UFGS_11_47_00_Ice_Machines_-_UFGS_11_47_00.pdf
PDF 41 KB Posted
- Attached to
- Fort Benning MATOC
- Solicitation number
- W911SF-18-R-0022
About this file
This solicitation notice is for an indefinite delivery/indefinite quantity contract to provide construction and repair services at Fort Benning, Georgia. The contract will have a one year base period and four one-year options, with a minimum guarantee of $5,000 and maximum task order of $5 million. The work includes construction, repair, maintenance, and related services for real property facilities. The solicitation will be set aside for small businesses with a NAICS code of 236220 and size standard of $36.5 million. Interested parties can download the solicitation from FedBizOpps on January 28th, with proposals due February 28th. The point of contact is provided for any questions.
View the file
Other files
Show 40 more
Latest 50 of 138 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 11 47 00 Page 1
SECTION 11 47 00
ICE MACHINES
02/09
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced . The publications are referred to within the text by the basic designation only.
NSF INTERNATIONAL (NSF )
NSF/ANSI 12 (2012) Automatic Ice Making Equipment
NSF/ANSI 14 (2016a) Plastics Piping System Components and Related Materials
NSF/ANSI 169 (2012)Special Purpose Food Equipment and Devices
U .S . DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U .S . NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910-SUBPART D Walking - Working Surfaces
29 CFR 1910.144 Safety Color Code for Marking Physical
Hazards
29 CFR 1910.145 Accident Prevention Signs and Tags
29 CFR 1910.306 Specific Purpose Equipment and Installations
1.2 SUMMARY
The work includes furnishing and installing ice making equipment, including dispensing, production, storage equipment and related work .
Include coordination of delivery through existing finished opening and vertical handling limitations within the building.
a. Provide rough-in and connect utilities to equipment in accordance with requirements specified in other sections of this specification and in conformance with the physical dimensions, capacities, manufacturer's instructions, and other requirements of the equipment furnished.
b . Equipment specified shall also conform to the applicable requirements of the following reference standards: NSF/ANSI 12, NSF/ANSI 14, NSF/ANSI 169, and Energy Star for powered equipment.
1.3 SUBMITTALS
SECTION 11 47 00 Page 2
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00, SUBM ITTAL PROCEDURES :
SD-03 Product Data
Ice Making Equipment
SD-05 Design Data
Manufacturer's Applicable Literature; G
SD-06 Test Reports
Manufacturer's Test Data; G Field Test Reports; G
SD-07 Certificates
NSF Certification; G UL Certification; G Energy Star Qualified
SD-08 Manufacturer's Instructions
Manufacturer's Instructions; G
1.4 ADM INISTRATIVE REQUIREMENTS
1.4.l Pre-Installation Meeting
Thirty days prior to the commencement of work, notify the Contracting Officer that the following items are prepared and ready for review:
1.4. l. l Shop Drawings
Detail drawings, as specified, including insulation and utility requirements, product data, installation instructions and diagrams. Submit custom fabricated equipment drawings after approval of ice machine equipment drawings. Drawings shall be 1:50 1/4 inch scale minimum.
1.4. l.2 Product Data
Submit the product data for the following equipment, as well as the associated manufacturer's data:
a. ice making equipment
b. Manufacturer's applicable literature
c. Manufacturer's Test Data
d. Energy Star Qualified
e. Manufacturer's Instructions for shipping, handling, storage, installation, and start-up .
SECTION 11 47 00 Page 3
1.4 .2 LIST OF EQUIPMENT
Submit detailed Food Service Equipment List. Include submittal of NSF Certification and UL Certification for ice making equipment.
PART 2 PRODUCTS
2 .1 MATERIALS
Provide ice making equipment conforming to OSHA standards 29 CFR 1910.144, 29 CFR 1910.145, 29 CFR 1910.306, and related NSF and UL standards.
Floor areas adjacent to ice making equipment point of operation shall conform to
29 CFR 1910-SUBPART D.
2 .2 CONSTRUCTION OF FABR ICATED EQUIPMENT
Construction and finish of fabricated equipment shall be all stainless steel welded construction.
2 .3 FACTORY TESTS AND CERTIFICATIONS
Submit copies of all Manufacturer's Test Data and certifications, including NSF Certification; UL Certification, and Energy Star Qualified data to the Contracting Officer prior to the commencement of any installation work.
2.4 OMITTED
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work, verify all existing dimensions, contract drawings, product data and all related conditions prior to commencing rough-in work . Advise the Contracting Officer of any discrepancies prior to ordering equipment. Submit Contractor's Field Verification Data prior to the pre-installation meeting.
3.2 INSTALLATION
Refer to Section 11 05 40 COMMON WORK RESULTS FOR FOOD SERVICE EQUIPMENT for detailed installation procedures, operation and maintenance manual requirements, training and project closeout procedures . Include all ice making equipment Field Test Reports.