UFGS_23_82_46.00_40_Electric_Unit_Heaters_-_UFGS_23_82_46.pdf
PDF 46 KB Posted
- Attached to
- Fort Benning MATOC
- Solicitation number
- W911SF-18-R-0022
About this file
This solicitation is for an indefinite delivery/indefinite quantity contract to provide construction and repair services at Fort Benning, Georgia. The contract will have a one year base period and four one-year options, with a minimum guarantee of $5,000 and maximum task order of $5,000,000. Services include construction, repair, maintenance, and related work at Fort Benning and its satellite sites. The solicitation sets aside this procurement entirely for small businesses. The NAICS code is 236220 and size standard is $36.5 million. The solicitation will be available on January 28, 2019 with proposals due February 28, 2019. The point of contact is provided for any questions.
View the file
Other files
Show 40 more
Latest 50 of 138 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 23 82 46.00 40 Page 1
SECTION 23 82 46.00 40
ELECTRIC UNIT HEATERS
08/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced . The publications are referred to within the text by the basic designation only.
UNDERWRITERS LABORATORIES (UL)
UL 1996 (2009; Reprint Jul 2016) UL Standard for Safety Electric Duct Heaters
1.2 ADM INISTRATIVE REQUIREMENTS
1.2.l Pre-Installation Meetings
The Contracting Officer will schedule a pre-installation meeting within 30 days of Contract Award.
a. Submit fabrication drawings for electric heaters indicating the of fabrication and assembly details to be performed in the factory.
b. Submit equipment and performance data for electric heaters life, test, system functional flows, safety features, and mechanical automated details.
c. Submit manufacturer's instructions for electric heaters stating the special provisions required to install equipment components and system packages. Detail impedances, hazards and safety precautions within the special notices.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00, SUBM ITTAL PROCEDURES :
Product Data
Equipment and Performance Data; G
Electric Unit Heaters ; G
Controls; G
Casings; G
Propellers and Motors ; G
SECTION 23 82 46.00 40 Page 2
SD-08 Manufacturer's Instructions
Manufacturer's Instructions; G
PART 2 PRODUCTS
2 .1 SYSTEM DESCRIPTION
Provide suspended electric unit heaters and arrange for discharge of air as indicated
Provide electric unit heaters with not less than the indicated capacity and conform to requirements specified herein. Ensure electric unit heaters are factory prewired, ready for field terminal connections.
Ensure products conform to the requirements of UL 1996 for electric unit heaters.
2 .2 COMPONENTS
2 .2.1 Heating Element
Construct heating element of a resistance wire insulated by highly compacted refractory insulation protected by a sealed metallic-finned sheath. Component materials are as follows:
a. Provide resistance wire not less than 20-helix wound alloy approximately 80-percent nickel and 20-percent chromium.
. Provide refractory insulation of magnesium oxide with a resistance of not less than 50,000-ohms after exposure to an ambient temperature and humidity of 32 degrees C 90 degrees F and 85 plus or minus 5-percent relative humidity, respectively, for not less than 24 hours.
c. Provide sheathing consisting of aluminum fins cast around an internal steel sheath containing refractory insulation and resistance wire or carbon-steel fins permanently attached to a tubular carbon-steel sheath containing refractory insulation and resistance wire and with external surfaces porcelainized.
Ensure maximum surface temperature of porcelain-protected steel sheathing is 700 degrees F.
Ensure maximum surface temperature of cast-aluminum sheathing is 500 degrees F.
2.2.2 Controls
Provide wall-mounted thermostats complete with thermometer, mechanical high-limit stop, calibrated operator, and an adjustable heater to effect anticipation and to prevent override of space temperature with a range between 12 and 41 degrees C 55 and 105 degrees F and a differential not exceeding l degrees C 1.5 degrees F. Provide thermostat rated for operation at 24 volts, 60 hertz. Provide transformers, wiring, and devices necessary to meet this requirement. Finish cases in brushed or satin chrome.
SECTION 23 82 46.00 40 Page 3
2 .2.3 Propellers and Motors
Provide propellers with all-aluminum blades statically and dynamically balanced to within 0.5 percent. Provide units with fan-inlet safety guards.
AMCA certify propellers and motors for air performance and noise level.
Protect motors against damage by the heating element and resilient mount.
Conform to Section 26 60 13.00 40 LOW-VOLTAGE MOTORS for motors, except that load-matched and custom-designed motors may be used and be so identified on the shop drawings. For motors not so identified conform to the requirements specified.
Subfractional and fractional custom-designed or applied motors may deviate from the preced ing motor requirements as follows:
a. Shaded-pole motors rated less than 125 watt 1/6-horsepower may be used for direct-drive service.
b. Permanent split-capacitor, split-phase, and capacitor-start motors rated 185 watt 1/4-horsepower and less may be used for direct-drive service.
c. Split-phase and capacitor-start motors, rated 185 watt 1/4-horsepower and less, may be used for belt-drive service.
d. Motor bearings may be manufacturer's standard prelubricated sleeve type except provide motor with antifriction thrust bearings, when specified. Ensure lubricant provisions are extended service type, requiring replenishment not more than twice per year of continuous operation.
Provide motor identification plate per manufacturer's standard.
Provide motor speed and control per unit-heater manufacturer's standard.
PART 3 EXECUTION
3.1 INSTALLATION
Install unit heaters in accordance with the manufacturer's instructions at the mounting heights indicated.
3.1.l Casings
Provide casings with smoothly contoured propeller orifice rings of not less than 1.0 millimeter 20-gage cold-rolled carbon steel. Provide casing surface finish with phosphate pretreatment, prime coating, and baked-enamel finish.
3.1.2 Air Distribution
Fit vertical discharge units with louver-cone diffusers.
Provide horizontal units with adjustable single- or double-deflection louvers.
SECTION 23 82 46.00 40 Page 4
3.2 FIELD QUALITY CONTROL
Demonstrate in the presence of the Contracting Officer that the unit heaters operate satisfactorily.
Cycle unit heaters five times, from start to operating thermal conditions to off, to verify adequacy of construction, system controls, and component performance.
Conduct an operational test for a minimum of 6 hours.
File details come from the government source that posted it. Updated .