This document provides requirements for an Indefinite Delivery/Indefinite Quantity construction contract opportunity at Fort Benning, Georgia. The U.S. Army Mission and Installation Command intends to award multiple IDIQ contracts between $5,000 and $5,000,000 to provide construction and repair services at Fort Benning and related sites for one five-year ordering period. Services include site work, construction, repairs, planning, reporting, and recordkeeping. The 100% small business set-aside solicitation will be available on January 28, 2019 with proposals due February 28, 2019. Interested parties should monitor the FedBizOpps website for additional details. The minimum guarantee is $5,000 and the minimum task order is $2,000.
FB Fire Protection Requirements
View the file
Other files
Show 40 more
Latest 50 of 138 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
ATLANTIC REGION
DIRECTORATE OF EMERGENCY SERVICES
FORT BENNING, GEORGIA 31905
IMBE-ESF 1 December 2016
MEMORANDUM FOR RECORD U.S. Army Corps of Engineers, Directorate of Family and
Morale, Welfare and Recreation, Directorate of Public Works, Army and Air Force Exchange
Service, and all Construction Contractors
SUBJECT: Fort Benning Installation Specific Fire Protection Requirements
1. Effective 1 December 2016, the Fort Benning Installation Specific Fire Protection Requirements
Report will be implemented. The report is designed to give engineers, designers, and others within the process specific guidance involving Fort Benning’s design and construction processes while incorporating the Directorate of Emergency Services, National Fire Protection Association and applicable Unified Facilities Criteria and national fire protection and life safety requirements.
2. The report shall apply to the following projects:
a. All new construction projects.
b. Projects that do not qualify as new construction as defined by Unified Facilities Criteria 03-
600-0.
c. Any construction projected that has been awarded prior to the effective date.
3. If you have any questions or comments, please contact Assistant Chief of Fire Prevention Steven
Lowell at steven.d.lowell.civ@mail.mil or 706-545-0283.
TIMOTHY J. SEIGAL, Sr., EFO, Directorate of Emergency Services
Fire Chief mailto:steven.d.lowell.civ@mail.mil
Fort Benning Fire Protection Supplement 1 May 2010
Change 2, 1 April 2015 Change 3, 1 December 2016
ATTACHMENT 1
1. Requirements/Compliance:
a. This Fort Benning Fire Protection Supplement shall be distributed to all General Contractors
(GC) and may be distributed to other entities as needed. It shall be onsite for reference to the GC and any said Sub-Contractor during all phases of construction.
b. Drawing submittals shall be delivered to the Recipient: Fort Benning Fire Prevention
Division; ATTN: Lead Inspector’s Office; 7180 Yeager Ave, Fort Benning, GA 31905. DES-FP will review drawings 14 days from the date received to the Lead Inspector’s office. Projects submitted with a suspense date(s) will be considered however, no comments provided does not relieve the contractor from complying with the contracting documents and applicable codes and standards. Comments submitted after the requested suspense date shall be corrected to the applicable codes and standards.
c. Required Drawings: 1 Large Full Set (Hard Copy); Scope of Work to include Project Manuals and/or equipment (Hard Copy); 1 Copy to a Disk with all required information.
d. Features in excess of the requirements of UFC 03-600-01 must be approved by the
Designated Fire Protection Engineer (DFPE) and where the IBC references the International Fire
Code (IFC), the IFC must be replaced with NFPA 1, except where superseded by 03-600-01. Plans not having the appropriate seal will not be reviewed by the Directorate of Emergency Services Fire
Prevention Division (DES-FP).
i. Leased facilities, UFC 03-600-01 must apply, unless it is determined by the DFPE it is not in the best interest of DoD. For conflicts between this UFC and the local municipal jurisdiction, the DFPE must be consulted.
ii. Where criteria are not included in UFC 03-600-01, fire protection criteria must conform to the requirements of the latest editions of the National Fire Codes. Where criteria are not available from the National Fire Codes, a fire protection design analysis must be submitted to the DFPE for approval.
e. All Major Projects require the design, review and oversight services of a QFPE. A QFPE must be involved in every aspect of the design, construction and testing/commissioning as it relates to fire protection and life safety. This includes, but is not limited to, building code analysis, life safety code analysis, design of automatic fire alarm, detection and suppression systems, water supply analysis, a multi-discipline review of the entire project, construction inspections and witnessing of fire protection acceptance testing/commissioning. This requirement is applicable to engineering services for design-bid-build projects as well as all phases of design-build projects including RFP development, design development, and construction.
Change 2, 1 April 2015
f. Army requires construction (shop) drawings and calculations must be prepared by, or prepared under the immediate supervision, of the QFPE. The QFPE must affix their professional engineering stamp with signature to the shop drawings, calculations and material data sheets, indicating approval prior to submitting the fire alarm system shop drawings to the DFPE. The
QFPE must monitor the installation of the fire alarm system and certify in writing that the fire alarm system has been constructed and operates as intended in the design plans and specifications.
ii. A registered P.E. in a related engineering discipline with a minimum of 5 years’ experience, dedicated to fire protection engineering and shall be verified with documentation.
g. Upon request, the QFPE shall submit, upon request, a written copy of their resume indicating education, professional registration and work experience, along with a letter attesting to their compliance with the requirements of this Section. The letter must include an imprint of their professional engineering stamp with signature.
h. A fire protection design analysis and life safety plans must be provided for all Major Projects and must address the fire protection requirements of the project as required by UFC 03-600-01.
The fire protection design analysis and life safety plans must be submitted with the initial design submission, separate from other disciplines. The final design analysis and life safety plans must be signed and sealed by the QFPE.
i. The QFPE must review the complete 100 percent design drawings and specification submission (all disciplines) and document in writing that the design is in compliance with this
UFC and all applicable fire protection and life safety design criteria. The review must provide verification that all items listed in the design analysis are correctly shown on the drawings and in the specification and list any approved equivalencies or deviations from this UFC. This design compliance document must be submitted with the final design submission as part of the design analysis and must bear the signature and professional seal of the QFPE.
j. A copy of the buildings as-build’s will be submitted on a CD/thumb drive to DES-FP to cover at a minimum of the floor plan, fire protection plan, and fire alarm system.
k. During construction the contractor shall maintain compliance with all listed safety codes to include National Fire Protection Association (NFPA) 241 and USACOE EM 385-1-1 under the most current edition.
l. Hot Work Permits are required for any operations for which work is being accomplished IAW
NFPA 51B.
i. Request for hot work permits shall be coordinated with the Lead Inspectors office prior to any hot work operation. Due to scheduling and mission requirements, it is recommended initial permits be requested 7 business days prior to work start.
Change 2, 1 April 2015
ii. Permits may be provided in 90 day increments depending on user compliance and safety status. Permits may be revoked for violations of codes/standards, disregard of safety requirements, and/or improper or non-issue of hot work permits.
iii. See Attachment 1A for contractor/requestor responsibilities.
2. KNOX Box:
a. KNOX boxes shall be required on all facilities.
b. KNOX boxes shall be located 4ft.-5ft. from final grade, within 5ft. of linear distance from the main entrance. If the facility has no main entrance the fire department will determine the location of the KNOX box.
c. KNOX boxes shall be a 4500 series, recessed or flushed mounted, and can be monitored by the security system, if required. The 4500 series shall activate a shunt to disconnect all power to the facility to include but not limited to any additional power sources. i.e. Solar Panels/Wind
Turbine(s).
d. KNOX boxes shall be black in color. Any changes of color shall be coordinated and approved by the DES-FP prior to purchase/install.
3. Emergency Response Access:
a. If electric gates are provided on an emergency access road, a siren activator device shall be provided to automatically open the gate for emergency vehicles. The gate shall have a power source provided for a minimum of 24 hours in the event of power loss or fail with the motor in a neutral position.
b. If provided, curbs shall be the roll on type access to the fire department access road.
c. All emergency access lane entrances shall be striped in red to include painting the curb and white lettering stating “fire lane, no parking”.
d. Emergency access lanes shall be a minimum of 20ft. wide and support 83,500lbs. All
Facilities greater than 5,000 ft2 (465 m2), or more than two stories in height, must have at least one means of all-weather ground access to allow emergency vehicles unimpeded access to the facility. All-weather ground access must be paved, start from the road, and terminate no farther than 33 feet (10 m) from an exterior door accessible for fire department ingress (i.e. a stair door or some other exterior door that provides access to the Facility interior). The route between the access surface and exterior door must be able to be traversed without the use of a ladder. An engineered all-weather surface that is not paved may be provided if approved by the DFPE.
e. All new facilities four stories or more in height and all new warehouses shall have a minimum of a 26ft. wide fire lane and must be provided with suitable all-weather ground access for aerial
Change 2, 1 April 2015 apparatus on a minimum of two sides of the perimeter of the structure. The access must be parallel to at least one entire side of the Facility with windows to allow aerial access to the entire side. The distance between the aerial apparatus access and the Facility must be based on the responding aerial apparatus and Facility height and be approved by the DFPE.
f. Fire department access, as required per the UFC 3-600-01, shall be provided from the corner to corner of the structure. **
** Special consideration shall be taken into account for facilities that do not meet the requirements four stories or more than height, but have complex layout or a long length of that is not accessible from the emergency access road.
4. Fire Hydrants:
a. Fire hydrants shall be installed 18in. from center nut of main discharge from final grade.
b. Fire hydrants installed near roadways shall have a DOT listed blue roadway indication marker at the center line of the road.
c. Fire hydrants install near roadways or parking areas shall have a 20ft. red line painted on the curb to indicate a dedicated “no parking area”. The line shall be centered at the 10ft. mark in front of the hydrant.
d. Fire hydrants shall be protected in areas that can be prone to vehicle access. If bollards are used they shall be at least 3ft. in distance from the center of the hydrant and cannot block the discharges of the fire hydrant.
e. Fire hydrant bonnet and cap color shall be in accordance with NFPA 291, Fire Flow and
Marking of Hydrants, based on flow capacity.
5. Electrical:
a. Emergency lighting shall be provided in all mechanical, electrical, and communication rooms greater than 100 sq ft.
b. All emergency lighting and exit sign devices shall be self-diagnosing to identify a fault with the fixture.
6. Suppression System:
a. A Class 1 standpipe shall be required if the facility is taller than four stories or more in height or if from any entrance of the facility to the most remote point is greater than 200 ft.**.
** The distance is reduced to 150 ft. for unsprinkled structures.
Change 2, 1 April 2015
b. The fire department will not use fire department apparatus to boost pressure in standpipe systems.
c. Structures containing three or more sprinkler zones shall have isolation valves allowing only one zone to be turned off while maintaining the other zones operational.
d. All suppression systems using a clean agent system shall have a notification device located on the outside of the structure that will activate only when the system is discharged.
e. The bell type for all sprinkler systems shall be electric unless otherwise noted by the installation fire department.
f. Fully concealed sprinkler heads shall be required in any open bay, recruit barracks.
g. Any sprinkler head located lower than 7ft., can be prone to mechanical damage, or can be grabbed by a hand shall be caged or fully recessed.
h. Sprinkler heads will be required to be installed in full prior to requesting a hydrostatic pressure test.
i. Wet systems shall require an air venting IAW NFPA 13, 2016 Edition, Paragraph 7.1.5.
7. Fire Department Connection (FDC):
a. A red collar shall be used to identify the fire department connection.
b. When the fire department connection is not located on the front of the building, signs shall indicate in which direction the FDC is located. The sign shall be white with red lettering. The lettering shall be a minimum of 3in. in height. The FDC shall be 18in.-36in. from final grade and cannot be obstructed by landscaping.
c. No landscaping shall be installed in front of the FDC that can grow taller than 18in.
d. Nothing shall be installed within 18in. linear of either side of the FDC.
e. Test headers/wall hydrants shall be tested at the sprinkler final to verify the required GPM shown on the sprinkler density plate is met.
f. When a FDC is installed in front of a parking area, a 10ft. (linear length) wide red stripe will be painted identifying “NO PARKING”.
g. If system pressure is greater than 150psi, sign shall be installed at the location of the FDC to indicate the pressure required at the inlets.
Change 2, 1 April 2015
8. Fire Alarm/Mass Notification Systems (FA/MNS) (See Attachment 1E FAS/MNS Tones):
a. Fire alarm wiring shall be Class X with a single fault on a pathway connected to the addressable devices shall not cause the loss of more than 50 addressable devices and if less than
50 no more than one half (½) of the addressable devices shall not be loss with IP communication.
(Example: 30 addressable devices; no more than 15)
b. All fire alarm systems shall be UL 864, current edition compliant. All MNS shall be
Underwriters Laboratory (UL) 2572 compliant.
c. Secondary Power shall be 48 hours for all systems to include all associated appliances and devices.
d. At final inspection, the installer/contractor shall show documentation of speech intelligibility of IAW NFPA 72.
e. Carbon monoxide detection shall be installed to provide coverage in all facilities that are serviced by natural gas, propane, or any other combustible gases or liquids.
f. All detection devices shall be required to pull their back-up power from the FA/MNS system.
No 9 (nine) volt batteries shall be permitted.
e. All barracks/living quarters that have a stove installed shall have a heat detector installed above the cooking area IAW NFPA. The heat detector shall activate the fire alarm system (in an alarm condition) and activate all devices in the suite.
g. All local operating consoles (LOC) shall be installed at the same height as a manual pull station.
h. In fully sprinkled facilities, at a minimum, pull stations shall be installed at all ground level exits.
i. The MNS shall be required to transmit a trouble, supervisory, and alarm functions to Fort
Benning Central Station while meeting the requirements of NFPA 72. All messages shall be point addressable regardless how activated. (Example: If the chemical button is pushed, it shall transmit an identification of chemical button active and LOC location to the central receiving station)
j. Text signs for the MNS shall be provided in all public accessible facilities that have an occupancy load equal to or greater than 300 people.
k. FA/MNS shall transmit through the use of an IP transmitter in combination with or without a DACT communicator. DSC TL300CF is a compatible transmitter, but any IP transmitter that is compatible with a DSC Sur-Gard III IP receiver shall be permitted.
Change 2, 1 April 2015
l. During the activation of the FA, the MNS system shall override the FA. The FA notification devices will shut off and the MNS notification devices shall activate. All prerecorded message shall automatically shut off at 10 minutes. At the end of 10 minutes the MNS devices shall shut off and the FA notification devices shall reactivate.
EXCEPTION: The circuit labeled “fire panel” does not time out at ten minutes if used as the part of the fire alarm system.
m. All strobes shall be marked with the word “ALERT” on the device, the lens CLEAR and the faceplate shall be red/white in color.
n. Device priorities shall be as follows: MNS main panel MIC, LOCs, MNS main panel prerecorded messages circuits 1-8 with circuit 1 with the highest priority going to circuit 9, fire alarm system, carbon monoxide, and finally general PA system.
o. MNS messages shall be listed in the priority shown below verbatim.
i. Chemical- May I have you attention please. There has been a chemical incident on Fort
Benning. Stay inside buildings and close windows and doors unless advised by authorities to evacuate. Please shutdown your HVAC system. Stay inside buildings and close windows and doors unless advised by authorities to evacuate area. Please shutdown your HVAC system.
ii. Bomb- May I have your attention please. There has been a bomb threat in your area. Please evacuate in an orderly fashion to your rally point. I repeat, there is a bomb threat in your area.
Please evacuate in an orderly fashion to your rally point.
iii. Intruder- May I have your attention please. There is an intruder in your area. Please lock all windows and doors immediately. Only admit authorized personnel. Attention. There is an intruder in your area. Please lock all windows and doors immediately. Only admit authorized personnel.
iv. Severe Weather- May I have your attention please. A severe weather warning has been issued for area. Seek shelter immediately.
v. Secondary Egress- May I have your attention please. An emergency has been reported in the facility. Please exit the facility through the secondary exits. Please do not use the main entrance.
vi. Fire Panel- May I have your attention please. A fire emergency has been reported in the facility. While this is being verified, please leave the building by the nearest exit and report to your rally point. ** Please do not use the elevator
**For structures with elevators
Change 2, 1 April 2015
vii. Test- May I have you attention please. This is a test. This is a test of the emergency warning system. This is only a test. This is a test. This is a test of the emergency warning system.
This is only a test.
viii. All Clear- May I have your attention please. All clear, the emergency is over. I repeat, all clear, the emergency is over. Resume your normal duties.
ix. Carbon Monoxide- May I have your attention please. An elevated level of carbon monoxide has been detected in the building. While this is being verified please leave the building by the nearest exit. (alert conditions)
p. MNS LOCs installed in areas that are open to the public shall have unrestricted access to the
LOC. They shall not be secured and/or require the use of a key or special device to access the
LOC.
q. If a remote fire alarm panel (remote annunciator) is provided in the structure, a LOC shall be provided next to the remote fire alarm panel.
r. All LOCs that are not easily identifiable shall be labeled on the front of the LOC cabinet in a minimum of 1in. lettering, in contrasting color.
s. A LOC shall be located on each floor and at any time where the travel distance is greater than
200’ from the closest LOC.
t. All conduit, junction/back boxes, covers and couplings, when provided, must be factory painted red in unfinished areas (e.g., above ceilings, mechanical rooms, etc.). All conduit, junction/back boxes, covers and couplings, when provided, are permitted to be painted to match the room finishing in finished areas. The inside cover of the junction box must be identified as
"Fire Alarm" and the conduit must have painted red bands 3/4-in. (20 mm) wide at 20 feet (6 m) intervals and on both sides of all floor, wall, and ceiling penetrations. The piping can match the color of the wall when exposed from floor level.
u. All pull stations located in areas designed for children (example: child development centers, schools) shall have pull station covers installed.
v. MNS announcements shall be provided inside all occupiable spaces to include, but not limited to, the elevator, mechanical, POL storage, or other areas determined by the AHJ.
w. Each mass notification system shall be provided with a radio receiver that is compatible with the installation’s Wheleln giant voice system to receive messages.
Change 2, 1 April 2015
9. Fire Signage:
a. Fire evacuation plans shall be posted at each entrance/exit and at each doorway leading into the stairwell.
b. Any stairwell that leads to roof access will be identified on the fire evacuation plan and in the stairwell on each landing.
c. For all structures with assembly areas or classified as assembly an occupancy load sign indicating the maximum occupancy for that area shall be provided at the main entrance.
d. Any room containing the fire alarm control panel (FACP) shall have signage on the door indicating FACP. The sign shall be in contrasting color (example: red/white) with 2in. lettering.
e. Any single room that contains roof access shall have signage indicating roof access. The sign shall be in contrasting color (example: red/white) with 2in. lettering.
10. Fire Rated Areas:
a. Fire rated areas shall be identified on the wall listing what type of wall it is and the hour rating of the wall. (Example: 1 Hr. Fire Barrier)
b. Fire Caulk shall be either red or yellow in color and shall be installed in accordance with the manufacture’s listed detail.
11. Fire Rated Doors:
a. Fire rated roll-up doors shall be integrated into the fire alarm system. Upon activation of the fire alarm system, all fire rated roll-up doors shall close. Detection devices shall be installed in accordance with NFPA. Roll down doors shall not gravity drop, but have resistance as to not to injure anyone.
b. All rated doors in the path of egress shall be equipped with magnet locks to hold to doors open during normal operation. Upon activation of the fire alarm system, all rated doors shall close.
Detection devices shall be installed in accordance with NFPA 72, National Fire Alarm and
Signaling Code.
c. All fire rated doors shall that are in the path of egress that are normally closed shall have signage identified as “fire door keep closed”.
12. Fire Extinguishers:
a. If the structure is classified as a “hotel or dormitory” by NFPA and is fully sprinkled, fire extinguishers are not required IAW NFPA 101.
Change 2, 1 April 2015
b. Fire extinguishers for all sprinkled structures shall be a minimum of a 5lb 3A:40B:C rated multi-purpose fire extinguisher.
c. Fire extinguishers for all unsprinkled structures shall be a minimum of a 10lb 4A: 80B:C rated multi-purpose fire extinguisher.
d. A Class “D” dry powder fire extinguisher shall be provided for all metal shops and areas with combustible metal.
e. A Class “K” Wet-Chem fire extinguisher shall be required in commercial kitchens IAW
NFPA 10. This does not waive the requirement for an ABC fire extinguisher.
f. All fire extinguishers located in a fire extinguisher cabinet shall be labeled with a fire extinguisher sticker and/or label.
g. Fire extinguisher cabinets shall be provided in all finished areas and fire extinguisher brackets shall be provided for all unfinished areas.
13. Elevators:
a. At least one elevator shall be designed to hold a stretcher and compartment size shall not be less than 7ft. 8in. Each lobby door shall have a 2in. minimum sized “Star of Life” sticker installed.
b. Before use of any elevator, an inspection certification issued by the State of Georgia or approved third party inspector shall be required regardless of use.
14. Authority Having Jurisdiction (AHJ) and Final Inspection Requirements:
a. Fort Benning Fire Prevention Division represents the Assistant Chief of Staff for Installation
Management (Army Fire Chief) with regards to plans reviews, inspections, and code compliance.
b. The Army Fire Chief is the ONLY AHJ for the United States Army for all waivers and/or variances of any codes and standards relating to fire and life safety. (See Attachment 1D) All requests shall be sent to the DES-FB (Assistant Chief of Fire Prevention) Requests will be vetted through the Installation Fire Chief, DES Director, to the Garrison Commander and/or their designated representative.
c. Requests for any construction/final inspection (Except Hot Work Permits) must be requested from the USACE, DPW, AAFES, and/or MWR project managers/inspectors. NO appointment will be granted to any GC or Sub-Contractor.
Change 2, 1 April 2015
d. Prior to requesting a final inspection from the Fire Prevention Division, an inspection shall be completed by USACE, DPW, AAFES, and/or MWR assigned project manager or Quality
Assurance (QA) inspector(s).
i. Sprinkler Tests – Witnessed pre-test shall be accomplished by the above agency project inspector and/or designated representative from the assigned agency for QA. Method of inspection used shall ensure that the requirements of NFPA 13 are met prior to scheduling a final with Fire
Prevention Division.
ii. FAS/MNS – Witnessed pre-test shall be accomplished by the above agency project inspector and/or designated representative from the assigned agency for QA and coordinated with
Tiya Support Services. Method of inspection used shall ensure that the requirements of NFPA 72 are met and template accurately loaded in the MAS prior to scheduling a final with Fire Prevention
Division.
e. Construction and Final Inspections are on a first come first serve basis. It is not the responsibility of the Fire Prevention Division to prioritize inspections with regards to outer agency priorities.
f. During any inspection, if any portion of the construction/final inspection(s) fails it should be assumed the contractor is NOT ready for inspection, and discontinue the inspection. At the discretion of the fire inspector, inspectors may use their professional judgement if items are easily correctable and whether to continue the inspection. Re-inspections will be based on the availability of manpower and time.
g. Final inspections for both fire alarms and sprinklers require the installing contractor to be on-site for all initial and re-inspections. It is the responsibility of the QA or designated representative to ensure all parties required for a final are scheduled and coordinated for said inspection(s).
(Example: Fire Alarm acceptance requires, Fire, Tiya (Alarm Shop and MAS Technician), QA, GC, and Sub-Contractor). See Attachments B and C for further guidance.
Change 2, 1 April 2015
ATTACHMENT 1A
HOT WORK COMPLIANCE AND ISSUANCE
A daily hot work permit must be issued by the receiving official of this inspection report or by a designated supervisor overseeing the work being completed. This person must be appointed on paper and a copy must be available to any fire inspector upon request.
(DESIGNATED PERSON’S) is the supervising official and will perform all pre/post hot work operations as required or any other supervisor (appointed in writing). Personnel requesting permit are not authorized to conduct ANY portion of the pre/post operation(s).
(COMPANY) shall document in writing personnel who are authorized to issue said permits and/or supervisory personnel for whom will be authorized to conduct pre and post operation(s) fire prevention and safety checks. Furthermore, it is the understanding of (COMPANY), personnel doing said hot work are not authorized to perform and/or sign off on any portion of the issued hot work permit with regards to pre and post operational safety checks at the end of the working day.
(COMPANY) will develop and implement a hot work permit with all required information as outlined on DA Form 5383 specifically for (COMPANY) and understand hot work permit(s) is
ONLY to be used for (COMPANY). Hot work permit number issued by the Fire and Emergency
Services Fire Prevention Division will be on all issued permits followed by a sequential number followed there after (Example 12345-1). Records of issued permits must be maintained on file and available for review or inspection at any time during and/or after issued permit date(s).
It is the understanding of (COMPANY) and Fort Benning Fire Prevention Division, any failure to meet the required referenced standards, codes, and/or regulations with regards to hot work operations could result in loss of permit and work stoppage.
Please sign and maintain a copy of this inspection report for your records. Failure to sign makes your hot work permit void. Your permit expires on (DATE) and it is your responsibility to contact
Fort Benning Fire Prevention office to renew your permit. Any questions please feel free to contact the issuing fire inspector.
Change 2, 1 April 2015
ATTACMENT 1B
FIRE ALARM ACCEPTANCE CHECKLIST
Instructions:
Inspectors are expected to check each of the items listed on the attached sheet during a fire alarm final inspection. This is not a complete list of all potential items, but a guideline to ensure that all inspectors observe certain minimum tests and to provide consistency. Inspectors can and should request additional tests as appropriate for unique or unusual systems. Any listed item not checked by the inspector shall be documented and explained on the inspection form, unless it is not applicable to the particular system.
The fire alarm technician should have already tested and verified the complete installation of the system, witnessed by a government representative. He/she should be ready to test any and all parts of the alarm system upon request per Unified Facilities Code (UFC) 03-600-01/04-021-01; National Fire Protection
Association (NFPA) Standard 72.
The tests witnessed by Fort Benning Fire Department inspectors are intended to verify that the alarm contractor has installed and tested the system IAW all UFC/NFPA codes and standards. It is the function of the fire alarm contractor to certify the system has been installed, tested, and is working as designed.
Therefore, if any portion or device in the system fails during the inspection you should assume the contractor is NOT ready for inspection, and discontinue the inspection. At the discretion of the fire inspector, inspectors may use their professional judgement if items are easily correctable.
It is not the function of the inspectors to provide a “punch list” of deficiencies for the contractor. If the system fails to meet all requirements at the time of the inspection the contractor should be advised to reschedule when defects have been corrected. Re-inspection will consist of a full inspection, not just a checks of deficiencies listed previously.
NOTE: If applicable, automatic fire suppression system alarm-initiating devices and supervisory signal-initiating devices shall be installed per NFPA 25 and are normally tested during the fire sprinkler final.
NOTE: If applicable, automatic fire pumps shall be supervised per NFPA 20 and are normally tested during the fire pump final.
NOTE: If applicable, fire suppression systems used for the removal of smoke & grease laden vapors from commercial cooking equipment shall be installed per NFPA 96 and are normally tested during the hood system final.
This checklist is a basis line for inspection thus does not relieve the contractor from complying with the contracting documents and applicable codes and standards.
Fire Inspector:___________________________ Date:_______________________
Alarm Shop Representative:____________________________________________
Facility Number:____________ Facility Name:______________________________
Construction Manager/Phone:___________________________________________
Fire Alarm Contractor/Phone:____________________________________________
Change 2, 1 April 2015
ITEM OR AREA TO BE CHECKED Yes No N/A Documents shall be made available prior to system testing, which include: Record of completion (see attachment), drawings of the fire alarm system (showing locations of each device and the number assigned to each device in the system, and shall be kept with the system record log), manufacture’s proper testing & maintenance requirements, operational manuals and an inventory of all alarm components.
Test shall be performed in witness of the TIYA fire alarm maintenance shop. Fire alarm shop is responsible for the testing and maintenance of equipment, once it is accepted by the DoA. Acceptance will not be approved by Fire Department inspector without approval of the fire alarm shop rep.
All primary power to the fire alarm shall be disconnected for 48 hours and the occurrence of required trouble indication for loss of primary power is verified, receipt of the trouble is verified by TYIA
MAS control shop. Using secondary power, the alarm system is operated for 10 or 15 minutes IAW
UFC 03-600-01 Chapter 5.
Reconnect primary power and disconnect secondary power. Ensure trouble indication is displayed and TYIA MAS control shop receives indication.
MAS transmitter (IP Communicator) will send trouble, supervisor, and fire alarms to fire dispatch.
Must confirm this with the TYIA MAS control shop. Confirm all overrides are displayed correctly.
All initiating devices shall be tested according to the manufacturer’s recommendations and applicable codes and standards (The alarm contractor must provide the necessary tools needed to test the devices during the alarm final.) Ensure TYIA MAS control shop receives all activations.
Visual and audible notification appliances are functional, sound level meets audibility requirements, and speech intelligibility. (15 db above average sound levels, or 5 db above maximum sound level, measured 5 feet above the floor/Speech Intelligibility .75-.84 {documentation required})
Are all visual notification devices, in the same areas, operating in-sync with each other?
ELEVATORS: If applicable, each elevator lobby, hoist way, machine room smoke detector initiates elevator recall when other devices have been placed in alarm. Check smoke detector on recall floor to ensure elevator does not return to fire floor.
All exits connected to the fire alarm unlock both upon receipt of alarm and loss of electrical power.
All air duct smoke detectors have remote alarm indicators in a readily accessible location, clearly labeled to indicate their function and the air-handling unit they are associated with and the detector is individually identified at the fire alarm control panel (addressable systems).
All notification and/or indication devices shall be labeled for location.
Check the release and closure of any smoke/fire doors. Operation should occur when fire detection system is activated.
Manual Fire Alarm Boxes: Operable portion not less than 3 ½ ft & not more than 4 ½ ft above floor level. Located within 5 ft of the exit doorway opening at each exit on each floor. Travel distance no more than 200 ft to the nearest box.
Audible Notification Appliances: Appliances shall have the top of the appliance not less than 90 inches above the floor & not less than 6 inches below ceilings. If Combination Appliance (both audible and visible) must be located not less than 80 inches & not greater than 96 inches from floor.
Visible Notification Appliances: Located not less than 80 inches & not greater than 96 inches from the floor.
HVAC Detectors: Located IAW manufacturer’s recommendations.
Spot-type Heat and Smoke Sensing Fire Detectors: Located on the ceiling not less than 4 inches from the sidewall or on the sidewalls between 4 inches and 12 inches from the ceiling.
An automatic smoke detector must be provided at the location of the fire alarm panel IAW NFPA 72.
Government rep shall ensure contractor provides a minimum of 4 copies of the NFPA 72 paperwork
(Record of Completion and Record of Inspection and Testing) to include a copy of the template and speech intelligibility report. An electronic copy of the programming shall be placed inside the panel.
Change 2, 1 April 2015
ATTACHMENT 1C
FIRE SPRINKLER/SUPPRESSION ACCEPTANCE CHECKLIST
Instructions:
Inspectors are expected to check each of the items listed on the attached sheet during a fire suppression final inspection. This is not a complete list of all potential items, but a guideline to ensure that all inspectors observe certain minimum tests and to provide consistency. Inspectors can and should request additional tests as appropriate for unique or unusual systems. Any listed item not checked by the inspector shall be documented and explained on the inspection form, unless it is not applicable to the particular system.
The fire suppression technician should have already tested and verified the complete installation of the system, witnessed by a government rep. He/she should be ready to test any and all parts of the suppression system upon request per National Fire Protection Association (NFPA) Standard 13.
The tests witnessed by Fort Benning Fire Department inspectors are intended to verify the sprinkler contractor has installed and tested the system IAW all UFC/NFPA codes and standards. It is the function of the fire suppression contractor to certify the system has been installed, tested, and is working as designed.
Therefore, if any portion or device in the system fails during the inspection you should assume the contractor is NOT ready for inspection, and discontinue the inspection. At the discretion of the fire inspector, inspectors may use their professional judgement if items are easily correctable.
It is not our function to provide a “punch list” of deficiencies for the contractor. If the system fails to meet all requirements at the time of the inspection the contractor should be advised to reschedule when defects have been corrected. Re-inspection will consist of a full inspection, not just a checks of deficiencies listed previously.
NOTE: If applicable, automatic fire pumps shall be supervised per NFPA 20 and are normally tested during the fire pump final.
NOTE: If applicable, fire suppression systems used for the removal of smoke & grease laden vapors from commercial cooking equipment shall be installed per NFPA 96 and are normally tested during the hood system final.
Fire Inspector:___________________________ Date:_______________________
Alarm Shop Representative:____________________________________________
Facility Number:____________ Facility Name:______________________________
Construction Manager/Phone:___________________________________________
Fire Alarm Contractor/Phone:____________________________________________
Change 2, 1 April 2015
ITEM OR AREA TO BE CHECKED Yes No N/A
Test shall be performed in witness of the TYIA utilities shop. The utilities shop is responsible for the testing and maintenance of equipment, once it is accepted by the
DoA. Acceptance will not be approved by Fire Department inspector without approval of the TYIA utilities shop representative.
Locate the fire department connection and ensure;
It has protective bollards if it’s location is remote
If the system covers only specific areas those areas are identified directly on FDC
FDC must have protective caps/plugs
Hydrant must be located within 150’ of FDC
If system demand is above 150 psi (check plate on riser ) operating pressure must be marked
FDC must have check valve and a drip valve, it must be accessible
FDC must be located within 150’ of an access road
FDC must be located between 18 inches and 48 inches above the ground
FDC properly connected to riser:
Wet single riser – connects to the system side of the valve
Wet multi riser – connects to the supply side of the valve
Dry system – connects between indicating control valve and dry pipe valve
Labels (IAW NFPA 13) Valves:
Ensure pressure gauges are located on both sides of the system alarm valve (clapper).
All control, drain, and test connection valves shall be provided with permanently marked weatherproof metal or rigid plastic identification signs. The identification sign shall be secured with corrosion-resistant wire, chain, or other approved means. The control valve sign shall identify the portion of the building served.
Hydraulic Design Information Sign must contain;
Location of the design area or areas
Discharge densities over the design area or areas
Required flow and residual pressure demand at the base of the riser
Occupancy classification or commodity classification and maximum permitted storage height and configuration
Hose stream allowance included in addition to the sprinkler demand
The name of the installing contractor
Inspectors test valve
Ensure inspectors test valve is accessible without ladders etc. and discharges outside.
Test valve must be smoothbore, corrosive resistant orifice same diameter as smallest sprinkler head. 1 inch in diameter
Sprinkler heads
Verify that the required spare sprinkler heads and correct head wrench for each sprinkler head type in cabinet in riser room as specified in plan review. (< 300 heads
6 are required; 300-1000 heads 12 are required)
Walk through facility and verify placement of sprinkler heads and spacing and installation of hangars. If coverage is not 100% throughout facility, verify against approved drawings. Ensure paint or other materials are removed from heads.
Ensure proper temperature rating for hazard classification
Change 2, 1 April 2015
PIV
Must be accessible and installed not less than 40 ft (12 m) from the building. (Bldgs
<40 ft see NFPA 24 for further)
Top of post must be at least 32 to 40 inches above final grade
Locked with DPW lock or Tamper Switch Installed
Riser Room Ensure access utilizing mechanical room key. NOTE: AAFES and MEDCOM have separate keys
Must be equipped with lighting & heat source.
System Testing
Hydrostatic of piping
Verify the hydrostatic test has been completed prior to inspection by contractor per standards and is documented on the contractors test certificate. (NFPA 13 - 200 PSI for 2 hours) Piping between the fire department connection and the check valve in the inlet pipe shall be tested hydrostatically in the same manner as the balance of the system.
DRY PIPE: An air pressure leakage test at 40 psi shall be conducted for 24 hours. Any leakage that results in a loss of pressure during a continuous 24-hour period shall be corrected.
Main drain test (DPW)
- Verify main drain valve operation.
- Conduct main drain test IAW NFPA 25
- Main drain test is conducted in the following manner:
- Record the pressure indicated by the supply water gauge
- Close the alarm control valve on alarm valves
- Fully open the main drain valve
- After the flow has stabilized, record the residual (flowing) pressure indicated by the water supply gauge
- Close the main drain valve slowly
- Record the time taken for the supply water pressure to return to the original static (non-flowing) pressure
- Open the alarm control valve
Static pressure __________ Residual pressure__________
Quick Opening Device (Dry Pipe)
If system volume is 500 gallons or greater than a quick opening device is required. If above 750 gallons multiple devices are required.
Flow switch test
Verify water flow alarm operation using the inspector’s test valve. The flow switch must transmit an alarm within 30 seconds (NFPA 13 and 72), and the electric bell must activate within 5 minutes (NFPA 25).
DRY PIPE: Verify test of the dry pipe valve using the inspector’s test valve. Times shall be recorded on the contractor’s test certificate. (If time is longer than 60 seconds, a quick opening device is required.)
Electric Water Flow Bell
Water flow detecting devices including the associated alarm circuits shall be flow tested through the inspector’s test connection and shall result in an audible alarm on the premises within 5 minutes after such flow begins and until flow stops.
Change 2, 1 April 2015
Supervisory alarm test
Test supervisory devices to ensure alarm (taper switch) activates. If no supervisory device is in place, valves must be chained and locked (must be a DPW type key)
Documentation
Certification letter verifying operation of the backflow prevention assemblies.
DPW/USACE verify all literature and instructions of the manufacturer describing proper operation and maintenance of all equipment and devices installed.
DPW/USACE receive a copy of the Contractor’s Material and Test Certificate and ensure all information is recorded. This should be signed by the sprinkler contractor and the DPW representative. Documentation to be turned into DPW upon completion of the project.
Change 2, 1 April 2015
ATTACHMENT 1D
Change 2, 1 April 2015
Change 2, 1 April 2015
Change 2, 1 April 2015
ATTACHMENT 1E
GENERAL ANNOUNCEMENTS AND PAGING
AUDIBLE in the following sequence:
Pre-announcement Sound – Ding-Dong – Percussive pairs of 700 and 570 Hz tones each damped to zero (one cycle)
Announcement – spoken message.
VISIBLE none
FIRE EMERGENCY / FIRE ALARM
AUDIBLE [Audible must sound for not less than 180 seconds (NFPA 72) ] in the following sequence:
Alert Sound – NFPA Temporal 3 (T-3) - 422-775Hz upward sweep over 850 ms for three-pulses each separated by 1 second followed by a 1.5 second delay (repeat 2 cycles)
Announcement: Voice – Tom or Donna (repeat 2 cycles):
VISIBLE [Visible must flash/operate until system is reset]:
White Strobe or other listed white appliance (Clear Lens White Flash).
Textual message signs (if provided).
CARBON MONOXIDE DETECTION {GENERIC} MESSAGES
AUDIBLE [Audible must sound for not less than 180 seconds (NFPA 72)] in the following sequence:
Alert Sound – Temporal 4 (T-4) pattern tone - 520Hz over 850 ms for four-pulses each separated by 1 second followed by a 1.5 second delay (repeat 2 cycles)
Announcement: Voice – Tom or Donna (repeat 2 cycles):
VISIBLE [Visible must flash/operate until system is reset]:
CHEMICAL/BOMB/INTRUDER
AUDIBLE [Audible must sound for not less than 180 seconds] in the following sequence:
Alert Sound – Siren - 600-1250 hz up and down sweep in 4 seconds; 1.5 second delay (repeat
2 cycles)
Announcement: Voice – Tom or Donna (repeat 2 cycles):
VISIBLE [Visible must flash/operate until system is reset]:
SECONDARY EGRESS
AUDIBLE [Audible must sound for not less than 180 seconds] in the following sequence:
Alert Sound – Hi-Lo - 780 to 600 hz alternately, 0.52 each (repeat 2 cycles)
Announcement: Voice – Tom or Donna (repeat 2 cycles):
VISIBLE [Visible must flash/operate until system is reset]:
Change 2, 1 April 2015
WEATHER
AUDIBLE - [Audible must continue to sound for not less than 180 seconds] in the following sequence:
Alert Sound – NOAA Standard alert tone - 1050 hz (8 seconds)
Announcement: Voice – Tom or Donna (repeat 2 cycles):
VISIBLE [Visible must flash/operate until system is reset]:
White Strobe or other listed white appliance (Clear Lens White Flash).
Textual message signs (if provided).
ALL CLEAR RETURN TO NORMAL OPERATIONS MESSAGES
AUDIBLE in the following sequence:
Pre-announcement Sound – Ding-Dong – Percussive pairs of 700 and 570 Hz tones each damped to zero (one cycle)
Announcement: Voice – Tom or Donna (repeat two cycles)
VISIBLE none
| 2016-11-04T15:55:32-0400 | |
| SEIGAL.TIMOTHY.J.SR.1005692071 |