COVER_SHEET_-_DRAWINGS_Revised_(1).pdf

PDF 63 KB Posted

Attached to
Fort Benning MATOC
Solicitation number
W911SF-18-R-0022
Issued by

About this file

This document provides details for a federal contract opportunity to support the U.S. Army Garrison Fort Benning. The solicitation number is W911SF-18-R-0022 and seeks proposals for an Indefinite Delivery/Indefinite Quantity contract with a minimum $5,000 guarantee and maximum $5,000,000 task order amount to provide construction and facilities repair services at Fort Benning and related sites for one five-year ordering period. Eligible contractors must be small businesses with a NAICS code of 236220 and size standard of $36.5 million. The pre-proposal conference is January 28th, 2019 and proposals are due February 28th, 2019. The scope of work includes construction, repair, planning, administration, site work, reporting and record keeping. The Department of the Army Mission and Installation Contracting Command Fort Leonard Wood will administer the contract.

Cover Sheet Drawings

View the file

Other files

File Type Posted
W911SF18R00220003.pdf PDF
Clarification__for_Question_135_from_Amendment_0003.pdf PDF
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632p4_(Revised_11_June_2019).pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
43632p3_(Revised_11_June_2019).pdf PDF
Level_of_Design_Matrix.pdf PDF
43632m10_(Revised_11_June_2019).pdf PDF
43632m4_(Revised_15_May_2019).pdf PDF
S1.pdf PDF
A03.pdf PDF
43632m3_(Revised_11_JUNE_2019).pdf PDF
43632a2_(Revised_11_June_2019).pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Construction_MATOC_SOW_11_June_2019.pdf PDF
Questions_for_Amendment_0002.pdf PDF
Addendum__Memo__Four.pdf PDF
COVER_SHEET_-_SPECIFICATIONS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
FP03_Life_Safety_Notes.pdf PDF
08_14_00_Wood_Doors.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
MATOC_Questions.pdf PDF
Fire_Alarm_Review_Submittal_for_CM_Building_14_7_Nov_2016.pdf PDF
Fort_Benning_Fire_Protection_Requirements_Effective_1_Dec_016_(4_Nov_016).pdf PDF
43632p4_(Revised_15_May_2019).pdf PDF
ufc_4_021_01_Chng1.pdf PDF
A04_Wall_Sections.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
Fire_Alarm_System_SOP.pdf PDF
Military_Installations_to_NFPA_780__2016.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
43632a5_(Revised_15_May_2019).pdf PDF
ENCL_1_-_SOW_BLDG_2882_-_Revised_15_May_2019.pdf PDF
S7_Masonry_Details.pdf PDF
Door_Hardware.pdf PDF
Addendum_2_JACE_8000_Series_Specs_for_Niagara_AX_Server_Installation.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
Attendance_Roster_Site_Visit_7_May_2019.pdf PDF
10_21_13.pdf PDF
43623a2_(Revised_15_May_2019).pdf PDF
UFC_3-600-01_Fire_Protection_Engineering_for_Facilities_8_August_2016.pdf PDF
Addendum_1.pdf PDF
Addendum_3_Memo.pdf PDF
S3_Framing_Plans.pdf PDF
43632p2_(Revised_15_May_2019).pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER SHEET – LIST OF MECHANICAL DRAWINGS PAGE 1 OF 3

DRAWING NO. DRAWING TITLE LATEST REVISION DATE

43632‐A1 DEMOLITION FLOOR PLANS, BLDG 2882 15 MAY 19

43632‐A2 NEW FLOOR PLANS, BLDG 2882 15 MAY 19

43632‐A3 NEW FLOOR PLAN – 2ND FLOOR, BLDG 2882 5 MAY 15

43632‐A4 WALL & FLOOR TYPES, BLDG 2882 15 MAY 19

43632‐A5 DOOR SCHEDULE, BLDG 2882 15 MAY 19

43632‐A6 REFLECTIVE CEILING PLAN, BLDG 2882 15 MAY 19

43632‐E1 ELECTRICAL LIGHTING DEMOLITION PLAN 5 MAY 15

43632‐E2 ELECTRICAL POWER DEMOLITION PLAN 5 MAY 15

43632‐E3 ELECTRICAL LIGHTING PLAN – NEW WORKS 5 MAY 15

1ST FLOOR

43632‐E4 ELECTRICAL LIGHTING PLAN – NEW WORKS 5 MAY 15

2ND FLOOR

43632‐E5 ELECTRICAL POWER PLAN – NEW WORKS 5 MAY 15

1ST FLOOR

43632‐E6 ELECTRICAL POWER PLAN – NEW WORKS 5 MAY 15

2ND FLOOR

43632‐E7 ENLARGED POWER PLAN 5 MAY 15

43632‐E8 NEW FIRE ALARM SYSTEMS 5 MAY 15

43632‐E9 ELECTRICAL DATA 5 MAY 15

43632‐E10 NEW RISER DIAGRAM FOR BLDG 2882 5 MAY 15

43632‐E11 EXISTING PANEL SCHEDULES 5 MAY 15

43632‐E12 NEW PANEL SCHEDULES 5 MAY 15

COVER SHEET – LIST OF MECHANICAL DRAWINGS PAGE 2 OF 3

43632‐M1 HVAC DEMOLITION – BLDG 2882 15 MAY 19

43632‐M2 ENLARGED MECHANICAL PLANS 5 MAY 15

(FOR INFO ONLY), BLDG 2882

43632‐M3 NEW SUPPLY & RETURN AIR DUCT PLAN 15 MAY 19

BLDG 2882

43632‐M4 ENLARGED MECHANICAL ROOM DUCTWORK 15 MAY 19

PLAN, BLDG 2882

43632‐M5 WATER SOURCE WATER LOOP PLAN 5 MAY 15

43632‐M6 ENLARGED MECHANICAL ROOM PLAN 15 MAY 19

43632‐M7 NORTH END WATER SOURCE PIPE RISER 5 MAY 15

DIAGRAM, BLDG 2882

43632‐M7.1 SOUTH END WATER SOURCE PIPE RISER 5 MAY 15

43632‐M8 EQUIPMENT SCHEDULES 15 MAY 19

43632‐M8.1 EQUIPMENT SCHEDULES 5 MAY 15

43632‐M9 TYPICAL EQUIPMENT PIPE CONNECTIONS 5 MAY 15

43632‐m10 EMCS LEGEND & MECHANICAL ROOM WATER 5 MAY 15

SOURCE LOOP

43632‐M11 I/O SUMMARY CHART FOR SHEET M10 5 MAY 15

43632‐M12 CONTROL SEQUENCING 5 MAY 15

43632‐P1 PLUMBING DEMOLITION – GANG LATRINES 15 MAY 19

43632‐P2 PLUMBING DEMOLITION – MECHANICAL 15 MAY 19

ROOM 110, BLDG 2882

COVER SHEET – LIST OF MECHANICAL DRAWINGS PAGE 3 OF 3

43632‐P3 NEW PLUMBING WORK – MECHANICAL 15 MAY 19

ROOM 110, BLDG 2882

43632‐P4 NEW PLUMBING WORK 15 MAY 19

43632‐P5 NPLUMBING NEW WORK – GANG LATRINES 15 MAY 19

43632‐P6 NEW LATRINES DRAIN/WASTE/VENT RISER 5 MAY 15

43632‐P7 NEW LATRINES DOMESTIC WATER RISER 5 MAY 15

43632‐P8 COOLING TOWER WATER SERVICES 5 MAY 15

AS‐BUILT DRAWINGS

A02 ELEVATIONS 1998

A04 WALL SECTIONS 1998

A05 WALL SECTIONS 1998

A07 ROOF PLAN 1998

E03 SCHEDULES & RISERS 1998

FP01 FIRE PROTECTION PLAN 1998

(LACKS PIPING ON EACH FLOOR)

FP03 LIFE SAFETY NOTES 1998

S2 FOUNDATION PLAN 1998

S3 FRAMING PLANS 1998

S4 BUILDING SECTIONS 1998

S6 LINTEL SCHEDULES & DETAILS 1998

S7 MASONRY DETAILS 1998