Addendum_1.pdf

PDF 50 KB Posted

Attached to
Fort Benning MATOC
Solicitation number
W911SF-18-R-0022
Issued by

About this file

This document provides details for an indefinite delivery/indefinite quantity contract solicitation. The U.S. Army Mission and Installation Command at Fort Benning intends to issue a solicitation for up to eight small business contractors to provide construction, repair, and related services for real property facilities at Fort Benning and satellite sites over a five-year ordering period. Services will include site preparation, cleanup, reporting, record keeping, and administrative tasks. The minimum guarantee is $5,000 and the maximum task order is $5,000,000. The NAICS code is 236220 for commercial and institutional building construction, with a size standard of $36.5 million. The solicitation will be available on January 28, 2019 with proposals due February 28, 2019. The solicitation seeks general construction and repair services for real property facilities at Fort Benning.

Addendum 1

View the file

Other files

File Type Posted
W911SF18R00220003.pdf PDF
Clarification__for_Question_135_from_Amendment_0003.pdf PDF
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632p4_(Revised_11_June_2019).pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
43632p3_(Revised_11_June_2019).pdf PDF
Level_of_Design_Matrix.pdf PDF
43632m10_(Revised_11_June_2019).pdf PDF
43632m4_(Revised_15_May_2019).pdf PDF
S1.pdf PDF
A03.pdf PDF
43632m3_(Revised_11_JUNE_2019).pdf PDF
43632a2_(Revised_11_June_2019).pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Construction_MATOC_SOW_11_June_2019.pdf PDF
Questions_for_Amendment_0002.pdf PDF
Addendum__Memo__Four.pdf PDF
COVER_SHEET_-_SPECIFICATIONS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
FP03_Life_Safety_Notes.pdf PDF
08_14_00_Wood_Doors.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
MATOC_Questions.pdf PDF
Fire_Alarm_Review_Submittal_for_CM_Building_14_7_Nov_2016.pdf PDF
COVER_SHEET_-_DRAWINGS_Revised_(1).pdf PDF
Fort_Benning_Fire_Protection_Requirements_Effective_1_Dec_016_(4_Nov_016).pdf PDF
43632p4_(Revised_15_May_2019).pdf PDF
ufc_4_021_01_Chng1.pdf PDF
A04_Wall_Sections.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
Fire_Alarm_System_SOP.pdf PDF
Military_Installations_to_NFPA_780__2016.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
43632a5_(Revised_15_May_2019).pdf PDF
ENCL_1_-_SOW_BLDG_2882_-_Revised_15_May_2019.pdf PDF
S7_Masonry_Details.pdf PDF
Door_Hardware.pdf PDF
Addendum_2_JACE_8000_Series_Specs_for_Niagara_AX_Server_Installation.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
Attendance_Roster_Site_Visit_7_May_2019.pdf PDF
10_21_13.pdf PDF
43623a2_(Revised_15_May_2019).pdf PDF
UFC_3-600-01_Fire_Protection_Engineering_for_Facilities_8_August_2016.pdf PDF
Addendum_3_Memo.pdf PDF
S3_Framing_Plans.pdf PDF
43632p2_(Revised_15_May_2019).pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TITLE: MATOC Seed Contract: Replace HVAC System, Building 2882

SUBJECT: Addendum No. 1, Energy Management Control System Document for Niagara 8000 Series Jace

Controller

1. The current design package given the contractors needs to be updated to include the Fort

Benning requirement document to provide and install with the energy management control system (EMCS). Fort Benning recently upgraded the central EMCS system utilized and requires that all new building EMCS systems be equipped with the Niagara 8000 Series Jace. The requirements for the Niagara 8000 Jace are specified in the attached document.

2. General Comment: Please read the design package thoroughly before sending in your requests for information (RFI).

File details come from the government source that posted it. Updated .