This document provides specifications for metal toilet partitions and screens. Key details include the following.

The specification covers materials, design, and installation requirements for metal toilet partitions and urinal screens. It defines acceptable materials as galvanized steel sheet, stainless steel, aluminum, and corrosion-resistant steel. Panels must be no less than one inch thick with solid phenolic or solid plastic faces that are smooth, non-absorbent, and resistant to chemicals. Toilet enclosures must meet federal specification CID A-A-60003 Type I Style A. The specification also provides requirements for pilasters, overhead bracing, floor anchoring, hardware, colors and finishes. Installation must comply with ADA guidelines and be rigid, plumb and level. The contractor must provide a two-year warranty and project closeout documentation.

View the file

Other files

File Type Posted
W911SF18R00220003.pdf PDF
Clarification__for_Question_135_from_Amendment_0003.pdf PDF
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632p4_(Revised_11_June_2019).pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
43632p3_(Revised_11_June_2019).pdf PDF
Level_of_Design_Matrix.pdf PDF
43632m10_(Revised_11_June_2019).pdf PDF
43632m4_(Revised_15_May_2019).pdf PDF
S1.pdf PDF
A03.pdf PDF
43632m3_(Revised_11_JUNE_2019).pdf PDF
43632a2_(Revised_11_June_2019).pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Construction_MATOC_SOW_11_June_2019.pdf PDF
Questions_for_Amendment_0002.pdf PDF
Addendum__Memo__Four.pdf PDF
COVER_SHEET_-_SPECIFICATIONS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
FP03_Life_Safety_Notes.pdf PDF
08_14_00_Wood_Doors.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
MATOC_Questions.pdf PDF
Fire_Alarm_Review_Submittal_for_CM_Building_14_7_Nov_2016.pdf PDF
COVER_SHEET_-_DRAWINGS_Revised_(1).pdf PDF
Fort_Benning_Fire_Protection_Requirements_Effective_1_Dec_016_(4_Nov_016).pdf PDF
43632p4_(Revised_15_May_2019).pdf PDF
ufc_4_021_01_Chng1.pdf PDF
A04_Wall_Sections.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
Fire_Alarm_System_SOP.pdf PDF
Military_Installations_to_NFPA_780__2016.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
43632a5_(Revised_15_May_2019).pdf PDF
ENCL_1_-_SOW_BLDG_2882_-_Revised_15_May_2019.pdf PDF
S7_Masonry_Details.pdf PDF
Door_Hardware.pdf PDF
Addendum_2_JACE_8000_Series_Specs_for_Niagara_AX_Server_Installation.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
Attendance_Roster_Site_Visit_7_May_2019.pdf PDF
10_21_13.pdf PDF
43623a2_(Revised_15_May_2019).pdf PDF
UFC_3-600-01_Fire_Protection_Engineering_for_Facilities_8_August_2016.pdf PDF
Addendum_1.pdf PDF
Addendum_3_Memo.pdf PDF
S3_Framing_Plans.pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 10 21 13 Page 1

SECTION 10 21 13

TOILET COMPARTMENTS

01/07

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced . The publications are referred to within the text by the basic designation only.

ALUMINUM ASSOCIATION (AA)

AA DAF45 (2003; Reaffirmed 2009) Designation System for Aluminum Finishes

ASTM INTERNATIONAL (ASTM)

ASTM A123/A123M (2013) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A167 (2011) Standard Specification for

Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

ASTM A336/A336M (2015) Standard Specification for Alloy

Steel Forgings for Pressure and High-Temperature Parts

ASTM A385/A385M (2011) Standard Practice for Providing

High-Quality Zinc Coatings (Hot-Dip)

ASTM A653/A653M (2015; E 2016) Standard Specification for

Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

ASTM B221M (2013) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)

ASTM B36/B36M (2013) Standard Specification for Brass

Plate, Sheet, Strip, and Rolled Bar

ASTM B456 (2011; E 2011) Standard Specification for

Electrodeposited Coatings of Copper Plus Nickel Plus Chromium and Nickel Plus Chromium

ASTM B86 (2013) Standard Specification for Zinc and

SECTION 10 21 13 Page 2

Zinc-Aluminum (ZA) Alloy Foundry and Die Castings

ASTM D6386 (2016) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting

ASTM D7611/D7611M (2013; E 2014) Standard Practice for

Coding Plastic Manufactured Art icles for Resin Identification

ASTM E2129 (2010) Standard Practice for Data

Collection for Sustainability Assessment of Building Products

INTERNATIONAL CODE COUNCIL (ICC)

ICC A117.1 COMM (2009) Standard And Commentary and Usable

Buildings and Facilities

SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)

SAE AMS2 460 (2013; Rev A) Plating, Chromium

U .S . GENERAL SERVICES ADM INISTRATION (GSA)

CID A-A-60003 (Basic) Partitions, Toilet, Complete

U .S . GREEN BUILDING COUNCIL (USGBC)

LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design (tm) Building Design and Construction (LEED-NC)

U .S . NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 1191 Americans with Disabilities Act (ADA)

Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines

1.2 SUSTAINABILITY REPORTING

Materials in this technical specification may contribute towards contract compliance with sustainability requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00, SUBM ITTAL PROCEDURES:

SD-02 Shop Drawings

Fabrication Drawings Installation Drawings; G

SECTION 10 21 13 Page 3

SD-03 Product Data

Cleaning and Maintenance Instructions Colors And Finishes Galvanized Steel Sheet Sound-Deadening Cores Anchoring Devices and Fasteners Hardware and Fittings Brackets Door Hardware

SD-04 Samples

Colors and Finishes; G Hardware and Fittings

Anchoring Devices and

Fasteners SD-07 Certificates

Warranty

SD-10 Operation and Maintenance Data

Plastic Identification; G

SD-11 Closeout Submittals

Local/Regional Materials Documentation; G Toilet Enclosures; G Room Entrance Screens; G Urinal Screens; G

II Pilaster Shoes; G

1.4 REGULATORY REQUIREMENTS

Conform to ICC A117.1 COMM code for access for the handicapped operation of toilet compartment door and hardware.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver materials in the manufacturer's original unopened packages with the brand, item identification, and project reference clearly marked.

Store components in a dry location that is adequately ventilated; free from dust, water, other contaminants, and damage during delivery, storage, and construction.

1.6 WARRANTY

Provide certification or warranties that toilet partitions will be free of defects in materials, fabrication, finish, and installation and will remain so for a period of not less than 2 years after completion.

PART 2 PRODUCTS

2 .1 SYSTEM REQUIREMENTS

Provide a complete and usable toilet partition system, including toilet enclosures and urinal screen system of pane ls, hardware, and support

SECTION 10 21 13 Page 4 components. Furnish the partition system from a single manufacturer, with a standard product as shown in the most recent catalog data . Submit Fabrication Drawings for metal toilet partitions and urinal screens consisting of fabrication and assembly details to be performed in the factory. Submit manufacturer's Cleaning and Maintenance Instructions with Fabrication Drawings for review.

2 .1.1 Omitted

2 .1.2 Plastic Identification

Verify that plastic products to be incorporated into the project are labeled in accordance with ASTM D7611/D7611M. Where products are not labeled, provide product data indicating polymeric information in the Operation and Maintenance Manual.

Type 1 Polyethylene Terephthalate (PET, PETE)

Type 2 High Density Polyethylene (HOPE)

Type 1 Polyethylene Terephthalate (PET, PETE)

Type 3 Vinyl (Polyvinyl Chloride or PVC)

Type 4 Low Density Polyethylene (LDPE)

Type 5 Polypropylene (PP)

Type 6 Polystyrene (PS)

Type 7 Other. Use of this code indicates that the package in question is made with a resin other than the six listed above, or is made of more than one resin listed above, and used in a multi-layer combination.

2 .2 MATERIALS

2 .2.1 Galvanized Steel Sheet

Provide galvanized steel sheet cold-rolled, stretcher-level, commercial quality material, conforming to ASTM A653/A653M. Conform surface preparation of material for painting to ASTM D6386, Method A.

2 .2.2 Omitted

2 .2.3 Anchoring Devices and Fasteners

Provide steel anchoring devices and fasteners hot-dipped galvanized after fabrication, in conformance with ASTM A385/A385M and ASTM A123/A123M.

Conceal all galvanized anchoring devices.

2 .2.4 Brackets

Wall brackets shall be two-ear panel brackets, T-style, 25 mm 1-inch stock. Provide stirrup style panel-to-pilaster brackets.

2 .2.5 Hardware and Fittings

SECTION 10 21 13 Page 5

2 .2.5.1 General

Requirements

Conform hardware for the toilet partition system to CID A-A-60003 for the specified type and style of partitions. Provide hardware finish highly resistant to alkalis, urine, and other common toilet room acids. Comply latching devices and hinges for handicap compartments with 36 CFR 1191;

provide stainless steel devices and hinges with door latches that operate without either tight grasping or twisting of the wrist of the operator .

Submit three samples of each item, including anchoring devices and fasteners. Approved hardware samples may be installed in the work if properly identified .

IMaterial !Conformance Standard

Cold-rolled sheet steel ASTM A336/A336M , commercial quality

Zinc-base alloy ASTM 886, Alloy AC41-A

Brass ASTM B36/B36M, Alloy C26800

Aluminum ASTM B221M ASTM 8221

Corrosion-resistant steel ASTM Al67, Type (302] (304]

2 .2.5.2 Finishes

a. Chrome plating shall conform to ASTM B456.

b . Finish shall conform to SAE AMS2460, Class I, Type I.

c. Aluminum shall have a clear anodic coating conforming to AA DAF 45.

d. Corrosion-resistant steel shall have a No. 4 finish .

e . Exposed fasteners shall match the hardware and fittings.

2 .2.6 Door Hardware

2 .2.6.l Hinges

Hinges shall be adjustable to hold in-swinging doors open at any angle up to 90 degrees and out swinging doors to 10 degrees. Provide self-lubricating hinges with the indicated swing . Hinges shall be the be the cutout-insert type and have one of the following type of return movement :

a. Gravity return movement b . Spring-action cam return movement

c. Torsion-rod return movement

2 .2.6.2 Latch and Pull

Latch and pull shall be a combination rubber-faced door strike and keeper

SECTION 10 21 13 Page 6 equipped with emergency access.

2 .2.6.3 Coat Hooks

Coat hooks shall be combination units with hooks and rubber tipped pins.

2 .3 PARTITION PANELS AND DOORS

Fabricate partition panels and doors not less than l inch thick with face sheets not less than 0.0396 inch thick .

2 .3.l Toilet Enclosures

Conform toilet enclosures to CID A-A-60003, Type I, Style A, floor supported, overhead braced. Furnish width, length, and height of toilet enclosures as shown. Provide a width of 1 inch. Finish surface of panels shall be solid phenolic, Finish 4 water resistant; graffiti resistant; non-absorbent . Reinforce panels indicated to receive toilet paper holders or grab bars for mounting of the items required. Provide grab bars to withstand a bending stress, shear stress, shear force, and a tensile force induced by 1112 N 250 lbf. Grab bars shall not rotate within their fittings.

2 .3.2 Omitted

2 .3.3 Urinal Screens

Urinal screens shall be of same materials as the toilet partitions and supplied by the same manufacturer as the toilet partitions. Panels shall be 1-inch thick, Style A floor supported and secured to the wall.

2 .4 OMITTED

2 .5 FLOOR-ANCHORED PARTITIONS

Pilasters shall be not less than 1-1/4 inch thick with face sheets not less than 0.0635 inch thick. Provide anchoring device at the bottom of the pilaster consisting of a steel bar not less than 1/2 by 7/8 inch welded to the reinforced face sheets and having not less than two 9.5 mm 3/8 inch round anchorage devices for securing to the floor slab . Provide anchorage devices complete with threaded rods, expansion shields, lock washers, and leveling-adjustment nuts. Trim piece at the floor shall be 3 inch high and fabricated from not less than 0.030 inch thick corrosion-resistant steel.

2 .6 OVERHEAD -BRACED PART ITIONS

Pilasters shall be not less than 1-1/4 inch thick with face sheets not less than 0.0393 inch thick. Provide anchoring device at the bottom of the pilaster consisting of a channel-shaped floor stirrup fabricated from not less than 0.0635 inch thick material and a leveling bolt. Secure the stirrup to the pilaster with not less than a 3/16 inch bolt and nut after the pilaster is leveled. Secure the stirrup to the floor with not less than two lead expansion shields and sheet metal screws. Fabricate overhead brace from a continuous extruded aluminum tube not less than l inch wide by 1-1/2 inch high, 0.125-inch wall thickness. Finish shall be AA-C22A31 in accordance with AA DAF45. Set and secure brace into the top of each pilaster. Fabricate 3 inch high trim piece at the floor from not less than 0.030 inch thick corrosion-resistant steel.

SECTION 10 21 13 Page 7

2 .7 PILASTER SHOES

Provide shoes at pilasters to conceal floor-mounted anchorage. Pilaster shoes shall be stainless steel. Height shall be 3 inches.

2 .8 HARDWARE

Provide hardware for the toilet partition system that conforms to CID A-A-60003 for the specified type and style of partitions. Provide hardware pre-drilled by manufacturer. Use a hardware finish that is highly resistant to alkalis, urine, and other common toilet room acids.

Provide latching devices and hinges for handicap compartments complying with 36 CFR 1191 and stainless steel door latches that operate without either tight grasping or twisting of the wrist of the operator.

Use stainless steel, tamper proof type screws and bolts. Wall mounting brackets must be continuous, full height, stainless steel, in accordance with toilet compartment manufacturer's instructions Provide floor-mounted anchorage consisting of corrosion-resistant anchoring assemblies with threaded rods, lock washers, and leveling adjustment nuts at pilasters for structural connection to floor.

2 .9 COLORS AND FINISHES

2 .9.1 Colors

Provide manufacturer's standard color charts for color of finishes for toilet partition system components. Color of pilaster shoes shall match the core of solid plastic compartments and screens. Submit three samples showing a finished edge on two adjacent sides and core construction, each not less than 304.8 mm 12-inch square

2 .9.2 Omitted

2 .9.3 Finishes No.4 and No. 5

Provide solid plastic fabricated of solid phenolic core with melamine facing sheets not less than one inch thick. Colors shall extend throughout the panel thickness. Provide exposed finish surfaces: smooth, waterproof, non-absorbent, and resistant to staining and marking with pens, pencils, or other writing devices.

Solid plastic partitions shall not show any sign of deterioration when immersed in the following chemicals and maintained at a temperature of 80 degrees F for a minimum of 30 days:

Acetic Acid (80 percent) Hydrochloric Acid (4 0 percent)

Acetone Hydrogen Peroxide (30 percent)

Ammonia (liquid) Isopropyl Alcohol

Ammonia Phosphate Lactic Acid (25 percent)

SECTION 10 21 13 Page 8

Bleach (12 percent) Lime Sulfur

Borax Nicotine

Brine Potassium Bromide

Caustic Soda Soaps

Chlorine Water Sodium Bicarbonate

Citric Acid Trisodium Phosphate

Copper Chloride Urea; Urine

Core Oils Vinegar

PART 3 EXECUTION

3.1 PREPARATION

Take field measurements prior to the preparation of drawing and fabrication to ensure proper fits. Verify that field measurements, surfaces, substrates and conditions are as required, and ready to receive wor . Verify correct spacing of plumbing fixtures. Verify correct location of built in framing, anchorage, and bracing. Report in writing to Contracting Officer prevailing conditions that will adversely affect satisfactory execution of the work of this section. Do not proceed with work until unsatisfactory conditions have been corrected.

3.2 METAL PART ITION FABR ICATION

a. Fabricate metal Partition Panels, doors, screens, and pilasters required for the project from galvanized-steel face sheets with formed edges. Face sheets shall be pressure-laminated to the sound-deadening core with edges sealed with a continuous locking strip and corners mitered and welded. Ground all welds smooth. Provide concealed reinforcement for installation of hardware, fittings, and accessories.

Surface of face sheets shall be smooth and free from wave, warp, or buckle.

b . Before application of an enamel coating system, solvent-clean galvanized-steel surfaces to remove processing compounds, oils, and other contaminants harmful to coating-system adhesion. After cleaning, coat the surfaces with a metal-pretreatment phosphate coating. After pretreatment, finish exposed galvanized-steel surfaces with a baked-enamel coating system as specified.

c. Provide an enamel coating system consisting of a factory-applied baked acrylic enamel coating system. Coating system shall be a durable, washable, stain-resistant, mar-resistant finish.

3.3 INSTALLATION

Install partitions rigid, straight, plumb, and level, with the pane ls centered between the fixtures. Provide a panel clearance of not more than 13 mm 1/2 inch and secure the panels to walls and pilasters with not less than two wall brackets attached near the top and bottom of the panel.

Locate wall brackets so that holes for wall bolts occur in masonry or tile joints. Secure Panels to pilasters with brackets matching the wall

SECTION 10 21 13 Page 9 brackets. Provide for adjustment due to minor floor variations. Locate head rail joints at pilaster center lines. Install adjacent components for consistency of line and plane. Equip each door with hinges, one door latch, and one coat hook and bumper. Align hardware to uniform clearance at vertical edges of doors.

a. Secure panels to hollow plastered walls with toggle bolts using not less than M6xl 1/4-20 screws of the length required for the wall thickness Toggle bolts shall have a load-carrying strength of not less than 2668.9 N 600 pounds per anchor.

b. Secure panels to ceramic tile on hollow plastered walls or hollow concrete-masonry walls with toggle bolts using not less than M6xl 1/4- 20 screws of the length required for the wall thickness. Toggle bolts shall have a load-carrying strength of not less than 600 pounds per anchor.

c. Secure panels to solid masonry or concrete with lead or brass expansion shields designed for use with not less than M6xl 1/4-20 screws, with a shield length of not less than 38.1 mm 1-1/2 inch.

Expansion shields shall have a load-carrying strength of not less than 600 pounds per anchor.

d. Submit Installation Drawings for metal toilet partitions and urinal screens showing plans, elevations, details of construction, hardware, reinforcing and blocking, fittings, mountings and escutcheons.

Indicate on drawings the type of partition, location, mounting height, cutouts, and reinforcement required for toilet-room accessories.

3.4 CEILING-HUNG PARTITIONS

Secure pilasters to the structural support above with the anchorage device specified. Make all leveling devices readily accessible for leveling, plumbing, and tightening the installation. Level the bottoms of doors with bottoms of pilasters when doors are in a closed position.

3.5 FLOOR-ANCHORED PARTITIONS

Secure pilasters to the floor with the anchorage device specified. Make all leveling devices readily accessible for leveling, plumbing, and tightening the installation. Level tops of doors with tops of pilasters when doors are in a closed position. Expansion shields shall have a minimum 2-inch penetration into the concrete slab.

3.6 OVERHEAD -BRACED PARTITIONS

Secure pilasters to the floor with the anchorage device specified. Make all leveling devices readily accessible for leveling, plumbing, and tightening the installation. Secure overhead brace to the pilaster face with not less than two fasteners per face. Expansion shields shall have a minimum 50.8 mm 2-inch penetration into the concrete slab. Make tops of doors parallel with the overhead brace when doors are in a closed position.

SECTION 10 21 13 Page 10

3.7 FINAL ADJUSTMENT

After completion of the installation, make final adjustments to the pilaster-leveling devices, door hardware, and other working parts of the partition assembly. Doors shall have a uniform vertical edge clearance of approximately 5 mm 3/16 inch and shall rest open at approximately 30 degrees when unlatched.

3.8 CLEANING

Baked enamel finish shall be touched up with the same color of paint that was used for the finish. Clean all surfaces of the work, and adjacent surfaces soiled as a result of the work, in an approved manner compliant with the manufacturers recommended cleaning and protection from damage procedures until accepted. Remove all equipment, tools, surplus materials, and work debris from the site.