Fire_Alarm_System_SOP.pdf

PDF 95 KB Posted

Attached to
Fort Benning MATOC Federal contract opportunity
Solicitation number
W911SF-18-R-0022
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Leonard Wood

About this file

This document provides a standing operating procedure for fire alarm and mass notification systems at Fort Benning, Georgia. It establishes policies and procedures for the design, installation, and acceptance testing of such systems. Key requirements include using Class A fire alarm systems for new construction and Class B systems only with approval. All new systems must communicate with the Mastermind Accountability System and use loop wiring. Installation must be performed by a company with a NICET level three technician to oversee the work. Mass notification systems are mandatory per UFC standards and must be designed to meet additional UFC requirements. Pre-final and final inspections involving the fire department and DPW are required before acceptance. Record drawings and documentation must be provided upon completion.

The related federal contract opportunity is a solicitation for an indefinite delivery/indefinite quantity contract in support of U.S. Army Garrison Fort Benning, Georgia. Solicitation number W911SF-18-R-0022 will be issued with a one five-year ordering period and $5,000 minimum guarantee. The minimum task order is $2,000 and maximum is $5,000,000. This 100% small business set-aside has a NAICS code of 236220 and size standard of $36.5 million. The general scope of work includes construction, repair, and related services for real property facilities. The proposal due date is February 28, 2019. The point of contact is provided.

Fire Alarm SOP

View the file

Other files for this federal contract opportunity

Other files attached to Fort Benning MATOC, newest first.
File Type Posted
43632m11_(Revised_11_June_2019).pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
Attachment_4_Performance_Assessment_Questionnaire.pdf PDF
13855N.pdf PDF
43632a4_(Revised_15_May_2019).pdf PDF
COVER_SHEET_-_SPECIFICATIONS_Revised.pdf PDF
16MAY20_Sources_Sought_Technical_Capability_Review_Form.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
08_14_00_Wood_Doors.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
FP01_Fire_Protection_Plan.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
10_28_13.pdf PDF
S2_Foundation_Plan.pdf PDF
Attachment_5_WD_GA190118_4-12-2019_GA118.pdf PDF
E03_Schedules_&_Risers.pdf PDF
S6_Lintel_Schedule_&_Details.pdf PDF
43632p1_(Revised_15_May_2019).pdf PDF
MEMO_FB_FP_Requirements_Ch.1.pdf PDF
43632m8_(Revised_15_May_2019).pdf PDF
43632m7.pdf PDF
43632-M12.pdf PDF
UFGS_23_11_25_Facility_Gas_Piping_-_UFGS_23_11_25.pdf PDF
43632-E3.pdf PDF
UFGS_01_35_26_Governmental_Safety_Requirements_-_UFGS_01_35_26.pdf PDF
43632a3.pdf PDF
UFGS_10_28_13_Toilet_Accessories_-_UFGS_10_28_13.pdf PDF
43632m2.pdf PDF
43632m7.1.pdf PDF
43632-E7.pdf PDF
43632-E11.pdf PDF
43632a2.pdf PDF
43632m4.pdf PDF
43632-E2.pdf PDF
43632p5.pdf PDF
UFC-3-410-02_DDC.pdf PDF
UFGS_01_45_00.00_10_Quality_Control_-_UFGS_01_45_00.pdf PDF
43632a6.pdf PDF
43632-E9.pdf PDF
43632-E4.pdf PDF
UFGS_10_21_13_Toilet_Compartments_-_UFGS_10_21_13.pdf PDF
43632-E8.pdf PDF
UFGS_11_47_00_Ice_Machines_-_UFGS_11_47_00.pdf PDF
43632p3.pdf PDF
Seed_Project_SOW_BLDG_2882_-_FY_18.pdf PDF
Show all 50

Fort Benning MATOC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE ALARM/MASS NOTIFICATION SYSTEM SOP

FORT BENNING, GEORGIA

21 APRIL 2010

1. GENERAL

a. Purpose: This standing operating procedure (SOP) establishes policies, procedures, and guidance for the design, installation, and acceptance testing of

Fire Alarm/Mass Notification systems.

b. Applicability: This SOP applies to all functions/parties etc. performing work on fire alarm systems at Fort Benning Georgia and Alabama.

c. Order of Precedence: Fort Benning Garrison Commander is the Authority Having

Jurisdiction (AHJ) for all fire protection/prevention matters. A fire alarm system

SOP at Fort Benning is the standard procedure to which has been mutually agreed. Specification 13855N shall be changed as needed to reflect new Army regulations, UFC codes, and NFPA standards. Any proposed changes to the

13855N specification must have mutually agreed upon codes and standards. If said codes and standards differ, the more stringent standard shall apply. In the event of a conflict in policy, Director of Public Works in concert with the AHJ will make a final decision on all fire protection related policy and requirement.

d. Changes: The DPW Administrative Office is the keeper of this SOP. The

Government or any contractor may initiate a change to the SOP. Suggested changes must be submitted in writing to the DPW Engineering Division.

Engineering Division will make the suggested changes to the SOP after consultation and agreement with all stakeholders. If no agreement can be reached for the suggested changes to SOP, the DPW Director in concert with the AHJ will make the final decision. The revised SOP will then become official.

e. Reference: National Electrical Code (NEC), National Fire Prevention Association

(NFPA), Ft. Benning Fire Alarm/Mass Notification Specification 13855N, Unified Facilities Criteria (UFC) 3-600-01, (UFC) 3-600-02, (UFC) 4-010-01, and (UFC) 4-021-01. All work shall be in accordance with the latest edition of this reference’s at start of work. The UFC documents are available at http://www.wbdg.org/ccb/ccb.php

2. Design:

a. All new Construction requires Class A Fire Alarm systems.

http://www.wbdg.org/ccb/ccb.php

b. Class B Fire Alarm systems can be repaired on existing facilities or in areas where communication lines are not available such as a Range sites etc. as approved by the DPW Engineering Division and the Ft. Benning Fire Chief.

c. All New Fire Alarm systems must report Contact ID information and must communicate with the Mastermind Accountability System (MAS).

d. The use of Proprietary Fire Alarm systems at Ft. Benning Ga. is prohibited.

3. Installation:

a. Installation of Fire Alarm systems at Ft. Benning must be performed by a

Company that is staffed with a NICET level three or higher person to oversee the work.

i. System working plans and calculations must be prepared and submitted for approval by a registered professional fire protection engineer or an individual that has obtained National institute for Certification in

Engineering Technologies, Fire Alarm Systems, Level III certification

(minimum). Submit the fire alarm reporting system, fire alarm evacuation system, and automatic fire detection system construction (shop) drawings to DPW representative.

ii. The individual building MNS shall be designed under the supervision of a registered fire protection engineer, by a registered professional engineer having at least four years of current experience in the design of fire protection and detection systems, or by an engineering technologist qualified at NICET Level IV in fire alarm systems. The individual’s name, signature, and professional engineer number or NICET certification number shall be included on all final design documents.

b. All connections shall be terminal points. No T-Taps or wire nuts shall be used.

c. Loop wiring for Class A systems shall be used.

d. Two weeks prior to start of construction contract activities, the Project Manager and/or the Construction Inspection Representative will notify the DPW O&M

Chief of said construction activities in order to allow the DPW maintenance contractor the opportunity to salvage old fire alarm devices from building.

4. Final and Pre-final Inspections

a. The Inspections of a new Fire Alarm system shall be scheduled thru the DPW

O&M Chief. A Pre-final and final inspections shall always be done prior to acceptance of fire alarm system. It shall be scheduled a minimum of 3 days in advance. Due to the distractions created by strobe horns, if schedules permit, the final inspection of the fire alarm systems shall be done separately from the final project inspection. DPW maintenance contractor and Fire Department shall be invited to all inspections. To avoid disruption of the 911 Center, the fire alarm installer shall not request nor shall they receive any inspection data and/or printouts from 911 Center. All inspection data and/or printouts shall be requested and received from the DPW maintenance contractor.

b. The final shall be attended by the contractor that installed the system to include the NICET level three or level four representatives overseeing the work.

c. A template explaining how the system will report to the MAS and identifying each appliance shall be turned in to the DPW maintenance contractor prior to scheduling the final.

d. A 100% test of the Fire Alarm/Mass Notification system shall be conducted to ensure it works properly.

e. The following documents shall be delivered to the Project Manager(PM) at the completion of the satisfactory test:

1. 2 ea. Copies of the Warranty

2. 2 ea. Copies of the As built drawings

3. 2 ea. Copies of the Operational manuals of the system

4. 2 ea. Copies of the completion of work testing forms from NFPA 72.

5. 2 ea. Copies of the 1354.

f. The Breaker controlling the power to the Fire Alarm/Mass Notification panel shall be locked/tagged in the off position 24 hours prior to the Scheduled Final test. At the beginning of the Fire Alarm test, the battery test shall be concluded and the power shall be restored and the tag/lock removed to the FACP.

g. Record Drawing Software: Furnish a CD containing schematic and as built CAD

Drawings in DGN format of as-built drawings and schematics. Furnish the

Government one CD set and DPW Plan Manager Office (Room 306) one CD set.

The DGN drawings shall be in Microstation V8 format.

h. The contractor shall request the Fort Benning Base Operations Contractor to place

Fire Alarm system in the test mode at beginning of any and all tests on any Fort

Benning Fire Alarm System.

i. At final inspection, the installer/contractor shall show documentation of speech intelligibility of 0.75 – 0.84 as required per the UFC.

5 Mass Notification:

A Mass Notifications system shall be installed as required by (UFC 4-010-01

DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS PARA

B4.7 and designed to meet UFC 4-021-01) DESIGN AND O&M: MASS

NOTIFICATION SYSTEMS.

See specification section from 13855N for Mass Notifications system requirements below.

Background: UFC 4-010-01, Design: DoD Minimum Antiterrorism Standards for

Buildings, dated 22 January 2007, requires that a mass notification system be installed in all new military construction and major renovation projects for inhabited, primary gathering, and billeting facilities. Inhabited buildings are defined as regularly occupied by 11 or more DoD personnel with a population density of greater than one person per 40 square meters. Primary gathering buildings are defined as inhabited buildings occupied by 50 or more DoD personnel. Mass notification systems are not required in family housing units unless there are 13 or more units in a single building. Design and install in accordance with UFC 4-021-01 DESIGN AND O&M: MASS NOTIFICATION

SYSTEMS.

Existing Buildings. For existing buildings, the above requirement is mandatory for primary gathering buildings, billeting, and high occupancy family housing, but highly recommended for all inhabited buildings. Therefore, the Government reserves the right to not install a Mass Notifications system in existing inhabited buildings after notifying the contractor in special cases.