This addendum memo provides revisions to the statement of work and solicitation documents for the MATOC Seed Project to replace the HVAC system at Building 2882 at Fort Benning, Georgia. The revisions include updating the project scope to renovate building interiors and install new cooling tower enclosures and metal canopies. The mechanical, doors and windows, and plumbing specifications were revised, and additional as-built drawings from 1998 were provided. The lists of specifications and drawings were also replaced with updated versions. Offerors are to provide all materials, equipment, and labor to complete the HVAC replacement and related renovations in accordance with the revised statement of work and construction drawings.

Addendum Memo Four

View the file

Other files

File Type Posted
W911SF18R00220003.pdf PDF
Clarification__for_Question_135_from_Amendment_0003.pdf PDF
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632p4_(Revised_11_June_2019).pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
43632p3_(Revised_11_June_2019).pdf PDF
Level_of_Design_Matrix.pdf PDF
43632m10_(Revised_11_June_2019).pdf PDF
43632m4_(Revised_15_May_2019).pdf PDF
S1.pdf PDF
A03.pdf PDF
43632m3_(Revised_11_JUNE_2019).pdf PDF
43632a2_(Revised_11_June_2019).pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Construction_MATOC_SOW_11_June_2019.pdf PDF
Questions_for_Amendment_0002.pdf PDF
COVER_SHEET_-_SPECIFICATIONS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
FP03_Life_Safety_Notes.pdf PDF
08_14_00_Wood_Doors.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
MATOC_Questions.pdf PDF
Fire_Alarm_Review_Submittal_for_CM_Building_14_7_Nov_2016.pdf PDF
COVER_SHEET_-_DRAWINGS_Revised_(1).pdf PDF
Fort_Benning_Fire_Protection_Requirements_Effective_1_Dec_016_(4_Nov_016).pdf PDF
43632p4_(Revised_15_May_2019).pdf PDF
ufc_4_021_01_Chng1.pdf PDF
A04_Wall_Sections.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
Fire_Alarm_System_SOP.pdf PDF
Military_Installations_to_NFPA_780__2016.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
43632a5_(Revised_15_May_2019).pdf PDF
ENCL_1_-_SOW_BLDG_2882_-_Revised_15_May_2019.pdf PDF
S7_Masonry_Details.pdf PDF
Door_Hardware.pdf PDF
Addendum_2_JACE_8000_Series_Specs_for_Niagara_AX_Server_Installation.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
Attendance_Roster_Site_Visit_7_May_2019.pdf PDF
10_21_13.pdf PDF
43623a2_(Revised_15_May_2019).pdf PDF
UFC_3-600-01_Fire_Protection_Engineering_for_Facilities_8_August_2016.pdf PDF
Addendum_1.pdf PDF
Addendum_3_Memo.pdf PDF
S3_Framing_Plans.pdf PDF
43632p2_(Revised_15_May_2019).pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TITLE: MATOC Seed Project; Replace HVAC System, Building 2882, Fort Benning, Georgia

SUBJECT: Addendum No. 4 – RFI Comment Changes

1. Upon review and responding to 145 request for information changes from soliciting contractors for the subject contract, the following changes to the contract documents are required:

a. Scope of Work Document, dated 15 May 2019, was revised and replaced by the revised

Statement of Work dated 11 June 2019 (Enclosure 1). The revised changes to the document include the following:

1) Division 001, General:

a) Page 1 under the header top of the page, change the “For Directorate of Family, Moral, and Welfare and Recreation” to “For Directorate of Public Works”.

b) Add new paragraph 1) to Division 001 General, page 1 to read as “Contractor shall coordinate the work with all other trades, the construction drawings, specs and statement of work and as directed by the Contracting Officer.”

c) Change the header date to 11 June 2019.

d) Paragraph 2) change the first sentence to read as follows:

“The project includes replacement of the HVAC system complete with architectural, electrical, and plumbing supporting work, renovations to the building interior, and design work to install new cooling tower enclosures, metal canopies at the first and second floor entry ways, replace the entire fire alarm system, and modify the fire suppression on the second floor to satisfy the new floor plan”.

e) Paragraph 9, change the last sentence to read as “Schedule power outages through the DPW inspector”.

f) Paragraph 10.f, change the sentence to read as “Saw cut and remove sections of the brick veneer to provide openings for HVAC and plumbing system components”.

g) Paragraph 10.h, delete the second sentence.

h) Delete paragraph 14.a.

i) Add paragraph 19) MICC Document Changes on page 7.

2) Division 006, WOOD:

a) Delete this section completely.

3) Division 008, DOORS AND WINDOWS:

a) Paragraph 3, add to the end of the sentence “(30 windows)”.

4) Division 015 Mechanical:

a) Paragraph 3, Plumbing System, delete paragraph d.

b) Paragraph 4, Submittal Requirements, add subparagraph j to read as “Drawings for replacement of the fire alarm system with mass notification.”

b. As‐Built Drawings: Add as‐built drawings A03, S1, and S5 dated 1998.

c. Revise solicitation drawings 43632‐A2, 43632‐M3, 43623‐M10, 43632‐M11, 43632‐M12, 43632‐P3, and 43632‐P4 dated 11 June 2019. Changes were required to correct deficiencies on the drawings.

d. Replace the current lists of specifications and drawings with the revised lists.

1) The List of Specifications was revised to delete the Toilet Compartment specification.

2) The List of Drawings was revised to show drawings 43632‐A2, M3, P3, and P4 were revised dated 11 June 2019, and to show the addition of as‐built drawings A03, S1, and

S5 dated 1998.