A07 TE 7.20 Stormwater Observation Report.pdf

PDF 854 KB Posted

Attached to
Base Operations Support Services on the Rock Island Arsenal, Rock Island, Illinois
Solicitation number
W52P1J-20-R-5001
Issued by

About this file

This document contains a stormwater observation report and a related sources sought notice for base operations support services. The stormwater observation report outlines requirements to monitor and report on 14 representative stormwater outfalls on a quarterly basis, including observing for runoff, odors, snow, clarity, foam, oil sheens, settled solids, color, and suspended solids. It also provides notes on documentation requirements, permissible timeframes between observations, and annual reporting deadlines.

The related sources sought notice is to identify potential offerors for base operations support services at Rock Island Arsenal in Illinois, with an estimated period of performance of one base year plus four option years beginning no sooner than January 2021. Services include municipal operations for hydroelectric plants, water and sewer systems, utility meter reading, grounds maintenance, snow and ice removal, and preventative maintenance for infrastructure and facilities. Interested parties are requested to provide organizational details, three relevant past project examples, cash flow and payment delay capabilities, and SAM registration information.

View the file

Other files

File Type Posted
A07 Amendment 00006.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev L 16 Feb 2021.xlsx XLSX spreadsheet
A07 RIA Overarching revised 11 September 2020.pdf PDF
Contractor Questions 2.pdf PDF
Contractor Questions 1.xlsx XLSX spreadsheet
Contractor Questions 4.pdf PDF
Contractor Questions 3.pdf PDF
A07 TE 10.3 Bridge Maintenance Procedures (SOP) 20200807.pdf PDF
A07 TE 1.7 Government Furnished Facilities revised 20200807.pdf PDF
A07 Att 4 Facility Maintenance Vertical revised 20200805.pdf PDF
A07 Att 5 Facility Maintenance Army Family Housing revised 20200807.pdf PDF
A07 Att 1 Definitions Acronyms and Regulations revised 20200821.pdf PDF
A07 TE 3.1 Snow and Ice Removal Standard Operating revised20200805.pdf PDF
A07 Att 2 Grounds Maintenance revised 20200808.pdf PDF
A07 RIA Overarching (OA) PWS BASEOPS revised 20200805.pdf PDF
A07 Att 3 Pavement Clearance revised 20200808.pdf PDF
DRAFT EVALUATION CRITERIA.pdf PDF
A07 ATTACHMENT 0006 Access Control Record Check Request Form.pdf PDF
A07 DRAFT SITE VISIT SCHEDULE AND RESERVATIONS.pdf PDF
A07 DRAFT SOLICITATION 10 JUNE 2020.pdf PDF
A07 Attachment 0008 ContractorVendor Guide - Contract Opportunities - beta.sam.gov - a Compi.._.pptx PPTX presentation
A07 TE 4.12 Electrical System Maintenance Procedures.pdf PDF
A07 TE 6.8 Auxiliary Emergency Generators.xlsx XLSX spreadsheet
A07 TE 6.3 RIA Sign Inventory.xlsx XLSX spreadsheet
A07 TE 6.7 Electrical Distribution Equip.xlsx XLSX spreadsheet
A07 TE 9.3 Specific Operator Maintenance Requirements.xlsx XLSX spreadsheet
A07 TE 4.15 Fire Alarm Systems.xlsx XLSX spreadsheet
A07 TE 1.7 Government Furnished Facilities.pdf PDF
A07 TE 4.13 Electrical System Equipment.xlsx XLSX spreadsheet
A07 TE 10.2 Bridge Operating Procedures (SOP).pdf PDF
A07 TE 5.6 Recreational Areas and Playgrounds AFH.pdf PDF
A07 TE 4.18 Playground Equipment.pdf PDF
A07 Att 1 Definitions Acronyms and Regulations.pdf PDF
A07 Att 6 Facility Maint Horizontal.pdf PDF
A07 TE 4.4 Eye Washes and Safety Showers.pdf PDF
A07 TE 4.7 List of Air Compressors.xlsx XLSX spreadsheet
A07 Att 7 Water Wastewater Stormwater Ops and Maint.pdf PDF
A07 TE 4.9 Hot Water Tanks.pdf PDF
A07 TE 7.3 Unidirectional Flushing Plan.pdf PDF
A07 TE 5.5 Off Post Housing Adequacy Checklist.pdf PDF
A07 DRAFT Pricing Matrix 12 May 2020.xlsx XLSX spreadsheet
A07 TE 5.8 Change of Occupancy Checklist Pest Control.pdf PDF
A07 TE 4.11 Oil Water Separator List.xlsx XLSX spreadsheet
A07 TE 8.2 Food Handling Establishments.xlsx XLSX spreadsheet
A07 TE 7.10 Water Distribution Valves.pdf PDF
A07 TE 1.4 RIA Spill Prevention Contingency and Countermeasure Plan 2017.pdf PDF
A07 TE 7.6 Major Components of Sanitary Sewer System.pdf PDF
A07 TE 7.21 RIA Flood Emergency Plan 2018.pdf PDF
A07 TE 6.5 Electrical Distribution.pdf PDF
A07 TE 4.14 Lightning Protection System Maintenance.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Code Time

Discharge Name (Associated Structures)

1 Outfall D93 (Manhole D93)

2 Outfall D92 (Manhole D92)

3 Outfall D98 (Manhole D98)

4 Outfal D105

5 Oufall F14 (Catch Basin)

6 Outfall 295 (Sluice Gate)

7 Pump Station 295

8 Outfall E56

9 Outfall 127 (Manhole 127)

10 Outfall C39 (Manhole C39)

11 Outfall C45 (Manhole C45)

12 Sluice Gate #3 at Test Track

13 Sluice Gate and Catch Basin SE of Building 40

14 Sluice Gate and Outfall at Building 25

Code Description

R Runoff

N No water present

O Odor

Sn Snow

C Clarity

F Foam

OS Oil Sheen

Se Settled Solids

Co Color

SS Suspended Solids

Notes:

- Must observe each representative outfall once per quarter from a storm event greater than 0.1 inches rainfall

-Observation must be made during daylight hours and within 1 hour of the runoff event

-Observation must be a minimum of 72 hours between rain events

-Annual report of quarterly observations due to IL EPA by 31 October of each calendar year

- IAW Permit No.: ILR001154

Location of Rain Gauge:

Reading at Rain Gauge (in inches):

Observations taken by:

Signature:

Outfall ID Notes

Date:

Stormwater Observation Report (Technical Exhibit 7.20)

Quarter/ Fiscal Year:

TE 7.20 Stormwater Observation Report

TE 7.20 Stormwater Observation Report 1

File details come from the government source that posted it. Updated .