This document provides details on a federal contract solicitation for construction services. The solicitation is for a six-bay high-bay consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft from Tyndall Air Force Base at Langley AFB. The facility will include hangar bays, staff administration, propulsion shop, ready room, break room, tools/parts support, aircraft maintenance equipment storage, wheel/tire shop, egress shop, restrooms, and building systems support. The project scope includes utilities, site improvements, pavements, detection/protection features, security enhancements, and other supporting work to deliver a complete and usable facility. The facility must withstand seismic and wind effects per applicable codes and design guides. Construction must comply with DoD requirements for minimum antiterrorism and sustainable principles. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Norfolk. The project duration is 700 calendar days from notice to proceed.

View the file

Other files

File Type Posted
W9123621R2003_0016.pdf PDF
W9123621R2003_0015.pdf PDF
W9123621R2003_0014.pdf PDF
W9123621R2003_0013.pdf PDF
W9123621R2003_0012.pdf PDF
Attachment 8 - CLIN Schedule_REVISION 1 on 01.05.2022.pdf PDF
AMENDMENT 0011_21 DEC 21 - Drawings.pdf PDF
Amend 0011_23 09 23_Amended V2.pdf PDF
Amend 0011_07 61 14.00 20_Amended.pdf PDF
W9123621R2003_0011.pdf PDF
Attachment 16 - Construction Security Plan (CSP).pdf PDF
Attachment 17 - Installation Restoration Program (IRP) Background Chem Data.pdf PDF
COMH Amended Drawings_14 DEC 2021.pdf PDF
W9123621R2003_0010.pdf PDF
COMH Amended Specs_14 DEC 2021_Combined.pdf PDF
A.07.23 - Solicitation COMH W9123621R2003 0009.pdf PDF
W9123621R2003_0008.pdf PDF
COMH Tech Amendment 0007 - 01 57 13.00 22_Amended.pdf PDF
COMH Tech Amendment 0007 - AMENDMENT 19 NOV 21 - Drawings.pdf PDF
COMH Tech Amendment 0007 - 07 27 19.01_Amended.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0007.pdf PDF
08 71 00_Amended 006.pdf PDF
W9123621R2003 Amendment 0006.pdf PDF
A.07.20 - Site Visit Sign-in Log - Dtd 20 Oct 2021_1Page.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0005.pdf PDF
Attachment 12 - COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf PDF
Attachment 11 - COMH_RTA_Design Drawings_Part 2 of 3_17MAR21.pdf PDF
Attachment 13 - COMH_RTA_Specifications part 1 of 1_17MAR21.pdf PDF
Attachment 10 - COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf PDF
Attachment 15 - COMH - RTA SID_17MAR21.pdf PDF
Attachment 14 - COMH - RTA FFE_17MAR21.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0004.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0003.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0002.pdf PDF
W9123621R2003 - 0001 - COMH.pdf PDF
Attachment 12 - COMH - Final Design Drawings Part 3 of 3.pdf PDF
Attachment 9 - Langley Environmental Management Special Conditions.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation W9123621R2003 - COMH.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Attachment 13 - COMH Final Design Specifications Part 1 of 1.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 11 - COMH - Final Design Drawings Part 2 of 3.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_G_R19.rvt

12/30/2020 11:47:10 AM

G-001

C O

V E

R S

H E

E T

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

D

S

T A

P L E

S

D S

T A

P L E

S

S G

R O

E T

H E

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

01-04-2021

FY19 F-22 FORMAL TRAINING UNIT (FTU)

CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR

(COMH)

PROJECT LOCATION

N

PROJECT LOCATION MAP

PROJECT VICINITY MAP

HAMPTON

NEWPORT NEWS

JOINT BASE LANGLEY - EUSTIS (JBLE)

FINAL DESIGN SUBMITTAL

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_G_R19.rvt

12/30/2020 11:47:10 AM

G-002

D R

A W

IN

G

I N

D E

X

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

D

S

T A

P L E

S

D S

T A

P L E

S

S G

R O

E T

H E

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SHEET INDEX

SHEET NUMBER SHEET NAME

EP102A SECOND FLOOR POWER PLAN - AREA A

EP102B SECOND FLOOR POWER PLAN - AREA B

EP102C SECOND FLOOR POWER PLAN - AREA C

EP102D SECOND FLOOR POWER PLAN - AREA D

EP103 ROOF POWER PLAN - OVERALL

EG101 FIRST FLOOR OVERALL GROUNDING PLAN

EG103 LIGHTNING PROTECTION OVERALL PLAN

E-401 ENLARGED ELECTRICAL PLANS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-503 ELECTRICAL DETAILS

E-504 ELECTRICAL DETAILS

E-505 ELECTRICAL DETAILS

E-506 ELECTRICAL DETAILS

E-601 LIGHTING SCHEDULES

E-602 EQUIPMENT CONNECTION SCHEDULES

E-603 EQUIPMENT CONNECTION SCHEDULES

E-604 ELECTRICAL CONNECTION SCHEDULES

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-607 PANEL SCHEDULES

E-608 PANEL SCHEDULES

E-609 PANEL SCHEDULES

E-610 PANEL SCHEDULES

E-611 PANEL SCHEDULES

E-612 PANEL SCHEDULES

E-613 PANEL SCHEDULES

E-701 ELECTRICAL ONE-LINE DIAGRAM

E-702 GROUNDING RISER DIAGRAM

E-703 SWITCHBOARD ELEVATIONS

16. TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TD101 TELECOMMUNICATIONS DEMOLITION SITE PLAN

TS101 TELECOMMUNICATIONS SITE PLAN

TS501 TELECOMMUNICATIONS DETAILS

T-101 FIRST FLOOR TELECOMMUNICATIONS PLAN - OVERALL

T-101A FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A

T-101B FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B

T-101C FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-101D FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-102 SECOND FLOOR TELECOMMUNICATIONS PLAN - OVERALL

T-102C SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-102D SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-103 ROOF TELECOMMUNICATIONS PLAN - OVERALL

T-111 FIRST FLOOR TELECOMMUNICATION DIAMOND STUDY PLAN - OVERALL

T-112 SECOND FLOOR TELECOMMUNICATIONS DIAMOND STUDY PLAN - OVERALL

T-121 FIRST FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL

T-122 SECOND FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL

T-401 ENLARGED TELECOMMUNICATIONS PLANS

T-501 TELECOM SERVICE ENTRANCE ELEVATION

T-502 TELECOM SERVICE ENTERANCE ELEVATION

T-503 TELECOM SERVICE ENTRANCE ELEVATION

T-504 TELECOM SERVICE ENTRANCE ELEVATION

T-505 TELECOMMUNICATIONS DETAILS

T-506 TELECOMMUNICATIONS DETAILS

T-507 TELECOMMUNICATIONS DETAILS

T-508 TELECOMMUNICATIONS DETAILS

T-509 TELECOMMUNICATIONS DETAILS

T-700 FIBER COMMUNICATIONS OSP DIAGRAM

T-701 TELECOMMUNICATIONS RISER DIAGRAM

T-702 TELECOMMUNICATIONS RACK ELEVATIONS

T-703 TELECOMMUNICATIONS RACK ELEVATIONS

T-704 TELECOMMUNICATIONS RACK ELEVATIONS

T-705 RISER DIAGRAMS

T-706 TELECOMMUNICATIONS GROUNDING RISER DIAGRAM

X-001 SECURITY SYMBOLS LEGEND AND ABBREVIATIONS

X-002 SECURITY GENERAL NOTES

X-101 FIRST FLOOR SECURITY PLAN - OVERALL

X-101A FIRST FLOOR SECURITY PLAN - AREA A

X-101B FIRST FLOOR SECURITY PLAN - AREA B

X-101C FIRST FLOOR SECURITY PLAN - AREA C

X-101D FIRST FLOOR SECURITY PLAN - AREA D

X-102 SECOND FLOOR SECURITY PLAN - OVERALL

X-102C SECOND FLOOR SECURITY PLAN - AREA C

X-102D SECOND FLOOR SECURITY PLAN - AREA D

X-501 SECURITY DETAILS

X-502 SECURITY DETAILS

X-503 SECURITY DETAILS

X-701 ACCESS CONTROL RISER DIAGRAM

X-702 INTRUSION DETECTION SYSTEM RISER DIAGRAM

X-703 CCTV RISER DIAGRAM

17. AUDIO VISUAL

TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TA101C FIRST FLOOR AUDIO VISUAL PLAN - AREA C

TA101D FIRST FLOOR AUDIO VISUAL PLAN - AREA D

TA102C SECOND FLOOR AUDIO VISUAL PLAN - AREA C

TA102D SECOND FLOOR AUDIO VISUAL PLAN - AREA D

TA201D FIRST FLOOR AUDIO VISUAL RCP - AREA D

TA202C SECOND FLOOR AUDIO VISUAL RCP - AREA C

TA202D SECOND FLOOR AUDIO VISUAL RCP - AREA D

TA400 AUDIO VISUAL ELEVATIONS

TA501 AUDIO VISUAL DETAILS

TA502 AUDIO VISUAL DETAILS

TA601 AUDIO VISUAL SIGNAL FLOWS

TA602 AUDIO VISUAL SIGNAL FLOWS

TA603 AUDIO VISUAL SIGNAL FLOWS

SHEET INDEX

SHEET NUMBER SHEET NAME

FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A

FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B

FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C

FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D

FX102 SECOND FLOOR FIRE SUPPRESSION PLAN - OVERALL

FX102A SECOND FLOOR FIRE SUPPRESSION PLAN - AREA A

FX102B SECOND FLOOR FIRE SUPPRESSION PLAN - AREA B

FX102C SECOND FLOOR FIRE SUPPRESSION PLAN - AREA C

FX102D SECOND FLOOR FIRE SUPPRESSION PLAN - AREA D

FX401 FIRE PROTECTION ENLARGED PLANS

FX501 FIRE PROTECTION DETAILS

11. PLUMBING

P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

P-101 UNDERFLOOR PLUMBING PLAN - OVERALL

P101A UNDERFLOOR PLUMBING PLAN - AREA A

P101B UNDERFLOOR PLUMBING PLAN - AREA B

P101C UNDERFLOOR PLUMBING PLAN - AREA C

P101D UNDERFLOOR PLUMBING PLAN - AREA D

P-110 FIRST FLOOR PLUMBING PLAN - OVERALL

P110A FIRST FLOOR PLUMBING PLAN - AREA A

P110B FIRST FLOOR PLUMBING PLAN - AREA B

P110C FIRST FLOOR PLUMBING PLAN - AREA C

P110D FIRST FLOOR PLUMBING PLAN - AREA D

P-120 SECOND FLOOR PLUMBING PLAN - OVERALL

P120A SECOND FLOOR PLUMBING PLAN - AREA C

P120B SECOND FLOOR PLUMBING PLAN - AREA D

P-301 ENLARGED PLAN - FIRST FLOOR WOMENS/MEN LOCKER ROOM

P-302 ENLARGED PLAN - SECOND FLOOR WOMENS/MEN LOCKER ROOM

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-701 PLUMBING DIAGRAMS

P-702 PLUMBING DIAGRAMS

P-703 PLUMBING DIAGRAMS

13. MECHANICAL

M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

MS101 MECHANICAL SITE PLAN

MS102 MECHANICAL SITE PLAN

MP101 FIRST FLOOR PIPING PLAN- OVERALL

MP101A FIRST FLOOR PIPING PLAN - AREA A

MP101B FIRST FLOOR PIPING PLAN - AREA B

MP101C FIRST FLOOR PIPING PLAN - AREA C

MP101D FIRST FLOOR PIPING PLAN - AREA D

MP102 SECOND FLOOR PIPING PLAN - OVERALL

MP102C SECOND FLOOR PIPING PLAN - AREA C

MP102D SECOND FLOOR PIPING PLAN - AREA D

MH101 FIRST FLOOR VENTILATION PLAN - OVERALL

MH101A FIRST FLOOR VENTILATION PLAN - AREA A

MH101B FIRST FLOOR VENTILATION PLAN - AREA B

MH101C FIRST FLOOR VENTILATION PLAN - AREA C

MH101D FIRST FLOOR VENTILATION PLAN - AREA D

MH102 SECOND FLOOR VENTILATION PLAN - OVERALL

MH102C SECOND FLOOR VENTILATION PLAN - AREA C

MH102D SECOND FLOOR VENTILATION PLAN - AREA D

M-110 MECHANICAL ROOF PLAN

M-301 FIRST FLOOR ENLARGED MECHANICAL ROOM

M-401 SECTIONS - MECHANICAL

M-402 SECTIONS - AIR HANDLING EQUIPMENT

M-403 SECTIONS - HANGAR BAY

M-501 DETAILS - HEATING

M-502 DETAILS - VENTILATION

M-503 DETAILS - HEATING

M-504 DETAILS - MECHANICAL

M-601 SCHEDULES - HEATING/COOLING

M-602 SCHEDULES - HEATING/COOLING

M-603 SCHEDULES - HEATING/COOLING

M-604 SCHEDULES - HEATING/COOLING

M-701 DIAGRAMS - HEATING/COOLING

M-801 CONTROL SEQUENCES

M-802 CONTROL SEQUENCES

M-803 CONTROL SEQUENCES

M-804 CONTROL SEQUENCES

M-805 CONTROL SEQUENCES

M-806 CONTROL SEQUENCES

M-807 CONTROL SEQUENCES

M-808 CONTROL SEQUENCES

M-809 CONTROL SEQUENCES

M-810 CONTROL SEQUENCES

M-811 CONTROL SEQUENCES

M-812 CONTROL SEQUENCES

14. ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

E-002 ELECTRICAL GENERAL NOTES

E-003 AREA CLASSIFICATIONS PLAN

ED101 DEMOLITION SITE PLAN

ES101 ELECTRICAL SITE PLAN

ES102 ELECTRICAL SITE PLAN

ES501 SITE DETAILS

ES502 SITE DETAILS

ES503 SITE DETAILS

ES701 ELECTRICAL ONE LINE DIAGRAM

ES702 ELECTRICAL ONE LINE DIAGRAM

ES703 ELECTRICAL ONE-LINE DIAGRAM

EL101 FIRST FLOOR LIGHTING PLAN - OVERALL

EL101A FIRST FLOOR LIGHTING PLAN - AREA A

EL101B FIRST FLOOR LIGHTING PLAN - AREA B

EL101C FIRST FLOOR LIGHTING PLAN - AREA C

EL101D FIRST FLOOR LIGHTING PLAN - AREA D

EL102 SECOND FLOOR LIGHTING PLAN - OVERALL

EL102A SECOND FLOOR LIGHTING PLAN - AREA A

EL102B SECOND FLOOR LIGHTING PLAN - AREA B

EL102C SECOND FLOOR LIGHTING PLAN - AREA C

EL102D SECOND FLOOR LIGHTING PLAN - AREA D

EL103 ROOF LIGHTING PLAN - OVERALL

EP101 FIRST FLOOR POWER PLAN - OVERALL

EP101A FIRST FLOOR POWER PLAN - AREA A

EP101B FIRST FLOOR POWER PLAN - AREA B

EP101C FIRST FLOOR POWER PLAN - AREA C

EP101D FIRST FLOOR POWER PLAN - AREA D

SHEET INDEX

SHEET NUMBER SHEET NAME

A-312 EXTERIOR WALL SECTIONS

A-313 EXTERIOR WALL SECTIONS

A-314 EXTERIOR WALL SECTIONS & DIAGRAMS

A-401 ENLARGED PLANS

A-402 ENLARGED PLANS

A-403 ENLARGED PLANS

A-404 ENLARGED PLANS -AIR SHOWERS

A-410 INTERIOR ELEVATIONS

A-411 INTERIOR ELEVATIONS

A-412 INTERIOR ELEVATIONS

A-413 INTERIOR ELEVATIONS

A-414 INTERIOR ELEVATIONS

A-415 INTERIOR ELEVATIONS

A-421 INTERIOR MILLWORK SECTIONS AND DETAILS

A-451 VERTICAL CIRCULATION - PLANS

A-452 VERTICAL CIRCULATION - SECTIONS

A-453 VERTICAL CIRCULATION - DETAILS

A-461 VERTICAL CIRCULATION - ELEVATOR PLANS

A-462 VERTICAL CIRCULATION - SECTIONS

A-463 VERTICAL CIRCULATION - ELEVATOR DETAILS

A-470 VERTICAL CIRCULATION - ROOF LADDERS

A-501 HANGAR DOOR DETAILS

A-502 HANGAR DOOR DETAILS

A-503 HANGAR DOOR DETAILS

A-504 HANGAR DOOR DETAILS

A-505 PLAN DETAILS

A-506 PLAN DETAILS

A-507 PLAN DETAILS

A-511 CEILING DETAILS

A-521 SECTION DETAILS

A-522 SECTION DETAILS

A-531 ROOF DETAILS

A-532 ROOF DETAILS

A-533 ROOF DETAILS

A-534 ROOF DETAILS

A-535 ROOF DETAILS

A-541 INTERIOR DETAILS

A-542 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN

A-543 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN

A-544 HANGAR SLAB DETAILS

A-545 HANGAR SLAB DETAILS

A-546 HANGAR SLAB DETAILS

A-547 HANGAR SLAB DETAILS

A-548 HANGAR SLAB DETAILS

A-549 HANGAR SLAB DETAILS

A-553 PRECAST CONCRETE PROFILES - DETAILS

A-554 PRECAST CONCRETE PROFILES - DETAILS

A-560 SEISMIC JOINT DETAILS

A-562 EXPANSION JOINTS DETAILS

A-570 CANOPY DETAILS

A-601 DOOR & FRAME TYPES

A-602 DOOR SCHEDULE

A-604 EXTERIOR DOOR DETAILS

A-605 INTERIOR DOOR DETAILS

A-611 WINDOW & FRAME TYPES

A-612 WINDOW & FRAME TYPES

A-613 LOUVER TYPES

A-801 HANGAR MARKINGS PLAN - OVERALL

A-802 ENLARGED HANGAR MARKINGS PLAN

08. INTERIOR DESIGN

I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL

I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A

I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B

I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C

I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D

I-102 SECOND FLOOR INTERIOR FINISH PLAN - OVERALL

I102C SECOND FLOOR INTERIOR FINISH PLAN - AREA C

I102D SECOND FLOOR INTERIOR FINISH PLAN - AREA D

I131A FIRST FLOOR SIGNAGE PLAN - AREA A

I131B FIRST FLOOR SIGNAGE PLAN - AREA B

I131C FIRST FLOOR SIGNAGE PLAN - AREA C

I131D FIRST FLOOR SIGNAGE PLAN - AREA D

I132C SECOND FLOOR SIGNAGE PLAN - AREA C

I132D SECOND FLOOR SIGNAGE PLAN - AREA D

I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES

I-602 TRANSITION DETAILS

I-621 SIGNAGE SCHEDULE

I-622 SIGNAGE SCHEDULE

I-631 SIGNAGE DETAILS

I-632 SIGNAGE DETAILS

I-633 SIGNAGE DETAILS

08. INTERIORS

IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A

IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B

IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C

IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D

IF102 SECOND FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF102C SECOND FLOOR INTERIOR FURNITURE PLAN - AREA C

IF102D SECOND FLOOR INTERIOR FURNITURE PLAN - AREA D

10. FIRE ALARM

FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA102 SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA102A SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA102B SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA102C SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA102D SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA501 FIRE ALARM DETAILS

FA502 FIRE ALARM DETAILS

FA601 FIRE ALARM SEQUENCE OF OPERATIONS

FA701 FIRE ALARM RISER DIAGRAMS

10. FIRE PROTECTION

FX001 FIRE SUPPRESSION GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL

SHEET INDEX

SHEET NUMBER SHEET NAME

SB102A SLAB PLAN - AREA A

SB102B SLAB PLAN - AREA B

SB102C SLAB PLAN - AREA C

SB102D SLAB PLAN - AREA D

SF111 SECOND FLOOR AND LOW ROOF FRAMING PLAN - OVERALL

SF111A LOW ROOF FRAMING PLAN - AREA A

SF111B LOW ROOF FRAMING PLAN - AREA B

SF111C SECOND FLOOR FRAMING PLAN - AREA C

SF111D SECOND FLOOR FRAMING PLAN - AREA D

SF121 ROOF FRAMING PLAN - OVERALL

SF121A ROOF FRAMING PLAN - AREA A

SF121B ROOF FRAMING PLAN - AREA B

SF121C ROOF FRAMING PLAN - AREA C

SF121D ROOF FRAMING PLAN - AREA D

S-201 FRAMING ELEVATIONS

S-202 FRAMING ELEVATIONS

S-203 FRAMING ELEVATIONS

S-204 HANGAR TRUSS ELEVATIONS

S-205 HANGER TRUSS ELEVATION AND DETAILS

S-301 BUILDING SECTIONS

S-302 BUILDING SECTIONS

S-311 FOUNDATION SECTIONS

S-321 ROOF FRAMING SECTIONS

S-401 ENLARGED PLANS

S-501 FOUNDATION DETAILS

S-502 FOUNDATION DETAILS

S-503 TYPICAL HANGAR SLAB DETAILS

S-504 TYP CMU DETAILS

S-505 TYP CMU DETAILS

S-506 MECHANICAL ENCLOSURE DETAILS

S-507 SLAB DETAILS

S-508 METAL STUD WALL DETAILS

S-509 STRUCTURAL SITE DETAILS

S-510 CMU DETAILS

S-511 TYPICAL FRAMING DETAILS

S-512 TYPICAL FRAMING DETAILS

S-513 ROOF FRAMING DETAILS

S-514 MISC. FRAMING DETAILS

S-515 TRUSS DETAILS

S-521 FRAMING ELEVATION DETAILS

S-522 FRAMING ELEVATION DETAILS

S-523 FRAMING ELEVATION DETAILS

S-601 REBAR SCHEDULES

S-602 SCHEDULES

S-603 COLUMN SCHEDULE

S-901 3D ISOMETRICS

07. ARCHITECTURAL

A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

A-002 ABA ACCESSIBILITY GUIDELINES

A-003 ABA ACCESS PLAN - FIRST FLOOR

A-004 ABA ACCESS PLAN - SECOND FLOOR

A-005 AIRCRAFT CLEARANCE REQUIREMENT SECTION

A-006 SECURE AREA PLANS

A-007 ACOUSTIC PARTITIONS PLAN - FIRST FLOOR

A-008 ACOUSTIC PARTITIONS PLAN - SECOND FLOOR

A-009 PARTITION TYPES

A-010 PARTITION HEAD CONDITIONS

A-011 PENETRATION DETAILS

A-012 PENETRATION DETAILS

A-013 PENETRATION DETAILS

A-015 EQUIPMENT SCHEDULE

AS101 ARCHITECTURAL SITE PLAN

AS401 ENLARGED ARCHITECTURAL SITE PLAN

AS402 ENLARGED ARCHITECTURAL SITE PLAN

AS501 ENLARGED ARCHITECTURAL SITE PLAN

AS502 ENLARGED ARCHITECTURAL SITE PLAN

A-101 FIRST FLOOR PLAN - OVERALL

A101A FIRST FLOOR PLAN - AREA A

A101B FIRST FLOOR PLAN - AREA B

A101C FIRST FLOOR PLAN - AREA C

A101D FIRST FLOOR PLAN - AREA D

A-102 SECOND FLOOR PLAN - OVERALL

A102A SECOND FLOOR PLAN - AREA A

A102B SECOND FLOOR PLAN - AREA B

A102C SECOND FLOOR PLAN - AREA C

A102D SECOND FLOOR PLAN - AREA D

A-121 ROOF PLAN - OVERALL

A121A ROOF PLAN - AREA A

A121B ROOF PLAN - AREA B

A121C ROOF PLAN - AREA C

A121D ROOF PLAN - AREA D

A-131 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL

A131A FIRST FLOOR REFLECTED CEILING PLAN-AREA A

A131B FIRST FLOOR REFLECTED CEILING PLAN-AREA B

A131C FIRST FLOOR REFLECTED CEILING PLAN-AREA C

A131D FIRST FLOOR REFLECTED CEILING PLAN-AREA D

A-132 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL

A132B SECOND FLOOR REFLECTED CEILING PLAN - AREA B

A132C SECOND FLOOR REFLECTED CEILING PLAN - AREA C

A132D SECOND FLOOR REFLECTED CEILING PLAN - AREA D

A-141 FIRST FLOOR AIR BARRIER PLAN

A-142 SECOND FLOOR AIR BARRIER PLAN

A-143 BUILDING SECTIONS - AIR BARRIER

A-201 BUILDING ELEVATIONS

A-202 BUILDING ELEVATIONS

A-203 BUILDING ELEVATIONS

A-204 BUILDING ELEVATIONS

A-211 PARTIAL BUILDING ELEVATIONS

A-212 PARTIAL BUILDING ELEVATIONS

A-213 PARTIAL BUILDING ELEVATIONS

A-221 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-222 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-223 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-230 PRECAST CONCRETE PROFILES - ELEVATIONS

A-231 PRECAST CONCRETE PROFILES - ELEVATIONS

A-232 PRECAST CONCRETE PROFILES - ELEVATIONS

A-301 BUILDING SECTION

A-302 BUILDING SECTION

A-311 EXTERIOR WALL SECTIONS

SHEET INDEX

SHEET NUMBER SHEET NAME

00. GENERAL

G-001 COVER SHEET

G-002 DRAWING INDEX

G-003 CODE COMPLIANCE SUMMARY

G-004 OCCUPANCY SUMMARY

G-005 CODE COMPLIANCE SITE PLAN

G-006 FIRST FLOOR LIFE SAFETY PLAN

G-007 SECOND FLOOR LIFE SAFETY PLAN

PH101 CONSTRUCTION SEQUENCING PLANS

PH102 CONSTRUCTION SEQUENCING PLANS

PH103 CONSTRUCTION SEQUENCING PLANS

AD101 OVERALL FIRST FLOOR DEMOLITION PLAN

AD102 OVERALL SECOND FLOOR DEMOLITION PLAN

AD103 OVERALL ROOF DEMOLITION PLAN

02. SURVEY / MAPPING

VF001 LEGENDS AND NOTES

VF100 OVERALL EXISTING CONDITIONS

VF101 EXISTING CONDITIONS PLAN

VF102 EXISTING CONDITIONS PLAN

VF103 EXISTING CONDITIONS PLAN

VF104 EXISTING CONDITIONS PLAN

04.CIVIL

C-001 LEGEND AND GENERAL NOTES

C-002 CONSTRUCTION ACCESS PLAN

C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL

C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL

C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN

C-006 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN

C-007 EROSION AND SEDIMENT CONTROL - PHASE 4 PLAN

C-008 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN INITIAL

C-009 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN FINAL

CD001 DEMOLITION LEGEND & NOTES

CD100 EXISTING CONDITIONS - OVERALL

CD101 DEMOLITION PLAN

CD102 DEMOLITION PLAN

CD103 DEMOLITION PLAN

CD104 DEMOLITION PLAN

CS001 SITE LAYOUT LEGEND & CONTROL POINTS

CS101 SITE LAYOUT PLAN

CS102 SITE LAYOUT PLAN

CS103 SITE LAYOUT PLAN

CS104 SITE LAYOUT PLAN

CG001 GRADING LEGEND, STORM SCHEDULES & NOTES

CG101 GRADING & DRAINAGE PLAN

CG102 GRADING PLAN

CG103 GRADING PLAN

CG201 STORM PROFILES

CG202 STORM PROFILES

CG203 STORM PROFILES

CG700 POST DEVELOPMENT DRAINAGE AREA PLAN

CG701 STORMWATER MANAGEMENT CALCULATIONS

CG702 STORMWATER MANAGEMENT CALCULATIONS

CG703 STORMWATER MANAGEMENT CALCULATIONS

CG704 STORMWATER MANAGEMENT CALCULATIONS

CU001 UTILITY LEGEND, CONTROL POINTS, & SCHEDULES

CU101 UTILITY PLAN

CU102 UTILITY PLAN

CU103 UTILITY PLAN

CU104 UTILITY PLAN

CU201 UTILITY PROFILES

CU202 UTILITY PROFILES

C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-505 EROSION AND SEDIMENT CONTROL DETAILS

C-506 DETAILS

C-507 DETAILS

C-508 DETAILS

C-509 DETAILS

C-510 DETAILS

C-511 DETAILS

C-512 DETAILS

C-513 DETAILS

C-514 DETAILS

C-515 DETAILS

C-516 DETAILS

C-517 DETAILS

C-518 DETAILS

C-519 DETAILS

CP101 APRON AND TOWWAY GEOMETRY PLAN

CP201 APRON AND TOWWAY JOINT LAYOUT PLAN

CP301 APRON AND TOWWAY SPOT ELEVATION PLAN

CP401 APRON AND TOWWAY TYPICAL SECTIONS

CP501 APRON AND TOWWAY JOINT DETAILS

CP502 APRON AND TOWWAY JOINT DETAILS

CM101 APRON AND TOWWAY MARKING PLAN

CM501 APRON AND TOWWAY MARKING DETAILS

05. LANDSCAPE

L-101 LANDSCAPE PLAN

L-102 LANDSCAPE PLAN

L-103 LANDSCAPE PLAN

L-104 LANDSCAPE PLAN

L-105 LANDSCAPE PLAN

L-106 LANDSCAPE PLAN

L-107 LANDSCAPE PLAN

L-501 LANDSCAPE DETAILS

06. STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES

S-002 GENERAL STRUCTURAL NOTES

S-003 LEGEND, ABBREVIATIONS & MISC LOAD INFO

S-010 AREA LOAD PLAN

S-011 ROOF WIND UPLIFT PLAN

SB101 FOUNDATION PLAN - OVERALL

SB101A FOUNDATION PLAN - AREA A

SB101B FOUNDATION PLAN - AREA B

SB101C FOUNDATION PLAN - AREA C

SB101D FOUNDATION PLAN - AREA D

SB102 SLAB PLAN - OVERALL

FIRE PROTECTION / LIFE SAFETY / ACCESSIBILITY CODE REVIEW

COMH FY19 F-22, JOINT BASE LANGLEY - EUSTIS (JBLE), HAMPTON, VA

PROJECT'S APPLIED CODES & STANDARDS

A. UFC 1-200-01: DOD BUILDING CODE, 8 OCTOBER 2019

B. UFC 3-600-01: DESIGN: FIRE PROTECTION ENGINEERING FOR FACILITIES, WITH CHANGE 4, 7 FEBRUARY 2020

C. UFC 4-010-01: DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12 DECEMBER 2018

D. UFC 4-021-01: DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, WITH CHANGE 1, JANUARY 2010

E. UFC 4-211-01: AIRCRAFT MAINTENANCE HANGARS, WITH CHANGE 2, MAY 18, 2020

F. IBC 2018: INTERNATIONAL BUILDING CODE FOR FIRE RESISTANCE REQUIREMENTS, ALLOWABLE FLOOR AREA, BUILDING HEIGHT

LIMITS, AND BUILDING SEPARATION DISTANCE, EXCEPT AS MODIFIED BY UFC 3-600-01

G. NFPA 1, 2018: FIRE CODE, FOR DETERMINING VEHICLE ACCESS REQUIREMENTS

H. NFPA 10, 2018: STANDARD FOR PORTABLE FIRE EXTINGUISHERS

I. NFPA 11, 2016: STANDARD FOR LOW-, MEDIUM-, AND HIGH-EXPANSION FOAM

K. NFPA 20, 2019: STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, FOR CONSTRUCTION &

INSTALLATION RQMTS FOR FIRE PUMPS

M. NFPA 30, 2018: FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, FOR CONSTRUCTION REQUIREMENTS AND FIRE RESISTANCE

RATINGS FOR LIQUID STORAGE AREAS

N. NFPA 70, 2020: NATIONAL ELECTRICAL CODE (NEC)

O. NFPA 72, 2019: NATIONAL FIRE ALARM AND SIGNALING CODE

P. NFPA 80, 2019: STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES

Q. NFPA 90A, 2018: STANDARD INSTALLATION OF AIR CONDITIONING & VENTILATION SYSTEMS, FOR PROTECTION OF OPENINGS, SHAFTS, FIRE DAMPERS, SMOKE DAMPERS, PENETRATIONS AND FAN CONTROL

S. NFPA 291, 2019: RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYDRANTS

V. ASME A17.1, 2019: SAFETY CODE FOR ELEVATORS AND ESCALATORS

W. ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARDS FOR DOD FACILITIES, 2015 (CHAPTERS 1-10)

1. BUILDING CODE REQUIREMENTS:

A. OCCUPANCY CLASSIFICATION:

B OFFICES, CIRCULATION, TESTING LABORATORIES,

CLASSROOMS, AND CONFERENCE ROOMS < 50 OCCUPANTS

IBC CHAPTER 3

S-1 AIRCRAFT HANGER (STORAGE AND REPAIR)

B. CONSTRUCTION TYPE: TYPE IIB CONSTRUCTION

IBC CHAPTER 6

C. MIXED USE & OCCUPANCY SEPARATIONS THE BUILDING IS BEING CONSTRUCTED AS NONSEPARATED / MIXED USE OCCUPANCY PER IBC SECTION 508.3 WITH S-1, B, AND ACCESSORY A-3 AREAS. A 1-HOUR RATED FIRE BARRIER IS REQUIRED BETWEEN HANGAR BAYS (S-1) AND ADJACENT (B, A-3) OCCUPANCIES PER UFC 4-211-01.IBC SECTION 508, UFC 4-211-01

D. AREA LIMITATIONS / MODIFICATIONS:

ALLOWABLE BUILDING AREA IS UNLIMITED PER IBC, SECTION 507.5. BUILDING IS GROUP B OR S NOT

MORE THAN TWO STORIES ABOVE GRADE PLANE, EQUIPPED THROUGHOUT WITH AN AUTOMATIC

SPRINKLER SYSTEM AND SURROUNDED WITH PUBLIC WAYS OR YARDS NOT LESS THAN 60 FEET IN

WIDTH.

IBC SECTION 503, 506, 507

E. HEIGHT LIMITATIONS:

ALLOWABLE BUILDING HEIGHT IS UNLIMITED WHEN CONSTRUCTED IN ACCORDANCE WITH UFC 4-211-01.

BUILDING IS 2 STORIES AND IS COMPLIANT WITH IBC FOR ALL OCCUPANCIES: GROUP B: 4 STORIES

ALLOWED AND GROUP S-1: 3 STORIES ALLOWED.

UFC 4-211-01 SECTION 3-3.1.7, IBC

SECTION 504

F. VERTICAL ENCLOSURES, CONTINUITY &

PROTECTION:

STAIRS AND SHAFT ENCLOSURES SHALL HAVE A FIRE-RESISTANCE RATING OF 1 HOUR PER IBC CHAPTER 7

IBC: SECTION 708

NFPA 101: 7.2.2, 8.6

NFPA 90A: 4.3.1.2, 5.3.4

G. OPENING PROTECTIVES & THRU-PENETRATIONS 1-HOUR FIRE BARRIER: 1-HOUR THRU-PENETRATIONS, 60-MINUTE OPENING PROTECTIVES REQUIRED FOR

STAIRS; 45-MINUTE OPENING PROTECTIVES FOR ALL OTHER DOOR OPENINGS.

NFPA 101: 8.3 THRU 8.6

NFPA 90A

SMOKE PARTITION: SEALED THRU-PENETRATIONS, SELF-CLOSING/SELF-LATCHING OPENING PROTECTIVES.

NFPA 80

H. HORIZONTAL ASSEMBLIES:

FIRE RESISTANCE RATED HORIZONTAL ASSEMBLIES NOT REQUIRED FOR TYPE IIB CONSTRUCTION

IBC: SECTION 711

I. FIRE RESISTIVE REQUIREMENTS: TYPE IIB IN ACCORDANCE WITH IBC CHAPTER 6.

IBC: TABLE 601 PRIMARY STRUCTURAL FRAME - 0 HOUR RATING

EXTERIOR BEARING WALLS - 0 HOUR RATING

INTERIOR BEARING WALLS - 0 HOUR RATING

EXTERIOR NONBEARING PARTITIONS - 0 HOUR RATING

INTERIOR NONBEARING PARTITIONS - 0 HOUR RATING

FLOOR CONSTRUCTION & SECONDARY MEMBERS - 0 HOUR RATING

ROOF CONSTRUCTION & SECONDARY MEMBERS - 0 HOUR RATING

J. ENCLOSURE PROTECTION:

NFPA 101: SPECIFIC OCCUPANCY CHAPTERS

ASME A17.1

UFC 4-211-01

FIRE PUMP ROOM - 1-HOUR RATING WITH 45-MINUTE PROTECTIVE PROVIDED.

HANGAR BAY SEPARATION - 1-HOUR RATING WITH 45-MINUTE PROTECTIVE PROVIDED.

EQUIPMENT ROOMS (HAVING A DEGREE OF HAZARD GREATER THAN THE GENERAL OCCUPANCY) - SMOKE PARTITION PROVIDED PER NFPA 101 SECTION 8.7.1.2. WHEN LOCATED ADJACENT TO BUSINESS AND ASSEMBLY OCCUPANCIES OPENING PROTECTIVES IN COMPLIANCE WITH NFPA 101 SECTION 8.4.

K. FIRE PROTECTION SYSTEM:

WET-PIPE SPRINKLER SYSTEMS WILL BE PROVIDED THROUGHOUT THE BUILDING. HANGAR BAYS WILL BE PROVIDED WITH HIGH EXPANSION (HI-EX) FOAM SYSTEMS. THE BUILDING WILL BE PROVIDED WITH A FIRE

PUMP TO SUPPLEMENT THE PRESSURE PROVIDED BY THE FIRE PUMPS IN B780.

UFC 3-600-01: CHAPTER 9

UFC 4-211-01: CHAPTER 3

UFC 3-600-01: CHAPTER 9 LIGHT HAZARD: 0.1 GPM/SF OVER 1,500 SF. OFFICES, CORRIDORS, BATHROOMS, LOCKER ROOMS, CONFERENCE ROOMS.

UFC 3-600-01: APPENDIX B

ORDINARY HAZARD: 0.2 GPM/SF OVER 2,500 SF. MEP SPACES, STORAGE, INDUSTRIAL AREAS.

EXTRA HAZARD: 0.3 GPM/SF OVER 2,500 SF. TIRE STORAGE AREA

HANGAR HAZARD: 0.2 GPM/SF OVER 5,000 SF. HANGAR BAYS.

UFC 3-600-01: CHAPTER 9-7 COVERAGE PER SPRINKLER MUST BE IN ACCORDANCE WITH NFPA 13.

NFPA 13 LIGHT HAZARD: 225 SF

ORDINARY HAZARD: 130 SF

EXTRA HAZARD: 100 SF

UFC 4-211-01: Chapter 3 HI-EX GENERATORS TO BE WITHIN CLOSE PROXIMITY BUT NOT OVER THE AIRCRAFT. HI-EX SYSTEM TO COVER 90% OF THE SILHOUETTE WITHIN 1 MINUTE AND PROVIDE A DEPTH OF 3.2 FEET WITHIN 4 MINUTES.

HYDRAULIC CALCULATIONS PERFORMED WITH FOAM SYSTEM AND CEILING-LEVEL SPRINKLER SYSTEM

FLOWING.

L. AVAILABLE WATER SUPPLY TESTING HYDRANT FLOW TESTS WERE PERFORMED ON JUNE 19, 2020 AND WITNESSED BY THE DESIGN TEAM.

FLOW HYDRANT: SOUTHEAST CORNER OF B753

PRESSURE HYDRANT: SOUTHEAST CORNER OF B752.

STATIC: 65 PSI

RESIDUAL: 50 PSI,

FLOW: 1,000 GPM.

TESTED LOOP TO PROVIDE SUPPLY TO NEW FIRE HYDRANTS AND PROVIDE ADEQUATE FIRE FLOW.

FIRE PROTECTION SYSTEMS WILL BE SERVED FROM BUILDING 780 FIRE PUMP HOUSE.

BUILDING 780 HAS 3, 125 PSI 1500 GPM PUMPS ARRANGED IN PARALLEL.

UFC 3-600-01: 9-6.4

NFPA 291

M. WATER STORAGE TANK REQUIREMENTS EXISTING 155,000 GALLON TANK (NOMINAL) PROVIDED TO SUPPLY BUILDING 780. NO NEW STORAGE

PROVIDED.

UFC 3-600-01: CHAPTER 9-4

N. BACKFLOW PREVENTER & TESTING NO BACKFLOW PREVENTER TO BE PROVIDED. FIRE PROTECTION SYSTEM SUPPLIED DIRECTLY FROM

BUILDING 780 AND ASSOCIATED FIRE WATER STORAGE TANK.

NFPA 13: 8.16.4.6.1

UFC 3-600-01; 9-6.6.1

O. FIRE PUMP(S) FIRE PROTECTION SYSTEMS WILL BE SUPPLIED FROM PUMPHOUSE LOCATED IN BUILDING 780 WITH 3, 125 PSI 1500 GPM FIRE PUMPS INSTALLED IN PARALLEL. A FIRE PUMP RATED AT 2,000 GPM, 80 PSI WILL BE PROVIDED IN THE COMH BUILDING FOR THE HIGH EXPANSION FOAM SYSTEM AS AVAILABLE PRESSURE

PROVIDED FROM BUILDING 780 WILL BE INSUFFICIENT.

UFC 3-600-01: 9-5

NFPA 20

2. LIFE SAFETY REQUIREMENTS:

A. CLASSIFICATION OF OCCUPANCY: BUSINESS

NFPA 101: CH 6

INDUSTRIAL, GENERAL,

ASSEMBLY

B. OCCUPANT LOAD:

NFPA 101: 7.3.1.2 & CHAPTERS 12-42

UFC 3-600-01: 10-3.1

C. CAPACITY OF MEANS OF EGRESS:

FIRST STORY LEVEL COMPONENTS EGRESS WIDTH

346 OCCUPANTS * .2 INCH/OCCUPANT = 69.2 INCHES REQUIRED

NFPA 101: 7.3.3 & CHAPTERS 12-42 36" EXT. DOORS: 33" CLEAR * 8 DOORS = 264"

36" EXT. DOUBLE DOORS: 66" CLEAR * 3 DOORS = 198"

42" EXT. DOORS: 39" CLEAR * 1 DOOR = 39"

48" EXT. DOORS: 45" CLEAR * 1 DOOR = 45"

48" EXT. DOUBLE DOORS: 91" CLEAR * 2 DOORS=182"

15 EXITS, TOTAL DOOR WIDTH = 728 INCHES PROVIDED

SECOND STORY LEVEL COMPONENTS EGRESS WIDTH:

382 OCCUPANTS * .2 INCH/OCCUPANT= 76.4 INCHES REQUIRED

42" STAIR DOORS: 39" CLEAR * 2 DOORS = 78"

2 EXIT STAIRS, TOTAL DOOR WIDTH = 78 INCHES PROVIDED

SECOND STORY STAIR EGRESS WIDTH:

382 OCCUPANTS * 0.3 INCHES/OCCUPANT = 114.6 INCHES REQUIRED

STAIR S1: 58" CLEAR WIDTH

STAIR S2: 60" CLEAR WIDTH

TOTAL: STAIR WIDTH = 118 INCHES PROVIDED

D. NUMBER OF EXITS:

NFPA 101: 7.4 & CHAPTERS 12-42

TWO EXITS REQUIRED FROM FIRST STORY AND FROM SECOND STORY.

TOTAL CALCULATED OCCUPANT LOAD PER FLOOR IS LESS THAN 500.

E. ARRANGEMENT OF MEANS OF EGRESS EXITS ARE REQUIRED TO BE SEPARATED BY NOT LESS THAN 1/3 THE OVERALL DIMENSION WITH APPROVED

AUTOMATIC FIRE SPRINKLER SYSTEM.

FIRST STORY EXIT SEPARATION: 128 FT / 203 FT OVERALL = 0.63

SECOND STORY EXIT SEPARATION: 113 FT / 202 FT OVERALL = 0.56

NFPA 101: 7.5 & CHAPTERS 12-42

F. TRAVEL DISTANCE TO EXITS:

BUSINESS: 100 FEET 50 FEET 300 FEET

NFPA 101, 38.2

NFPA 101: 7.6 & CHAPTERS 12-42

UFC 4-211-01

INDUSTRIAL: 100 FEET 50 FEET 250 FEET

NFPA 101, 40.2

UNLIMITED

ASSEMBLY:

NFPA 101, 12.2

G. ILLUMINATION OF MEANS OF EGRESS: ILLUMINATION OF STAIRS SHALL BE 10 FT-CANDLE AND 1 FT-CANDLE FOR WALKING SURFACES DURING OCCUPANCY. ILLUMINATION WILL BE PROVIDED BY LIGHTING FIXTURES. REFER TO ELECTRICAL

DRAWINGS.NFPA 101: 7.8 & CHAPTERS 12-42

H. EMERGENCY LIGHTING: ILLUMINATION SHALL BE FOR 90 MINUTES AND PROVIDE NOT LESS THAN AN AVERAGE 1 FT-CANDLE.

LIGHTING FIXTURES WITH INTEGRAL BATTERY PACKS WITH 90 MINUTES OF BATTERY POWER WILL BE

PROVIDED. REFER TO ELECTRICAL DRAWINGS.NFPA 101: 7.9 & CHAPTERS 12-42

COMMON PATH DEAD-END TRAVEL DISTANCE

75' (50 OR FEWER PEOPLE) 20'

(GREATER THAN 50 PEOPLE)

250 FEET

DOORS SPACED 150 FEET ALONG

PERIMETER

HANGAR:

UFC 4-211-01, 3-3

L. PORTABLE FIRE EXTINGUISHERS: FIRE EXTINGUISHERS ARE REQUIRED IN THE BUILDING PER NFPA 101, 38.3.5. FIRE EXTINGUISHERS WILL

BE PROVIDED IN ACCORDANCE WITH NFPA 10.

NFPA 101: 9.9

NFPA 10

M. CORRIDORS: CORRIDORS ARE NOT REQUIRED TO BE RATED SINCE THE BUILDING IS PROTECTED THROUGHOUT BY A SUPERVISED AUTOMATIC SPRINKLER SYSTEM PER NFPA 101 38.3.6.1 (3). A MINIMUM CORRIDOR WIDTH OF 44 INCHES MUST BE MAINTAINED FOR ANY CORRIDOR SERVING AN OCCUPANT LOAD OF 50 OCCUPANTS OR MORE PER NFPA 38.2.3.2 AND 36 INCHES SERVING LESS THAN 50 OCCUPANTS PER

NFPA 101 7.3.4.1.

NFPA 101: CHAPTERS 12-42

N. FIRE DAMPERS: DUCT FIRE DAMPERS ARE NOT REQUIRED BECAUSE ALL WALLS AND PARTITIONS PENETRATED BY A DUCT HAVE A FIRE RESISTANCE RATING LESS THAN 2 HOURS AND NO AIR TRANSFER OPENINGS ARE PRESENT IN

ANY FIRE RESISTANCE RATED PARTITIONS.NFPA 90A: 5.3.1, 5.4.1 & 5.4.2

O. SMOKE DAMPERS: SMOKE DAMPERS ARE NOT REQUIRED BECAUSE AIR-HANDLING UNITS ARE LOCATED ON THE FLOOR THEY SERVE OR ON THE ROOF ABOVE. BUILDING DOES NOT CONTAIN ANY SMOKE BARRIERS THAT

WOULD REQUIRE SMOKE DAMPERS.

IBC: SECTION 716

NFPA 90A: 4.3.10.2

P. DUCT SMOKE DETECTORS DUCT SMOKE DETECTORS INSTALLED DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY BRANCH

CONNECTIONS IN AIR SUPPLY SYSTEMS HAVING CAPACITY GREATER THAN 2,000 CFM.

NFPA 90A: 6.4.2.1

Q. ELEVATORS ONE ELEVATOR LOCATED IN THE BUILDING COMPLIANT WITH THE REQUIREMENTS OF ASME A17.1. THE ELEVATOR INCLUDES A CONTROL ROOM REQUIRED TO HAVE THE SAME 1 HOUR FIRE RESISTANCE RATING AS THE ELEVATOR SHAFT ENCLOSURE. SMOKE DETECTION PROVIDED AT THE TOP OF THE HOISTWAY AND ELEVATOR LOBBIES. AUTOMATIC SPRINKLERS PROVIDED AT THE TOP OF THE HOISTWAY AND IN THE CONTROL ROOM. ACTIVATION OF SPRINKLER WATERFLOW SWITCH DIRECTLY CONNECTED TO A SHUNT TRIP BREAKER SHALL REMOVE POWER TO THE ELEVATOR. PROVIDE ELEVATOR CONTROL

RELAY WITH SUPERVISED INTERFACE BETWEEN THE FIRE ALARM SYSTEM AND THE ELEVATOR

CONTROLLER AS REQUIRED BY NFPA 72.

UFC 3-600-01: 4-12.2.1.1

IBC CHAPTER 30

NFPA 72

R. ROOF ACCESS: A STAIR TO THE ROOF IS NOT REQUIRED. ACCESS TO THE ROOF REQUIRED TO BE BY AN ALTERNATING

TREAD DEVICE, SHIP'S LADDER OR PERMANENT LADDER.

UFC 3-600-01: 10-4

IBC Chapter 1009.13 SECTION 1011.12

S. HAZARDOUS LOCATIONS ALL SPACES WITHIN 5 FEET HORIZONTALLY AND 5 FEET VERTICALLY FROM THE AIRCRAFT SHALL BE A MINIMUM CLASS I DIVISION 2. SPACES ADJACENT TO THE HANGAR BAYS ARE NOT REQUIRED TO BE CONSIDERED HAZARDOUS AS THE DOOR HAS SEALED OPENINGS EXCEPT WITHIN 3 FEET RADIUS OF ALL DOORS SHALL BE CLASS I DIVISION 2. HANGAR BAYS WILL BE CLASSIFIED IN ACCORDANCE WITH NFPA 70.

NFPA 70:

UFC 4-211-01, 3-7.1

UFC 4-211-02, 3-7.2

T. FIRE DEPT VEHICLE ACCESS ONE MEANS OF ALL-WEATHER GROUND ACCESS TO ALLOW EMERGENCY VEHICLES UNIMPEDED ACCESS TO THE FACILITY. ALL-WEATHER GROUND ACCESS MUST BE PAVED, START FROM THE ROAD, AND TERMINATE NO FARTHER THAN 33 FEET FROM AN EXTERIOR DOOR ACCESSIBLE FOR FIRE DEPARTMENT INGRESS. THE ROUTE BETWEEN THE ACCESS SURFACE AND EXTERIOR DOOR MUST BE ABLE TO BE TRAVERSED WITHOUT THE USE OF A LADDER. ACCESS IS PROVIDED TO THE HANGAR PERSONNEL DOORS FOR FIRE DEPARTMENT INGRESS TO THE FACILITY. ADDITIONALLY, PROVIDE SUITABLE EXTERIOR FIRE APPARATUS ACCESS ON AT LEAST TWO COMPLETE SIDES OF THE BUILDING INCLUDING APRONS, AUTOMOTIVE PARKING AREAS, FIRE APPARATUS ACCESS ROADS AND STABILIZED LANDSCAPED AREAS. SEE UFC 4-211-01: 3-3.1.11.

UFC 3-600-01: 9-1

NFPA 1: CH. 18

U. FIRE HYDRANT INSTALLATION HYDRANTS ARE REQUIRED AT 300 FOOT INTERVALS AROUND THE BUILDING.

UFC 3-600-01: 9-3.5 ALL PARTS OF THE FACILITY EXTERIOR MUST BE WITHIN 350 FEET OF A HYDRANT.

HYDRANTS WILL NOT BE INSTALLED IN FRONT OF HANGAR BAY DOORS.

ONE HYDRANT WILL BE PROVIDED WITHIN 100 FEET OF EACH CORNER OF THE BUILDING.

WHERE THE APRON ABUTS THE BUILDING, HYDRANTS WILL BE LOCATED WITHIN 10 FEET OF THE BUILDING.

HYDRANTS ADJACENT TO AIRFIELD PAVEMENT WILL NOT HAVE THEIR TOPS MORE THAN 2.5 FEET ABOVE

THE LEVEL OF ADJACENT AIRFIELD PAVEMENT.

V. KITCHEN COOKING EXHAUST EQUIPMENT THERE IS NO KITCHEN IN THE FACILITY.

NFPA 101: 9.2.3, CHAPTERS 12-42

NFPA 96

3. MASS NOTIFICATION:

UFC 4-021-01 A COMBINED FIRE ALARM AND MASS NOTIFICATION SYSTEM WILL BE INSTALLED. ALL NOTIFICATION APPLIANCES WILL UTILIZE CLEAR STROBES AND BE MARKED "ALERT." AMBER LENSES AND APPLIANCES MARKED "FIRE" WILL NOT BE USED. TEXT SIGNS WILL BE UTILIZED SHOWING "EVACUATE" WHEN THE FIRE ALARM IS ACTIVATED OR "ANNOUNCEMENT" WHEN THE MASS NOTIFICATION IS ACTIVATED. TEXT SIGNS TO BE INSTALLED OVER SUBSTANTIAL MEANS OF EGRESS. EXTERIOR DOORS FROM A SINGLE ROOM DO NOT

REQUIRE A TEXT SIGN.

ENGINEERING AND CONSTRUCTION BULLETIN

2018-17

4. ACCESSIBILITY REQUIREMENTS:

ABA CHAPTERS 1-10 THE FACILITY SHALL BE COMPLETELY ACCESSIBLE IN ACCORDANCE WITH ABA.

J. NFPA 13, 2019: STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS, MINIMUM REQUIREMENTS FOR DESIGN AND INSTALLATION OF AUTOMATIC FIRE

SPRINKLER SYSTEMS AND EXPOSURE PROTECTION

L. NFPA 24, 2019: STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES

T. NFPA 400, 2019: HAZARDOUS MATERIALS CODE

ELEVATOR SHAFT ENCLOSURE AND CONTROL ROOM - 1 HOUR RATING WITH 60-MINUTE OPENING

PROTECTIVE PROVIDED.

20 FEET

I. MARKING OF MEANS OF EGRESS: ACCESS TO EXITS SHALL BE MARKED WHERE THE EXIT OR WAY TO REACH THE EXIT IS NOT READILY APPARENT. EXIT SIGNS WILL BE INSTALLED WHERE THE DIRECTION TO THE EXIT IS NOT READILY

APPARENT. REFER TO ELECTRICAL DRAWINGS.NFPA 101: 7.10 & CHAPTERS 12-42

J. INTERIOR FINISH CLASSIFICATION LIMITS:

BUSINESS: A OR B, I OR II A OR B A, B OR C

NFPA 101: TABLE A.10.2.2

INDUSTRIAL: A OR B, I OR II A, B OR C, I OR II A, B OR C

K. DETECTION, ALARM & COMMUNICATIONS: A FIRE ALARM SYSTEM IS REQUIRED SINCE OCCUPANCY IS GREATER THAN 100 TOTAL OCCUPANTS (38-3.4.1). THE SYSTEM SHALL BE ACTIVATED BY MANUAL MEANS, FIRE DETECTION AND SPRINKLER SYSTEM ACTIVATION AND SHALL PROVIDE OCCUPANT NOTIFICATION. IN ADDITION, FLAME DETECTION, FOAM START/STOP STATION AND A RELEASING SERVICE FIRE ALARM CONTROL UNIT SHALL BE

PROVIDED. THE FIRE ALARM SYSTEM MUST BE COMBINED WITH THE FACILITY MASS NOTIFICATION SYSTEM. A DETECTION, ALARM AND RELEASING SYSTEM COMBINED WITH A MASS NOTIFICATION SYSTEM

WILL BE PROVIDED IN ACCORDANCE WITH THE APPLICABLE CODES.

UFC 3-600-01, 9-18

NFPA 101: 9.6 & CHAPTERS 12-42

OCCUPANCY EXITS EXIT ACCESS CORRIDORS OTHER SPACES

A-3 ASSEMBLY, CONFERENCE ROOMS >50 PERSONS (ACCESSORY TO BUSINESS

OCCUPANCY, <10% AGGREGATE FLOOR AREA)

R. NFPA 101, 2018: LIFE SAFETY CODE, FOR BUILDING EGRESS AND LIFE SAFETY EXCEPT AS MODIFIED IN UFC 3-600-01

INTERIOR WALL AND CEILING FINISHES WILL BE CLASS A IN ASSEMBLY AREAS, A OR B IN ALL OTHER AREAS. INTERIOR FLOOR FINISHES WILL BE NOT LESS THAN CLASS II IN EXIT ENCLOSURES AND EXIT

ACCESS CORRIDORS.

STORAGE: A OR B, I OR II A, B OR C A, B OR C

ASSEMBLY: A , I OR II A OR B, I OR II A, B OR C

U. NFPA 409, 2016: STANDARD ON AIRCRAFT HANGARS (ONLY APPLICABLE WHERE REFERENCED SPECIFICALLY BY THE UFC)

ENCLOSED STAIRS - 1 HOUR RATING WITH 60-MINUTE OPENING PROTECTIVE PROVIDED.

WHERE BUSINESS OCCUPANCY CONTAINS AN ACCESSORY ASSEMBLY OCCUPANCY THE MORE

RESTRICTIVE REQUIREMENTS OF THE ASSEMBLY OCCUPANCY WILL BE UTILIZED.

2 BUSINESS LESS CONCENTRATED ASSEMBLY 805 15 54

2 BUSINESS STORAGE/MEP (UFC) 686 500 2

2ND FLOOR TOTAL 382

FLOOR

NFPA 101

OCCUPANCY

USE

TOTAL SF OCCUPANT LOAD

FACTOR

OCCUPANT

LOAD

1 ASSEMBLY CONCENTRATED ASSEMBLY 834 7 120

1 BUSINESS BUSINESS 5386 150 36

2 BUSINESS BUSINESS 9733 150 65

2 BUSINESS CONFERENCE ROOM (UFC) 2471 15 165

2 BUSINESS IT EQUIPMENT (UFC) 418 300 2

1 BUSINESS STORAGE 5514 500 12

1 INDUSTRIAL GENERAL INDUSTRIAL 5497 100 55

1 INDUSTRIAL LABORATORY 393 100 4

1 INDUSTRIAL AIRCRAFT HANGAR (UFC) 35949 500 72

1ST FLOOR TOTAL 346

2 ASSEMBLY FIXED SEATING ASSEMBLY 1535 # SEATS 94

1 BUSINESS IT EQUIPMENT (UFC) 274 300 1

1 BUSINESS LESS CONCENTRATED ASSEMBLY 452 15 31

1 BUSINESS LOCKER (UFC) 742 50 15

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:24:37 AM

G-003

C O

D E

C O

M P

L

IA

N C

E S

U M

M A

R Y

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S O

N

J A

N D

E R

S O

N

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

158 PRIMARY INSPECTION AREA 1367 GROUP B INDUSTRIAL GENERAL INDUSTRIAL 100 14

159 TOOL ROOM 259 GROUP B INDUSTRIAL GENERAL INDUSTRIAL 100 3

160 CLASSROOM/BRIEF 834 GROUP A-3 ASSEMBLY CONCENTRATED ASSEMBLY 7 119

161 ADMIN 178 GROUP B BUSINESS BUSINESS 150 1

162 ADMIN 172 GROUP B BUSINESS BUSINESS 150 1

101 CORRIDOR 139 GROUP B BUSINESS BUSINESS 150 1

102 MOBILITY STORAGE 343 GROUP B BUSINESS STORAGE 500 1

103 COLLATERAL STORAGE 544 GROUP B BUSINESS STORAGE 500 1

104 CORRIDOR 162 GROUP B BUSINESS BUSINESS 150 1

105 JAN 51 GROUP B BUSINESS STORAGE 500 1

106 LO SUPPORT STORAGE 1244 GROUP B BUSINESS STORAGE 500 2

107 CORRIDOR 142 GROUP B BUSINESS BUSINESS 150 1

108 CORRIDOR 154 GROUP B BUSINESS BUSINESS 150 1

109 LO SUPPORT BREAK AREA 226 GROUP B BUSINESS LESS CONCENTRATED ASSEMBLY 15 15

110 CORRIDOR 366 GROUP B BUSINESS BUSINESS 150 2

112 LO SUPPORT VEST 134 GROUP B BUSINESS BUSINESS 150 1

113 CORRIDOR 182 GROUP B BUSINESS BUSINESS 150 1

114 ELECTRICAL 218 GROUP B BUSINESS MEP (UFC) 500 1

120 VESTIBULE/ AIR SHOWER 57 GROUP B BUSINESS BUSINESS 150 1

121 CORRIDOR 241 GROUP B BUSINESS BUSINESS 150 2

122 VESTIBULE 70 GROUP B BUSINESS BUSINESS 150 1

130 FEMALE SHOWERS 118 GROUP B BUSINESS BUSINESS 150 1

131 CORRIDOR 485 GROUP B BUSINESS BUSINESS 150 3

132 OPEN OFFICE 388 GROUP B BUSINESS BUSINESS 150 3

133 TIRE STORAGE 860 GROUP B BUSINESS STORAGE 500 2

134 HAZMAT STORAGE 349 GROUP B BUSINESS STORAGE 500 1

135 WORK SPACE 691 GROUP B INDUSTRIAL GENERAL INDUSTRIAL 100 7

136 OFFICE 116 GROUP B BUSINESS BUSINESS 150 1

137 LO SUPPORT 2671 GROUP B INDUSTRIAL GENERAL INDUSTRIAL 100 27

138 OFFICE 168 GROUP B BUSINESS BUSINESS 150 1

139 OFFICE 169 GROUP B BUSINESS BUSINESS 150 1

140 MOBILITY TOOL AREA 509 GROUP B INDUSTRIAL GENERAL INDUSTRIAL 100 5

141 CORRIDOR 86 GROUP B BUSINESS BUSINESS 150 1

142 VESTIBULE 145 GROUP B BUSINESS BUSINESS 150 1

143 WOMENS RESTROOM 179 GROUP B BUSINESS BUSINESS 150 1

144 MENS RESTROOM 178 GROUP B BUSINESS BUSINESS 150 1

150 VESTIBULE 64 GROUP B BUSINESS BUSINESS 150 1

123 MALE RESTROOM 349 GROUP B BUSINESS BUSINESS 150 2

124 LOCKER ROOM 409 GROUP B BUSINESS LOCKER 50 8

125 MALE SHOWERS 154 GROUP B BUSINESS BUSINESS 150 1

126 STOR. 52 GROUP B BUSINESS STORAGE 500 1

127 JAN 54 GROUP B BUSINESS STORAGE 500 1

128 VESTIBULE 64 GROUP B BUSINESS BUSINESS 150 1

FEMALE RESTROOM 220 GROUP B BUSINESS BUSINESS 150 1

FEMALE LOCKERS 113 GROUP B BUSINESS LOCKER 50 2

ROOM NAME SF

OCCUPANCY CLASSIFICATION

USE

Occupant Load

Factor Occupants

IBC LSC

1 ELECTRICAL 187 GROUP B BUSINESS MEP (UFC) 500 1

2 MECHANICAL 186 GROUP B BUSINESS MEP (UFC) 500 1

3 FIRE PUMP ROOM 694 GROUP B BUSINESS MEP (UFC) 500 1

4 MECHANICAL 471 GROUP B BUSINESS MEP (UFC) 500 1

5 COMM 67 GROUP B BUSINESS IT EQUIPMENT (UFC) 300 1

100 HANGAR 35949 GROUP S-1 INDUSTRIAL AIRCRAFT HANGAR (UFC) 500 72

151 VESTIBULE 227 GROUP B BUSINESS BUSINESS 150 2

152 JAN 73 GROUP B BUSINESS STORAGE 500 1

153 COMM 207 GROUP B BUSINESS IT EQUIPMENT (UFC) 300 1

154 CORRIDOR 279 GROUP B BUSINESS BUSINESS 150 2

LOCKERS 220 GROUP B BUSINESS LOCKER 50 4

STORAGE 188 GROUP B BUSINESS STORAGE 500 1

156 BREAKROOM 226 GROUP B BUSINESS LESS CONCENTRATED ASSEMBLY 15 15

157 OIL LAB 393 GROUP B INDUSTRIAL LABORATORY 100 4

254 COMM 203 GROUP B BUSINESS IT EQUIPMENT (UFC) 300 1

213 1/192 AMXS CC 146 GROUP B BUSINESS BUSINESS 150 1

214 149TH S.ENL 146 GROUP B BUSINESS BUSINESS 150 1

215 149TH DO 146 GROUP B BUSINESS BUSINESS 150 1

216 149TH DSG 731 GROUP B BUSINESS BUSINESS 150 5

217 STOR 105 GROUP B BUSINESS STORAGE 500 1

218 149TH CC 146 GROUP B BUSINESS BUSINESS 150 1

219 ELECT 120 GROUP B BUSINESS MEP (UFC) 500 1

220 CONFERENCE ROOM 263 GROUP B BUSINESS CONFERENCE ROOM (UFC) 15 18

205 CONFERENCE/ BRIEFING 930 GROUP A-3 ASSEMBLY FIXED SEATING ASSEMBLY 59 59

206 1/192 AMXS 1ST SGT 121 GROUP B BUSINESS BUSINESS 150 1

207 1/192 OFFICE 121 GROUP B BUSINESS BUSINESS 150 1

208 1/192 AMXS 338 GROUP B BUSINESS BUSINESS 150 2

209 1/192 AMXS CSS 520 GROUP B BUSINESS BUSINESS 150 3

210 1/192 AMXS WORK ROOM 658 GROUP B BUSINESS BUSINESS 150 4

211 CORRIDOR 1149 GROUP B BUSINESS BUSINESS 150 8

212 1/192 AMXS CHIEFS 342 GROUP B BUSINESS BUSINESS 150 2

246 APO CONFERENCE ROOM 605 GROUP A-3 ASSEMBLY FIXED SEATING ASSEMBLY 35 35

247 APO SERVER ROOM 201 GROUP B BUSINESS IT EQUIPMENT (UFC) 300 1

248 W/C 71 GROUP B BUSINESS BUSINESS 150 1

249 W/C 71 GROUP B BUSINESS BUSINESS 150 1

250 APO STORAGE /JAN 87 GROUP B BUSINESS STORAGE 500 1

251 APO ELEC 72 GROUP B BUSINESS MEP (UFC) 500 1

252 CORRIDOR 255 GROUP B BUSINESS BUSINESS 150 2

253 AMXS PLANS & SCHED. 357 GROUP B BUSINESS CONFERENCE ROOM (UFC) 15 24

237 APO PM 117 GROUP B BUSINESS BUSINESS 150 1

238 GSSO SUPER 117 GROUP B BUSINESS BUSINESS 150 1

239 GSSO SECURITY OFFICE 600 GROUP B BUSINESS BUSINESS 150 4

240 APO CONFERENCE 403 GROUP B BUSINESS CONFERENCE ROOM (UFC) 15 27

241 ISSO OFFICE 182 GROUP B BUSINESS BUSINESS 150 1

242 APO BRIEFING 301 GROUP B BUSINESS CONFERENCE ROOM (UFC) 15 20

243 MX/LOGISTICS 121 GROUP B BUSINESS BUSINESS 150 1

244 APO BRIEFING 242 GROUP B BUSINESS CONFERENCE ROOM (UFC) 15 16

229 STORAGE 99 GROUP B BUSINESS STORAGE 500 1

230 HERITAGE/BREAK 689 GROUP B BUSINESS LESS CONCENTRATED ASSEMBLY 15 46

231 FLIGHT COMMANDER'S OFFICE 219 GROUP B BUSINESS BUSINESS 150 1

232 APO MAN TRAP 60 GROUP B BUSINESS BUSINESS 150 1

233 CORRIDOR 764 GROUP B BUSINESS BUSINESS 150 5

234 ADMIN 156 GROUP B BUSINESS BUSINESS 150 1

235 BREAK 116 GROUP B BUSINESS LESS CONCENTRATED ASSEMBLY 15 8

236 ISSO SUPER 119 GROUP B BUSINESS BUSINESS 150 1

221 MECH 62 GROUP B BUSINESS MEP (UFC) 500 1

222 ASST. DIR. OF OPERATIONS 147 GROUP B BUSINESS BUSINESS 150 1

223 OPS 134 GROUP B BUSINESS BUSINESS 150 1

224 VEST. 44 GROUP B BUSINESS BUSINESS 150 1

225 MALE RESTROOM 630 GROUP B BUSINESS BUSINESS 150 4

226 VEST. 41 GROUP B BUSINESS BUSINESS 150 1

227 FEMALE RESTROOM 386 GROUP B BUSINESS BUSINESS 150 3

228 JAN 122 GROUP B BUSINESS STORAGE 500 1

ROOM NAME SF

OCCUPANCY CLASSIFICATION

USE

OCCUPANT

LOAD FACTOR

OCCUPANTS

IBC LSC

200 VESTIBULE 312 GROUP B BUSINESS BUSINESS 150 2

201A CONF. ROOM 362 GROUP B BUSINESS CONFERENCE ROOM (UFC) 15 24

201B MECHANICAL 540 GROUP B BUSINESS MEP (UFC) 500 1

202 NURSING/ LACTATION ROOM 160 GROUP B BUSINESS BUSINESS 150 1

203 CORRIDOR 531 GROUP B BUSINESS BUSINESS 150 4

204 1/192 AMXS CONFERENCE ROOM 544 GROUP B BUSINESS CONFERENCE ROOM (UFC) 15 36

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:24:39 AM

G-004

O C

C U

P A

N C

Y S

U M

M A

R Y

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S O

N

J A

N D

E R

S O

N

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: N.T.S.

C2

1ST FLOOR OCCUPANT LOAD TABLE

SCALE: N.T.S.

C6

2ND FLOOR OCCUPANT LOAD TABLE

GENERAL NOTES:

1. THE "OCCUPANCY CLASSIFICATION" COLUMNS IN THE OCCUPANCY LOAD TABLES

ARE FOR REFERENCE ONLY. THE TOTAL OCCUPANT LOAD FOR EACH

OCCUPANCY USE WAS CALCULATED USING THE COMBINED GROSS FLOOR AREA,

UNLESS REQUIRED BY CODE TO USE NET FLOOR AREA, DIVIDED BY APPLICABLE

OCCUPANT LOAD FACTOR. REFER TO DRAWING G-003 SECTION 2.B. FOR

OCCUPANT USE SUMMARY AND TOTAL OCCUPANCY LOAD BY FLOOR.

UGELEC

UG

ELEC

W

W

W

W

W

W

W

W

W

W

2 W

W

W

S A N

S A N

S A N

S A N

SAN

G A S

GAS

S

GAS

W

.6

.5

UGELEC

UG

ELEC

S A N

S A N

S A N

S A N

SAN

6 S A N

SAN

SAN

S A N

SAN

S A N

SA

N

S

N

S

GAS

BLDG 789

BLDG 782

BLDG 784

PROPOSED FIRE

HYDRANT

PROPOSED FIRE

HYDRANT

PROPOSED FIRE

HYDRANT

MAIN ENTRANCE FMCP

LOCATION

EXISTING FIRE

HYDRANT

50' - 0 "

PROPOSED FIRE HYDRANT

BLDG 780 PUMPHOUSE

FIRE PUMP/FOAM ROOM

10" FIRE SERVICE

FROM B780

D A

N F

O R

T H

A V

E

FDC

F L

IG

H

T

LI

N E

R D

PROPOSED

FIRE HYDRANT

118' - 1"FIRE DEPARTMENT ACCESS

< 33 FT

PROPOSED

FIRE HYDRANT

SEPARATION DISTANCES

ALL BUILDINGS GREATER THAN 60 FEET.

BUILDING PERIMETER USED FOR FRONTAGE

NO FRONTAGE INCREASES REQUIRED AS THE BUILDING WILL BE CONSTRUCTED AS AN

UNLIMITED AREA BUILDING IN ACCORDANCE WITH IBC 507.5. BUILDING IS NOT MORE THAN

TWO STORIES ABOVE GRADE PLANE; IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC

SPRINKLER SYSTEM AND IS SURROUNDED WITH PUBLIC WAYS OR YARDS NOT LESS THAN 60

FEET IN WIDTH.

FIRE DEPARTMENT ACCESS

FIRE DEPARTMENT ACCESS TO THE SITE IS FROM FLIGHT LINE ROAD TO THE NORTH OR

DANFORTH AVE TO THE SOUTH. THE APRON OF THE BUILDING HAS DIRECT FIRE

DEPARTMENT ACCESSES FROM BOTH ROADS. THE APRON PROVIDES FIRE DEPARTMENT

ACCESS WITHIN 33 FEET OF 4 PERSONNEL ACCESS DOORS IN THE HANGAR BAY DOORS FOR

FIRE DEPARTMENT INGRESS.

FIRE LANE WIDTH, MARKING, APPROACH ROADS AND TURN RADIUS

ALL ACCESSES TO BE 20 FEET WIDE OR GREATER AND HAVE AN UNOBSTRUCTED CLEARANCE

OF 13 FEET 6 INCHES. ALL FIRE DEPARTMENT ACCESS ROADS WILL BE PAVED AND BE

CAPABLE OF SUPPORTING A FIRE SERVICE APPARATUS. NO TURNING RADIUS OR DEAD ENDS

ARE EXPECTED WITH THROUGH ACCESS TO THE APRON IS AVAILABLE FROM BOTH

APPROACH ROADS.

INTENDED MAIN ENTRANCE TO THE FACILITY

THE MAIN ENTRANCE TO THE FACILITY IS ON THE NORTHWEST SIDE OF THE BUILDING ALONG

FLIGHT LINE ROAD AT THE MAIN CORRIDOR IN THE SUPPORT AREA.

LOCATION OF FIRE DEPARTMENT CONNECTIONS

FIRE DEPARTMENT CONNECTION IS LOCATED ON THE SOUTHEAST SIDE OF THE BUILDING

ALONG DANFORTH AVE. ON THE EXTERIOR WALL OF THE BUILDING OUTSIDE OF THE FIRE

PUMP/FIRE FOAM ROOM.

FIRE HYDRANTS, POST INDICATOR VALVES AND CONNECTED DISTRIBUTION

EXISTING FIRE HYDRANTS ARE SERVED FROM THE DOMESTIC/WATER LOOP ON BASE AND

ARE SEPARATE FROM THE PRESSURIZED FIRE LOOP. THERE IS ONE EXISTING FIRE HYDRANT

ON FLIGHTLINE ROAD. FIVE NEW PROPOSED HYDRANT LOCATIONS WILL BE REQUIRED TO

COMPLY WITH HYDRANT SPACING PROVISIONS. ALL HYDRANTS TO BE SERVED FROM THE

DOMESTIC/WATER LOOP ON BASE. HYDRANTS ARE REQUIRED AT 300 FOOT INTERVALS

AROUND THE BUILDING. ALL PARTS OF THE FACILITY EXTERIOR MUST BE WITHIN 350 FEET OF

A HYDRANT. HYDRANTS WILL NOT BE INSTALLED IN FRONT OF HANGAR BAY DOORS. ONE

HYDRANT WILL BE PROVIDED WITHIN 100 FEET OF EACH CORNER OF THE BUILDING. WHERE

THE APRON ABUTS THE BUILDING, HYDRANTS WILL BE LOCATED WITHIN 10 FEET OF THE

BUILDING. HYDRANTS WITHIN 25 FEET OF AIRFIELD PAVEMENT WILL NOT HAVE THEIR TOPS

MORE THAN 30 INCHES ABOVE THE LEVEL OF ADJACENT AIRFIELD PAVEMENT. HYDRANTS

WILL BE PROVIDED, AS REQUIRED.

POST INDICATOR VALVES ARE REQUIRED TO BE PROVIDED SUCH THAT A COMBINED 5

HYDRANTS OR THREE BUILDING FEEDS ARE NOT OUT OF SERVICE WITH A SINGLE BREAK OF

A PIPE. POST INDICATOR VALVES WILL BE PROVIDED, AS REQUIRED.

FIRE PUMP ROOM

THE DESIGN INCLUDES A FIRE PUMP RATED 80 PSI AT 2,000 GPM. IN THE FIRE PUMP/FIRE

FOAM ROOM. ADDITIONALLY, THE BASE HAS PRESSURIZED UNDERGROUND SERVICE MAINS

AND SERVICE LATERALS FROM THE FIRE PUMPS LOCATED IN BUILDING 780.

WATER STORAGE TANKS

THE EXISTING WATER STORAGE TANK SERVING BUILDING 753 WILL CONTINUE TO SERVE

BUILDING 780.

HAZARDOUS MATERIAL SPILL CONTAINMENT TANKS

ONE 5,000 GALLON FUEL CAPTURE TANK WILL BE PROVIDED.

EXISTING FOAM/WATER CAPTURE TANK ADJACENT TO BUILDING 780 WILL BE USED FOR

CONTAINMENT OF THE DISCHARGE OF THE HIGH EXPANSION FOAM SYSTEM.

BACKFLOW PREVENTION ASSEMBLY (IF LOCATED OUTSIDE OF BUILDING)

NO BACKFLOW PREVENTION ASSEMBLIES WILL BE PROVIDED OUTSIDE OF THE BUILDING. NO

BACKFLOW PREVENTION ASSEMBLY WILL BE PROVIDED IN THE BUILDING AS THE BUILDING IS

SERVED FROM A DEDICATED FIRE WATER STORAGE TANK AND PUMP HOUSE IN B348.

TYPE AND QUANTITY OF ANTITERRORISM SECURE ACCESS

THE BUILDING IS LOCATED WITHIN THE BASE SECURE BOUNDARY. A 33 FOOT UNOBSTRUCTED

SPACE IS PROVIDED.

CODE COMPLIANCE SITE PLAN

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:24:40 AM

G-005

C O

D E

C O

M P

L

IA

N C

E S

IT

E

P L

A N

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S O

N

J A

N D

E R

S O

N

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1" = 50'-0"

A1

LIFE SAFETY SITE PLAN

SCALE: 1" =

0 50 10050

50' - 0"

P F

S

S

S

S

S

S

S

S

S S

S S

S SS

A

B

129 10 11

Q

R

8761 2 3 4 5

C

F

J

P

L

N

D

E

G

H

K

M

180' - 0"

0"

16511

TD 124 FT, 250 ALLOWED

CPT 40 FT, 75 FT ALLOWED

TD

F

T , 2

A

LL

O

W E

D C

P T

FT

, 7

FT

A

LL

O W

E D

TD 135 FT, 250 ALLOWED

CPT 40 FT, 75 FT ALLOWED

TD

F

T , 2

A

LL

O

W E

D C

P T

FT

, 7

FT

A

LL

O W

E D

HANGAR

COMM

LO SUPPORT

STORAGE

CORRIDOR

COLLATERAL

STORAGE

CORRIDOR

JAN

MOBILITY STORAGE

CORRIDOR

ELECTRICAL

MECHANICAL

FIRE PUMP ROOM

VESTIBULE/ AIR

SHOWER

JAN

VESTIBULE

VESTIBULE/ AIR

SHOWER

CORRIDOR

OFFICE

CORRIDOR

CORRIDOR

ADMIN

OIL LAB

VESTIBULE

MALE SHOWERS

OFFICE

OPEN OFFICE

FEMALE RESTROOM/

LOCKERS

FEMALE SHOWERS

CLASSROOM/BRIEF

MALE RESTROOM

LO SUPPORT VEST

LO SUPPORT BREAK

AREA

LOCKER ROOM

COMM

LOCKERS/ STORAGE

BREAKROOM

TOOL ROOM

JAN

VESTIBULE

STOR.

CORRIDOR

WORK SPACE

MENS RESTROOM

WOMENS RESTROOM

HAZMAT STORAGE

ADMIN

MOBILITY TOOL AREA

LO SUPPORT

STAIRS

S1

CORRIDOR

STAIRS

S2

CONTROL ROOM

MECHANICAL YARD

CORRIDOR

TIRE STORAGE

PRIMARY INSPECTION

AREA

ELEVATOR

EL01

VESTIBULE

ELECTRICAL

MECHANICAL

CORRIDOR

OFFICE

TD

FT

, 2

A

LL

O W

E D

C P

T

F T, FT

A

LL

O

W E

D

DEC-17 FT

20 FT ALLOWED

SYMBOL

LIFE SAFETY LEGEND

OCCUPANT USAGE OF EGRESS COMPONENT

DESCRIPTION

XXX

XXX EGRESS CAPACITY

EGRESS MEASUREMENT STARTING/ENDING POINT

EGRESS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .