W911SA25QA133 Amendment 1 (f) 9-11-25.pdf
PDF 3 MB Posted
- Solicitation number
- W911SA25QA133
About this file
This document is an Amendment of Solicitation for a maintenance and repair services contract issued by the U.S. Army (W911 MICC FT McCoy). The amendment extends the offer due date from 17 September 2025 to 23 September 2025 at 10:00 AM CDT and includes responses to 20 vendor questions covering various contract details. Key clarifications include: proposal pricing should be based on the existing Repair, Preventive, and Immediate Emergency (RPIE) inventory, parts and materials for corrective maintenance must be included in firm-fixed-price Contract Line Item Numbers (CLINs), phase-in and phase-out periods are both 1 month long, and the Government will provide MAXIMO system access and training. The contract covers maintenance services for thirteen dispersed sites, with an estimated 500 annual service calls, and includes specific maintenance requirements for various equipment types across different maintenance frequencies.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of amendment one (1) is to:Block 14 (Description of Amendment/Modification):
1. Answer questions from vendors
2. Revise Attachment 1 - Price Schedule and Attachment 2 - Performance Work Statement
3. Update unit of measure on CLINs 0006 & 2006 from 1 Job to 1 Month
4. Extend the offer due date from 17 Sept 2025 to 23 Sept 2025 at 10:00 AM CDT All other terms and conditions of the solicitation remain unchanged.
The point of contact for this action is Deena Murphy, email: deena.l.murphy.civ@army.mil
Solicitation/Contract Form Continuation
The following changes have been made:
INFORMATION FROM TO
Response Due Date 17 Sep 2025 23 Sep 2025
Miscellaneous text in this section has been added to:
RESPONSE TO VENDOR QUESTIONS
Q1. The instructions to offerors in the RFP (Page 34 of 49) do not call for a technical or past performance volume. Is that correct? Noted there's a reference to Management Plan in the solicitation; is there a page limit?
A1. Offerors are not required to submit technical and past performance information as part of their proposal.
The Management Plan should be limited to 25 pages.
Q2. Since there is a significant cost to performing a RPIE, suggest a separate CLIN be added just for a
RPIE.
A2. The RPIE validation can occur during normal PM operations. It does not require a separate CLIN.
Q3. Attachment 01 - Price Schedule. CLIN 0001,1001, 2001 (Services Calls) asks for a unit price for each of the three categories of service calls and Used Oil Collection, Recycling and Disposal. Without knowing the types of service calls issued, it would be difficult to assign an overall unit price for each.
Recommend only asking for an overhead and profit rate for each category of call service.
A3. Please review Attachment 07 - Historical Workload to determine pricing.
Q4. Will the successful contractor be able to submit an initial deficiency list during the RPIE phase of the transition?
A4. Yes, a list may be submitted.
W911SA25QA1330001
Q5. Are the 500 annual service calls a not-to-exceed cap, a minimum guarantee, or simply an estimate? If fewer than 500 service calls are requested, will the contractor still receive the full firm-fixed-price payment? (Reference: Solicitation, Continuation of Supplies or Services and Prices/Costs, CLINs 0001 /1001/2001)
A5. The number of service calls is an estimate not a fixed, guaranteed quantity. The services will be funded with task order(s) and payment will be based on work performed and not a full firm fixed-price payment. As stated in FAR clause 52.216-22, the... "The quantities of supplies and services specified in the Price Schedule are estimates only and are not purchased by this contract." There is a minimum guarantee of $2,500, which can be found in FAR clause 52.216-19 Order Limitations.
Q6. Should proposal pricing be based strictly on the preventive maintenance frequencies listed in Technical Exhibit 03 - Detailed Equipment Inventory (TE-03), or should assumptions be made for future Government updates to the RPIE inventory?
A6. Proposal pricing should be based on the existing RPIE.
Q7. If the Government adds or removes assets from TE-03 after award, will there be a contract adjustment to pricing?
A7. The contractor would submit a Request for Equitable Adjustment to the contract price if a change ordered by the contracting officer affects the cost or time required for performance.
Q8. Are parts and materials for corrective maintenance expected to be included in the firm-fixed-price CLINs, or will they be reimbursed separately? If corrective maintenance materials are reimbursed separately, what markup or handling percentage is allowed?
A8. They should be included in the Firm Fixed Price.
Q9. For the Phase-In CLIN (0006), what specific activities should be included in pricing (e.g., CAC processing, background checks, safety training, MAXIMO setup, RPIE validation)?
A9. Please refer to PWS sections 1.2.14.1 and 1.2.14.2 for specifics
Q10. For the Phase-Out CLIN (2006), what specific activities should be included in pricing?
A10. Please refer to PWS sections 1.2.14.1 and 1.2.14.2 for specifics
Q11. Is there a fixed duration for phase-in and phase-out (e.g., 30 days), or should the contractor propose timelines? (Reference: Solicitation, Continuation of Supplies or Services and Prices/Costs, CLINs 0006 & 2006)
A11. The phase-in and phase-out are both 1 month in duration.
Q12. Should travel costs between the thirteen (13) dispersed sites (labor hours, mileage, lodging if required) be built into the firm-fixed-price, or will travel be reimbursed separately? (Reference: TE-01 [Facilities Site Index & Maps])
A12. There is no separate travel CLIN, so if reimbursement of travel costs is desired, it should be factored into the pricing of services.
Q13. What is the process for equitable adjustments if the actual workload differs significantly from the TE-03 inventory?
A13. The contractor would submit a Request for Equitable Adjustment, which would require review and approval from the contracting officer.
Q14. Will the Government provide MAXIMO user licenses and training, or should contractors include these costs in pricing?
A14. The Government will provide the contractor with access to the Maximo system, including user credentials and any necessary permissions. Additionally, the Government will provide training in using the Maximo system.
Q15. Is there an expected turnaround time for entering work orders and data into MAXIMO (e.g., same-day entry) that should drive staffing assumptions?
A15. See PWS section 5.3.1 and Table 5.3.1 for required timeframe.
Q16. For systems that require licensed or certified technicians (e.g., boilers, fire protection systems, backflow preventers), should these specialty services be assumed within firm-fixed-price CLINs?
(Reference: TE-03 [RPIE Inventory])
A16. Yes, the quoted price should include specialty services, when applicable.
Q17. Will third-party certifications and inspections performed by licensed subcontractors be reimbursed separately, or should they be included in the contractor's firm-fixed-price? (Reference: TE-03 [RPIE Inventory])
A17. Yes, it should be included as part of the contractor's pricing.
Q18. Many of the line items in TE-03 have a frequency of "NO PM REQUIRED" listed in column N. Is the contractor supposed to omit these items from consideration, or is the contractor still responsible to maintain these items? If the contractor is responsible to maintain all of these items, under which CLIN are they to be priced: CLIN 0002 Annual Maintenance, CLIN 0003 Semi Annual Maintenance, or CLIN 0004 Quarterly Maintenance?
A18. There is no PM requirement if the TE-03 Detailed Equipment Inventory states "No PM Required."
Q19. In the Attachment 01 Price Schedule, CLIN 0006 has no blue cell for the contractor to fill in. Is the contractor to price CLIN 0006? If so, where/how would the Government prefer this pricing be included?
A19. Please refer to the revised Price Schedule attachment as the cells for CLINs 0006 and 2006 have been updated.
Q20. Some of the PM Frequencies for line items in TE-03 do not line up with standard industry practice.
For example, the PM Frequency for boilers (item #2 in CLIN 0003) and elevators (item #4 in CLIN 0003) is listed as semi-annual in TE-03. However, standard industry practice is to do PMs on boilers monthly, as long as they are running/in-service. Is the contractor to perform only semi-annual maintenance on the boilers/elevators, or do we follow standard industry practice and conduct monthly maintenance? If monthly maintenance is required, how are offerors to price these PMs? (Reference: TE- 03 [RPIE Inventory], Attachment 01 [Price Schedule])
A20. The contractor will follow the frequencies listed in TE-03.
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0001 |
| EffDate: 10 SEP 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W911SA |
| AdmCode: |
| IssuedBy: W6QM MICC FT MCCOY (RC) |
KO DIRECTORATE OF CONTRACTIN, BLDG 1108 SOUTH R STREET
FORT MCCOY, WI 54656-5142
UNITED STATES
DEENA MURPHY, EMAIL: DEENA.L.MURPHY.CIV@ARMY.MIL TELEPHONE: 502-898-7816
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W911SA25QA133 |
| SolDate: 14 AUG 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: SEE SCHEDULE |
| ContNameTitle: |
| CoNameTitle: JAMES K. HUBERT |
| ContDate: |
| CODate: 11 SEP 2025 |
File details come from the government source that posted it. Updated .