A07 TE 7.12 Hydrant Inspection, Maintenance.pdf
PDF 2 MB Posted
- Solicitation number
- W52P1J-20-R-5001
About this file
This document contains a sources sought notice and related federal contract opportunity for base operations support services. The Army Contracting Command - Rock Island is seeking sources to identify contractors capable of providing base operations support services at the U.S. Army Garrison - Rock Island Arsenal in Rock Island, Illinois under NAICS code 561210. Services include municipal services, preventative maintenance, Army family housing management and maintenance, and work orders up to $150,000. Experience successfully using the GFEBS system on a military installation is required. The estimated period of performance is one base year plus four option years beginning no sooner than January 2021. Interested contractors should provide organizational information, three relevant project examples, cash flow and payment delay sustainment data, and DUNS, CAGE, SAM, and NAICS codes by the response deadline.
View the file
Other files
Show 40 more
Latest 50 of 94 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hydrant Inspection, Maintenance, and Flushing
Fire Hydrant
1) Maintenance and flushing timeframe.
a) Annually during the months of July - September.
2) The following tasks shall be accomplished during the annual maintenance:
a) Inspect hydrants visually. Evaluate whether painting is required.
b) Remove obstructions around hydrants.
c) Check hydrant height to match surface grade.
d) Check the breakaway device for damage on traffic model hydrants.
e) Check for main valve leakage throughout the process.
f) Check for the presence of water or ice in the hydrant barrel
g) Open the hydrant and flush to remove foreign material from the interior and lead.
h) Check the operation of the drain valve
i) Remove water from barrel on no drain hydrants
j) Using a listening device, check the main valve for leakage.
k) Check hydrant for ease of operation. Lubricate to improve operation.
l) Check for leakage at flanges, around outlet nozzles, at packing or seals, and around the operating stem.
m) Flush the drain outlets
n) Clean outlet nozzle caps threads, check the condition of the gaskets, and lubricate the threads.
o) Check outlet nozzle cap chains or cables for free action on each cap.
p) Check the lubrication of operating nut threads. Lubricate per the manufacturer's recommendation.
q) Locate and exercise the auxiliary valve.
Yard Hydrants
1) Annual Yard Hydrant maintenance and inspection timeframe:
a) Shall be conducted annually in April.
b) Activate yard hydrants at the valve for use in April.
c) De-activate yard hydrants in October.
2) Annual Yard Hydrant maintenance and inspection tasks:
a) Inspect nozzles.
b) Flow test nozzles to verify function and range of motion.
c) Lubricate nozzles.
d) Inspect hose houses for accessibility and physical condition.
e) Inspect and clean strainers.
f) Conduct flow test of yard hydrant.
TE 7.12 Hydrant Inspection, Maintenance and Flushing