W911QY-17-R-0003_ESPS_Solicitation_Amendment_0001.pdf

PDF 21 KB Posted

Attached to
Expeditionary Shelter Protection System (ESPS)
Solicitation number
W911QY-16-R-0003
Issued by

About this file

W911QY-17-R-0003 ESPS Solicitation Amendment 0001

View the file

Other files

File Type Posted
Attachment_0022_ESPS_Solicitation_Q&A_Revised_05Jan17.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised_04Jan17.pdf PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0007.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0007.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised_22Dec16.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised.pdf PDF
Attachment_0021_Past_Performance_Questionnaire.docx DOCX document
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0006.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0006.pdf PDF
Attachment_0023_5-10-2020_ESPS_REVD_Revised_13Dec16.pdf PDF
Attachment_0024_5-10-2021_SUPPORT_STRUT_ESPS_REVC_Revised_13Dec16.pdf PDF
Attachment_0025_5-10-2022_U-STRUT_HANDLE_ESPS_REVA_Revised_13Dec16.pdf PDF
Attachment_0026_5-10-2023_BLAST_PANEL_ESPS_REVD_Revised_13Dec16.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised_13Dec16.pdf PDF
Attachment_0027_5-10-0208_Ground_Anchor_Bracket_REVA_Added_13Dec16.pdf PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0005.pdf PDF
Attachment_0022_ESPS_Solicitation_Q&A_Revised_6Dec16.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0005.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A_Revised_15Nov16.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A_Revised_8Nov16.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0004.pdf PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0004.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0003.pdf PDF
Attachment_0024_5-10-2021_SUPPORT_STRUT_ESPS_Revised_4Nov2016.PDF PDF
Attachment_0025_5-10-2022_U-STRUT_HANDLE_ESPS_Revised_4Nov2016.PDF PDF
Attachment_0023_5-10-2020_ESPS_Revised_4Nov2016.PDF PDF
Attachment_0001_MIL-PRF-32521A_Revised_1Nov2016.pdf PDF
Attachment_0026_5-10-2023_BLAST_PANEL_ESPS_Revised_4Nov2016.PDF PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0003.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A_Revised_4Nov16.pdf PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0002.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A.pdf PDF
W911QY-17-R-0003_ESPS_Solicitation_Amendment_0002.pdf PDF
Attachment_0001_MIL-PRF-32521A_18Oct2016.pdf PDF
Attachment_0022_ESPS_Solicitation_Q A.pdf PDF
Attachment_0025_5-10-2022_U-STRUT_HANDLE_ESPS.PDF PDF
W911QY-17-R-0003_ESPS_Conformed_Solicitation_Amendment_0001.pdf PDF
Attachment_0023_5-10-2020_ESPS.PDF PDF
Attachment_0026_5-10-2023_BLAST_PANEL_ESPS.PDF PDF
Attachment_0024_5-10-2021_SUPPORT_STRUT_ESPS.PDF PDF
W911QY-17-R-0003_ESPS_Solicitation.pdf PDF
A018_ESPS_PCA_Summary_Report_22_May_2015.pdf PDF
A003_ESPS_MAC_14_May_2015.pdf PDF
Attachment_0007_ESPS_NET_SOW_26_May_2015.pdf PDF
A010_ESPS_NMWR_12_May_2015.pdf PDF
A017_ESPS_FAT_Plan_and_Report_22_May_2015.pdf PDF
Attachment_0010_DI-NDTI-80566A_Test_Plan.pdf PDF
Attachment_0014-3_DD_Form_1692_ECP(pg3).pdf PDF
Attachment_0002_ESPS_Provisioning_SOW_14_May_2015.pdf PDF
A019_ESPS_LAT_Plan_and_Report_22_May_2015.pdf PDF
Show 40 more

Latest 50 of 100 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update sections J.2 and J.3 to inlcude new draw ing attchments 0023-0026 and the questions & answ er attachment 0022. Attachment 0001 has been updated. All new and updated attachments have been posted to FBO.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Oct-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911QY-17-R-0003

X 9B. DATED (SEE ITEM 11)

13-Oct-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Oct-2016

CODE

W6QK ACC-APG NATICK

CONTRACTING DIVISION

BLDG 1 GENERAL GREENE AVENUE

NATICK MA 01760-5011

W911QY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911QY-17-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF DOCUMENTS

J.1 CONTRACT DATA REQUIREMENT LIST (CDRL)

CDRL# TITLE

A001 Maintenance Task Analysis (MTA) A002 Level of Repair Analysis (LORA) A003 Maintenance Allocation Chart (MAC) A004 Provisioning Parts List (PPL) A005 Engineering Data for Provisioning (EDFP) A006 Operator and Field Maintenance Manual A007 Manual Validation Plan and Report A008 Interactive Media Instruction (IMI) A009 Special Packaging Instructions (SPI) A010 National Maintenance Work Requirement (NMWR) A011 NMWR Validation Plan and Report

A012 NMWR PPL

A013 NMWR EDFP

A014 Safety Assessment Report (SAR) A015 Production Drawings A016 Monthly Progress Report A017 First Article Test (FAT) Plan and Report A018 Physical Configuration Audit (PCA) Summary Report A019 Lot Acceptance Testing (LAT) Plan and Report

J.2 LIST OF TECHNICAL ATTACHMENTS

ATTACHMENT# DESCRIPTION

0001 ESPS Performance Specification (MIL-PRF-32521) 0002 Provisioning Statement of Work 0003 Technical Publications Statement of Work 0004 Technical Manual Editable Matrix 0005 NMWR Statement of Work 0006 NMWR Editable Matrix 0007 IMI DVD Statement of Work

0008 DI-SESS-81000E

0009 MIL-STD-31000

0010 DI-NDTI-80566A

0011 DI-NDTI-80809B

0012 MIL-STD-882E

0013 DI-SAFT-80102B

W911QY-17-R-0003

0014-1 to 0014-7 ECP Form DD-1692 0015-1 to 0015-3 NOR Form DD-1695

0016 DI-CMAN-81022C

0017 DI-MGMT-80368

0018 Army Golden Master Vista 9.X Compliance Guidance 0019 PDM Dimensions

0023 5-10-2020 ESPS

0024 5-10-2021 Support Strut ESPS 0025 5-10-2022 U-Strut Handle ESPS 0026 5-10-2023 Blast Panel ESPS

J.3 LIST OF SOLICITATION ATTACHMENTS

ATTACHMENT# DESCRIPTION

0020 Past Performance Information 0021 Past Performance Questionnaire 0022 Solicitation Questions & Answers

(End of Summary of Changes)

File details come from the government source that posted it. Updated .