This document contains standard operating procedures for bridge operations and emergency power procedures on a federal facility. It outlines the normal steps for opening and closing the swing span bridge, including activating warning lights, clearing traffic, operating controls to turn the span, and aligning the bridge. Emergency power can be provided from a nearby lock and dam, with procedures to switch to this source including coordinating with personnel, ensuring power loads are off, transferring the power supply, and later reconnecting to main power. Procedures are also defined for locking and unlocking the swing span bridge through placing and removing locking devices on lifting mechanisms and railroad tracks.

A related federal sources sought notice seeks capabilities statements from contractors to provide base operations support services at a military installation, with an estimated performance period of one base year plus four option years beginning in January 2021. Services may include municipal operations such as hydroelectric plant operations, water and sewage systems, utility meter reading, grounds maintenance, snow removal and pest management. Preventative maintenance is also required for utilities, structures and roads. Experience with the GFEBS system on a military base is mandatory. Responses are requested to include organizational details, references, financial information, DUNS and CAGE codes, and SAM registered NAICS codes.

View the file

Other files

File Type Posted
A07 Amendment 00006.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev L 16 Feb 2021.xlsx XLSX spreadsheet
A07 RIA Overarching revised 11 September 2020.pdf PDF
Contractor Questions 2.pdf PDF
Contractor Questions 1.xlsx XLSX spreadsheet
Contractor Questions 4.pdf PDF
Contractor Questions 3.pdf PDF
A07 TE 10.3 Bridge Maintenance Procedures (SOP) 20200807.pdf PDF
A07 TE 1.7 Government Furnished Facilities revised 20200807.pdf PDF
A07 Att 4 Facility Maintenance Vertical revised 20200805.pdf PDF
A07 Att 5 Facility Maintenance Army Family Housing revised 20200807.pdf PDF
A07 Att 1 Definitions Acronyms and Regulations revised 20200821.pdf PDF
A07 TE 3.1 Snow and Ice Removal Standard Operating revised20200805.pdf PDF
A07 Att 2 Grounds Maintenance revised 20200808.pdf PDF
A07 RIA Overarching (OA) PWS BASEOPS revised 20200805.pdf PDF
A07 Att 3 Pavement Clearance revised 20200808.pdf PDF
DRAFT EVALUATION CRITERIA.pdf PDF
A07 ATTACHMENT 0006 Access Control Record Check Request Form.pdf PDF
A07 DRAFT SITE VISIT SCHEDULE AND RESERVATIONS.pdf PDF
A07 DRAFT SOLICITATION 10 JUNE 2020.pdf PDF
A07 Attachment 0008 ContractorVendor Guide - Contract Opportunities - beta.sam.gov - a Compi.._.pptx PPTX presentation
A07 TE 4.12 Electrical System Maintenance Procedures.pdf PDF
A07 TE 6.8 Auxiliary Emergency Generators.xlsx XLSX spreadsheet
A07 TE 6.3 RIA Sign Inventory.xlsx XLSX spreadsheet
A07 TE 6.7 Electrical Distribution Equip.xlsx XLSX spreadsheet
A07 TE 9.3 Specific Operator Maintenance Requirements.xlsx XLSX spreadsheet
A07 TE 4.15 Fire Alarm Systems.xlsx XLSX spreadsheet
A07 TE 7.20 Stormwater Observation Report.pdf PDF
A07 TE 1.7 Government Furnished Facilities.pdf PDF
A07 TE 4.13 Electrical System Equipment.xlsx XLSX spreadsheet
A07 TE 5.6 Recreational Areas and Playgrounds AFH.pdf PDF
A07 TE 4.18 Playground Equipment.pdf PDF
A07 Att 1 Definitions Acronyms and Regulations.pdf PDF
A07 Att 6 Facility Maint Horizontal.pdf PDF
A07 TE 4.4 Eye Washes and Safety Showers.pdf PDF
A07 TE 4.7 List of Air Compressors.xlsx XLSX spreadsheet
A07 Att 7 Water Wastewater Stormwater Ops and Maint.pdf PDF
A07 TE 4.9 Hot Water Tanks.pdf PDF
A07 TE 7.3 Unidirectional Flushing Plan.pdf PDF
A07 TE 5.5 Off Post Housing Adequacy Checklist.pdf PDF
A07 DRAFT Pricing Matrix 12 May 2020.xlsx XLSX spreadsheet
A07 TE 5.8 Change of Occupancy Checklist Pest Control.pdf PDF
A07 TE 4.11 Oil Water Separator List.xlsx XLSX spreadsheet
A07 TE 8.2 Food Handling Establishments.xlsx XLSX spreadsheet
A07 TE 7.10 Water Distribution Valves.pdf PDF
A07 TE 1.4 RIA Spill Prevention Contingency and Countermeasure Plan 2017.pdf PDF
A07 TE 7.6 Major Components of Sanitary Sewer System.pdf PDF
A07 TE 7.21 RIA Flood Emergency Plan 2018.pdf PDF
A07 TE 6.5 Electrical Distribution.pdf PDF
A07 TE 4.14 Lightning Protection System Maintenance.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE 10.2 Bridge Operating Procedures (SOP)

TE 10.2 Bridge Operating Procedures (SOP) 1

SOP: SWING SPAN BRIDGE OPERATION

SECTION 1 - PROCEDURES FOR OPENING AND CLOSING OF SWING

SPAN

Normal steps involved in opening and closing of swing span (sometimes called turning of the bridge).

1. Turn on advanced warning lights 5 minutes prior to a turn.

2. Turn on "Bridge Open" lights.

3. Sound air whistle.

4. Monitor camera system throughout following procedures.

5. Stop and clear all traffic to include pedestrians.

6. Close all vehicle and pedestrian gates and barriers.

7. Operate Interlocking Controls.

a. Disengage rail-locks.

b. Lower bridge ends.

c. Operate control levers to turn swing span.

8. Align opened bridge.

9. Allow vessel to pass.

10. Close bridge.

11. Align bridge in closed position.

12. Raise bridge ends.

13. Engage rail-locks

14. Open all vehicle and pedestrian gates and barriers.

15. Resume bridge traffic.

16. Turn off "Bridge Open" and advance warning lights.

TE 10.2 Bridge Operating Procedures (SOP) 2

SECTION 2 - PROVIDE ALTERNATE ELECTRICAL POWER FROM LOCK

AND DAM #15

1. Coordinate with on duty personnel from Lock 15 for any operation that requires switching to auxiliary power. Only one operation (Lock gate/valve or Bridge) can be accommodated at a time while both operations are on the emergency generator.

2. Operator must ensure that any power draw is turned OFF or disconnected before switching to emergency power.

3. Place the transfer switch handle in the control tower attic in the middle (neutral, open) position.

4. Inside the breaker panel box marked (SB), on the inside east wall of the bridge workshop, verify that the emergency power switch #1 is in the OFF position.

5. Connect the emergency power cable stored in the workshop area beneath the bridge swing span from the outlet on the outside of the shop wall to the one on the bridge structure.

6. Inside the breaker panel box marked (SB), on the inside east wall of the bridge workshop, place the emergency power switch #1 in the ON position.

7. Place the transfer switch handle located in the operating tower attic in the DOWN (emergency power) position. Front cover is marked.

8. Perform normal turning procedures, except swing span can only be turned 90 degrees and back (Due to cable length).

9. Reconnect to main power supply when it is restored by reversing the procedure.

SECTION 3 - LOCKING AND UNLOCKING SWING SPAN

Normal steps involved in locking and unlocking swing span bridge.

1. Locking:

a. Place locking devices onto lifting mechanisms. This is done on both ends of the swing span (designated J-1 and J-2).

b. Attach railroad-interlocking locks to each rail at both ends of swing span (8 total).

TE 10.2 Bridge Operating Procedures (SOP) 3

c. Unhook all roadway and sidewalk gate control arms and lock the gates in open position.

2. Unlocking:

a. Remove and store locking devices used on lifting mechanism.

b. Remove and store locking bars used on railroad interlocking.

c. Connect all roadway and sidewalk gate control arms to motors and unlock