A010_ESPS_NMWR_12 May 2015
View the file
Other files
Show 40 more
Latest 50 of 100 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: A010 |
| 2_TITLE_OF_DATA_ITEM: National Maintenance Work Requirements (NMWR) Including Repair Parts and Special Tools Lists (RPSTL) for the Expeditionary Shelter Protection System |
| 3_SUBTITLE: NMWR 10-5450-252 |
| 4_AUTHORITY_Data_Acquisit: MIL-STD-40051-2B (XML) |
| 5_CONTRACT_REFERENCE: Technical Publications SOW |
| 6_REQUIRING_OFFICE: AMSTA-LCS-EB |
| 7_DID_250_REQ: DD |
| 8_APP_CODE: A |
| DIST_STATEMENT: A |
| 10_FREQUENCY: 3T |
| 11_AS_OF_DATE: 22 April 2015 |
| 12_DATE_OF_FIRST_SUBMISSI: See Blk 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: See Blk 16 |
| addressee1: AMSTA-LCS-EB |
| draft1: |
| reg1: |
| repro1: |
| addressee2: |
| draft2: |
| reg2: |
| repro2: |
| addressee3: Initial Submittal |
| draft3: |
| reg3: |
| repro3: |
| addressee4: Hard Copy |
| draft4: 2 |
| reg4: |
| repro4: |
| addressee5: Composed PDF |
| draft5: 1 |
| reg5: |
| repro5: |
| addressee6: XML Source File |
| draft6: 1 |
| reg6: |
| repro6: |
| addressee7: All TM Graphics Files |
| draft7: 1 |
| reg7: |
| repro7: |
| addressee8: Graphics Worksheet |
| draft8: 1 |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: Second Submittal |
| draft10: |
| reg10: |
| repro10: |
| addressee11: Hard Copy |
| draft11: 2 |
| reg11: |
| repro11: |
| addressee12: Composed PDF |
| draft12: 1 |
| reg12: |
| repro12: |
| addressee13: XML Source File |
| draft13: 1 |
| reg13: |
| repro13: |
| addressee14: All TM Graphics Files |
| draft14: 1 |
| reg14: |
| repro14: |
| addressee15: Graphics Worksheet |
| draft15: 1 |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: FRC Submittal |
| draft17: |
| reg17: |
| repro17: |
| addressee18: Hard Copy |
| draft18: |
| reg18: |
| repro18: 2 |
| addressee19: Composed PDF |
| draft19: |
| reg19: |
| repro19: 1 |
| addressee20: XML Source File |
| draft20: |
| reg20: |
| repro20: 1 |
| addressee21: All TM Graphics Files |
| draft21: |
| reg21: |
| repro21: 1 |
| addressee22: Graphics Worksheet |
| draft22: |
| reg22: |
| repro22: 1 |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 12 |
| total_repro: 6 |
| 16_REMARKS: Initial submission of the TM is due 60 days after Government acceptance of the Final Reproducible Copy (FRC) of the Expeditionary Shelter Protection System (ESPS) IMI DVD (CDRL A008) |
Second submission of the NMWR is due 60 days after Contractor receipt of Government mark-up of the Initial submission.
Verification conference will be held after Government acceptance of the Second submission. The Contractor will receive review comments for the Second Submission NMWR and master mark-up at the conclusion of the Verification Conference.
FRC of the NMWR is due 45 days after Contractor receipt of the NMWR master mark-up made as a result of the Verification conference.
The Government will review each submission and will determine acceptance or rejection of each submission. For the Initial and Second Submissions, if accepted, the Contractor will receive review comments within 60 days after the Government receipt of the each submission. For the FRC submission, the Government will determine acceptance or rejection with 45 days of receipt of the submission.
If a submission is rejected, the Contractor shall have 30 days from the date of notification to make necessary corrections and return to the Government. Each submission shall be considered a draft until accepted by the Government.
Each Submission will consist of: (1) Two hard copy NMWRs for distribution, (2) One compiled digital PDF file, (3) the XML source file with graphics embedded, (4) All graphics source files provided individually in 300 DPI .TIFF or .EPS format, and (5) a Graphics worksheet (MS Word or equivalent) as determined in the Statement of Work (SOW).
Each Submission shall be accompanied by a Letter of Transmittal.
Upon notification of the FRC acceptance by the Government, the contract can submit the Receiving Report (DD 250) through the Wide Area Work Flow (WAWF).
| 17_PRICE_GROUP: | |
| ESTIMATED_TOTAL_PRICE: | |
| G_PREPARED_BY: | |
| H_DATE: | |
| 1_APPROVED_BY: | |
| J_DATE: | |
| Page: | |
| reg38t: 0 | |
| A_CONTRACT_LINE_ITEM_NO: | |
| B_EXHIBIT: | |
| TDP: | |
| TM: X | |
| OTHER: | |
| DSYSTEMITEM: Expeditionary Shelter Protection System (ESPS) | |
| E_CONTRACTPR_NO: | |
| FCONTRACTOR: | |
| of_pages: | |
| Reset: | |
| 2015-05-04T17:38:17-0400 | |
| SHARON.LORRAINE.ANITA.1399679555 |
| 2015-05-11T15:03:13-0400 | |
| PITTS.SAMUEL.A.1390904548 |