This memorandum provides a design review submittal for fire alarm system upgrades at Camp Merrill Building 14 at Fort Benning, Georgia. The submittal is deficient in several respects, including the need for addressable monitoring network systems, appropriate fire alarm wiring, HVAC shutdown integration, pre-alert tones, message priorities, and battery calculations. Additional requirements specified are for surge suppression, locked breakers, fire protection engineer stamping, and installer certification. The contracting office must address deficiencies and comply with unified facility criteria and Fort Benning fire protection standards.

A related solicitation seeks bids for an indefinite delivery/indefinite quantity contract for construction and repair services at Fort Benning and associated sites. The five-year IDIQ has a minimum $5,000 guarantee and contemplates task orders up to $5,000,000. The solicitation will be set aside 100% for small businesses and available on January 28, 2019, with proposals due February 28, 2019. Interested parties should monitor www.fbo.gov. The Department of the Army Mission and Installation Contracting Command at Fort Leonard Wood will administer the contract.

Fire Alarm Submittal

View the file

Other files

File Type Posted
W911SF18R00220003.pdf PDF
Clarification__for_Question_135_from_Amendment_0003.pdf PDF
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632p4_(Revised_11_June_2019).pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
43632p3_(Revised_11_June_2019).pdf PDF
Level_of_Design_Matrix.pdf PDF
43632m10_(Revised_11_June_2019).pdf PDF
43632m4_(Revised_15_May_2019).pdf PDF
S1.pdf PDF
A03.pdf PDF
43632m3_(Revised_11_JUNE_2019).pdf PDF
43632a2_(Revised_11_June_2019).pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Construction_MATOC_SOW_11_June_2019.pdf PDF
Questions_for_Amendment_0002.pdf PDF
Addendum__Memo__Four.pdf PDF
COVER_SHEET_-_SPECIFICATIONS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
FP03_Life_Safety_Notes.pdf PDF
08_14_00_Wood_Doors.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
MATOC_Questions.pdf PDF
COVER_SHEET_-_DRAWINGS_Revised_(1).pdf PDF
Fort_Benning_Fire_Protection_Requirements_Effective_1_Dec_016_(4_Nov_016).pdf PDF
43632p4_(Revised_15_May_2019).pdf PDF
ufc_4_021_01_Chng1.pdf PDF
A04_Wall_Sections.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
Fire_Alarm_System_SOP.pdf PDF
Military_Installations_to_NFPA_780__2016.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
43632a5_(Revised_15_May_2019).pdf PDF
ENCL_1_-_SOW_BLDG_2882_-_Revised_15_May_2019.pdf PDF
S7_Masonry_Details.pdf PDF
Door_Hardware.pdf PDF
Addendum_2_JACE_8000_Series_Specs_for_Niagara_AX_Server_Installation.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
Attendance_Roster_Site_Visit_7_May_2019.pdf PDF
10_21_13.pdf PDF
43623a2_(Revised_15_May_2019).pdf PDF
UFC_3-600-01_Fire_Protection_Engineering_for_Facilities_8_August_2016.pdf PDF
Addendum_1.pdf PDF
Addendum_3_Memo.pdf PDF
S3_Framing_Plans.pdf PDF
43632p2_(Revised_15_May_2019).pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

ATLANTIC REGION

DIRECTORATE OF EMERGENCY SERVICES

FORT BENNING, GEORGIA 31905

IMBE-ESF-P 7 November 2016

MEMORANDUM FOR DPW

SUBJECT: Fire Alarm Design Review Submittal for Camp Merrill Building 14, Business

Occupancy:

1. During the submittal review of Camp Merrill Building 14, the following was found deficient:

a. MNS is not listed as addressable. MNS shall be required to transmit a trouble, supervisory, and alarm functions to Fort Benning Central Station while meeting the requirements of NFPA

72. All messages shall be point addressable regardless how activated.

b. Fire alarm wiring shall be Class X with a single fault on a pathway connected to the addressable devices shall not cause the loss of more than 50 addressable devices and if less than

50 no more than one half (½) of the addressable devices shall not be loss with IP communication. (Example: 30 addressable devices; no more than 15)

c. Chemical button will shutdown the HVAC system.

d. HVAC shutdown may be incorporated in the ACU/LOC’s.

e. Pre-Alert Tones shall be IAW UFC 03-600-01.

f. Messages shall be in override priority order.

g. IP Comminator not listed in the equipment submittal.

h. Battery caculations are labeled with Bldg 13. Please change to proper facility name.

i. UFC 03-600-01 requires the battery back-up to sustain operational status for 48 hours.

j. Matrix missing from drawings.

k. Drawings are not stamped by a certified fire protection engineer and/or NICET as outlined in UFC 03-600-01 and/or Fort Benning Fire Protection Requirements Supplement dated 1 Apr

2015.

2. RFI/FYI

a. Fire alarm system shall be installed IAW Unified Facilities Criteria (UFC) to include appropriate codes as outlined in the UFC’s.

b. Paint all fire alarm junction boxes and covers red in unfinished areas (i.e., above ceilings, mechanical rooms, etc).

c. Activation of a carbon monoxide detection device shall initiate a voice notification message distinctly different from a fire alarm notification and transmit a unique signal/message to the constantly attended location.

d. Mass notification messages shall be provided in accordance with Fort Benning Fire

Protection Requirements MFR dated 1 Apr 2015.

e. All local operating consoles (LOC) shall be installed at the same height as a manual pull station.

f. Surge suppression shall be required on the incoming 110V to the MNS panel. Furthermore, the breaker shall be locked and painted red.

REPLY TO

ATTENTION OF

g. Installer/Supervisor shall be certified as outlined Fort Benning Installation Fire Protection

Requirement MFR dated 1 April 2015.

3. Acceptance of this submittal or portions thereof does not relieve the contractor from complying with the contracting documents and applicable codes and standards.

4. If you have any questions, please contact Christopher M. Sleeper at 706-545-3036 or christopher.m.sleeper.civ@mail.mil.

\\e-signed\\cms\\7-Nov-2016\\

Christopher M. Sleeper

Lead Inspector file://///e-signed/cms/7-Nov-2016/

File details come from the government source that posted it. Updated .