOWER

201 SF

CORRIDOR

475 SF

CORRIDOR

168 SF

OFFICE

238 SF

STAIRS

S1

168 SF

OFFICE

2651 SF

LO SUPPORT

479 SF

MECHANICAL

295 SF

LO SUPPORT BREAK AREA

133 SF

LO SUPPORT VEST

482 SF

MOBILITY TOOL AREA

972 SF

MECHANICAL YARD

71 SF

VESTIBULE

64 SF

VESTIBULE

128 52 SF

STOR.

351 SF

CORRIDOR

165 SF

CORRIDOR

FLOOR FINISH LEGEND

EPY-1

PT-1

RT-1, RST-1

SC-1

VT-1

S E

E A

1/ I1

D

S E

E A

1/ I1

B

SEE A1/I101D

727 SF

LOCKER ROOM

380 SF

FEMALE

RESTROOM/

LOCKERS

36334 SF

HANGAR

WOM-1

9'

7"

1' - 0" 10' - 0"

CG-1

CG-1

PT-5 PT-4

PT-5PT-5 PT-5

CG-1

P-4

TS-2

TS-2

TS-2

TS-2

TS-5

TS-2

TS-2

TS-2

TS-2

TS-2TS-3 TS-3

CG-1

TS-2

TS-5

4" V

.I.

F

4"

6"

V.I.F.

6"

WOM-2

TS-2

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

3. PAINT ALL WALLS P-1 U.N.O.

4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

19. WINDOW SILLS TO BE SSM-2.

20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

ACCENT WALL LEGEND

ACCENT WALL PAINT LOCATION

WITH PAINT COLOR CODE. SEE

FINISH LEGEND FOR PAINT COLOR

INFORMATION.

P-X US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:10:45 PM

I101C

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A C

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA C

N

KEY PLAN

SCALE: = 1'-0"

273 SF

STAIRS

S2

198 SF

ELECTRICAL

366 SF

OIL LAB

487 SF

LOCKERS/ STORAGE

259 SF

TOOL ROOM

273 SF

BREAKROOM

177 SF

ADMIN

161842 SF

CLASSROOM/BRIEF

1373 SF

PRIMARY INSPECTION AREA

139 SF

VESTIBULE

180 SF

MENS RESTROOM

356 SF

HAZMAT STORAGE

676 SF

WORK SPACE

380 SF

FEMALE RESTROOM/ LOCKERS

73 SF

JAN

172 SF

ADMIN

207 SF

COMM

64 SF

VESTIBULE/ AIR SHOWER

181 SF

WOMENS RESTROOM

270 SF

CORRIDOR

727 SF

LOCKER ROOM

117 SF

FEMALE SHOWERS

118 SF

OFFICE

152 SF

MALE SHOWERS

83 SF

CORRIDOR

166 SF

CORRIDOR

192 SF

VESTIBULE

FLOOR FINISH LEGEND

EPY-1

PT-1

RT-1, RST-1

SC-1

VT-1

S E

E A

1/ I1

A

SEE A1/I101C

94 SF

CONTROL ROOM

36334 SF

HANGAR

84 SF

ELEVATOR

EL01

333 SF

MALE RESTROOM

WOM-1

9" 4' - 0"

CG-1

CG-1

CG-1 CG-1

CG-1

CG-1

CG-1

CG-1

P-5

CG-1

P-5P-5

P-4

CG-1

VT-2

VT-22'

2'

2'

2'

2'

2'

2'

2'

4'

2' - 0" 2' - 0"

2' - 0" 4' - 0"

P-4

TS-2

TS-2

TS-2

TS-2 TS-4

TS-2

TS-2

TS-2

TS-2

TS-2

TS-3

TS-3

TS-5

TS-5

6" V.I.F. 6"

4" V

.I.

F

4"

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

3. PAINT ALL WALLS P-1 U.N.O.

4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

19. WINDOW SILLS TO BE SSM-2.

20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

ACCENT WALL LEGEND

ACCENT WALL PAINT LOCATION

WITH PAINT COLOR CODE. SEE

FINISH LEGEND FOR PAINT COLOR

INFORMATION.

P-X US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:10:52 PM

I101D

F

IR

S T

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A D

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR INTERIOR FINISH PLAN - AREA D

N

KEY PLAN

SCALE: = 1'-0"

DN

S2

201A

238237231 235

S1

244225

248249

210 204

229 234

236 241

FLOOR FINISH LEGEND

CPT-1

LVT-1

PT-1

RT-1, RST-1

SC-1

SDT-1

VT-1

OPEN OPEN

SEE A1/I102D

SEE A1/I102C

201B

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:48 PM

I-102

S E

C O

N D

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

O

V E

R A

L L

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/16" = 1'-0"

A1

SECOND FLOOR INTERIOR FINISH PLAN - OVERALL N

KEY PLAN

SCALE: = 1'-0"

0 16 3216

1/16"

ROOM NUMBER LEGEND - SECOND FLOOR

ROOM NO. ROOM NAME

200 VESTIBULE

201A CONFERENCE

201B MECHANICAL

202 NURSING/ LACTATION ROOM

203 CORRIDOR

204 1/192 AMXS CONFERENCE ROOM

205 CONFERENCE/ BRIEFING

206 1/192 AMXS 1ST SGT

207 1/192 OFFICE

208 1/192 AMXS

209 1/192 AMXS CSS

210 1/192 AMXS CHIEFS

211 CORRIDOR

211A CORRIDOR

212 1/192 AMXS WORK ROOM

213 1/192 AMXS CC

214 149TH S.ENL

215 149TH DO

216 149TH DSG

217 STOR

218 149TH CC

219 ELECT

220 CONFERENCE ROOM

221 MECH

222 ASST. DIR. OF OPERATIONS

223 OPS

224 VEST.

225 MALE RESTROOM /LOCKER

226 VEST.

227 FEMALE RESTROOM /LOCKER

228 JAN

229 STORAGE

230 HERITAGE/BREAK

231 FLIGHT COMMANDER'S OFFICE

232 APO MAN TRAP

233 CORRIDOR

234 ADMIN

235 BREAK

236 ISSO SUPER

237 APO PM

238 GSSO SUPER

239 GSSO SECURITY OFFICE

240 APO CONFERENCE

241 ISSO OFFICE

242 APO BRIEFING

243 MX/LOGISTICS

244 APO BRIEFING

246 APO CONFERENCE ROOM

247 APO SERVER ROOM

248 W/C

249 W/C

250 APO STORAGE /JAN

251 APO ELEC

252 CORRIDOR

253 AMXS PLANS & SCHED.

254 COMM

S1 STAIRS

S2 STAIRS

146 SF

149TH CC

301 SF

APO BRIEFING

402 SF

APO CONFERENCE

613 SF

GSSO SECURITY OFFICE

116 SF

GSSO SUPER

116 SF

APO PM

219 SF

FLIGHT COMMANDER'S OFFICE

135 SF

BREAK

124 SF

OPS

61 SF

MECH

239 SF

STAIRS

S1

240 SF

APO BRIEFING

613 SF

MALE RESTROOM /LOCKER

781 SF

HERITAGE/BREAK

386 SF

FEMALE RESTROOM /LOCKER

71 SF

W/C

70 SF

W/C

120 SF

ELECT

847 SF

CORRIDOR

262 SF

CONFERENCE ROOM

142 SF

ASST. DIR. OF OPERATIONS

99 SF

STORAGE

153 SF

ADMIN

60 SF

APO MAN TRAP

119 SF

ISSO SUPER

180 SF

ISSO OFFICE

119 SF

MX/LOGISTICS

105 SF

STOR

93 SF

JAN

45 SF

VEST.

41 SF

VEST.

604 SF

APO CONFERENCE ROOM

71 SF

APO ELEC

FLOOR FINISH LEGEND

CPT-1

LVT-1

PT-1

RT-1, RST-1

SC-1

VT-1

1171 SF

CORRIDOR

SEE A1/I102D

CORRIDOR

211A

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1CG-1

CG-1

P-4

P-4

4' - 0" 4' - 0" 2' - 0"

2'

2'

2'

4'

VT-2

P-4

P-4

VT-2

TS-3

TS-3

TS-3

TS-3

TS-2

TS-2

TS-3

TS-3

TS-3

TS-3

TS-3

TS-3

TS-3

TS-3

TS-3

PT-4

TS-4

TS-3

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

3. PAINT ALL WALLS P-1 U.N.O.

4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

19. WINDOW SILLS TO BE SSM-2.

20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

ACCENT WALL LEGEND

ACCENT WALL PAINT LOCATION

WITH PAINT COLOR CODE. SEE

FINISH LEGEND FOR PAINT COLOR

INFORMATION.

P-X US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:10:58 PM

I102C

S E

C O

N D

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A C

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

SECOND FLOOR INTERIOR FINISH PLAN - AREA C

N

KEY PLAN

SCALE: = 1'-0"

274 SF

STAIRS

S2

368 SF

CONFERENCE

201A

201 SF

APO SERVER ROOM

84 SF

APO STORAGE /JAN

356 SF

AMXS PLANS & SCHED.

146 SF

149TH S.ENL

214 927 SF

CONFERENCE/ BRIEFING

146 SF

149TH DO

655 SF

1/192 AMXS CHIEFS

538 SF

1/192 AMXS CONFERENCE

ROOM

121 SF

1/192 AMXS 1ST SGT

146 SF

1/192 AMXS CC

121 SF

1/192 OFFICE

341 SF

1/192 AMXS WORK ROOM

730 SF

149TH DSG

519 SF

1/192 AMXS CSS

194 SF

VESTIBULE

202 SF

COMM

335 SF

1/192 AMXS

162 SF

NURSING/ LACTATION ROOM

202534 SF

CORRIDOR

120 SF

CORRIDOR

1171 SF

CORRIDOR

FLOOR FINISH LEGEND

CPT-1

PT-1

RT-1, RST-1

SC-1

SDT-1

VT-1

SEE A1/I102C SEE A1/I102C

84 SF

ELEVATOR

EL01

CORRIDOR

CG-1

CG-1

CG-1 CG-1 CG-1

CG-1

CG-1 CG-1

CG-1

CG-1

CG-1CG-1 CG-1

CG-1

CG-1

P-5

P-4

P-5/CR-1

P-5

P-4

P-4

P-1 / CR-1

P-1 / CR-1

P-1 / CR-1

P-1 / CR-1

CG-1

TS-3

TS-3

TS-3

TS-3

TS-3

TS-3

TS-3

TS-3

TS-3

TS-2TS-4

TS-3

TS-2

TS-3

TS-4TS-4

TS-3TS-3TS-3

TS-3

MECHANICAL

201B

GENERAL SHEET NOTES

FINISH PLAN GENERAL NOTES

1. REFERENCE SHEET I-601 FOR INTERIOR FINISH CODE MATERIAL INFORMATION AND DETAILS.

2. REFERENCE SHEET I-601 FOR INTERIOR FINISH SCHEDULE.

3. PAINT ALL WALLS P-1 U.N.O.

4. APPLY CORNER GUARD TO ALL OUTSIDE CORNERS AT GYP. BOARD WALLS.

5. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR COMPLETE INSTALLATION OF

WALL AND FLOOR TILE.

6. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE.

7. ALIGN ALL PORCELAIN TILE GROUT JOINTS WITH BASE OR WALL TILE.

8. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

9. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

10. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE INSTRUCTIONS AND

SPECIFICATIONS OF PAINT MANUFACTURER.

11. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH PAINT SPRAYER. MATCH

ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH IS NOT ACCEPTABLE.

12. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

13. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO NOT INSTALL THERMOSTAT

IN CENTER OF WALL.

14. PROVIDE TRANSITIONS THAT MEET ABA REQUIREMENTS.

15. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND DRAINS.

16. REFERENCE ARCHITECTURAL FLOOR PLANS FOR FLOOR RAMP TRANSITIONS.

17. DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS OR LABELS.

18. FLOOR FINISH TRANSITIONS TO OCCUR AT CENTERLINE OF DOOR, U.N.O.

19. WINDOW SILLS TO BE SSM-2.

20. INSIDE MOUNT WS1 ON ALL INTERIOR WINDOWS. ALL WINDOWS RECEIVE SHADES.

21. SLOPE TILED FLOORS TO FLOOR DRAINS AS REQUIRED.

ACCENT WALL LEGEND

ACCENT WALL PAINT LOCATION

WITH PAINT COLOR CODE. SEE

FINISH LEGEND FOR PAINT COLOR

INFORMATION.

P-X

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:02 PM

I102D

S E

C O

N D

F L

O O

R I

N T

E R

IO

R

F

IN

IS

H

P L

A N

A

R E

A D

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

SECOND FLOOR INTERIOR FINISH PLAN - AREA D N

KEY PLAN

SCALE: = 1'-0"

HANGAR

COLLATERAL

STORAGE

LO SUPPORT

STORAGE

CORRIDOR

CORRIDOR

B 026

B 027

E 068

B 028

B 030

E 073

E 074

I 403

L 420

N 445

M 424M 421M 422M 423

N 461 N 446

M 431

M 435 M 432 M 433 M 434

1'

T Y

P

TYPE "M" HAZARD SIGN PAINTED ON

PAVEMENT (10) LOCATIONS EXTERIOR AND

(10) LOCATIONS INTERIOR EACH SIDE.

S 102

B 055

B 056

U 469

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:06 PM

I131A

F

IR

S T

F L

O O

R S

IG

N

A G

E P

L A

N

A R

E A

A

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR SIGNAGE PLAN - AREA A N

KEY PLAN

SCALE: = 1'-0"

MOBILITY

STORAGE

COLLATERAL

STORAGE

JAN

ELECTRICAL

FIRE PUMP

ROOM

MECHANICAL

CORRIDOR

CORRIDOR

COMM

ENCLOSURE

B 029

E 069

B 030

B 031

B 032

B 033 E 070

B 034

B 041

B 049

B 048

L 094

N 447

M 429 M 428 M 427 M 426

N 448

N 449

J 407

J 419

J 408

N 459

P 464

P 466

P 467

M 440 M 437 M 438 M 439

I 406

TYPE "M" HAZARD SIGN PAINTED ON PAVEMENT (10)

LOCATIONS EXTERIOR AND (10) LOCATIONS INTERIOR

EACH SIDE

O 462

S 103

U 471

M 444

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:10 PM

I131B

F

IR

S T

F L

O O

R S

IG

N

A G

E P

L A

N

A R

E A

B

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR SIGNAGE PLAN - AREA B

N

KEY PLAN

SCALE: = 1'-0"

HAZMAT

STORAGE

TIRE STORAGE

OPEN OFFICE

MALE

RESTROOM

FEMALE

RESTROOM/

LOCKERS

JAN

VESTIBULE/ AIR

SHOWER

CORRIDOR

CORRIDOR

OFFICE

STAIRS

S1

OFFICE

LO SUPPORT

MECHANICAL

LO SUPPORT

BREAK AREA

LO SUPPORT

VEST

LOCKER ROOM

MOBILITY TOOL

AREA

MECHANICAL

YARD

VESTIBULE

VESTIBULE

STOR.

CORRIDOR

CORRIDOR

CORRIDOR

C 057 C 058

C 059

B 007B 008

B 009 B 010C 060

C 061

K 093

B 016 B 017

B 018

B 019B 020

B 021

B 022

J 418

E 067

B 023

B 024

B 025

A 003

G 079

I 401

E 072

B 040

A 005

E 077

I 402

B 046

B 047

M 429

N 449

M 430

N 450

N 453

N 451

N 452

N 457

N 455

N 454

J 409

I 400

B 053

J 410

J 411

I 404

J 412

J 413

J 414

P 465

P 463

M 442 M 441 M 440

TYPE "M" HAZARD SIGN PAINTED ON

PAVEMENT (10) LOCATIONS EXTERIOR AND

(10) LOCATIONS INTERIOR EACH SIDE

Z 108

H 086

B 054

H 087

H 088

H 089 S 100

Q 098 U 470

T 106

H 090

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:15 PM

I131C

F

IR

S T

F L

O O

R S

IG

N

A G

E P

L A

N

A R

E A

C

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR SIGNAGE PLAN - AREA C

N

KEY PLAN

SCALE: = 1'-0"

P F

A 002

A 001

B 006

STAIRS

S2

ELECTRICAL

OIL LAB

LOCKERS/

STORAGE

TOOL ROOM

BREAKROOM

ADMIN

CLASSROOM/BRIEF

PRIMARY

INSPECTION

AREA

VESTIBULE

MENS

RESTROOM

HAZMAT

STORAGE

WORK SPACE

MALE

RESTROOM

JAN

ADMIN

COMM

VESTIBULE/ AIR

SHOWER

WOMENS

RESTROOM

CORRIDOR

FEMALE

SHOWERS

OFFICE

MALE

SHOWERS

CORRIDOR

CORRIDOR

VESTIBULE

ELEVATOR

EL01

CONTROL

ROOM

K 092

C 063 C 062

C 064

C 065

B 011

B 012

B 013

B 014 B 015

B 035

B 036 B 037 B 038

G 246

A 004

B 039

G 080 B 042

B 043

B 044

D 076

B 048

B 050

B 051

E 075

M 423

N 461

N 454

N 456

N 458

M 425

J 415

J 416

J 417

I 405

M 436 M 435

TYPE "M" HAZARD SIGN PAINTED ON

PAVEMENT (10) LOCATIONS EXTERIOR AND

(10) LOCATIONS INTERIOR EACH SIDE

H 082

H 083

H 084

H 085

F 078

Q 097

P 095 P 096

D 066

S 101

U 468

T 104

T 105

R 099

T 107

H 091

N 460

M 443

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:20 PM

I131D

F

IR

S T

F L

O O

R S

IG

N

A G

E P

L A

N

A R

E A

D

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR SIGNAGE PLAN - AREA D N

KEY PLAN

SCALE: = 1'-0"

149TH CC

APO BRIEFING

APO

CONFERENCE

GSSO

SECURITY

OFFICE

GSSO SUPER

APO PM

FLIGHT

COMMANDER'S

OFFICE

BREAK

OPS

MECH

STAIRS

S1

APO BRIEFING

MALE

RESTROOM

/LOCKER

HERITAGE/BREAK

FEMALE

RESTROOM

/LOCKER

W/C

W/C

ELECT

CORRIDOR

CONFERENCE

ROOM

ASST. DIR. OF

OPERATIONS

STORAGE

ADMIN

APO MAN TRAP

ISSO SUPER

ISSO OFFICE

MX/LOGISTICS

STOR

JAN

VEST.

VEST.

APO

CONFERENCE

ROOM

APO ELEC

A 201

A 202

A 203 A 204

A 205

A 206

A 207

A 208

A 209

A 210

A 217

A 200

B 223

B 224

B 225

B 226

B 227

B 228

B 233

B 234

B 235

G 081

A 222

C 241

C 242

H 252

H 253

H 254 H 255

H 256

H 257

H 258

H 259

T 271

Q 267

P 265

P 266

B 237

B 239

T 274

T 275

T 276 T 277

T 270

H 260

H 262

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:24 PM

I132C

S E

C O

N D

F L

O O

R S

IG

N

A G

E P

L A

N

A R

E A

C

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

SECOND FLOOR SIGNAGE PLAN - AREA C

N

KEY PLAN

SCALE: = 1'-0"

STAIRS

S2

CONFERENCE

201A

149TH CC

APO SERVER

ROOM

APO STORAGE

/JAN

AMXS PLANS &

SCHED.

149TH S.ENL

CONFERENCE/

BRIEFING

149TH DO

1/192 AMXS

CHIEFS

1/192 AMXS

CONFERENCE

ROOM

1/192 AMXS 1ST

SGT

1/192 AMXS CC

1/192 OFFICE

1/192 AMXS

WORK ROOM

149TH DSG

1/192 AMXS CSS

VESTIBULE

COMM

1/192 AMXS

NURSING/

LACTATION

ROOM

CORRIDOR

CORRIDOR

CORRIDOR

ELEVATOR

EL01

A 211

A 212

A 213

A 214

A 215

A 220

A 216

A 218 A 219

A 200

A 221

B 229B 230

B 231

B 232

B 236

B 045

G 247

B 052

F 245H 248

H 249

H 250

H 251

H 263

P 264

T 272

Q 268

B 238

C 244 C 243

B 239

T 273

R 269 B 240

MECHANICAL

201B

H 261

SIGNAGE TAG SYMBOL

A 101

TAG NUMBER

SIGN TYPE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:28 PM

I132D

S E

C O

N D

F L

O O

R S

IG

N

A G

E P

L A

N

A R

E A

D

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

SECOND FLOOR SIGNAGE PLAN - AREA D

N

KEY PLAN

SCALE: = 1'-0"

GENERAL SHEET NOTES

GENERAL MATERIAL FINISH NOTES

1. PAINT ALL WALLS P-1 U.N.O.

2. PAINT ALL EXPOSED STRUCTURE P-6 U.N.O.

3. APPLY HOLLOW METAL DOOR FRAMES TO MATCH ADJACENT WALL COLOR,

UNLESS OTHERWISE NOTED.

4. INSTALL MANUFACTURER'S TRIM/ACCESSORY PIECES AS REQUIRED FOR

COMPLETE INSTALLATION OF WALL AND FLOOR TILE.

5. INSTALL ALL PORCELAIN TILE TO FLUSH OUT WITH BASE. PROVIDE METAL

TRANSITION PIECE AT ALL HORIZONTAL TO VERTICAL TILE APPLICATIONS.

6. ALIGN ALL PORCELAIN TILE FLOOR GROUT JOINTS WITH BASE OR WALL TILE

GROUT JOINTS. MAX GROUT JOINT IS 1/8".

7. ORDER ALL FINISH MATERIALS IN A TIMELY MATTER TO AVOID DELAYS.

8. FINISH ALL GYPSUM BOARD SURFACES TO A LEVEL 4 FINISH.

9. PREPARE AND CLEAN ALL SURFACES IN STRICT ACCORDANCE WITH THE

INSTRUCTIONS AND SPECIFICATIONS OF PAINT MANUFACTURER.

10. PAINT ELECTRICAL PANELS, ACCESS PANELS, AND EXPANSION JOINTS WITH

PAINT SPRAYER. MATCH ADJACENT WALL COLOR. PAINTING PANELS BY BRUSH

IS NOT ACCEPTABLE.

11. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL DRAWINGS.

12. INSTALL THERMOSTAT NEAR CORNER OF ROOM OR BY LIGHT SWITCHES. DO

NOT INSTALL THERMOSTAT IN CENTER OF WALL.

13. CLEANLY INSTALL AND TRIM OUT FLOORING AROUND CLEAN-OUT COVERS AND

DRAINS.

14. PROVIDE CONCRETE SLAB VAPOR TRANSMISSION TESTING FOR VARIOUS

FLOOR FINISH MATERIALS PER THE MANUFACTURERS RECOMMENDED

GUIDELINES. TEST RESULTS SHALL BE REVIEWED AND APPROVED IN ALL

LOCATIONS WHERE MATERIAL IS GOING TO BE INSTALLED.

15. FINISHES ARE SCHEDULED ACCORDING TO PLAN NORTH.

FINISH MATERIAL ABBREVIATIONS

ACT ACOUSTIC CEILING TILE

AWP ACOUSTIC WALL PANEL

CG CORNER GUARD

CON CONCRETE

CPT CARPET TILE

EPP EPOXY PAINT

EPY EPOXY

EXP EXPOSED

GR GROUT

LVT LUXURY VINYL TILE

P PAINT

PLAM PLASTIC LAMINATE

PT PORCELAIN TILE

PTB PORCELAIN TILE BASE

RB RUBBER BASE

RSS RUBBER STAIR STRIP

RST RUBBER STAIR TREAD

RT RUBBER TILE

SC SEALED CONCRETE WITH HARDENER

SDT STATIC DISSIPATIVE TILE

SIGN SIGNAGE

SSM SOLID SURFACE MATERIAL

TP TOILET PARTITION

TS TRANSITION

VT VINYL TILE

WOM WALK OFF MAT

WS WINDOW SHADE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

W -2

-R

-2

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_A_R19.rvt

3/15/2021 3:11:50 PM

I-601

R O

O M

F

IN

IS

H

S C

H E

D U

L E

L

E G

E N

D A

N D

N O

T E

S

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

B

.F O

R E

T

B F

O R

E T

S G

R O

E T

H E

-1

-2

READY TO ADVERTISE

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

INTERIOR FINISH SCHEDULE

ROOM

NO. ROOM NAME

FLOOR FINISH WALL FINISH CEILING

FINISH

CEILING

HEIGHT REMARKSFLOOR BASE NORTH EAST SOUTH WEST

144 MENS RESTROOM PT-1 N/A PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" SEE RESTROOM ELEVATIONS. PROVIDE 5/8" MOLD

RESISTANT AND ANTI-MICROBIAL GWB ON CEILINGS

150 VESTIBULE/ AIR SHOWER SC-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6/EX

P

9'-0" WOM-2 TO BE PROVIDED AT AIR SHOWERS. SEE

FIRST FLOOR INTERIOR FINISH PLANS.

151 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

152 JAN SC-1 RB-1 EPP-1 EPP-1 EPP-1 EPP-1 EXP -

153 COMM SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

154 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

155 LOCKERS/ STORAGE VT-1 RB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"

156 BREAKROOM VT-1 RB-1 P-1/PT-4 P-1 P-1 P-1 ACT-1 9'-0"

157 OIL LAB SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0"

158 PRIMARY INSPECTION AREA SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 10'-0"

159 TOOL ROOM SC-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

160 CLASSROOM/BRIEF VT-1 RB-1 P-1 P-5 P-1 P-1 ACT-1 9'-0"

161 ADMIN VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

162 ADMIN VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

200 VESTIBULE VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

201A CONFERENCE CPT-1 RB-2 P-1 P-5 P-1 P-1 ACT-1 -

201B MECHANICAL SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

202 NURSING/ LACTATION ROOM VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

203 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

204 1/192 AMXS CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-1 P-4 ACT-1 9'-0"

205 CONFERENCE/ BRIEFING CPT-1 RB-2 P-1 P-1/P-5/CR-1 P-1 P-1/P-5/CR-1 ACT-1 10'-0" SEE SHEET I102D

206 1/192 AMXS 1ST SGT CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

207 1/192 OFFICE CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

208 1/192 AMXS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

209 1/192 AMXS CSS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

210 1/192 AMXS CHIEFS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

211 CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

211A CORRIDOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

212 1/192 AMXS WORK ROOM CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

213 1/192 AMXS CC CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

214 149TH S.ENL CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

215 149TH DO CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

216 149TH DSG CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

217 STOR VT-1 RB-1 P-1 P-1 P-1 P-1 ACT-1 9'-0"

218 149TH CC CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

219 ELECT SC-1 RB-1 P-1 P-1 P-1 P-1 EXP -

220 CONFERENCE ROOM CPT-1 RB-2 P-1 P-1 P-4 P-1 ACT-1 9'-0"

221 MECH SC-1 RB-1 P-1 P-1 P-1 P-1 EXP

222 ASST. DIR. OF OPERATIONS CPT-1 RB-2 P-1 P-1 P-1 P-1 ACT-1 9'-0"

223 OPS CPT-1 RB-2 P-4 P-4 P-1 P-1 ACT-1 9'-0"

224 VEST. PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"

225 MALE RESTROOM /LOCKER PT-1 PTB-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 PT-2/PT-3/EPP-1 GYP/P-6 9'-0" PROVIDE 5/8" MOLD RESISTANT AND ANTI-MICROBIAL

GWB ON CEILINGS, REFER TO INTERIOR ELEVATIONS

FOR TILE LOCATIONS.

226 VEST. PT-1 PTB-1 P-1 P-1 P-1 P-1 GYP/P-6 9'-0"

227 FEMALE…