Attachment 12 - COMH - Final Design Drawings Part 3 of 3.pdf

PDF 35 MB Posted

Attached to
F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB
Solicitation number
W9123621R2003
Issued by

About this file

This document provides details on a federal contract solicitation for construction services. The solicitation is for a six-bay high-bay consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft from Tyndall Air Force Base at Langley AFB. The facility will include hangar bays, staff administration spaces, a propulsion shop, ready room, break room, tools/parts support, aircraft maintenance equipment storage, wheel/tire shop, egress shop, and restrooms. The project scope includes site work, utilities, pavements, security features, and demolition of an existing facility. The facility must withstand seismic and wind loads according to codes. Construction will comply with DoD sustainability and antiterrorism requirements. Responses for the bifurcated solicitation are requested initially for evaluation Factors 1 and 2 only. The performance period is 700 calendar days from notice to proceed. The solicitation was issued by the Department of the Army Corps of Engineers Norfolk District.

View the file

Other files

File Type Posted
W9123621R2003_0016.pdf PDF
W9123621R2003_0015.pdf PDF
W9123621R2003_0014.pdf PDF
W9123621R2003_0013.pdf PDF
W9123621R2003_0012.pdf PDF
Attachment 8 - CLIN Schedule_REVISION 1 on 01.05.2022.pdf PDF
AMENDMENT 0011_21 DEC 21 - Drawings.pdf PDF
Amend 0011_23 09 23_Amended V2.pdf PDF
Amend 0011_07 61 14.00 20_Amended.pdf PDF
W9123621R2003_0011.pdf PDF
Attachment 16 - Construction Security Plan (CSP).pdf PDF
Attachment 17 - Installation Restoration Program (IRP) Background Chem Data.pdf PDF
COMH Amended Drawings_14 DEC 2021.pdf PDF
W9123621R2003_0010.pdf PDF
COMH Amended Specs_14 DEC 2021_Combined.pdf PDF
A.07.23 - Solicitation COMH W9123621R2003 0009.pdf PDF
W9123621R2003_0008.pdf PDF
COMH Tech Amendment 0007 - 01 57 13.00 22_Amended.pdf PDF
COMH Tech Amendment 0007 - AMENDMENT 19 NOV 21 - Drawings.pdf PDF
COMH Tech Amendment 0007 - 07 27 19.01_Amended.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0007.pdf PDF
08 71 00_Amended 006.pdf PDF
W9123621R2003 Amendment 0006.pdf PDF
A.07.20 - Site Visit Sign-in Log - Dtd 20 Oct 2021_1Page.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0005.pdf PDF
Attachment 12 - COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf PDF
Attachment 11 - COMH_RTA_Design Drawings_Part 2 of 3_17MAR21.pdf PDF
Attachment 13 - COMH_RTA_Specifications part 1 of 1_17MAR21.pdf PDF
Attachment 10 - COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf PDF
Attachment 15 - COMH - RTA SID_17MAR21.pdf PDF
Attachment 14 - COMH - RTA FFE_17MAR21.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0004.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0003.pdf PDF
A.07.24 SF30 - W9123621R2003 - 0002.pdf PDF
W9123621R2003 - 0001 - COMH.pdf PDF
Attachment 9 - Langley Environmental Management Special Conditions.pdf PDF
Attachment 8 - CLIN Schedule.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation W9123621R2003 - COMH.pdf PDF
Attachment 7 - Small Business Participation Plan.pdf PDF
Attachment 13 - COMH Final Design Specifications Part 1 of 1.pdf PDF
Attachment 1 - Proposal Data Sheet.pdf PDF
Attachment 10 - COMH - Final Design Drawings Part 1 of 3.pdf PDF
Attachment 5 - Letter of Commitment Sample.pdf PDF
Attachment 6 - Small Business Subcontracting Record.pdf PDF
Attachment 4 - Telephone Interview Questionnaire (For Government Use Only).pdf PDF
Attachment 2 - Company Specialized Experience.pdf PDF
Attachment 11 - COMH - Final Design Drawings Part 2 of 3.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_G_R19.rvt

12/30/2020 11:47:10 AM

G-001

C O

V E

R S

H E

E T

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

D

S

T A

P L E

S

D S

T A

P L E

S

S G

R O

E T

H E

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

01-04-2021

FY19 F-22 FORMAL TRAINING UNIT (FTU)

CONSOLIDATED OPERATIONS AND MAINTENANCE HANGAR

(COMH)

PROJECT LOCATION

N

PROJECT LOCATION MAP

PROJECT VICINITY MAP

HAMPTON

NEWPORT NEWS

JOINT BASE LANGLEY - EUSTIS (JBLE)

FINAL DESIGN SUBMITTAL

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_G_R19.rvt

12/30/2020 11:47:10 AM

G-002

D R

A W

IN

G

I N

D E

X

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

D

S

T A

P L E

S

D S

T A

P L E

S

S G

R O

E T

H E

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SHEET INDEX

SHEET NUMBER SHEET NAME

EP102A SECOND FLOOR POWER PLAN - AREA A

EP102B SECOND FLOOR POWER PLAN - AREA B

EP102C SECOND FLOOR POWER PLAN - AREA C

EP102D SECOND FLOOR POWER PLAN - AREA D

EP103 ROOF POWER PLAN - OVERALL

EG101 FIRST FLOOR OVERALL GROUNDING PLAN

EG103 LIGHTNING PROTECTION OVERALL PLAN

E-401 ENLARGED ELECTRICAL PLANS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-503 ELECTRICAL DETAILS

E-504 ELECTRICAL DETAILS

E-505 ELECTRICAL DETAILS

E-506 ELECTRICAL DETAILS

E-601 LIGHTING SCHEDULES

E-602 EQUIPMENT CONNECTION SCHEDULES

E-603 EQUIPMENT CONNECTION SCHEDULES

E-604 ELECTRICAL CONNECTION SCHEDULES

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-607 PANEL SCHEDULES

E-608 PANEL SCHEDULES

E-609 PANEL SCHEDULES

E-610 PANEL SCHEDULES

E-611 PANEL SCHEDULES

E-612 PANEL SCHEDULES

E-613 PANEL SCHEDULES

E-701 ELECTRICAL ONE-LINE DIAGRAM

E-702 GROUNDING RISER DIAGRAM

E-703 SWITCHBOARD ELEVATIONS

16. TELECOMMUNICATIONS

T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TD101 TELECOMMUNICATIONS DEMOLITION SITE PLAN

TS101 TELECOMMUNICATIONS SITE PLAN

TS501 TELECOMMUNICATIONS DETAILS

T-101 FIRST FLOOR TELECOMMUNICATIONS PLAN - OVERALL

T-101A FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA A

T-101B FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA B

T-101C FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-101D FIRST FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-102 SECOND FLOOR TELECOMMUNICATIONS PLAN - OVERALL

T-102C SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA C

T-102D SECOND FLOOR TELECOMMUNICATIONS PLAN - AREA D

T-103 ROOF TELECOMMUNICATIONS PLAN - OVERALL

T-111 FIRST FLOOR TELECOMMUNICATION DIAMOND STUDY PLAN - OVERALL

T-112 SECOND FLOOR TELECOMMUNICATIONS DIAMOND STUDY PLAN - OVERALL

T-121 FIRST FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL

T-122 SECOND FLOOR TELECOMMUNICATIONS RACEWAY PLAN - OVERALL

T-401 ENLARGED TELECOMMUNICATIONS PLANS

T-501 TELECOM SERVICE ENTRANCE ELEVATION

T-502 TELECOM SERVICE ENTERANCE ELEVATION

T-503 TELECOM SERVICE ENTRANCE ELEVATION

T-504 TELECOM SERVICE ENTRANCE ELEVATION

T-505 TELECOMMUNICATIONS DETAILS

T-506 TELECOMMUNICATIONS DETAILS

T-507 TELECOMMUNICATIONS DETAILS

T-508 TELECOMMUNICATIONS DETAILS

T-509 TELECOMMUNICATIONS DETAILS

T-700 FIBER COMMUNICATIONS OSP DIAGRAM

T-701 TELECOMMUNICATIONS RISER DIAGRAM

T-702 TELECOMMUNICATIONS RACK ELEVATIONS

T-703 TELECOMMUNICATIONS RACK ELEVATIONS

T-704 TELECOMMUNICATIONS RACK ELEVATIONS

T-705 RISER DIAGRAMS

T-706 TELECOMMUNICATIONS GROUNDING RISER DIAGRAM

X-001 SECURITY SYMBOLS LEGEND AND ABBREVIATIONS

X-002 SECURITY GENERAL NOTES

X-101 FIRST FLOOR SECURITY PLAN - OVERALL

X-101A FIRST FLOOR SECURITY PLAN - AREA A

X-101B FIRST FLOOR SECURITY PLAN - AREA B

X-101C FIRST FLOOR SECURITY PLAN - AREA C

X-101D FIRST FLOOR SECURITY PLAN - AREA D

X-102 SECOND FLOOR SECURITY PLAN - OVERALL

X-102C SECOND FLOOR SECURITY PLAN - AREA C

X-102D SECOND FLOOR SECURITY PLAN - AREA D

X-501 SECURITY DETAILS

X-502 SECURITY DETAILS

X-503 SECURITY DETAILS

X-701 ACCESS CONTROL RISER DIAGRAM

X-702 INTRUSION DETECTION SYSTEM RISER DIAGRAM

X-703 CCTV RISER DIAGRAM

17. AUDIO VISUAL

TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TA101C FIRST FLOOR AUDIO VISUAL PLAN - AREA C

TA101D FIRST FLOOR AUDIO VISUAL PLAN - AREA D

TA102C SECOND FLOOR AUDIO VISUAL PLAN - AREA C

TA102D SECOND FLOOR AUDIO VISUAL PLAN - AREA D

TA201D FIRST FLOOR AUDIO VISUAL RCP - AREA D

TA202C SECOND FLOOR AUDIO VISUAL RCP - AREA C

TA202D SECOND FLOOR AUDIO VISUAL RCP - AREA D

TA400 AUDIO VISUAL ELEVATIONS

TA501 AUDIO VISUAL DETAILS

TA502 AUDIO VISUAL DETAILS

TA601 AUDIO VISUAL SIGNAL FLOWS

TA602 AUDIO VISUAL SIGNAL FLOWS

TA603 AUDIO VISUAL SIGNAL FLOWS

SHEET INDEX

SHEET NUMBER SHEET NAME

FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A

FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B

FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C

FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D

FX102 SECOND FLOOR FIRE SUPPRESSION PLAN - OVERALL

FX102A SECOND FLOOR FIRE SUPPRESSION PLAN - AREA A

FX102B SECOND FLOOR FIRE SUPPRESSION PLAN - AREA B

FX102C SECOND FLOOR FIRE SUPPRESSION PLAN - AREA C

FX102D SECOND FLOOR FIRE SUPPRESSION PLAN - AREA D

FX401 FIRE PROTECTION ENLARGED PLANS

FX501 FIRE PROTECTION DETAILS

11. PLUMBING

P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

P-101 UNDERFLOOR PLUMBING PLAN - OVERALL

P101A UNDERFLOOR PLUMBING PLAN - AREA A

P101B UNDERFLOOR PLUMBING PLAN - AREA B

P101C UNDERFLOOR PLUMBING PLAN - AREA C

P101D UNDERFLOOR PLUMBING PLAN - AREA D

P-110 FIRST FLOOR PLUMBING PLAN - OVERALL

P110A FIRST FLOOR PLUMBING PLAN - AREA A

P110B FIRST FLOOR PLUMBING PLAN - AREA B

P110C FIRST FLOOR PLUMBING PLAN - AREA C

P110D FIRST FLOOR PLUMBING PLAN - AREA D

P-120 SECOND FLOOR PLUMBING PLAN - OVERALL

P120A SECOND FLOOR PLUMBING PLAN - AREA C

P120B SECOND FLOOR PLUMBING PLAN - AREA D

P-301 ENLARGED PLAN - FIRST FLOOR WOMENS/MEN LOCKER ROOM

P-302 ENLARGED PLAN - SECOND FLOOR WOMENS/MEN LOCKER ROOM

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-701 PLUMBING DIAGRAMS

P-702 PLUMBING DIAGRAMS

P-703 PLUMBING DIAGRAMS

13. MECHANICAL

M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

MS101 MECHANICAL SITE PLAN

MS102 MECHANICAL SITE PLAN

MP101 FIRST FLOOR PIPING PLAN- OVERALL

MP101A FIRST FLOOR PIPING PLAN - AREA A

MP101B FIRST FLOOR PIPING PLAN - AREA B

MP101C FIRST FLOOR PIPING PLAN - AREA C

MP101D FIRST FLOOR PIPING PLAN - AREA D

MP102 SECOND FLOOR PIPING PLAN - OVERALL

MP102C SECOND FLOOR PIPING PLAN - AREA C

MP102D SECOND FLOOR PIPING PLAN - AREA D

MH101 FIRST FLOOR VENTILATION PLAN - OVERALL

MH101A FIRST FLOOR VENTILATION PLAN - AREA A

MH101B FIRST FLOOR VENTILATION PLAN - AREA B

MH101C FIRST FLOOR VENTILATION PLAN - AREA C

MH101D FIRST FLOOR VENTILATION PLAN - AREA D

MH102 SECOND FLOOR VENTILATION PLAN - OVERALL

MH102C SECOND FLOOR VENTILATION PLAN - AREA C

MH102D SECOND FLOOR VENTILATION PLAN - AREA D

M-110 MECHANICAL ROOF PLAN

M-301 FIRST FLOOR ENLARGED MECHANICAL ROOM

M-401 SECTIONS - MECHANICAL

M-402 SECTIONS - AIR HANDLING EQUIPMENT

M-403 SECTIONS - HANGAR BAY

M-501 DETAILS - HEATING

M-502 DETAILS - VENTILATION

M-503 DETAILS - HEATING

M-504 DETAILS - MECHANICAL

M-601 SCHEDULES - HEATING/COOLING

M-602 SCHEDULES - HEATING/COOLING

M-603 SCHEDULES - HEATING/COOLING

M-604 SCHEDULES - HEATING/COOLING

M-701 DIAGRAMS - HEATING/COOLING

M-801 CONTROL SEQUENCES

M-802 CONTROL SEQUENCES

M-803 CONTROL SEQUENCES

M-804 CONTROL SEQUENCES

M-805 CONTROL SEQUENCES

M-806 CONTROL SEQUENCES

M-807 CONTROL SEQUENCES

M-808 CONTROL SEQUENCES

M-809 CONTROL SEQUENCES

M-810 CONTROL SEQUENCES

M-811 CONTROL SEQUENCES

M-812 CONTROL SEQUENCES

14. ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

E-002 ELECTRICAL GENERAL NOTES

E-003 AREA CLASSIFICATIONS PLAN

ED101 DEMOLITION SITE PLAN

ES101 ELECTRICAL SITE PLAN

ES102 ELECTRICAL SITE PLAN

ES501 SITE DETAILS

ES502 SITE DETAILS

ES503 SITE DETAILS

ES701 ELECTRICAL ONE LINE DIAGRAM

ES702 ELECTRICAL ONE LINE DIAGRAM

ES703 ELECTRICAL ONE-LINE DIAGRAM

EL101 FIRST FLOOR LIGHTING PLAN - OVERALL

EL101A FIRST FLOOR LIGHTING PLAN - AREA A

EL101B FIRST FLOOR LIGHTING PLAN - AREA B

EL101C FIRST FLOOR LIGHTING PLAN - AREA C

EL101D FIRST FLOOR LIGHTING PLAN - AREA D

EL102 SECOND FLOOR LIGHTING PLAN - OVERALL

EL102A SECOND FLOOR LIGHTING PLAN - AREA A

EL102B SECOND FLOOR LIGHTING PLAN - AREA B

EL102C SECOND FLOOR LIGHTING PLAN - AREA C

EL102D SECOND FLOOR LIGHTING PLAN - AREA D

EL103 ROOF LIGHTING PLAN - OVERALL

EP101 FIRST FLOOR POWER PLAN - OVERALL

EP101A FIRST FLOOR POWER PLAN - AREA A

EP101B FIRST FLOOR POWER PLAN - AREA B

EP101C FIRST FLOOR POWER PLAN - AREA C

EP101D FIRST FLOOR POWER PLAN - AREA D

SHEET INDEX

SHEET NUMBER SHEET NAME

A-312 EXTERIOR WALL SECTIONS

A-313 EXTERIOR WALL SECTIONS

A-314 EXTERIOR WALL SECTIONS & DIAGRAMS

A-401 ENLARGED PLANS

A-402 ENLARGED PLANS

A-403 ENLARGED PLANS

A-404 ENLARGED PLANS -AIR SHOWERS

A-410 INTERIOR ELEVATIONS

A-411 INTERIOR ELEVATIONS

A-412 INTERIOR ELEVATIONS

A-413 INTERIOR ELEVATIONS

A-414 INTERIOR ELEVATIONS

A-415 INTERIOR ELEVATIONS

A-421 INTERIOR MILLWORK SECTIONS AND DETAILS

A-451 VERTICAL CIRCULATION - PLANS

A-452 VERTICAL CIRCULATION - SECTIONS

A-453 VERTICAL CIRCULATION - DETAILS

A-461 VERTICAL CIRCULATION - ELEVATOR PLANS

A-462 VERTICAL CIRCULATION - SECTIONS

A-463 VERTICAL CIRCULATION - ELEVATOR DETAILS

A-470 VERTICAL CIRCULATION - ROOF LADDERS

A-501 HANGAR DOOR DETAILS

A-502 HANGAR DOOR DETAILS

A-503 HANGAR DOOR DETAILS

A-504 HANGAR DOOR DETAILS

A-505 PLAN DETAILS

A-506 PLAN DETAILS

A-507 PLAN DETAILS

A-511 CEILING DETAILS

A-521 SECTION DETAILS

A-522 SECTION DETAILS

A-531 ROOF DETAILS

A-532 ROOF DETAILS

A-533 ROOF DETAILS

A-534 ROOF DETAILS

A-535 ROOF DETAILS

A-541 INTERIOR DETAILS

A-542 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN

A-543 INTERIOR DETAILS - RETRACTABLE THERMAL CURTAIN

A-544 HANGAR SLAB DETAILS

A-545 HANGAR SLAB DETAILS

A-546 HANGAR SLAB DETAILS

A-547 HANGAR SLAB DETAILS

A-548 HANGAR SLAB DETAILS

A-549 HANGAR SLAB DETAILS

A-553 PRECAST CONCRETE PROFILES - DETAILS

A-554 PRECAST CONCRETE PROFILES - DETAILS

A-560 SEISMIC JOINT DETAILS

A-562 EXPANSION JOINTS DETAILS

A-570 CANOPY DETAILS

A-601 DOOR & FRAME TYPES

A-602 DOOR SCHEDULE

A-604 EXTERIOR DOOR DETAILS

A-605 INTERIOR DOOR DETAILS

A-611 WINDOW & FRAME TYPES

A-612 WINDOW & FRAME TYPES

A-613 LOUVER TYPES

A-801 HANGAR MARKINGS PLAN - OVERALL

A-802 ENLARGED HANGAR MARKINGS PLAN

08. INTERIOR DESIGN

I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL

I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A

I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B

I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C

I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D

I-102 SECOND FLOOR INTERIOR FINISH PLAN - OVERALL

I102C SECOND FLOOR INTERIOR FINISH PLAN - AREA C

I102D SECOND FLOOR INTERIOR FINISH PLAN - AREA D

I131A FIRST FLOOR SIGNAGE PLAN - AREA A

I131B FIRST FLOOR SIGNAGE PLAN - AREA B

I131C FIRST FLOOR SIGNAGE PLAN - AREA C

I131D FIRST FLOOR SIGNAGE PLAN - AREA D

I132C SECOND FLOOR SIGNAGE PLAN - AREA C

I132D SECOND FLOOR SIGNAGE PLAN - AREA D

I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES

I-602 TRANSITION DETAILS

I-621 SIGNAGE SCHEDULE

I-622 SIGNAGE SCHEDULE

I-631 SIGNAGE DETAILS

I-632 SIGNAGE DETAILS

I-633 SIGNAGE DETAILS

08. INTERIORS

IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A

IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B

IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C

IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D

IF102 SECOND FLOOR INTERIOR FURNITURE PLAN - OVERALL

IF102C SECOND FLOOR INTERIOR FURNITURE PLAN - AREA C

IF102D SECOND FLOOR INTERIOR FURNITURE PLAN - AREA D

10. FIRE ALARM

FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA102 SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

FA102A SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

FA102B SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

FA102C SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

FA102D SECOND FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D

FA501 FIRE ALARM DETAILS

FA502 FIRE ALARM DETAILS

FA601 FIRE ALARM SEQUENCE OF OPERATIONS

FA701 FIRE ALARM RISER DIAGRAMS

10. FIRE PROTECTION

FX001 FIRE SUPPRESSION GENERAL NOTES, SYMBOLS & ABBREVIATIONS

FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL

SHEET INDEX

SHEET NUMBER SHEET NAME

SB102A SLAB PLAN - AREA A

SB102B SLAB PLAN - AREA B

SB102C SLAB PLAN - AREA C

SB102D SLAB PLAN - AREA D

SF111 SECOND FLOOR AND LOW ROOF FRAMING PLAN - OVERALL

SF111A LOW ROOF FRAMING PLAN - AREA A

SF111B LOW ROOF FRAMING PLAN - AREA B

SF111C SECOND FLOOR FRAMING PLAN - AREA C

SF111D SECOND FLOOR FRAMING PLAN - AREA D

SF121 ROOF FRAMING PLAN - OVERALL

SF121A ROOF FRAMING PLAN - AREA A

SF121B ROOF FRAMING PLAN - AREA B

SF121C ROOF FRAMING PLAN - AREA C

SF121D ROOF FRAMING PLAN - AREA D

S-201 FRAMING ELEVATIONS

S-202 FRAMING ELEVATIONS

S-203 FRAMING ELEVATIONS

S-204 HANGAR TRUSS ELEVATIONS

S-205 HANGER TRUSS ELEVATION AND DETAILS

S-301 BUILDING SECTIONS

S-302 BUILDING SECTIONS

S-311 FOUNDATION SECTIONS

S-321 ROOF FRAMING SECTIONS

S-401 ENLARGED PLANS

S-501 FOUNDATION DETAILS

S-502 FOUNDATION DETAILS

S-503 TYPICAL HANGAR SLAB DETAILS

S-504 TYP CMU DETAILS

S-505 TYP CMU DETAILS

S-506 MECHANICAL ENCLOSURE DETAILS

S-507 SLAB DETAILS

S-508 METAL STUD WALL DETAILS

S-509 STRUCTURAL SITE DETAILS

S-510 CMU DETAILS

S-511 TYPICAL FRAMING DETAILS

S-512 TYPICAL FRAMING DETAILS

S-513 ROOF FRAMING DETAILS

S-514 MISC. FRAMING DETAILS

S-515 TRUSS DETAILS

S-521 FRAMING ELEVATION DETAILS

S-522 FRAMING ELEVATION DETAILS

S-523 FRAMING ELEVATION DETAILS

S-601 REBAR SCHEDULES

S-602 SCHEDULES

S-603 COLUMN SCHEDULE

S-901 3D ISOMETRICS

07. ARCHITECTURAL

A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

A-002 ABA ACCESSIBILITY GUIDELINES

A-003 ABA ACCESS PLAN - FIRST FLOOR

A-004 ABA ACCESS PLAN - SECOND FLOOR

A-005 AIRCRAFT CLEARANCE REQUIREMENT SECTION

A-006 SECURE AREA PLANS

A-007 ACOUSTIC PARTITIONS PLAN - FIRST FLOOR

A-008 ACOUSTIC PARTITIONS PLAN - SECOND FLOOR

A-009 PARTITION TYPES

A-010 PARTITION HEAD CONDITIONS

A-011 PENETRATION DETAILS

A-012 PENETRATION DETAILS

A-013 PENETRATION DETAILS

A-015 EQUIPMENT SCHEDULE

AS101 ARCHITECTURAL SITE PLAN

AS401 ENLARGED ARCHITECTURAL SITE PLAN

AS402 ENLARGED ARCHITECTURAL SITE PLAN

AS501 ENLARGED ARCHITECTURAL SITE PLAN

AS502 ENLARGED ARCHITECTURAL SITE PLAN

A-101 FIRST FLOOR PLAN - OVERALL

A101A FIRST FLOOR PLAN - AREA A

A101B FIRST FLOOR PLAN - AREA B

A101C FIRST FLOOR PLAN - AREA C

A101D FIRST FLOOR PLAN - AREA D

A-102 SECOND FLOOR PLAN - OVERALL

A102A SECOND FLOOR PLAN - AREA A

A102B SECOND FLOOR PLAN - AREA B

A102C SECOND FLOOR PLAN - AREA C

A102D SECOND FLOOR PLAN - AREA D

A-121 ROOF PLAN - OVERALL

A121A ROOF PLAN - AREA A

A121B ROOF PLAN - AREA B

A121C ROOF PLAN - AREA C

A121D ROOF PLAN - AREA D

A-131 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL

A131A FIRST FLOOR REFLECTED CEILING PLAN-AREA A

A131B FIRST FLOOR REFLECTED CEILING PLAN-AREA B

A131C FIRST FLOOR REFLECTED CEILING PLAN-AREA C

A131D FIRST FLOOR REFLECTED CEILING PLAN-AREA D

A-132 SECOND FLOOR REFLECTED CEILING PLAN - OVERALL

A132B SECOND FLOOR REFLECTED CEILING PLAN - AREA B

A132C SECOND FLOOR REFLECTED CEILING PLAN - AREA C

A132D SECOND FLOOR REFLECTED CEILING PLAN - AREA D

A-141 FIRST FLOOR AIR BARRIER PLAN

A-142 SECOND FLOOR AIR BARRIER PLAN

A-143 BUILDING SECTIONS - AIR BARRIER

A-201 BUILDING ELEVATIONS

A-202 BUILDING ELEVATIONS

A-203 BUILDING ELEVATIONS

A-204 BUILDING ELEVATIONS

A-211 PARTIAL BUILDING ELEVATIONS

A-212 PARTIAL BUILDING ELEVATIONS

A-213 PARTIAL BUILDING ELEVATIONS

A-221 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-222 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-223 EXPANSION JOINTS LAYOUT - ELEVATIONS

A-230 PRECAST CONCRETE PROFILES - ELEVATIONS

A-231 PRECAST CONCRETE PROFILES - ELEVATIONS

A-232 PRECAST CONCRETE PROFILES - ELEVATIONS

A-301 BUILDING SECTION

A-302 BUILDING SECTION

A-311 EXTERIOR WALL SECTIONS

SHEET INDEX

SHEET NUMBER SHEET NAME

00. GENERAL

G-001 COVER SHEET

G-002 DRAWING INDEX

G-003 CODE COMPLIANCE SUMMARY

G-004 OCCUPANCY SUMMARY

G-005 CODE COMPLIANCE SITE PLAN

G-006 FIRST FLOOR LIFE SAFETY PLAN

G-007 SECOND FLOOR LIFE SAFETY PLAN

PH101 CONSTRUCTION SEQUENCING PLANS

PH102 CONSTRUCTION SEQUENCING PLANS

PH103 CONSTRUCTION SEQUENCING PLANS

AD101 OVERALL FIRST FLOOR DEMOLITION PLAN

AD102 OVERALL SECOND FLOOR DEMOLITION PLAN

AD103 OVERALL ROOF DEMOLITION PLAN

02. SURVEY / MAPPING

VF001 LEGENDS AND NOTES

VF100 OVERALL EXISTING CONDITIONS

VF101 EXISTING CONDITIONS PLAN

VF102 EXISTING CONDITIONS PLAN

VF103 EXISTING CONDITIONS PLAN

VF104 EXISTING CONDITIONS PLAN

04.CIVIL

C-001 LEGEND AND GENERAL NOTES

C-002 CONSTRUCTION ACCESS PLAN

C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL

C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL

C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN

C-006 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN

C-007 EROSION AND SEDIMENT CONTROL - PHASE 4 PLAN

C-008 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN INITIAL

C-009 EROSION AND SEDIMENT CONTROL - PHASE 5 PLAN FINAL

CD001 DEMOLITION LEGEND & NOTES

CD100 EXISTING CONDITIONS - OVERALL

CD101 DEMOLITION PLAN

CD102 DEMOLITION PLAN

CD103 DEMOLITION PLAN

CD104 DEMOLITION PLAN

CS001 SITE LAYOUT LEGEND & CONTROL POINTS

CS101 SITE LAYOUT PLAN

CS102 SITE LAYOUT PLAN

CS103 SITE LAYOUT PLAN

CS104 SITE LAYOUT PLAN

CG001 GRADING LEGEND, STORM SCHEDULES & NOTES

CG101 GRADING & DRAINAGE PLAN

CG102 GRADING PLAN

CG103 GRADING PLAN

CG201 STORM PROFILES

CG202 STORM PROFILES

CG203 STORM PROFILES

CG700 POST DEVELOPMENT DRAINAGE AREA PLAN

CG701 STORMWATER MANAGEMENT CALCULATIONS

CG702 STORMWATER MANAGEMENT CALCULATIONS

CG703 STORMWATER MANAGEMENT CALCULATIONS

CG704 STORMWATER MANAGEMENT CALCULATIONS

CU001 UTILITY LEGEND, CONTROL POINTS, & SCHEDULES

CU101 UTILITY PLAN

CU102 UTILITY PLAN

CU103 UTILITY PLAN

CU104 UTILITY PLAN

CU201 UTILITY PROFILES

CU202 UTILITY PROFILES

C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES

C-505 EROSION AND SEDIMENT CONTROL DETAILS

C-506 DETAILS

C-507 DETAILS

C-508 DETAILS

C-509 DETAILS

C-510 DETAILS

C-511 DETAILS

C-512 DETAILS

C-513 DETAILS

C-514 DETAILS

C-515 DETAILS

C-516 DETAILS

C-517 DETAILS

C-518 DETAILS

C-519 DETAILS

CP101 APRON AND TOWWAY GEOMETRY PLAN

CP201 APRON AND TOWWAY JOINT LAYOUT PLAN

CP301 APRON AND TOWWAY SPOT ELEVATION PLAN

CP401 APRON AND TOWWAY TYPICAL SECTIONS

CP501 APRON AND TOWWAY JOINT DETAILS

CP502 APRON AND TOWWAY JOINT DETAILS

CM101 APRON AND TOWWAY MARKING PLAN

CM501 APRON AND TOWWAY MARKING DETAILS

05. LANDSCAPE

L-101 LANDSCAPE PLAN

L-102 LANDSCAPE PLAN

L-103 LANDSCAPE PLAN

L-104 LANDSCAPE PLAN

L-105 LANDSCAPE PLAN

L-106 LANDSCAPE PLAN

L-107 LANDSCAPE PLAN

L-501 LANDSCAPE DETAILS

06. STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES

S-002 GENERAL STRUCTURAL NOTES

S-003 LEGEND, ABBREVIATIONS & MISC LOAD INFO

S-010 AREA LOAD PLAN

S-011 ROOF WIND UPLIFT PLAN

SB101 FOUNDATION PLAN - OVERALL

SB101A FOUNDATION PLAN - AREA A

SB101B FOUNDATION PLAN - AREA B

SB101C FOUNDATION PLAN - AREA C

SB101D FOUNDATION PLAN - AREA D

SB102 SLAB PLAN - OVERALL

FMCP

NAC

RM

RSFACU

LOC

ANN

TEXT

RTP

AMP

RTS

RCM

MM

P

KD

TS

WF

SL

FIRE ALARM / MASS NOTIFICATION CONTROL PANEL

MOUNT UP 72" A.F.F. TO TOP AND 120VAC DEDICATED CIRCUIT. NO CONDUITS SHALL ENTER

BOTTOM OF BOX.

RELEASING SERVICE FIRE ALARM CONTROL UNIT

(DET-TRONICS EAGLE QUANTUM PREMIER OR EQUAL)

MOUNT UP 72" A.F.F. TO TOP AND 120VAC DEDICATED CIRCUIT. NO CONDUITS SHALL ENTER

THE TOP OF BOX.

FAMNS NAC POWER SUPPLY

MOUNT UP 72" A.F.F. TO TOP OR AS INDICATED IN ELEVATION DETAILS AND 120VAC

DEDICATED CIRCUIT. NO CONDUITS SHALL ENTER BOTTOM OF BOX.

FAMNS AMPLIFIER

MOUNT UP 72" A.F.F. TO TOP AND 120VAC DEDICATED CIRCUIT. NO CONDUITS SHALL ENTER

BOTTOM OF BOX.

MNS LOCAL OPERATION CONSOLE MOUNT SO THAT THE TOP MESSAGE BUTTON IS NO HIGHER THAN 48 INCHES ABOVE THE FLOOR

FMCP REMOTE ANNUNCIATOR MOUNT UP 66" A.F.F. TO TOP.

D21 FAMNS RADIO TRANSCEIVER PANEL

MOUNT UP 72" A.F.F. TO TOP AND 120VAC DEDICATED CIRCUIT. NO CONDUITS SHALL ENTER

BOTTOM OF BOX.

OMNI-DIRECTIONAL MONACO ANTENNA SEE MANUFACTURERS INSTRUCTIONS.

TRIPLE IR FLAME DETECTOR (DET-TRONICS X3301)

MOUNT DETECTORS IN ACCORDANCE WITH THEIR LISTING AT APPROXIMATELY 8 FT A.F.F.

IN THE HANGAR BAY.

ADDRESSABLE PHOTOELECTRIC SMOKE W/STANDARD BASE DO NOT MOUNT WITHIN 36" OF AN AIR DIFFUSER.

KEYED REMOTE TEST SWITCH W/LED

MOUNT IN A SERVICEABLE LOCATION SUCH THAT THE LED/KEY SWITCH ARE VISIBLE AND

ACCESSIBLE FROM THE FLOOR.

FMCP REMOTE RELEASING CONTROL MODULE MOUNT WITH-IN 3 FT OF THE DEVICE BEING CONTROLLED.

ADDRESSABLE MONITOR MODULE MOUNT WITH-IN 3 FT OF THE DEVICE BEING MONITORED.

ADDRESSABLE MANUAL PULL STATION MOUNT UP 48" A.F.F TO TOP.

MANUAL FOAM RELEASE STATION MOUNT UP 48" A.F.F TO TOP AND 5' MINIMUM HORIZONTALLY FROM MANUAL PULL STATION.

FOAM STOP STATION MOUNT UP 48" A.F.F TO TOP AND WITH-IN 12" OF MANUAL FOAM RELEASE STATION

FOAM KEYED DISCONNECT SWITCH LOCATE IN RISER ROOM IN READILY ACCESSIBLE LOCATION NEAR THE SOLENOID.

TAMPER SWITCH FLEX TO ASSOCIATED MODULE.

WATERFLOW SWITCH FLEX TO ASSOCIATED MODULE.

FOAM RELEASE SOLENOID CONNECT TO ASSOCIATED RELEASING CIRCUIT.

STROBE - WALL - FAMNS, CLEAR LENS, WHITE BODY MARKED 'ALERT' MOUNT APPLIANCE UP 80" A.F.F. TO BOTTOM OF BOX FOR ADA COMPLIANCE.

BLUE ROTATING BEACON - 120VAC 400 CD MINIMUM. MOUNT APPLIANCE UP 20 -30 FT. A.F.F. OF THE HANGAR BAY

SPEAKER/STROBE - WALL - FAMNS, CLEAR LENS, WHITE BODY

MARKED 'ALERT'

MOUNT APPLIANCE UP 80" A.F.F. TO BOTTOM OF BOX FOR ADA COMPLIANCE.

SPEAKER - WALL - FAMNS, WHITE BODY, NO MARKING MOUNT APPLIANCE UP 90" A.F.F.

SPEAKER - WALL - FAMNS, WHITE BODY, NO MARKING -

WEATHER PROOF

REQUIRES WEATHER-PROOF BACKBOX. MOUNT APPLIANCE UP 96" ABOVE GRADE.

DIRECTIONAL LOUD SPEAKER - WALL - FAMNS MOUNT APPLIANCE UP 90" A.F.F.

SPEAKER - CEILING - FAMNS, WHITE BODY, NO MARKING

MOUNT IN APPROPRIATE BACKBOX IN DROP CEILING OR GYP CEILING. SURFACE MOUNT IN

OPEN CEILING APPLICATIONS.

HORN/STROBE - WALL - FIRE ALARM, CLEAR LENS, RED BODY

MARKED 'FIRE' - WEATHER-PROOF

REQUIRES WEATHER-PROOF BACKBOX. MOUNT APPLIANCE UP 96" ABOVE GRADE.

MNS VISUAL TEXT SIGN MOUNT OVER DOOR OR ADJACENT TO SUBSTANTIAL MEANS OF EGRESS.

ADDRESSABLE RELAY MODULE MOUNT WITH-IN 3 FT OF THE DEVICE BEING CONTROLLED.

SYMBOL DESCRIPTION ROUGH-IN LOCATION

C

S

WP

S

S

WP

S

C

ELECTRIC BELL FOR WATER FLOW ALARM MOUNT AT 120" A.F.F.WP

S

SPEAKER/STROBE - CEILING - FAMNS, CLEAR LENS, WHITE BODY

MARKED 'ALERT'

C

XXcd

XXcd

FO

A

B

EDIO ENHANCED DISCRETE I/O MODULE - 8 CHANNEL MOUNT IN CABINET UP 72" A.F.F. TO TOP. NO CONDUITS SHALL ENTER BOTTOM OF BOX.

TEMP TEMPERATURE SENSOR INSTALL AT CEILING LEVEL OF ASSOCIATED ROOM.

STROBE - CEILING - FAMNS, CLEAR LENS, WHITE BODY MARKED 'ALERT'

C

C

RSPS RELEASING SERVICE POWER SUPPLY MOUNT TO FLOOR IN FIRE/FOAM ROOM.

ADDRESSABLE CARBON MONOXIDE DETECTOR W/ STANDARD BASE

PS ALARM PRESSURE SWITCH FLEX TO ASSOCIATED MODULE.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:26:07 AM

FA001

F

IR

E A

L A

R M

G E

N E

R A

L N

O T

E S

S

Y M

B O

L S

A

B B

R E

V

IA

T

IO

N S

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S O

N

J A

N D

E R

S O

N

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

ELECTRICAL NOTES:

ALL FIRE ALARM, MASS NOTIFICATION SYSTEM AND RELEASING SYSTEM CONDUIT SIZE SHALL BE 3/4"

MINIMUM UNLESS OTHERWISE NOTED. OBSERVE NEC ALLOWABLE FILL RATIOS.

ALL FIRE ALARM, FOAM RELEASING AND MASS NOTIFICATION 120VAC CIRCUIT BREAKERS SHALL BE RED IN COLOR AND PROVIDED WITH LOCK-OUT DEVICES. THE LOCATION OF BREAKERS SHALL BE PERMANENTLY

IDENTIFIED AT THE ASSOCIATED CONTROL EQUIPMENT.

ALL CONDUIT, JUNCTION/BACK BOXES, COVERS AND COUPLINGS, WHEN PROVIDED, MUST BE FACTORY PAINTED RED IN UNFINISHED AREAS. ALL CONDUIT, JUNCTION/BACK BOXES, COVERS AND COUPLINGS, WHEN PROVIDED, ARE PERMITTED TO BE PAINTED TO MATCH THE ROOM FINISHING IN FINISHED AREAS.

INSTALLING CONTRACTOR SHALL PROVIDE COLOR CODED CABLING FOR DIFFERENT CIRCUIT TYPES.

MAINTAIN COLOR CODE THROUGHOUT EACH CIRCUIT.

ALL EXPOSED AND CONCEALED CONDUITS SHALL BE EMT (ELECTRICAL METALLIC TUBING). ALL UNDERGROUND CONDUIT SHALL BE PVC CONDUIT SCHEDULE 40, UNLESS NOTED OTHERWISE. USE

FLEXIBLE METAL CONDUIT AND SEAL-TIGHT WHERE APPLICABLE.

PROVIDE NEMA 250 TYPE 4 WALL MOUNTED DEVICES AND APPLIANCES WITHIN THE HANGAR BAYS (INCLUDING BACKBOXES) PROVIDE WATER TIGHT CONDUIT AND JUNCTION BOXES THROUGHOUT THE HANGAR BAY. REGARDLESS OF ENVIRONMENTAL CONDITIONS, DO NOT PROVIDE OPENINGS OR CONDUIT ENTRY INTO THE TOP OF THE RSFACU. ROUTE CONDUIT INTO THE BOTTOM OF THE BACKBOX FOR MANUAL FOAM RELEASE STATIONS, STOP STATIONS, AND FLAME DETECTORS. PROVIDE A LOW POINT DRAIN. WHERE THE CONDUIT IS IN A HAZARDOUSLY CLASSIFIED AREA, PROVIDE BREATHERS IN ISOLATED

PORTIONS OF THE CONDUIT.

PROVIDE SURGE PROTECTIVE DEVICES TO PROTECT ALL POWER SUPPLY CIRCUITS TO FMCP AND RSFACU. INCLUDING ANY SUBPANELS SUCH AS AUTONOMOUS CONTROL UNITS, AMPLIFIER PANELS, AND

NOTIFICATION APPLIANCE CIRCUIT BOOSTER PANELS

PROVIDE A 120VAC CIRCUIT POWERED FROM A DEDICATED EMERGENCY PANEL IN ACCORDANCE WITH

UFC 3-520-01.

FOR 120VAC SYSTEMS; PROVIDE LOCK-ON BREAKER IN THE SERVICE EQUIPMENT. IF MORE THAT ONE FIRE PROTECTION CIRCUIT IS REQUIRED, PROVIDE A DEDICATED EMERGENCY PANEL (SIZED FOR A MINIMUM SIX CIRCUITS) POWERED FROM THE LOCK-ON BREAKER IN THE SERVICE EQUIPMENT. UFC 3-520-01 3-2.7.

PROVIDE FIRE ALARM SYSTEM LOOPS AND ADDRESSABLE CIRCUITS THAT ENTER OR LEAVE SEPARATE BUILDINGS, UL LISTED OR THIRD-PARTY VERIFIED AND TESTED TO UL 497B, WITH A MINIMUM 9,000A SURGE

CURRENT RATING.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

ACRONYMS:

RSFACU RELEASING SERVICE FIRE ALARM CONTROL UNIT

CD CANDELA

AFF ABOVE FINISHED FLOOR

EOL END OF LINE

FPL FIRE ALARM POWER LIMITED

SLC SIGNAL LINE CIRCUIT

MNS MASS NOTIFICATION SYSTEM

NAC NOTIFICATION APPLIANCE CIRCUIT

IDC INITIATION DEVICE CIRCUIT

WP WEATHER-PROOF

TWP TWISTED SINGLE PAIR

FMCP FIRE ALARM / MASS NOTIFICATION CONTROL PANEL

IAW IN ACCORDANCE WITH

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

FIRE ALARM, MASS NOTIFICATION, RELEASING SERVICE LEGEND:

GENERAL NOTES:

FIRE ALARM SYSTEM SHALL COMPLY WITH:

A. NFPA 70 (NATIONAL ELECTRIC CODE), 2020

B. NFPA 72 (FIRE ALARM CODE), 2019

C. NFPA 90A, 2018

D. NFPA 101 (LIFE SAFETY CODE), 2018

E. NFPA 720, 2015

F. IBC, 2018

G. ADA/ABA, 2015

H. UFC 3-600-01 CHANGE 4 DATED 7 FEBRUARY 2020

I. UFC 4-021-01 CHANGE 1 DATED JANUARY 2010

J. UFC 4-211-01 CHANGE 2 DATED 18 MAY 2020

K. SPECIFICATION SECTIONS 21 13 13.00 10, 21 13 25, 21 30 00 AND 28 31 76

PROVIDE A FMCP FOR DEVICES AND APPLIANCES THROUGHOUT THE BUILDING THAT ARE NOT PART OF THE FOAM/WATER RELEASING SYSTEM. PROVIDE A MASS NOTIFICATION SYSTEM THROUGHOUT THE SUPPORT AREAS AND HANGAR BAYS. PROVIDE A RSFACU FOR FOAM/WATER RELEASING IN THE HANGAR BAYS. ALL SYSTEMS SHALL INCORPORATE REPORTING VIA A MONACO BT-XM TO TWO ON BASE MONACO D021 RECEIVERS.

MINIMUM CIRCUIT PERFORMANCE REQUIREMENTS:

IDC - INITIATING DEVICE CIRCUIT SHALL BE CLASS B.

NAC - NOTIFICATION APPLICATION CIRCUIT SHALL BE CLASS B.

SLC - SIGNALING LINE CIRCUIT SHALL BE CLASS B.

FIRE ALARM CONTRACTOR SHALL PROVIDE SPARE DEVICES TO THE OWNER IN ACCORDANCE WITH THE PROJECT

SPECIFICATION.

A WEATHER-PROOF FIRE ALARM ELECTRIC BELL SHALL BE INSTALLED WITHIN 10' HORIZONTALLY OF THE FIRE

DEPARTMENT CONNECTION.

VISUAL NOTIFICATION APPLIANCES IN THE SAME ROOM OR ADJACENT SPACE WITHIN THE FIELD OF VIEW SHALL OPERATE IN SYNCHRONIZATION. AUDIBLE SIGNALS SHALL BE SYNCHRONIZED WITHIN A NOTIFICATION ZONE.

AMPLIFIERS SHALL NOT BE LOADED AT MORE THAN 50% OF THEIR RATED CAPACITY. STROBE CIRCUITS SHALL

NOT BE LOADED AT MORE THAN 75% OF THEIR RATED CAPACITY.

ALL FIRE ALARM DEVICES SHALL BE LABELED WITH APPROPRIATE CIRCUIT AND DEVICE DESIGNATOR USING WHITE LABELS WITH BLACK LETTERING. LABEL EACH CABLE AT EACH POINT OF TERMINATION. CLEARLY LABEL EACH

E.O.L. DEVICE.

PROVIDE BATTERY BACKUP TO SUPPORT BOTH 48 HR STANDBY / 15 MIN ALARM, AND 0 HR STANDBY / 60 MIN

ALARM. REQUIREMENTS SHOULD BE APPLIED INDIVIDUALLY.

PROVIDE A SEPARATE FMCP AND RSFACU. INSTALL THE FMCP AND RSFACU IN A LOCATION READILY ACCESSIBLE

TO THE EMERGENCY RESPONDERS AND MAINTENANCE PERSONNEL.

LOCATE THE RSFACU, RELEASING MODULES, AND MONITOR MODULES INTEGRAL TO THE RELEASING AND

STOPPING OF THE FOAM/WATER SYSTEM IN A NORMALLY OCCUPIED CONDITIONED SPACE.

PROVIDE A KEY OPERATED SUPERVISED DISCONNECT SWITCH TO PHYSICALLY DISABLE THE SOLENOID FOR EACH FOAM/WATER RISER. DO NOT PROVIDE A TROUBLE SIGNAL UPON OPERATION OF THE DISCONNECT. LOCATE THE

DISCONNECT IN THE RISER ROOM.

WHERE PANELS ARE LOCATED IN NORMALLY OCCUPIED AREAS, PROVIDE RECESSED PANELS AND COMBINE

MISCELLANEOUS COMPONENTS IN COMMON RECESSED ENCLOSURES.

WHERE A BATTERY BOX IS REQUIRED AND CANNOT BE RECESSED, LOCATE IT REMOTELY IN A NORMALLY

UNOCCUPIED AREA.

INSTALL FIRE ALARM MANUAL PULL STATIONS AND FOAM RELEASE STATIONS ON OPPOSITE SIDES OF THE DOOR.

WHERE NOT POSSIBLE, MAINTAIN 5 FEET SEPARATION BETWEEN FIRE ALARM MANUAL PULL STATIONS AND FOAM RELEASE STATIONS. PROVIDE A CLEAR PLASTIC TAMPER COVER (ALARMED) OVER FOAM RELEASE STATIONS.

PROVIDE NEMA 250 TYPE 4 MANUAL FOAM STOP STATIONS OF THE "DEAD-MAN" TYPE WITHIN 12 INCHES OF FOAM

RELEASE STATION AND PROVIDE A CLEAR PLASTIC TAMPER COVER (NON-ALARMED).

PROVIDE DUCT SMOKE DETECTORS DOWNSTREAM OF AIR FILTERS AND AHEAD OF ANY BRANCH CONNECTIONS IN

ALL AIR SUPPLY SYSTEMS HAVING CAPACITY OF 2,000 CFM OR GREATER.

PROVIDE MNS INTELLIGIBILITY PER UFC 4-021-01 (4-6.1.2). MINIMUM CIS FOR AIR FORCE IS 0.8 CIS WHERE OCCUPANTS TYPICALLY COULD BE FOUND. THE CIS VALUE CANNOT BE LESS THAN 0.6 CIS AT ANY LOCATION WITHIN A LARGE CAVERNOUS AREA INCLUDING HANGAR BAYS. SPEAKERS SHOWN ARE DIAGRAMATIC ONLY AND NOT INDICATIVE OF PROVIDING INTELLIGIBILITY AS REQUIRED. SPEAKER SPACING AND DESIGN SHALL USE A MAXIMUM OF 0.5 WATT TAP SETTING EXCEPT FOR LARGE HARDENED SURFACE AREA WHICH MAY USE HIGHER TAP

SETTINGS.

ALL DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL NOT USE THESE DRAWINGS FOR EXACT MEASUREMENTS OR FABRICATION. THE QUANTITY AND LOCATION OF DEVICES/APPLIANCES SHALL INCLUDE, AT A MINIMUM, THE LAYOUT SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADDITIONAL DEVICES/APPLIANCES AS NECESSARY TO COMPLY WITH APPLICABLE CODES, STATEMENT OF WORK, SPECIFICATIONS, AND INTELLIGIBILITY. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF SYSTEM

COMPONENTS, WIRING, AND COUNDUIT WITH ALL OTHER TRADES.

ALL COMPONENTS REQUIRED FOR A WORKING FIRE ALARM AND MASS NOTIFICATION SYSTEM ARE NOT SHOWN ON THESE CONCEPT DRAWINGS. THE CONTRACTOR SHALL PROVIDE EQUIPMENT AS NECESSARY FOR A FULLY OPERATIONAL SYSTEM THAT COMPLIES WITH ALL APPLICABLE CODES, STATEMENT OF WORK, SPECIFICATIONS, AND MANUFACTURER'S REQUIREMENTS.

PROVIDE EXPANSION ASSEMBLIES IN ALL CONDUIT FOR CROSSING BUILDING EXPANSION JOINTS.

REFER TO SHEET E003 FOR ELECTRICAL CLASSIFICATIONS OF ALL SPACES. ALL DEVICES OR APPLIANCES IN ELECTRICALLY CLASSIFIED ROOMS/LOCATIONS SHOULD BE LISTED FOR THE ELECTRICAL CLASSIFICATION FOR

THE INSTALLATION LOCATION.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

MONACO INSTALLATION NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

ANTENNA INSTALLATION SHALL COMPLY WITH NEC ARTICLE 810.

DO NOT MOUNT THE ANTENNA WHERE IT MAY CONTACT POWER LINES, POWER DROPS, POWER POLES, OR OTHER TRANSMITTING ANTENNAS.

INSTALL AN OMNIDIRECTIONAL ANTENNA, CUT TO FREQUENCY.

INSTALL THE ANTENNA WITH A CLEARANCE OF AT LEAST 10'-0" HORIZONTAL AND 10'-0" VERTICAL FROM OTHER ANTENNAS AND A CLEARANCE OF 3 FEET ABOVE THE STRUCTURE AND 2 FEET AWAY FROM THE

STRUCTURE.

INSTALL THE ANTENNA WITH A MINIMUM OF 3 1/2 FEET FROM ANY METAL SURFACE (HEATING DUCTS, WIRES, ETC.).

INSTALL THE ANTENNA SUCH THAT IT NOT TOUCH ANY WIRES OR PROJECTIONS UNDER HIGH WIND

CONDITIONS.

INSTALL THE ANTENNA MAST SECURELY SUCH THAT IT WILL NOT COME LOOSE IN HIGH WINDS OR ICING

CONDITIONS.

DO NOT MOUNT THE ANTENNA HIGHER THAN EXISTING LIGHTNING RODS.

ANTENNA SHALL BE RATED FOR 100 MPH WIND LOAD.

MOUNT THE ANTENNA AT THE ROOF LINE OR HIGHER TO ENSURE RECEPTION OF INCOMING SIGNALS AND

TRANSMISSION OF OUTGOING SIGNALS.

INSTALL THE ANTENNA, LIGHTNING ARRESTOR, AND TRANSRECEIVER AS CLOSE TOGETHER AS POSSIBLE

TO MINIMIZE COAXIAL CABLE LENGTH.

ANTENNA MASTS SHALL BE WELL SECURED AND ABLE TO WITHSTAND LOCAL ENVIRONMENTAL

CONDITIONS. ANCHORING MATERIALS SHOULD BE SUITABLE FOR THE MOUNTING SURFACE; BOLTS, SCREWS, STUDS, ETC. USED FOR SUPPORT SHOULD BE NO LESS THAN 1/4 INCH IN DIAMETER.

ALL ANTENNA CABLING SHALL BE ENCLOSED IN CONDUIT UTILIZING RIGID CONDUIT FOR EXTERIOR RUNS.

ANTENNA MAST SHALL BE A MINIMUM OF 1" RIGID CONDUIT.

SEAL COAX CONNECTION TO ANTENNA. SEAL TOP OF MAST TO PREVENT WATER FROM ENTERING. SEAL COAX CONNECTIONS TO LIGHTNING ARRESTOR. SEAL BUILDING PENETRATION HOLE AND CONDUIT.

INSTALLATION:

GROUNDING:

ENCLOSE THE COAXIAL CABLE ENTIRELY IN CONDUIT. THE CONDUIT PENETRAITING THE BUILDING SHALL BE 3/4-INCH MINIMUM RIGID CONDUIT. PENETRATING CONDUIT SHALL DIRECTLY ENTER THE LIGHTNING ARRESTOR ENCLOSURE ON THE INSIDE OF THE BUILDING. TERMINATE THE 3/4-INCH RIGID CONDUIT

EXTENDING FROM THE ANTENNA TO THE LIGHTNING ARRESTOR ENCLOSURE WITH A CONDUIT

GROUNDING BUSHING. DO NOT USE NON-METALLIC FITTINGS IN THE ANTENNA MAST OR CONDUIT CONNECTIONS. BOND THE CONDUIT GROUNDING BUSHING AND THE LIGHTNING ARRESTOR GROUNDING

BOLT WITH A #8 AWG SOLID COPPER BARE WIRE.

CONNCECT THE LIGHTNING ARRESTOR GROUNDING BOLT TO THE NEAREST OF THE NEC-QUALIFIED BUILDING OR STRUCTURE GOUNDING ELECTRODE SYTEM USING A #8 SOLID COPPER BARE WIRE. THE

GROUNDING CONDUCTOR DOES NOT NEED TO BE INSTALLED IN CONDUIT UNLESS REQUIRED FOR

MECHANICAL PROTECTION, BUT IT MUST BE PROPERLY SUPPORTED AND RUN IN AS STRAIGHT A LINE AS

POSSIBLE.

1.

2.

A

B

129 10 11

Q

R

8761 2 3 4 5

C

F

J

P

L

N

FA101A

A1

FA101D

A1

FA101B

A1

FA101C

A1

D

E

G

H

K

M

A

B C

D

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:26:12 AM

FA101

F

IR

S T

F L

O O

R F

IR

E

A L

A R

M R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N

O V

E R

A L

L

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S O

N

J A

N D

E R

S O

N

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: = 1'-0"

0 16 3216

1/16"

N

KEY PLAN

SCALE: 1/16" = 1'-0"

A1

FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL

SHEET NOTES:

NORTH HANGAR BAY FLOOR AREA WITH IR FLAME DETECTOR COVERAGE

FROM 3 OR MORE DETECTORS WITH THERMAL CURTAIN CLOSED

SOUTH HANGAR BAY FLOOR AREA WITH IR FLAME DETECTOR COVERAGE

FROM 3 OR MORE DETECTORS WITH THERMAL CURTAIN CLOSED

GENERAL NOTES:

1. A SINGLE ZONE HIGH EXPANSION FOAM SYSTEM WILL BE INSTALLED IN THE

HANGAR BAY. FLAME DETECTION IN THE HANGAR BAY WILL INITIATE

DISCHARGE OF HIGH EXPANSION FOAM TO PROVIDE SUPPRESSION IN THE

ENTIRE HANGAR AREA.

F

O A

P

C

15cd

C

45cd

C

45cd

S

S W

P S

W P

A

B

129 10 11

C

F

D

E

G

MATCHLINE

SEE A1/FA101B

M A

T C

H

LI

N E

S E

E A

1/ F

A

1D

M A

T C

H

LI

N E

S E

E A

1/ F

A

1D

MATCHLINE

SEE A1/FA101B

T E

X T

LO SUPPORT

STORAGE

CORRIDOR

COLLATERAL

STORAGE

HANGAR

TEMP

MM

SHEET NOTES:

X3301 TRIPLE INFRARED TYPE OPTICAL DETECTION WITH 5 FT. OF FLEXIBLE

CONDUIT TO ALLOW FOR MINOR ADJUSTMENTS. MOUNT DETECTOR AT 8 FEET ABOVE

FLOOR. ANGLE DETECTORS AND PROVIDE BLINDS SO THE CONE-OF-VISION IS CONTAINED

WITHIN DESIGNATED SUPPRESSION ZONE. EACH FLAME DETECTOR TO HAVE HIGH

CONTRAST MARKING ON ALL COLLAR AND BRACKET ADJUSTMENTS TO INDICATE FINAL

ORIENTATION.

ROTATING BLUE BEACONS POWERED BY 120VAC DEDICATED FEED. (RSFACU) TO ACTIVATE

BLUE BEACONS. MOUNT BEACON AT 20 FEET ABOVE FLOOR, WHERE POSSIBLE. INSTALL

ONE BLUE BEACON WITHIN 10 FEET TO 25 FEET OF EACH CORNER OF THE HANGAR.

PROVIDE A SIGN NEXT TO EACH BLUE BEACON WITH A YELLOW OR LIME YELLOW

BACKGROUND MATCHING THE MANUAL FOAM RELEASING STATION SIGNAGE, WITH "FOAM

RELEASE WHEN ILLUMINATED" IN RED LETTERING NOT LESS THAN 3" HIGH. SEE SHEET

FA501 FOR SIGNAGE DETAILS.

PROVIDE DISTINCTIVELY DIFFERENT NEMA 250 TYPE 4 MANUAL FOAM RELEASING STATIONS

AND SIGNAGE FROM THE MANUAL FIRE ALARM PULL

STATIONS. PROVIDE TAMPER COVER WITH COLORED PORTIONS IN YELLOW AND LETTERING

ON THE COVER READING "FOAM." PROVIDE LOCKING TYPE MANUAL FOAM RELEASING

STATIONS THAT REQUIRE A KEY TO BE RESET. MOUNT STATION AT LEAST 5 FEET FROM

FIRE ALARM MANUAL PULL STATION, ON THE OPPOSITE SIDE OF THE DOOR WHERE

POSSIBLE. PROVIDE A CLEAR PLASTIC TAMPER COVER OVER RELEASING STATION. BRING

CONDUITS INTO THE BOTTOM OF THE DEVICE. PROVIDE SIGNAGE WITH YELLOW

BACKGROUND WITH 'START FOAM SYSTEM' IN RED LETTERING NOT LESS THAN 3" HIGH. SEE

SHEET FA501 FOR SIGNAGE DETAILS.

4 PROVIDE NEMA 250 TYPE 4 'DEAD-MAN' TYPE MANUAL STOP STATIONS AT EACH MANUAL

FOAM RELEASING STATION. BRING CONDUITS INTO THE BOTTOM OF THE DEVICE. PROVIDE

MANUAL FOAM STOP STATIONS WITH DISTINCTIVE SIGNAGE AT EACH DEVICE. PROVIDE A

RED MUSHROOM TYPE PUSH BUTTON AND INCLUDE THE WORD 'PUSH'. PROVIDE THE

COLORED PORTIONS OF THE TAMPER COVER IN BLUE AND LETTERING ON THE COVER

STATING 'STOP'. PROVIDE SIGNAGE WITH WHITE BACKGROUND AND A MINIMUM 1/2" WIDE

BLUE BORDER WITH 'STOP FOAM SYSTEM' IN BLUE LETTERING NOT LESS THAN 3" TALL

PLACED DIRECTLY ABOVE FOAM STOP STATION. SEE SHEET FA501 FOR SIGNAGE DETAILS.

5 PROVIDE LISTED TEMPERATURE SENSORS MONITORED BY THE FIRE ALARM SYSTEM AND

EMCS SYSTEM SET AT 32ºF IN THE FIRE PUMP ROOM AND IN THE HANGAR BAY AT THE SAME

LEVEL AS THE SPRINKLER BRANCHLINE. A LOW TEMPERATURE ALARM SHALL PRODUCE A

SUPERVISORY CONDITION AT THE FIRE ALARM CONTROL UNIT.

6 RSPS (RSFACU POWER SUPPLY) TO BE INSTALLED IN THE FIRE PUMP ROOM. PROVIDE ALL

INTERFACE FROM THE RSFACU AND THE FOAM/FIRE SUPPRESSION EQUIPMENT.

7 MONITOR MODULES FOR INTERFACE WITH THE FIRE PUMP CONTROLLER

FOR FIRE PUMP RUN, FIRE PUMP LOSS OF POWER AND FIRE PUMP PHASE REVERSAL.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:26:16 AM

FA101A

F

IR

S T

F L

O O

R F

IR

E

A L

A R

M R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N

A R

E A

A

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S O

N

J A

N D

E R

S O

N

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A

SCALE: = 1'-0"

0 8 168

1/8"

N

KEY PLAN

S

S

LOC ANN

B F

O A

P

P

F O

S

S

P

P

P

C

15cd

S W

P

S

A

129 10 11

Q

R

J

P

L

N

H

K

M

M A

T C

H

LI

N E

S E

E A

1/ F

A

1C

M A

T C

H

LI

N E

S E

E A

1/ F

A

1C

MATCHLINE

SEE A1/FA101A

MATCHLINE

SEE A1/FA101A

T E

X T

T E

X T

COMM

CORRIDOR

JAN

MOBILITY STORAGE

CORRIDOR

ELECTRICAL

MECHANICAL

FIRE PUMP ROOM

HANGAR

TEMP

TEMP

WP

C

C

MM

MM

MM WF

MM WF

MM WF

MM WF

MM WF

MM TS

MM TS

MM TS

MM TS

MM TS

MM TS

MM TS

MM TS

MM

MM

MM

RSPS

EDIO

SEE CIVIL PLANS

FOR CONTINUATION

OF FIRE SERVICE

SHEET NOTES:

X3301 TRIPLE INFRARED TYPE OPTICAL DETECTION WITH 5 FT. OF FLEXIBLE

CONDUIT TO ALLOW FOR MINOR ADJUSTMENTS. MOUNT DETECTOR AT 8 FEET ABOVE

FLOOR. ANGLE DETECTORS AND PROVIDE BLINDS SO THE CONE-OF-VISION IS CONTAINED

WITHIN DESIGNATED SUPPRESSION ZONE. EACH FLAME DETECTOR TO HAVE HIGH

CONTRAST MARKING ON ALL COLLAR AND BRACKET ADJUSTMENTS TO INDICATE FINAL

ORIENTATION.

ROTATING BLUE BEACONS POWERED BY 120VAC DEDICATED FEED. (RSFACU) TO ACTIVATE

BLUE BEACONS. MOUNT BEACON AT 20 FEET ABOVE FLOOR, WHERE POSSIBLE. INSTALL

ONE BLUE BEACON WITHIN 10 FEET TO 25 FEET OF EACH CORNER OF THE HANGAR.

PROVIDE A SIGN NEXT TO EACH BLUE BEACON WITH A YELLOW OR LIME YELLOW

BACKGROUND MATCHING THE MANUAL FOAM RELEASING STATION SIGNAGE, WITH "FOAM

RELEASE WHEN ILLUMINATED" IN RED LETTERING NOT LESS THAN 3" HIGH. SEE SHEET

FA501 FOR SIGNAGE DETAILS.

PROVIDE DISTINCTIVELY DIFFERENT NEMA 250 TYPE 4 MANUAL FOAM RELEASING STATIONS

AND SIGNAGE FROM THE MANUAL FIRE ALARM PULL

STATIONS. PROVIDE TAMPER COVER WITH COLORED PORTIONS IN YELLOW AND LETTERING

ON THE COVER READING "FOAM." PROVIDE LOCKING TYPE MANUAL FOAM RELEASING

STATIONS THAT REQUIRE A KEY TO BE RESET. MOUNT STATION AT LEAST 5 FEET FROM

FIRE ALARM MANUAL PULL STATION, ON THE OPPOSITE SIDE OF THE DOOR WHERE

POSSIBLE. PROVIDE A CLEAR PLASTIC TAMPER COVER OVER RELEASING STATION. BRING

CONDUITS INTO THE BOTTOM OF THE DEVICE. PROVIDE SIGNAGE WITH YELLOW

BACKGROUND WITH 'START FOAM SYSTEM' IN RED LETTERING NOT LESS THAN 3" HIGH. SEE

SHEET FA501 FOR SIGNAGE DETAILS.

4 PROVIDE NEMA 250 TYPE 4 'DEAD-MAN' TYPE MANUAL STOP STATIONS AT EACH MANUAL

FOAM RELEASING STATION. BRING CONDUITS INTO THE BOTTOM OF THE DEVICE. PROVIDE

MANUAL FOAM STOP STATIONS WITH DISTINCTIVE SIGNAGE AT EACH DEVICE. PROVIDE A

RED MUSHROOM TYPE PUSH BUTTON AND INCLUDE THE WORD 'PUSH'. PROVIDE THE

COLORED PORTIONS OF THE TAMPER COVER IN BLUE AND LETTERING ON THE COVER

STATING 'STOP'. PROVIDE SIGNAGE WITH WHITE BACKGROUND AND A MINIMUM 1/2" WIDE

BLUE BORDER WITH 'STOP FOAM SYSTEM' IN BLUE LETTERING NOT LESS THAN 3" TALL

PLACED DIRECTLY ABOVE FOAM STOP STATION. SEE SHEET FA501 FOR SIGNAGE DETAILS.

5 PROVIDE LISTED TEMPERATURE SENSORS MONITORED BY THE FIRE ALARM SYSTEM AND

EMCS SYSTEM SET AT 32ºF IN THE FIRE PUMP ROOM AND IN THE HANGAR BAY AT THE SAME

LEVEL AS THE SPRINKLER BRANCHLINE. A LOW TEMPERATURE ALARM SHALL PRODUCE A

SUPERVISORY CONDITION AT THE FIRE ALARM CONTROL UNIT.

6 RSPS (RSFACU POWER SUPPLY) TO BE INSTALLED IN THE FIRE PUMP ROOM. PROVIDE ALL

INTERFACE FROM THE RSFACU AND THE FOAM/FIRE SUPPRESSION EQUIPMENT.

7 MONITOR MODULES FOR INTERFACE WITH THE FIRE PUMP CONTROLLER

FOR FIRE PUMP RUN, FIRE PUMP LOSS OF POWER AND FIRE PUMP PHASE REVERSAL.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:26:19 AM

FA101B

F

IR

S T

F L

O O

R F

IR

E

A L

A R

M R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N

A R

E A

B

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S O

N

J A

N D

E R

S O

N

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B

SCALE: = 1'-0"

0 8 168

1/8"

KEY PLAN

C

15cd

C

15cd

C

15cd

S3 c d

C

15cd

C

15cd

C

15cd

C

15cd

C

15cd

C

15cd

C

15cd

C

15cd

C

45cd

C

45cd

C

30cd

C

30cd

C

15cd c d 7 c d

75cd 75cd

FMCP RSFACU

C

45cd

45cd

A B

P

P

A

P

C

15cd

C

15cd

F O

F O

P

S

C

S

C

S

C

S

C

P

P

S S

C

15cd

S

S W

P

SWP

LOC

Q

R

8761 2 3 4 5

J

P

L

N

H

K

M

MATCHLINE

SEE A1/FA101D

MATCHLINE

SEE A1/FA101D

M A

T C

H

LI

N E

S E

E A

1/ F

A

1B

M A

T C

H

LI

N E

S E

E A

1/ F

A

1B

TEXT

T E

X T

T E

X T

S

VESTIBULE/ AIR

SHOWER

VESTIBULE

OFFICE

CORRIDOR

OPEN OFFICE

LO SUPPORT VEST

LO SUPPORT BREAK

AREA

JAN

VESTIBULE

STOR.

CORRIDOR

MOBILITY TOOL AREA

LO SUPPORT

STAIRS

S1

MECHANICAL YARD

CORRIDOR

TIRE STORAGE

MECHANICAL

CORRIDOR

OFFICE

HANGAR

C C

RTP

SHEET NOTES:

X3301 TRIPLE INFRARED TYPE OPTICAL DETECTION WITH 5 FT. OF FLEXIBLE

CONDUIT TO ALLOW FOR MINOR ADJUSTMENTS. MOUNT DETECTOR AT 8 FEET ABOVE

FLOOR. ANGLE DETECTORS AND PROVIDE BLINDS SO THE CONE-OF-VISION IS CONTAINED

WITHIN DESIGNATED SUPPRESSION ZONE. EACH FLAME DETECTOR TO HAVE HIGH

CONTRAST MARKING ON ALL COLLAR AND BRACKET ADJUSTMENTS TO INDICATE FINAL

ORIENTATION.

ROTATING BLUE BEACONS POWERED BY 120VAC DEDICATED FEED. (RSFACU) TO ACTIVATE

BLUE BEACONS. MOUNT BEACON AT 20 FEET ABOVE FLOOR, WHERE POSSIBLE. PROVIDE A

SIGN NEXT TO EACH BLUE BEACON WITH A YELLOW OR LIME YELLOW BACKGROUND

MATCHING THE MANUAL FOAM RELEASING STATION SIGNAGE, WITH "FOAM RELEASE WHEN

ILLUMINATED" IN RED LETTERING NOT LESS THAN 3" HIGH. SEE SHEET FA501 FOR SIGNAGE

DETAILS.

PROVIDE DISTINCTIVELY DIFFERENT NEMA 250 TYPE 4 MANUAL FOAM RELEASING STATIONS

AND SIGNAGE FROM THE MANUAL FIRE ALARM PULL

STATIONS. PROVIDE TAMPER COVER WITH COLORED PORTIONS IN YELLOW AND LETTERING

ON THE COVER READING "FOAM." PROVIDE LOCKING TYPE MANUAL FOAM RELEASING

STATIONS THAT REQUIRE A KEY TO BE RESET. MOUNT STATION AT LEAST 5 FEET FROM

FIRE ALARM MANUAL PULL STATION, ON THE OPPOSITE SIDE OF THE DOOR WHERE

POSSIBLE. PROVIDE A CLEAR PLASTIC TAMPER COVER OVER RELEASING STATION. BRING

CONDUITS INTO THE BOTTOM OF THE DEVICE. PROVIDE SIGNAGE WITH YELLOW

BACKGROUND WITH 'START FOAM SYSTEM' IN RED LETTERING NOT LESS THAN 3" HIGH. SEE

SHEET FA501 FOR SIGNAGE DETAILS.

3 4 PROVIDE NEMA 250 TYPE 4 'DEAD-MAN' TYPE MANUAL STOP STATIONS AT EACH MANUAL

FOAM RELEASING STATION. BRING CONDUITS INTO THE BOTTOM OF THE DEVICE. PROVIDE

MANUAL FOAM STOP STATIONS WITH DISTINCTIVE SIGNAGE AT EACH DEVICE. PROVIDE A

RED MUSHROOM TYPE PUSH BUTTON AND INCLUDE THE WORD 'PUSH'. PROVIDE THE

COLORED PORTIONS OF THE TAMPER COVER IN BLUE AND LETTERING ON THE COVER

STATING 'STOP'. PROVIDE SIGNAGE WITH WHITE BACKGROUND AND A MINIMUM 1/2" WIDE

BLUE BORDER WITH 'STOP FOAM SYSTEM' IN BLUE LETTERING NOT LESS THAN 3" TALL

PLACED DIRECTLY ABOVE FOAM STOP STATION. SEE SHEET FA501 FOR SIGNAGE DETAILS.

5 PROVIDE A 2-POSITION NON-KEY OPERATED SWITCH LOCATED WITHIN THE RSFACU

ENCLOSURE THAT DISABLES THE RELEASING FUNCTION OF ALL OPTICAL FLAME

DETECTORS IN THE HANGAR BAY WHILE LEAVING ALL OTHER FUNCTIONS OF THE RSFACU

OPERATIONAL.PROVIDE A SUPERVISORY SIGNAL TO THE RECEIVING STATION INDICATING

THE OPTICAL FLAME DETECTORS ARE INHIBITED, A TROUBLE SIGNAL IS NOT PERMITTED.

LABEL THE SWITCH "INHIBIT OPTICAL FLAME DETECTION." PROVIDE ENGRAVED LABELS ON

THE INHIBIT SWITCH INDICATING WHEN THE OPTICAL FLAME DETECTORS ARE IN "NORMAL"

OR "INHIBIT" MODE.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:26:21 AM

FA101C

F

IR

S T

F L

O O

R F

IR

E

A L

A R

M R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N

A R

E A

C

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S O

N

J A

N D

E R

S O

N

-0

-2

PRELIMINARY NOT FOR CONSTRUCTION

C O

N S

O L

ID

A

T E

D O

P E

R A

T

IO

N S

A N

D M

A

IN

T E

N A

N C

E H

A N

G A

R

C O

M H

SCALE: = 1'-0"

0 8 168

1/8"

N

KEY PLAN

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C

C

45cd

C

30cd

C

15cd

C

15cd

30cd

C

30cd

C

15cd

C

15cd

C

30cd

C

30cd

C

15cd

C

15cd

C

15cd, WP

C

15cd, WP

S

C

15cd

C

15cd

C

30cd

C

30cd

C

30cd

C

30cd

C

15cd

S

LOC

C

45cd

B

P

C

15cd

P

F O

F O

C

15cd

P

S

C

S

C

A A

C

30cd

S

S

S

P

C

30cd

S W

P

S WP

A

B

8761 2 3 4 5

C

F

D

E

G

MATCHLINE

SEE A1/FA101C

M A

T C

H

LI

N E

S E

E A

1/ F

A

1A

M A

T C

H

LI

N E

S E

E A

1/ F

A

1A

MATCHLINE

SEE A1/FA101C

T E

X T

TEXT

TEXT

SS

JAN

VESTIBULE/ AIR

SHOWER

CORRIDOR

CORRIDOR

ADMIN

OIL LAB

VESTIBULE

MALE SHOWERS

OFFICE

FEMALE RESTROOM/

LOCKERS

FEMALE SHOWERS

CLASSROOM/BRIEF

MALE RESTROOM

LOCKER ROOM

COMM

LOCKERS/ STORAGE

BREAKROOM

TOOL ROOM

WORK SPACE

MENS RESTROOM

WOMENS RESTROOM

HAZMAT STORAGE

ADMIN

CORRIDOR

STAIRS

S2

CONTROL ROOM

PRIMARY INSPECTION

AREA

ELEVATOR

EL01

VESTIBULE

ELECTRICAL

HANGAR

SS

C C

C C

TS WF

RM

MM

TS

SHEET NOTES:

X3301 TRIPLE INFRARED TYPE OPTICAL DETECTION WITH 5 FT. OF FLEXIBLE

CONDUIT TO ALLOW FOR MINOR ADJUSTMENTS. MOUNT DETECTOR AT 8 FEET ABOVE

FLOOR. ANGLE DETECTORS AND PROVIDE BLINDS SO THE CONE-OF-VISION IS CONTAINED

WITHIN DESIGNATED SUPPRESSION ZONE. EACH FLAME DETECTOR TO HAVE HIGH

CONTRAST MARKING ON ALL COLLAR AND BRACKET ADJUSTMENTS TO INDICATE FINAL

ORIENTATION.

ROTATING BLUE BEACONS POWERED BY 120VAC DEDICATED FEED. (RSFACU) TO ACTIVATE

BLUE BEACONS. MOUNT BEACON AT 20 FEET ABOVE FLOOR, WHERE POSSIBLE. PROVIDE A

SIGN NEXT TO EACH BLUE BEACON WITH A YELLOW OR LIME YELLOW BACKGROUND

MATCHING THE MANUAL FOAM RELEASING STATION SIGNAGE, WITH "FOAM RELEASE WHEN

ILLUMINATED" IN RED LETTERING NOT LESS THAN 3" HIGH. SEE SHEET FA501 FOR SIGNAGE

DETAILS.

PROVIDE DISTINCTIVELY DIFFERENT NEMA 250 TYPE 4 MANUAL FOAM RELEASING STATIONS

AND SIGNAGE FROM THE MANUAL FIRE ALARM PULL

STATIONS. PROVIDE TAMPER COVER WITH COLORED PORTIONS IN YELLOW AND LETTERING

ON THE COVER READING "FOAM." PROVIDE LOCKING TYPE MANUAL FOAM RELEASING

STATIONS THAT REQUIRE A KEY TO BE RESET. MOUNT STATION AT LEAST 5 FEET FROM

FIRE ALARM MANUAL PULL STATION, ON THE OPPOSITE SIDE OF THE DOOR WHERE

POSSIBLE. PROVIDE A CLEAR PLASTIC TAMPER COVER OVER RELEASING STATION. BRING

CONDUITS INTO THE BOTTOM OF THE DEVICE. PROVIDE SIGNAGE WITH YELLOW

BACKGROUND WITH 'START FOAM SYSTEM' IN RED LETTERING NOT LESS THAN 3" HIGH. SEE

SHEET FA501 FOR SIGNAGE DETAILS.

4 PROVIDE NEMA 250 TYPE 4 'DEAD-MAN' TYPE MANUAL STOP STATIONS AT EACH MANUAL

FOAM RELEASING STATION. BRING CONDUITS INTO THE BOTTOM OF THE DEVICE. PROVIDE

MANUAL FOAM STOP STATIONS WITH DISTINCTIVE SIGNAGE AT EACH DEVICE. PROVIDE A

RED MUSHROOM TYPE PUSH BUTTON AND INCLUDE THE WORD 'PUSH'. PROVIDE THE

COLORED PORTIONS OF THE TAMPER COVER IN BLUE AND LETTERING ON THE COVER

STATING 'STOP'. PROVIDE SIGNAGE WITH WHITE BACKGROUND AND A MINIMUM 1/2" WIDE

BLUE BORDER WITH 'STOP FOAM SYSTEM' IN BLUE LETTERING NOT LESS THAN 3" TALL

PLACED DIRECTLY ABOVE FOAM STOP STATION. SEE SHEET FA501 FOR SIGNAGE DETAILS.

5 CONNECT ELEVATOR CONTROL ROOM ISOLATION VALVE, TAMPER, AND WATERFLOW

SWITCHES TO FIRE ALARM SYSTEM. WATERFLOW SWITCH SHALL HAVE NO TIME DELAY

CAPABILITY. ACTUATION OF THE FLOW SWITCH SHALL REMOVE POWER TO THE ELEVATOR

VIA DIRECT CONNECTION TO A SHUNT TRIP BREAKER.

6 PROVIDE MONITOR MODULES AND CONTROL RELAYS AS REQUIRED FOR ELEVATOR

OPERATIONS.

7 CONNECT ELEVATOR PIT VALVE TAMPER SWITCH TO FIRE ALARM SYSTEM.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

R H

A M

M E

T T

N A

O F

IL

E

N O

B

BIM 360://3012011031_F22 CONSOLIDATED OPS MAINT HANGAR COMH/3012011031_COMH_FP_R19.rvt

12/31/2020 7:26:24 AM

FA101D

F

IR

S T

F L

O O

R F

IR

E

A L

A R

M R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N

A R

E A

D

F Y

F

-2 F

O R

M A

L T

R A

IN

IN

G U

N

IT

F

T U

W

M

E Y

R

IN

G

L

IV

E R

S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .