W911QY-17-R-0003_ESPS_Solicitation.pdf
PDF 432 KB Posted
- Attached to
- Expeditionary Shelter Protection System (ESPS)
- Solicitation number
- W911QY-16-R-0003
About this file
W911QY-17-R-0003 ESPS Solicitation
View the file
Other files
Show 40 more
Latest 50 of 100 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C X D
EX
X
G F 52 - 56
57 - 68 X H 69 - 75 sean.g.auld.civ@mail.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 75
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W911QY 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
SEAN AULD 508-233-6183
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3 4 - 22
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
23 - 27 28 - 31
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
32 - 33 34 - 38
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 39 - 40 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 41 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
42 - 49
PART II - CONTRACT CLAUSES
W6QK ACC-APG NATICK
CONTRACTING DIVISION BLDG 1 KANSAS STREET
NATICK MA 01760-5011
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
50 - 51
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
13 Oct 2016
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W911QY-17-R-0003
Section A - Solicitation/Contract Form
SUPPLEMENTAL INFORMATION
A.1. The US Army Contracting Command-Aberdeen Proving Ground (ACC-APG), Natick Contracting Division has a requirement for Expeditionary Shelter Protection System (ESPS).
A.2. The Government plans to award a single Firm Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract as a result of this solicitation; however the Government reserves the right to award one or no contracts at the Governments discretion. The resulting contract will have an established minimum of fifty (50) ESPS Engineering, Manufacturing, and Development (EMD) Test Units. The anticipated contract is planned to be structured with a five (5) year ordering period that consists of the engineering and design of ESPS, fabrication of Test units, conduct of First Article Test (FAT), deliverable preparation and transition to full rate production and delivery of production units. Funds will be obligated for quantities ordered upon issuance of delivery orders and not by the basic contract.
A.3. This acquisition is for a 100% Small Business Set-Aside. The North American Industry Classification System (NAICS) code is 326130 and the standard size is 500 employees.
A.4 The offeror’s proposal will be evaluated in accordance with the evaluation criteria identified in Section M.
A.5. This solicitation is subject to the availability of funds. Proposals shall be valid for at least 120 days. Please annotate the last day the proposal will be valid. Firms will not be reimbursed for any cost associated with proposal preparation.
A.6. The solicitation including Exhibits and Attachments listed in Section J, may be downloaded from the solicitation posting located on https://www.fbo.gov/.
A.7. Proposals shall be valid for 180 days after the closing date of the solicitation. Contractors shall clearly indicate the period of validity.
A.8. Offerors will not be reimbursed for any proposal preparation costs.
A.9. Proposals are due NLT 2:00 P.M. EST 13 December 2016.
A.10. FAR Clause 52.219‐14 Limitations on Subcontracting has been included by full text in section I of the solicitation applies to the resulting contract.
A.11. DFARS Clauses 252.211‐7006 Passive Radio Frequency Identification (PRFID) and 252.211‐7003 Item Unique Identification and Valuation (IUIDV) apply and are incorporated in Section I of the solicitation.
A.12. DFARS 252.225‐7012 Preference for Certain Domestic Commodities (Berry Amendment) applies to the resultant contract.
A.13. Proposals shall be addressed to the following:
Army Contracting Command – Aberdeen Proving Ground Natick Contracting Division (CCAP‐SCN) Natick B Branch ATTN: Safoune Elalaoui Subject: W911QY‐17‐R‐0003 15 General Greene Avenue, Bldg 1, 3rd Floor Natick, MA 01760
A.14. Prior to hand delivering proposals offerors shall coordinate the delivery with Safoune Elalaoui via email at safouane.elalaoui.civ@mail.mil.
A.15. Offerors shall access http://www.assistdocs.com herein for all Mil‐STD’s referenced in this document for complete up to date information.
A.16. Any changes in the agreed upon arrangements are to be submitted to the Contracting Officer in advance for approval. In the event of any conflict or ambiguity between the Contractor's Technical Proposal and the Government's Performance Specification, the Government's Performance Specification takes precedence.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 50 Each Engr., Manuf., Dev. (EMD) Test Units
FFP
Fabrication of ESPS modules for EMD IAW section C.3.1.1 and attachment 0001.
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 15,000 Each Production Units
FFP
ESPS production units IAW section C.4.2. Offerors shall propose stepladder pricing in section B.2 of the solicitation. The maximum quantity per calendar year shall be 5,000.
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED Job Contractor Support
FFP
Contractor support IAW section C.3.4. Offerors shall propose their labor rates for this CLIN in section B.2. of the solicitation. The support requirements will be defined at the delivery order level. Delivery orders will be awarded based on the level of effort and the proposed labor rates in section B.2. This CLIN will not be included in the total evaluated price (TEP).
UNIT UNIT PRICE MAX AMOUNT
0004 1 Job FAT Testing
FFP
First Article Test (FAT) IAW section C.4.1.
UNIT UNIT PRICE MAX AMOUNT
0005 1 Job Maintenance Task Analysis (MTA)
FFP
MTA IAW section C.3.3.1 and CDRL A001.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0006 1 Job Level of Repair Analysis (LORA)
FFP
LORA IAW section C.3.3.2 and CDRL A002.
UNIT UNIT PRICE MAX AMOUNT
0007 1 Job Maintenance Allocation Chart (MAC)
FFP
MAC IAW section C.3.3.3 and CDRL A003.
0008 1 Job Provisioning Parts List (PPL)
FFP
PPL IAW section C.3.3.4 and CDRL A004.
0009 1 Job Engineering Data for Provisioning (EDFP)
FFP
EDFP IAW section C.3.3.5 and CDRL A005.
UNIT UNIT PRICE MAX AMOUNT
0010 1 Job Operator and Field Maintenance Manual
FFP
Operator and Field Maintenance Manual, to include Repair Parts and Special Tools List (RPSTL), IAW section C.3.3.6 and CDRL A006.
UNIT UNIT PRICE MAX AMOUNT
0011 1 Job Manual Validation Plan
FFP
Validation Plan for the Operator and Field Maintenance Manual, to include RPSTL, IAW section C.3.3.7 and CDRL A007.
UNIT UNIT PRICE MAX AMOUNT
0012 1 Job Manual Validation Report
FFP
Validation Report for the Operator and Field Maintenance Manual, to include RPSTL, IAW section C.3.3.7 and CDRL A007.
UNIT UNIT PRICE MAX AMOUNT
0013 1 Job Interactive Media Instruction (IMI)
FFP
IMI IAW section C.3.3.8 and CDRL A008.
UNIT UNIT PRICE MAX AMOUNT
0014 1 Job Special Packaging Instructions (SPI)
FFP
SPI IAW section C.3.3.9 and CDRL A009.
UNIT UNIT PRICE MAX AMOUNT
0015 1 Job National Maintenance Work Requirement
FFP
National Maintenance Work Requirement (NMWR) IAW section C.3.3.10 and
CDRL A010.
UNIT UNIT PRICE MAX AMOUNT
0016 1 Job Validation Plan for NMWR
FFP
Validation Plan for NMWR IAW section C.3.3.11 and CDRL A011.
UNIT UNIT PRICE MAX AMOUNT
0017 50 Job Validation Report for NMWR
FFP
Validation Report for NMWR IAW section C.3.3.11 and CDRL A011.
UNIT UNIT PRICE MAX AMOUNT
0018 1 Job PPL for NMWR
FFP
PPL for NMWR IAW section C.3.3.12 and CDRL A012.
UNIT UNIT PRICE MAX AMOUNT
0019 1 Job EDFP for NMWR
FFP
EDFP for NMWR IAW section C.3.3.13 and CDRL A013.
UNIT UNIT PRICE MAX AMOUNT
0020 1 Job Safety Assessment Report (SAR)
FFP
SAR IAW section C.3.3.14 and CDRL A014.
UNIT UNIT PRICE MAX AMOUNT
0021 1 Job Product Drawings and Associated Lists
FFP
ESPS Product Drawings and Associated Lists IAW section C.3.3.15 and CDRL A015.
UNIT UNIT PRICE MAX AMOUNT
0022 UNDEFINED
Monthly Progress Report
FFP
Monthly Progress Report IAW section C.3.3.16 and CDRL A016.
UNIT UNIT PRICE MAX AMOUNT
0023 1 Job First Article Test (FAT) Plan
FFP
FAT Plan IAW section C.4.1.1 and CDRL A017.
UNIT UNIT PRICE MAX AMOUNT
0024 1 Job First Article Test (FAT) Report
FFP
FAT Report IAW section C.4.1.3 and CDRL A017.
UNIT UNIT PRICE MAX AMOUNT
0025 1 Job PCA Summary Report
FFP
Physical Configuration Audit (PCA) Summary Report IAW section C.4.4.3 and
CDRL A018.
UNIT UNIT PRICE MAX AMOUNT
0026 1 Job Lot Acceptance Testing (LAT) Plan
FFP
LAT Plan IAW section C.4.3.1 and CDRL A019.
UNIT UNIT PRICE MAX AMOUNT
0027 1 Job Lot Acceptance Testing (LAT) Report
FFP
LAT Report IAW section C.4.3.3 and CDRL A019.
UNIT UNIT PRICE MAX AMOUNT
0028 1 Job Future Product Development (FPD)
FFP
Future product development work to be conducted by the contractor in partnership with the government to improve the ESPS to address emerging threats IAW section C.5. Offerors shall propose their labor rates for this CLIN in section B.2.
of the solicitation. The FPD requirements will be defined at the delivery order level. Delivery orders will be awarded based on the level of effort and the proposed labor rates in section B.2. This CLIN will not be included in the total evaluated price (TEP).
UNIT UNIT PRICE MAX AMOUNT
0029 1 Job Travel
FFP
Offerors shall not submit any pricing information for this CLIN. Travel is anticipated during the performance of this requirement. These costs cannot be accurately forecast at this time and are therefore awarded on a cost reimbursable basis and may be partially funded as indicated on the award document. Travel costs are limited to the constraints of FAR 31.205-46 and the Joint Travel Regulations.
All requests for travel must be submitted to the Contracting Officers Representative for approval at least 5 days prior to incurring costs. Travel will be reimbursed to the extent allowable pursuant to the Federal Travel Regulations (FTR). Profit is not allowed on travel.
UNIT UNIT PRICE MAX AMOUNT
0030 1 Job Shipping
FFP
Offerors shall not propose a price for this CLIN. The price for this CLIN will be negotiated at the delivery order level when shipping destinations are determined.
Shipping is required during the performance of this requirement. These costs cannot be accurately forecasted at this time and are therefore will be determined at the delivery order level when shipping destinations are known. The awardee shall be reimbursed on an actual cost basis for this shipping CLIN. This CLIN will not be included in the total evaluated price (TEP).
STEP LADDER PRICING
B.2 STEPLADDER PRICING
B.2.1 Proposed stepladder pricing for CLIN 0002 (Production Units)
Range Quantities
From: To: Unit Price:
1 20 $
21 50 $
51 500 $
501 5000 $
B.2.2 Proposed Labor Rates for CLIN 0003 (Contractor Support)
Year 1 Contractor Support
Labor Categories
Proposed Fully Burdened
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Engineer IV $
Engineer V $
Year 2 Contractor Support
Proposed Fully Burdened
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Year 3 Contractor Support
Proposed Fully Burdened
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Year 4 Contractor Support
Proposed Fully Burdened
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Year 5 Contractor Support
Proposed Fully Burdened
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
B.2.3 Proposed Labor Rates for CLIN 0028 (Future Product Development)
Year 1 Future Product Development
Proposed Fully Burdened
Hourly Rates
Manager $
Draftsman $
Trainer $
Tech Writer $
Administrative Support $
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Year 2 Future Product Development
Proposed Fully Burdened
Hourly Rates
Manager $
Draftsman $
Trainer $
Tech Writer $
Administrative Support $
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Year 3 Future Product Development
Proposed Fully Burdened
Hourly Rates
Manager $
Draftsman $
Trainer $
Tech Writer $
Administrative Support $
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Year 4 Future Product Development
Proposed Fully Burdened
Hourly Rates
Manager $
Draftsman $
Trainer $
Tech Writer $
Administrative Support $
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Year 5 Future Product Development
Proposed Fully Burdened
Hourly Rates
Manager $
Draftsman $
Trainer $
Tech Writer $
Administrative Support $
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Section C - Descriptions and Specifications
STATEMENT OF WORK
SECTION C – DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 BACKGROUND: The intent of this contract is to provide for the fabrication of the Expeditionary Shelter Protection System (ESPS). The ESPS shall be a ballistic panel and attachment system that protects Warfighters living and working in military shelter systems. The ESPS would improve expeditionary Warfighter survivability by providing rapidly deployable, mobile ballistic protection against small arms and fragmentation threats. The ESPS also would provide immediate protection to troops at the beginning of a deployment before more robust protection such as sandbags and concrete barriers are readily available.
C.2 GENERAL SCOPE: The contractor shall supply all necessary personnel, facilities, equipment and materials to accomplish the requirements set forth herein. The contractor shall produce fifty (50) complete ESPS modules, in accordance with CLIN 0001, for use during Government-conducted Engineering, Manufacturing, and Development (EMD) testing as required by the ESPS Performance Specification (Attachment 0001). The contractor shall also provide all logistic support material including a military technical manual, provisioning data, packaging data and training material in accordance with the contract requirements. All details for Technical Testing (TT), Logistics Demonstration (LD), and Early User Evaluation (EUE) to be conducted in the EMD phase will be provided in the approved ESPS Test and Evaluation Master Plan (TEMP). Upon successful completion of Government-conducted EMD testing, the contractor shall produce fifty (50) complete ESPS modules, in accordance with CLIN 0002, for contractor-conducted, Government-witnessed First Article Test (FAT). Upon completion of FAT, the contractor shall produce complete ESPS modules, in accordance with CLIN 0002 and in accordance with the quantities defined in Sections B and F of this solicitation.
C.3 EMD EFFORTS
C.3.1 EMD TESTING: The Government shall conduct all EMD testing in accordance with the ESPS Performance Specification (Attachment 0001).
C.3.1.1 EMD TEST UNITS: The contractor shall produce and deliver fifty (50) ESPS modules for use as EMD Test units during Government conducted EMD testing, which includes Technical Testing (TT), Logistics Demonstration (LD), and Early User Evaluation (EUE). The contractor shall supply any necessary tools, spare parts, and accessories necessary for EMD testing. The EMD Test units shall be production representative (i.e. fabricated using all materials, processes, fixtures, and tooling intended for use in production). The contractor shall provide a draft manual of commercial style for use during EMD testing. The draft manual shall include, as a minimum, material composition, baseline design premise, and setup and takedown instructions.
C.3.2 GOVERNMENT VERIFICATION OF TECHNICAL MANUAL (TM): TM Verification is a Government responsibility. Verification will be scheduled in accordance with the CDRL for Data Item A006. Verification will take place at Natick, MA unless otherwise specified by the contracting activity. The contractor shall consider verification support and conduct in the pricing proposal. The contractor shall take corrective action resulting from the Verification and furnish the Final Reproducible Copy (FRC), digitized and PDF submissions, no later than the date specified on the CDRL for Data Item A006 and Attachment 0003.
C.3.3 TECHNICAL DATA
C.3.3.1 MAINTENANCE TASK ANALYSIS: The contractor shall develop and produce a Maintenance Task Analysis (MTA) for the ESPS in accordance with Attachment 0002 and CDRL A001.
C.3.3.2 LEVEL OF REPAIR ANALYSIS: The contractor shall develop and produce a Level of Repair Analysis (LORA) for the ESPS in accordance with Attachment 0002 and CDRL A002.
C.3.3.3 MAINTENANCE ALLOCATION CHART: The contractor shall develop and produce a Maintenance Allocation Chart (MAC) for the ESPS in accordance with Attachment 0002 and CDRL A003.
C.3.3.4 PROVISIONING PARTS LIST: The contractor shall develop and produce a Provisioning Parts List (PPL) for the ESPS in accordance with Attachment 0002 and CDRL A004.
C.3.3.5 ENGINEERING DATA FOR PROVISIONING: The contractor shall develop and produce Engineering Data for Provisioning (EDFP) for the ESPS in accordance with Attachment 0002 and CDRL A005.
C.3.3.6 DEVELOPMENT AND PRODUCTION OF EQUIPMENT PUBLICATIONS: Contractor developed technical manuals (TM(s)) IAW MIL-STD-40051-2(B) including all changes, are a required component of each capability and no capability shall be deemed delivered or complete without the required, acceptable technical manuals. The contractor shall develop and produce an Operator and Field Maintenance Manual including Repair Parts and Special Tools List (RPSTL) for the ESPS in accordance with Attachments 0003 and 0004 and CDRL A006. The contractor, at no additional cost to the Government, shall incorporate changes resulting from all testing, TM Validation, Logistics Demonstration (LD), Early User Evaluation (EUE), and TM Verification into the manual.
The Contractor shall ensure that data deliverables accurately reflect all changes resulting from approved Design Change Notices (DCNs), Engineering Change Proposals (ECPs), Requests for Waiver (RFW), etc. The cost of data changes resulting from DCNs, ECPs and RFWs shall be included in the basic cost for these items.
C.3.3.7 VALIDATION PLAN AND REPORT FOR EQUIPMENT PUBLICATIONS: The contractor shall provide a Validation Plan and Report for Operator and Field Maintenance Manual including Repair Parts and Special Tools List (RPSTL) for the ESPS in accordance with Attachments 0003 and 0004 and CDRL A007.
C.3.3.8 INTERACTIVE MULTIMEDIA INSTRUCTION: The contractor shall develop and produce a contractor provided training video on DVD, Interactive Multimedia Instruction (IMI) on DVD, and user instructions to install and run the IMI DVD for the ESPS in accordance with Attachment 0007 and CDRL A008.
C.3.3.9 SPECIAL PACKAGING INSTRUCTIONS: The contractor shall develop and produce Special Packaging Instructions (SPI) for the ESPS in accordance with CDRL A009. All National Maintenance Work Requirement (NMWR) candidate items are considered SPI. When determining which type of container to use, reference MIL- STD-2073-1E (including all changes), Appendix C. Packaging processes and materials shall be described for cleaning, drying, preserving, unit, intermediate (as applicable), and exterior packing, marking, and unitization.
Figures and narrative data shall be developed to describe the form, fit, and function of packaging in sufficient detail for reproduction.
C.3.3.10 NATIONAL MAINTENANCE WORK REQUIREMENT: The contractor shall develop and produce a National Maintenance Work Requirement (NMWR) including Repair Parts and Special Tools List (RPSTL) for the ESPS in accordance with Attachments 0005 and 0006 and CDRL A010.
C.3.3.11 VALIDATION PLAN AND REPORT FOR NMWR: The contractor shall develop and produce a NMWR Validation Plan and Report for the ESPS in accordance with Attachments 0005 and 0006 and CDRL A011.
C.3.3.12 PROVISIONING PARTS LIST FOR NMWR: The contractor shall develop and produce a NMWR Provisioning Parts List (PPL) for the ESPS in accordance with Attachment 0002 and CDRL A012.
C.3.3.13 ENGINEERING DATA FOR PROVISIONING FOR NMWR: The contractor shall develop and produce a NMWR Engineering Data for Provisioning (EDFP) for the ESPS in accordance with Attachment 0002 and CDRL A013.
C.3.3.14 SAFETY ASSESSMENT REPORT: The contractor shall develop and produce a Safety Assessment Report (SAR) for the ESPS in accordance with Attachments 0012 and 0013 and CDRL A014.
C.3.3.15 PRODUCT DRAWINGS: The contractor shall develop and produce product drawings for the ESPS in accordance with Attachments 0008 and 0009 and CDRL A015. Prior to the completion of FAT, beginning with the design and fabrication of EMD Test Units, the contractor shall maintain internal configuration control of the product drawings. However, upon completion of FAT, the Government shall assume configuration control of the product drawings, and from that point further, any proposed changes to the drawings shall be submitted in the form of a PdM FSS approved Engineering Change Proposal (C.5.4.2).
C.3.3.16 MONTHLY PROGRESS REPORTS: The contractor shall develop and produce monthly progress reports for ESPS in accordance with Attachment 0017 and CDRL A016.
C.3.4 CONTRACTOR SUPPORT REQUIREMENTS
C.3.4.1 TESTING LOCATIONS: The Contractor may be present, at the Government’s discretion, during EMD testing at locations away from the contractor's facility. Locations may include Aberdeen Test Center, MD; a to-be determined Field location; and Natick, MA as described herein.
C.3.4.2 CONTRACTOR SUPPORT: The contractor may be required, at the Government’s request, to provide technical support throughout the five year ordering period. EMD testing that occurs at Aberdeen Proving Ground, MD or equivalent can be assumed to require two (2) trips of three (3) days each. Logistics Demonstration (LD), Early User Evaluation (EUE), and TM Verification that occurs at Natick Soldier Center, Natick, MA can be assumed to require two (2) trips of three (3) days each.
C.3.4.3 MEETINGS, REVIEWS, AND CONFERENCES: The Contractor shall ensure that all personnel and sub-contractors required for an adequate discussion of the contract effort are in attendance and prepared to support the Government at all meetings, reviews and conferences, as required. Scheduling of the meetings, reviews and conferences shall not change the delivery schedule of the contract.
C.3.4.3.1 POST AWARD CONFERENCE: A Post Award Conference shall be conducted within ten (10) days after contract award. The purpose of the conference shall be to provide a mutual understanding of the technical requirements, contractual requirements and the Quality Assurance (QA) provisions of the contract.
C.3.4.3.2 LOGISTICS GUIDANCE CONFERENCE AND MEETINGS: The contractor shall attend the Logistics Guidance Conference to be held within two (2) weeks after post award conference, and other meetings, reviews and conferences, as required, at locations to be specified by the Government. The Logistics Guidance Conference will be organized by the Government and will provide details concerning CDRL development. The contractor should be prepared to ask questions concerning all technical data development.
C.3.4.3.3 LOGISTICS DEMONSTRATION: The Government-managed Logistics Demonstration (LD) shall be conducted at Natick, MA after Government receipt of the Army Test and Evaluation Command (ATEC) Production Qualification Test (PQT) test report, after Contractor managed TM Validation, and after Government acceptance of the 2nd submission of the Technical Manual.
C.3.4.3.4 TECHNICAL MANUAL VALIDATION AND VERIFICATION CONFERENCES: A Contractor managed Technical Manual (TM) Validation Conference, a Government managed TM Verification Conference, and ongoing TM In-Process Reviews (IPRs) shall be required in accordance with Attachment 0003. All in-person TM meetings and conferences, other than the TM Validation shall be held at Natick, MA unless otherwise specified by the Government.
C.3.4.3.5 PROVISIONING CONFERENCE: A Provisioning Conference shall be conducted at a location acceptable to both Government and Contractor within 30 days after the Logistics Demonstration.
C.4 PRODUCTION EFFORTS
C.4.1 FIRST ARTICLE TEST: The contractor shall conduct Government-witnessed First Article Test (FAT) in accordance with the ESPS Performance Specification sections 4.2.1 and 4.2.3 (Attachment 0001).
C.4.1.1 FAT PLAN: The contractor shall develop and produce a FAT Plan for the ESPS in accordance with Attachment 0010 and CDRL A017. The plan shall include an inspection and test system to substantiate product conformance to drawings, specifications, and contract requirements and to all inspections and tests required by the resultant contract. The plan shall describe sample, in-process, and end items tests to be performed as required by the applicable specification. Test procedures shall include applicable test reference, required equipment to perform the test, location of the test, step by step instructions for the test, data to be recorded, and pass/fail criteria.
C.4.1.2 FAT UNITS: The contractor shall produce fifty (50) ESPS modules for assessment during FAT. The contractor shall supply any necessary tools, spare parts, and accessories necessary for FAT. The FAT units shall be production units (i.e. fabricated using all materials, processes, fixtures, and tooling for use in production).
C.4.1.3 FAT REPORT: The contractor shall develop and produce a FAT report in accordance with Attachment 0011 and CDRL A017. The contractor shall provide a copy of the FAT report to the Government no later than thirty (30) days after completion of FAT.
C.4.2 PRODUCTION UNITS: The contractor shall fabricate production units in accordance with the ESPS Performance Specification (Attachment 0001) and the configuration baseline established during EMD, and shall test them in accordance with their approved Test Plans and Procedures. Quantities shall be in accordance with Section B and deliveries shall be in accordance with Section F.
C.4.3 LOT ACCEPTANCE TEST: The Contractor shall conduct Lot Acceptance Tests (LATs) in accordance with the ESPS Performance Specification sections 4.2.2 and 4.2.3 (Attachment 0001).
C.4.3.1 LAT PLAN: The contractor shall develop and produce a Lot Acceptance Test (LAT) Plan for the ESPS in accordance with Attachment 0010 and CDRL A019. The plan shall include an inspection and test methodology to substantiate product conformance to drawings, specifications, and contract requirements and to all inspections and tests required by the resultant contract. The plan shall describe sample, in-process, and end items tests to be performed as required by the applicable specification. Test procedures shall include applicable test reference, required equipment to perform the test, location of the test, step by step instructions for the test, data to be recorded, and pass/fail criteria.
C.4.3.2 LAT UNITS: The contractor shall randomly select an ESPS module from each production lot to conduct LAT in accordance with the ESPS Performance Specification sections 4.2.2 and 4.2.3 (Attachment 0001). A lot shall be considered 50 complete ESPS modules or the quantity of one delivery order, whichever is fewer. The contractor shall supply any necessary tools, spare parts, and accessories necessary for LAT. The LAT unit shall be a production unit (i.e. fabricated using all materials, processes, fixtures, and tooling for use in production). Any change in materials, processes, fixtures, tooling, or lapse in production of greater than one month shall signal the beginning of a new lot.
C.4.3.3 LAT REPORT: For each LAT conducted, the contractor shall develop and produce a LAT report in accordance with Attachment 0011 and CDRL A019. The contractor shall provide a copy of the LAT report to the Government no later fifteen (15) days after completion of LAT.
C.4.4 CONFIGURATION MANAGEMENT: The contractor shall implement and maintain an internal configuration management program for the ESPS throughout the life of the contract.
C.4.4.1 CONFIGURATION CONTROL: The contractor shall use configuration control to manage proposed changes to the design beginning with the submission of the Production Qualification Test units. Configuration control shall be used to document the impact of proposed changes and to update configuration documentation.
Upon completion of FAT, the Government shall assume configuration control of the design, and the Contractor shall not alter the design in form, fit, or function without prior approval from the Contracting Officer, in the form of a PdM FSS approved Engineering Change Proposal.
C.4.4.2 ENGINEERING CHANGE PROPOSAL (ECP): An ECP shall be prepared for proposed changes. MIL- STD-973, Appendix D may be used for reference when preparing ECPs. Sample ECP and Notice Of Revision (NOR) forms are provided in Attachments 0014 and 0015. At a minimum, the ECP shall include the following:
a. Date Prepared
b. ECP Number
c. Justification and Priority Code
d. System Designation (i.e. Cage Code, nomenclature, model, P/N)
e. Name of Part (or Lowest Assembly) Affected
f. Baselines Affected
g. Title of Change
h. Description of Change
i. Need for Change
j. Effect on Interfaces (i.e. Integrated Logistics Support (ILS), Interchangeability and Interoperability)
k. Total Costs/Savings
l. Retrofit Information (if applicable)
m. Impact to Technical Data
C.4.4.3 PHYSICAL CONFIGURATION AUDIT SUMMARY REPORT: The Contractor shall develop and produce a Physical Configuration Audit (PCA) Summary Report at the completion of FAT, in accordance with Attachment 0016 and CDRL A018.
C.4.4.4 TECHNICAL MANUAL, INTERACTIVE MULTIMEDIA INSTRUCTION (IMI) DVD TRAINING
PRESENTATION AND TRAINING VIDEO OVER-PACK REQUIREMENTS: The contractor shall over-pack one copy of the Government furnished Department of the Army authenticated Technical Manual, a contractor provided Training video on DVD and a contractor provided Interactive Multimedia Instruction (IMI) Training Presentation on DVD per individual delivery order.
C.5 FUTURE PRODUCT DEVELOPMENT: As battlefield threats evolve, the Government may choose to further develop the ESPS product to address them. As such, the contractor shall be prepared to work in partnership with the Government to develop the ESPS, using the armor panels designed herein in a new or unique configuration, to provide enhanced protection.
Section D - Packaging and Marking
CLAUSES INCORPORATED BY FULL TEXT
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
Title: Number: Date: Tailoring:
Quality Management Systems ISO 9001:2008 15 NOV 2008
The Government is requiring that ISO 9001‐2008 is the minimal acceptable ISO standard.
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
PACKAGING AND MARKING
D.1 PRESERVATION AND PACKAGING
D.1.1 The Expeditionary Shelter Protection System (ESPS) including any attachments, special purpose kits, Basic Issue Items (BII), Components of End Item (COEI) and Initial Support Kit (ISK) shall be processed to the level of protection specified in the Delivery Order. ESPS modules shall be packaged in sets of twelve (12) modules to allow for efficient delivery and reduced dunnage. Each set of twelve modules, and all associated support equipment, shall be packaged to the level of protection specified in the Delivery Order. Spare ESPS modules and parts shall be individually packaged in the event that an individual spare module or part is required. These spare modules and parts shall be packaged to the level of protection specified in the Delivery Order.
D.1.2 All software, technical data, reports, and contractual documentation delivered under this contract shall be preserved and packaged to deter theft and assure safe arrival at destination without damage to contents.
D.1.3 Contractor shall preserve and package all spare and reparable items In Accordance With (IAW) the approved packaging data as generated and submitted by the Contractor and approved by the Government.
D.1.4 Consumable items, Training Aids, System Support Packages (SSP) and Special Tools scheduled for shipment shall be preserved and packaged by the Contractor to provide physical and mechanical protection, provide multiple handling, shipment by any mode, placed into storage for a period of one year in an enclosed environmentally controlled facility and suitable for redistribution without additional repackaging. Item shall be free of dirt and other contaminants. Coatings and preservatives applied to an item are not considered contaminants. Components susceptible to corrosion or deterioration shall be provided protection by means of preservative coatings, volatile corrosion inhibitors, desiccants, water proof and/or water vapor proof barriers. Components requiring protection from physical and mechanical damage shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration to prevent damage during handing and shipment.
D.1.4.1 In addition to Paragraph D.1.4 requirements, each item must comply with the regulations of the dedicated freight carrier used and shall provide safe delivery to destination at the lowest possible tariff cost. Any wood material used in the fabrication of Contractor’s generated Inter-stacking Pattern (ISP) packaging design must comply with requirement outlined in Paragraph D.1.5.
D.1.5 All Non-manufactured Wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. Box, pallet and dunnage and any wood used as inner packaging made of Non- Manufactured Wood shall be heat-treated. The box, pallet and dunnage manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box, pallet and dunnage manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment. All Non-manufactured wood products used for shipment to OCONUS locations MUST conform to the International Plant Protection Convention (IPPC) International Phytosanitary Measure-15 (ISPM-15).
D.1.6 For each hazardous material item shipped under this contract, a copy of the Safety Data Sheets, formerly known as Material Safety Data Sheet (MSDS) shall be placed into a sealed pouch and attached to the outside surface area of the Unit Container and Intermediate Container containing the prescribed hazardous material item. The contractor shall comply with the applicable codes and standards listed here: (1) Code of Federal Regulation Titles 29, 40 and 49, (2) International Maritime Dangerous Goods Code, for vessel transport, and (3) AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipments.
D.2 MARKING
D.2.1 When the ESPS will be shipped through the military distribution system or by commercial carriers, the ESPS shall be marked and labeled IAW MIL-STD-129 Revision R, Military Marking for Shipment and Storage.
D.2.2 All software, technical data, reports, etc. and contractual documentation referenced in Paragraph D.1.2 shall be identified by the prime contract number, name and address of the prime Contractor, and where applicable, the name and address of the subcontractor generating the data.
D.2.3 Each Non-manufactured wood box, pallet and dunnage shall be marked to show the conformance to the International Phytosanitary Measure-15 (ISPM-15). The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Wood used as dunnage for blocking and bracing shall be ordered with American Lumber Standard Committee (ALSC) certified markings or the markings may be applied locally at two foot intervals.
D.3 ITEM UNIQUE IDENTIFICATION (IUID)
D.3.1 IUID CONSTRUCT AND METHOD: The Contractor shall create the IUID and marking method in accordance with MIL-STD-130N, Change 1. The Contractor shall use IUID Construct #2. The UID marking shall include the UII on the IUID plate or label, or on the item identification plate, or directly on the item in 2D Data Matrix barcode symbology. The end item UID marking shall be embedded on the system data plate. A 2D Data Matrix, ECC 200 compliant bar code (ISO/IEC 16022) shall be used to carry the IUID data elements. The machine readable information (MRI) shall contain discrete elements including:
Unique item identifier (Construct 2) Enterprise Identifier Original Part Number Serial Number
D.3.2 IDENTIFICATION/DATA PLATE FOR END ITEMS: The Contractor shall use MIL-STD-130N, Change 1, as a guide when developing the “SYSTEM” data plate. The end item UID marking shall be embedded on the system data plate. The End Item 2D matrix shall contain human and machine-readable markings and shall be no less than 1 cm wide and no less than 40% contrast. The minimum data plate information for the Parent End Item is listed below:
Official Nomenclature National Stock Number (NSN) Design Activity: (MFR ID Cage Code) Government Ownership Designation: US Property Contract Number 2-dimensional IUID data matrix Unique Item Identifier (UII)
D.3.2.1 DATA PLATES FOR SUBASSEMBLIES, COMPONENTS, OR OTHER PARTS AS REQUIRED: All spare parts, secondary repairables, and consumables candidates that are determined from the DFARs clause 252.211-7003 shall also be marked with the IUID prior to delivery to the Government. The Contractor shall ensure all use MIL-STD-130N, Change 1, Figure 9 as a guide when developing the IUID marking for subassembly, component or parts. The Child End Item 2D matrix shall contain human and machine-readable markings when possible and shall be no less than 1 cm wide and no less than 40% contrast. If the item has a data plate the UID marking shall be embedded on the data plate.
D.3.2.2 IUID LOCATION AND MARKING: The locations and marking methods selected should bear no impact on the performance of the part and minimal configuration change(s) to the part. All 2D data matrix shall be permanently affixed and have the ability to withstand and perform within the same environmental conditions as the
SYSTEM.
The Contractor shall perform engineering analysis required to determine the appropriate method for marking each item that requires IUID. The Contractor shall ensure that the IUID marking location will be optimized for ease of scanning, and shall avoid applying IUID markings on curved or rounded surfaces.
The IUID marking should be incorporated into existing data plates when possible. The end item UID marking shall always be embedded on the system data plate. The Contractor shall document the location and marking method on the engineering technical documentation (e.g. drawings).
D.3.3 ITEM UNIQUE IDENTIFICATION (IUID) MARKING AND REGISTRATION: The contractor shall update the IUID marking of all “SYSTEM” unique components IAW MIL-STD-130N, Change 1, and the latest guidance found on the Defense Procurement and Acquisition Policy IUID website (http://www.acq.osd.mil/dpap/pdi/uid/index.html). The contractor shall develop and assign IUID constructs for components and assemblies and shall be applied to items IAW MIL-STD-130N, Change 1 or current revision. The contractor shall upload IUID records into the DoD registry.
D.3.3.1 IUID REGISTRATION: The prime Contractor has the responsibility to furnish IUID data to the IUID registry. The Contractor shall validate and verify all IUIDs in accordance with (IAW) MIL-STD-130N, Change 1 prior to registering the IUID with the DoD IUID Registry and shall ensure all item parent/child relationships are accurately recorded in the IUID Registry. Data submission of IUID data and acquisition cost should be submitted via Wide Area Work Flow (WAWF), IUID XML file, IUID flat file or web entry. Additional information regarding data submission as well as the actual marking can be found at http://www.acq.osd.mil/dpap/UID/.
D.3.3.2 IUID DATA RECORDS: The Contractor shall maintain an accurate, current list of UIIs for all items procured under this contract. This data shall include Lot or batch number (if there is serialization within the lot or batch number), UII, P/N, Serial Number, CAGE, Parent UII (if applicable), construct used, IUID location, type of marking, and registration method used. The data shall be prepared and delivered with each delivery order for all end items.
D.4 HARDWARE CHANGES IN IUID: For any hardware change as a result of a Government-approved ECP, the contractor shall make a recommendation and the Government will need to concur on the determination of tag locations. As changes are made to the “System”, the contractor shall use the above information in deciding if changes need to be made or revised to ensure IUID tag marking.
D.5 Technical Data shall be shipped to and marked as follows:
DoDAAC #W56T7W US Army Soldier Systems Center – Natick ATTN: SFAE-CSS-E2-FS (Ryan Devine – ESPS) Accountable Property Officer – Warehouse #20 Natick, MA 01760 Contract No. W911QY-17-D-XXXX
(508) 233-4633
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Origin Government Origin Government 0002 Origin Government Origin Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 0025 Destination Government Destination Government 0026 Destination Government Destination Government 0027 Destination Government Destination Government 0028 Destination Government Destination Government 0029 Destination Government Destination Government 0030 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(a) The Contractor shall test 50 unit(s) of Lot/Item 0002 as specified in this contract. At least 45 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report IAW CDRL A017. The test report shall be marked for US Army Soldier Systems Center – Natick, ATTN: SFAE-CSS-E2-FS (Ryan Devine – ESPS), Accountable Property Officer – Warehouse #20 Natick, MA 01760 marked "FIRST ARTICLE TEST REPORT: Contract No. W911QY- 16-D-XXXX, Lot/Item No. 0002" Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph
(b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
Section F - Deliveries or Performance
TECHNICAL DATA
F.1 DELIVERY OF TECHNICAL DATA
The contractor shall prepare and deliver all data and reports in accordance with requirements, quantities, and schedule set forth in the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .