Key_Personnel_Price_Worksheet.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Fort Benning MATOC
Solicitation number
W911SF-18-R-0022
Issued by

About this file

This document contains a price evaluation worksheet and federal contract opportunity notice. The price evaluation worksheet is a template requiring offerors to input direct labor rates, fringe rates, overhead rates, G&A rates, profit rates, and projected hours for key personnel and other labor categories. It calculates fully burdened labor rates and total prices. The federal contract opportunity is a solicitation for an IDIQ contract to provide construction and repair services at Fort Benning, Georgia. Services include planning, programming, construction, repairs, administration, management, site work, and reporting. The minimum guarantee is $5,000 and maximum task order is $5 million. The NAICS code is 236220 and size standard is $36.5 million. The solicitation will be available on January 28, 2019 with proposals due February 28, 2019. The point of contact is provided.

Price Worksheet Key Personnel

View the file

Other files

File Type Posted
W911SF18R00220003.pdf PDF
Clarification__for_Question_135_from_Amendment_0003.pdf PDF
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632p4_(Revised_11_June_2019).pdf PDF
43632p3_(Revised_11_June_2019).pdf PDF
Level_of_Design_Matrix.pdf PDF
43632m10_(Revised_11_June_2019).pdf PDF
43632m4_(Revised_15_May_2019).pdf PDF
S1.pdf PDF
A03.pdf PDF
43632m3_(Revised_11_JUNE_2019).pdf PDF
43632a2_(Revised_11_June_2019).pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Construction_MATOC_SOW_11_June_2019.pdf PDF
Questions_for_Amendment_0002.pdf PDF
Addendum__Memo__Four.pdf PDF
COVER_SHEET_-_SPECIFICATIONS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
FP03_Life_Safety_Notes.pdf PDF
08_14_00_Wood_Doors.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
MATOC_Questions.pdf PDF
Fire_Alarm_Review_Submittal_for_CM_Building_14_7_Nov_2016.pdf PDF
COVER_SHEET_-_DRAWINGS_Revised_(1).pdf PDF
Fort_Benning_Fire_Protection_Requirements_Effective_1_Dec_016_(4_Nov_016).pdf PDF
43632p4_(Revised_15_May_2019).pdf PDF
ufc_4_021_01_Chng1.pdf PDF
A04_Wall_Sections.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
Fire_Alarm_System_SOP.pdf PDF
Military_Installations_to_NFPA_780__2016.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
43632a5_(Revised_15_May_2019).pdf PDF
ENCL_1_-_SOW_BLDG_2882_-_Revised_15_May_2019.pdf PDF
S7_Masonry_Details.pdf PDF
Door_Hardware.pdf PDF
Addendum_2_JACE_8000_Series_Specs_for_Niagara_AX_Server_Installation.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
Attendance_Roster_Site_Visit_7_May_2019.pdf PDF
10_21_13.pdf PDF
43623a2_(Revised_15_May_2019).pdf PDF
UFC_3-600-01_Fire_Protection_Engineering_for_Facilities_8_August_2016.pdf PDF
Addendum_1.pdf PDF
Addendum_3_Memo.pdf PDF
S3_Framing_Plans.pdf PDF
43632p2_(Revised_15_May_2019).pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAIDIQ Contract Price Eval WS

For the following tables offerors are required to fill in all yellow cells and the green cells in the second table. The green cells identify the maximum CAP rates which will be deomstrated in the second worksheet. The total price that will be evaluated is Column A Row 26. Should offerors add additional rows in the second table the total price to be evaluated may shift down.

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Fringe Rate Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Overhead Rate Key Positions Direct Labor Fringe Overhead G&A Burdened Cost Profit Fully Burdened Labor Rate Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Resulting FBLR is the CAP Binding Rate for these positionsHoursTotal Key Position Price
Project Manager

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Offers shall enter the hourly direct labor rates here.

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert G&A Rate$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Alternate Project Manager

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Offers shall enter the hourly direct labor rates here. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Offers shall enter the hourly direct labor rates here.

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Profit Rate Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Resulting FBLR is the CAP Binding Rate for these positions Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert projected number of hours for contract completion.

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert projected number of hours for contract completion. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert projected number of hours for contract completion.$0.00
Total Key Position Price$0.00

For the following table offerors may add additional rows as necessary so long as they remain above the Total Cost Input row.

Labor (less key positions)
Fringe

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Fringe Rate$0.00
OH

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Overhead Rate$0.00
Material
Subcontracts
Total Cost Input$0.00
G&A

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Binding CAP G&A Rate$0.00
Subtotal Cost$0.00
Profit

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Binding CAP Profit Rate$0.00
Subtotal Price$0.00
Total Key Position Price$0.00
Total Offered Price$0.00
Color Key
Offerors Input Data
Maximum Binding CAP Rates

MAIDIQ CAP Rates

Fully Burdened Labor Rate
Project Manager$0.00
Alternate Project Mngr$0.00
G&A0%
Profit0%

SEED Task Order Price Eval

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Fringe Rate Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Overhead Rate Key Positions Direct Labor Fringe Overhead G&A Burdened Cost Profit Fully Burdened Labor Rate Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Resulting FBLR is the CAP Binding Rate for these positionsHoursTotal Key Position Price
Project Manager

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Offers shall enter the hourly direct labor rates here.

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert G&A Rate$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Alternate PM

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Offers shall enter the hourly direct labor rates here. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Offers shall enter the hourly direct labor rates here.

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Profit Rate Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Resulting FBLR is the CAP Binding Rate for these positions Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert projected number of hours for contract completion.

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert projected number of hours for contract completion. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert projected number of hours for contract completion.$0.00
Total Key Position Price$0.00

For the following table offerors may add additional rows as necessary so long as they remain above the Total Cost Input row.

Labor (less key positions)
Fringe

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Fringe Rate$0.00
OH

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Overhead Rate$0.00
Material
Subcontracts
Total Cost Input$0.00
G&A

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert G&A Rate. Rate shall be equal to or less than MAIDIQ Contract Rate.$0.00
Subtotal Cost$0.00
Profit

Bertacini, Scott R CIV USA: Bertacini, Scott R CIV USA:

Insert Profit Rate. Rate shall be equal to or less than MAIDIQ Contract Rate.$0.00
Subtotal Price$0.00
Total Key Position Price$0.00
Total Offered Price$0.00
Color Key
Offerors Input Data
Maximum Binding CAP Rates or Less

File details come from the government source that posted it. Updated .