Door_Hardware.pdf

PDF 96 KB Posted

Attached to
Fort Benning MATOC Federal contract opportunity
Solicitation number
W911SF-18-R-0022
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Leonard Wood

About this file

This document outlines requirements for a solicitation seeking construction services. The U.S. Army Mission and Installation Command at Fort Benning, Georgia intends to issue a solicitation for an indefinite delivery/indefinite quantity contract to support the U.S. Army Garrison at Fort Benning. The contract would have a one year base period and four one-year options, with a minimum guarantee of $5,000 and maximum task order of $5 million. The work includes repair and construction of real property facilities. The solicitation will be set aside for small businesses with a NAICS code of 236220 and size standard of $36.5 million. The proposal due date is February 28, 2019. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Leonard Wood will serve as the agency for this solicitation.

Door Hardware Specs

View the file

Other files for this federal contract opportunity

Other files attached to Fort Benning MATOC, newest first.
File Type Posted
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
FP01_Fire_Protection_Plan.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
10_28_13.pdf PDF
S2_Foundation_Plan.pdf PDF
Attachment_5_WD_GA190118_4-12-2019_GA118.pdf PDF
E03_Schedules_&_Risers.pdf PDF
S6_Lintel_Schedule_&_Details.pdf PDF
43632p1_(Revised_15_May_2019).pdf PDF
MEMO_FB_FP_Requirements_Ch.1.pdf PDF
43632m8_(Revised_15_May_2019).pdf PDF
COVER_SHEET_-_DRAWINGS_Revised_(1).pdf PDF
A04_Wall_Sections.pdf PDF
FP03_Life_Safety_Notes.pdf PDF
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
13855N.pdf PDF
43632a4_(Revised_15_May_2019).pdf PDF
COVER_SHEET_-_SPECIFICATIONS_Revised.pdf PDF
16MAY20_Sources_Sought_Technical_Capability_Review_Form.pdf PDF
UFGS_01_45_00.00_10_Quality_Control_-_UFGS_01_45_00.pdf PDF
43632a6.pdf PDF
43632-E9.pdf PDF
43632-E4.pdf PDF
UFGS_10_21_13_Toilet_Compartments_-_UFGS_10_21_13.pdf PDF
43632-E8.pdf PDF
UFGS_11_47_00_Ice_Machines_-_UFGS_11_47_00.pdf PDF
43632p3.pdf PDF
43632m8.1.pdf PDF
43632m9.pdf PDF
43632m7.pdf PDF
43632-M12.pdf PDF
UFGS_23_11_25_Facility_Gas_Piping_-_UFGS_23_11_25.pdf PDF
43632-E3.pdf PDF
UFGS_01_35_26_Governmental_Safety_Requirements_-_UFGS_01_35_26.pdf PDF
43632a3.pdf PDF
UFGS_10_28_13_Toilet_Accessories_-_UFGS_10_28_13.pdf PDF
43632m2.pdf PDF
43632m7.1.pdf PDF
43632-E7.pdf PDF
43632-E11.pdf PDF
43632a2.pdf PDF
43632m4.pdf PDF
43632-E2.pdf PDF
Seed_Project_SOW_BLDG_2882_-_FY_18.pdf PDF
Show all 50

Fort Benning MATOC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bonair, Paul D CIV (US)

From: Davis, Charles C CIV CPMS (USA) Sent: Wednesday, May 15, 2019 4:14 PM To: Bonair, Paul D CIV (US) Subject: Door Hardware and keying questions (UNCLASSIFIED)

Classification: UNCLASSIFIED

CLASSIFICATION: UNCLASSIFIED

7. Hardware:

7.1. See attached specification section 08710 Door Hardware; finish to match existing.

7.1.1. Provide new hardware on new doors.

7.1.2. Doors to be keyed to Ft. Benning keying system; provide five keys per level of keying as instructed by DPW real estate division (Eric Connor).

7.1.3. Key all exterior doors alike to match existing door locks.

7.1.4. Interior doors keyed separately.

7.1.5. Master key

7.1.6. Grand master key.

7.1.7. All new locksets to be lever type design.

7.1.8. Install Weather stripping and door bottom seals on doors.

7.1.9. Contractor shall install new doors, frames, hardware, closers, and lock.

7.2. Exterior Door Hardware: Exterior door hardware shall include the following items. Items not specifically identified shall be provided based on suitability of use, durability, and aesthetic character. Finishes on exterior hardware shall match existing hardware.

7.2.1. General: All exterior doors shall have new heavy duty metal kick plates, stainless steel thresholds, weather stripping, door stops, and locking hardware as indicated on the drawings. All door hardware shall be stainless steel construction.

7.2.2. Hinges; shall comply with ANSI/BHMA A156.1; template, full mortise, heavy duty, ball bearing, minimum size 4‐ 1/2" x 4‐1/2", non‐ferrous base metal, non‐removable pins.

7.2.3. Locksets; shall comply with ANSI/BHMA A156.2; , Grade 1, non‐ferrous base metal, 7‐pin removable core compatible with the Base keying system. Lever handles shall be provided per ABA Accessibility Guidelines for Buildings and Facilities. All new locksets to be lever type design.

7.2.4. Exit doors to the exterior (except for mechanical rooms) will be equipped with a full width heavy duty panic hardware device. Exit (Panic) Devices; devices shall comply with ANSI/BHMA 156.3; heavy‐duty touch‐pad type, through‐ bolted mounting. Listed and labeled for panic protection based on UL 305.

7.2.5. Closers; shall comply with ANSI/BHMA A156.4; series C02000, Grade 1, hydraulic, factory‐sized, and adjustable to meet field conditions, mounted on interior of doors. Include overhead hold‐open capability on exterior door closers.

7.2.6. Auxiliary Hardware; shall comply with ANSI/BHMA A156.16. Provide wall or floor stops for all exterior doors.

Provide other hardware as necessary for a complete installation.

7.2.7. Kick Plates; shall comply with ANSI/BHMA A156.6 and shall be non‐ferrous metal.

7.2.8. Thresholds; Thresholds shall comply with ANSI/BHMA A156.21 and ABA Accessibility Guidelines for Buildings and Facilities. Thresholds shall be non‐ferrous metal and shall be provided at all exterior doors.

7.2.9. Weatherstripping; shall comply with ANSI/BHMA A156.22 and shall be provided at all exterior doors.

7.3. Doors to be keyed to Ft. Benning keying system;

7.3.1. Provide five keys per level of keying as instructed by DPW real estate division.

7.3.1.1. Key all exterior doors alike.

7.3.1.2. Interior doors keyed separately.

7.3.1.3. Master key

7.3.1.4. Grand master key.

7.3.2. DPW CORE INFORMATION SHEET

7.3.2.1. Interchangeable Core

7.3.2.2. 7 Pin

7.3.2.3. E Keyway

7.3.2.4. Cylindrical Lock Set (Class 1)

7.3.2.5. Core mark stamped on side of core and face of key

7.3.2.6. All keys cut Tip to Bow

7.3.2.7. 2 operating keys per core

7.3.2.8. Bitting List must be provided to Addressee below by Lock Core Provider.

7.3.2.9. Core mark to be designated by DPW unless using BEST Locks or IDN Armstrong.

7.3.3. Fort Benning Master System

7.3.3.1. Control 40 99 55 7

7.3.3.2. GM 66 13 33 9

7.3.4. Fort Benning Mechanical Core; Used in ALL Electrical, Communication, Mechanical and Elevator equipment Rooms

7.3.4.1. Control 8382446

7.3.4.2. Operating Key 8789826

7.3.4.3. NO Control Keys to be made.

7.3.4.4. NO Mechanical Keys to be made.

7.3.5. Delivery/Shipping:

7.3.6. All Cores & Keys must be sent by supplier to the following address:

7.3.6.1.1.1.1.1. F & A Officer USA, Fort Benning

6650 Meloy Drive, Suite 316 Fort Benning, Georgia 31905 ATTN: DPW Master Planning

C. Craig Davis, RA DPW Engineering Division Meloy Hall, Bldg 6 6650 Meloy Dr.

Fort Benning, GA 31905 706.545.2223

CLASSIFICATION: UNCLASSIFIED

File details come from the government source that posted it. Updated .