UFGS_11_47_00_Ice_Machines_-_UFGS_11_47_00.pdf

PDF 41 KB Posted

Attached to
Fort Benning MATOC
Solicitation number
W911SF-18-R-0022
Issued by

About this file

This solicitation notice is for an indefinite delivery/indefinite quantity contract to provide construction and repair services at Fort Benning, Georgia. The contract will have a one year base period and four one-year options, with a minimum guarantee of $5,000 and maximum task order of $5 million. The work includes construction, repair, maintenance, and related services for real property facilities. The solicitation will be set aside for small businesses with a NAICS code of 236220 and size standard of $36.5 million. Interested parties can download the solicitation from FedBizOpps on January 28th, with proposals due February 28th. The point of contact is provided for any questions.

View the file

Other files

File Type Posted
W911SF18R00220003.pdf PDF
Clarification__for_Question_135_from_Amendment_0003.pdf PDF
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632p4_(Revised_11_June_2019).pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
43632p3_(Revised_11_June_2019).pdf PDF
Level_of_Design_Matrix.pdf PDF
43632m10_(Revised_11_June_2019).pdf PDF
43632m4_(Revised_15_May_2019).pdf PDF
S1.pdf PDF
A03.pdf PDF
43632m3_(Revised_11_JUNE_2019).pdf PDF
43632a2_(Revised_11_June_2019).pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Construction_MATOC_SOW_11_June_2019.pdf PDF
Questions_for_Amendment_0002.pdf PDF
Addendum__Memo__Four.pdf PDF
COVER_SHEET_-_SPECIFICATIONS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
FP03_Life_Safety_Notes.pdf PDF
08_14_00_Wood_Doors.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
MATOC_Questions.pdf PDF
Fire_Alarm_Review_Submittal_for_CM_Building_14_7_Nov_2016.pdf PDF
COVER_SHEET_-_DRAWINGS_Revised_(1).pdf PDF
Fort_Benning_Fire_Protection_Requirements_Effective_1_Dec_016_(4_Nov_016).pdf PDF
43632p4_(Revised_15_May_2019).pdf PDF
ufc_4_021_01_Chng1.pdf PDF
A04_Wall_Sections.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
Fire_Alarm_System_SOP.pdf PDF
Military_Installations_to_NFPA_780__2016.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
43632a5_(Revised_15_May_2019).pdf PDF
ENCL_1_-_SOW_BLDG_2882_-_Revised_15_May_2019.pdf PDF
S7_Masonry_Details.pdf PDF
Door_Hardware.pdf PDF
Addendum_2_JACE_8000_Series_Specs_for_Niagara_AX_Server_Installation.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
Attendance_Roster_Site_Visit_7_May_2019.pdf PDF
10_21_13.pdf PDF
43623a2_(Revised_15_May_2019).pdf PDF
UFC_3-600-01_Fire_Protection_Engineering_for_Facilities_8_August_2016.pdf PDF
Addendum_1.pdf PDF
Addendum_3_Memo.pdf PDF
S3_Framing_Plans.pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 11 47 00 Page 1

SECTION 11 47 00

ICE MACHINES

02/09

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced . The publications are referred to within the text by the basic designation only.

NSF INTERNATIONAL (NSF )

NSF/ANSI 12 (2012) Automatic Ice Making Equipment

NSF/ANSI 14 (2016a) Plastics Piping System Components and Related Materials

NSF/ANSI 169 (2012)Special Purpose Food Equipment and Devices

U .S . DEPARTMENT OF ENERGY (DOE)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)

U .S . NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910-SUBPART D Walking - Working Surfaces

29 CFR 1910.144 Safety Color Code for Marking Physical

Hazards

29 CFR 1910.145 Accident Prevention Signs and Tags

29 CFR 1910.306 Specific Purpose Equipment and Installations

1.2 SUMMARY

The work includes furnishing and installing ice making equipment, including dispensing, production, storage equipment and related work .

Include coordination of delivery through existing finished opening and vertical handling limitations within the building.

a. Provide rough-in and connect utilities to equipment in accordance with requirements specified in other sections of this specification and in conformance with the physical dimensions, capacities, manufacturer's instructions, and other requirements of the equipment furnished.

b . Equipment specified shall also conform to the applicable requirements of the following reference standards: NSF/ANSI 12, NSF/ANSI 14, NSF/ANSI 169, and Energy Star for powered equipment.

1.3 SUBMITTALS

SECTION 11 47 00 Page 2

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00, SUBM ITTAL PROCEDURES :

SD-03 Product Data

Ice Making Equipment

SD-05 Design Data

Manufacturer's Applicable Literature; G

SD-06 Test Reports

Manufacturer's Test Data; G Field Test Reports; G

SD-07 Certificates

NSF Certification; G UL Certification; G Energy Star Qualified

SD-08 Manufacturer's Instructions

Manufacturer's Instructions; G

1.4 ADM INISTRATIVE REQUIREMENTS

1.4.l Pre-Installation Meeting

Thirty days prior to the commencement of work, notify the Contracting Officer that the following items are prepared and ready for review:

1.4. l. l Shop Drawings

Detail drawings, as specified, including insulation and utility requirements, product data, installation instructions and diagrams. Submit custom fabricated equipment drawings after approval of ice machine equipment drawings. Drawings shall be 1:50 1/4 inch scale minimum.

1.4. l.2 Product Data

Submit the product data for the following equipment, as well as the associated manufacturer's data:

a. ice making equipment

b. Manufacturer's applicable literature

c. Manufacturer's Test Data

d. Energy Star Qualified

e. Manufacturer's Instructions for shipping, handling, storage, installation, and start-up .

SECTION 11 47 00 Page 3

1.4 .2 LIST OF EQUIPMENT

Submit detailed Food Service Equipment List. Include submittal of NSF Certification and UL Certification for ice making equipment.

PART 2 PRODUCTS

2 .1 MATERIALS

Provide ice making equipment conforming to OSHA standards 29 CFR 1910.144, 29 CFR 1910.145, 29 CFR 1910.306, and related NSF and UL standards.

Floor areas adjacent to ice making equipment point of operation shall conform to

29 CFR 1910-SUBPART D.

2 .2 CONSTRUCTION OF FABR ICATED EQUIPMENT

Construction and finish of fabricated equipment shall be all stainless steel welded construction.

2 .3 FACTORY TESTS AND CERTIFICATIONS

Submit copies of all Manufacturer's Test Data and certifications, including NSF Certification; UL Certification, and Energy Star Qualified data to the Contracting Officer prior to the commencement of any installation work.

2.4 OMITTED

PART 3 EXECUTION

3.1 EXAMINATION

After becoming familiar with all details of the work, verify all existing dimensions, contract drawings, product data and all related conditions prior to commencing rough-in work . Advise the Contracting Officer of any discrepancies prior to ordering equipment. Submit Contractor's Field Verification Data prior to the pre-installation meeting.

3.2 INSTALLATION

Refer to Section 11 05 40 COMMON WORK RESULTS FOR FOOD SERVICE EQUIPMENT for detailed installation procedures, operation and maintenance manual requirements, training and project closeout procedures . Include all ice making equipment Field Test Reports.