A07 TE 6.4 Sign Replacement Requirements.pdf

PDF 276 KB Posted

Attached to
Base Operations Support Services on the Rock Island Arsenal, Rock Island, Illinois
Solicitation number
W52P1J-20-R-5001
Issued by

About this file

This document outlines requirements for a base operations support services contract on the Rock Island Arsenal in Illinois. The U.S. Army Contract Command - Rock Island is seeking information from businesses capable of providing municipal services, preventative maintenance, demand maintenance orders up to $2,500, project work orders from $2,500 to $150,000, and housing management support. Services include hydroelectric plant operations, water and sewage system maintenance, utility meter reading, grounds maintenance, snow removal, pest management and more. Firms must demonstrate experience utilizing the GFEBS system on a military base. Interested parties should provide details on relevant past project experience along with organizational information and System for Award Management registration by January 2021 for a one year base period plus four option years beginning no later than that date. The point of contact is listed for any questions.

View the file

Other files

File Type Posted
A07 Amendment 00006.pdf PDF
A07 Pricing Matrix RIA Base Ops Rev L 16 Feb 2021.xlsx XLSX spreadsheet
A07 RIA Overarching revised 11 September 2020.pdf PDF
Contractor Questions 2.pdf PDF
Contractor Questions 1.xlsx XLSX spreadsheet
Contractor Questions 4.pdf PDF
Contractor Questions 3.pdf PDF
A07 TE 10.3 Bridge Maintenance Procedures (SOP) 20200807.pdf PDF
A07 TE 1.7 Government Furnished Facilities revised 20200807.pdf PDF
A07 Att 4 Facility Maintenance Vertical revised 20200805.pdf PDF
A07 Att 5 Facility Maintenance Army Family Housing revised 20200807.pdf PDF
A07 Att 1 Definitions Acronyms and Regulations revised 20200821.pdf PDF
A07 TE 3.1 Snow and Ice Removal Standard Operating revised20200805.pdf PDF
A07 Att 2 Grounds Maintenance revised 20200808.pdf PDF
A07 RIA Overarching (OA) PWS BASEOPS revised 20200805.pdf PDF
A07 Att 3 Pavement Clearance revised 20200808.pdf PDF
DRAFT EVALUATION CRITERIA.pdf PDF
A07 ATTACHMENT 0006 Access Control Record Check Request Form.pdf PDF
A07 DRAFT SITE VISIT SCHEDULE AND RESERVATIONS.pdf PDF
A07 DRAFT SOLICITATION 10 JUNE 2020.pdf PDF
A07 Attachment 0008 ContractorVendor Guide - Contract Opportunities - beta.sam.gov - a Compi.._.pptx PPTX presentation
A07 TE 4.12 Electrical System Maintenance Procedures.pdf PDF
A07 TE 6.8 Auxiliary Emergency Generators.xlsx XLSX spreadsheet
A07 TE 6.3 RIA Sign Inventory.xlsx XLSX spreadsheet
A07 TE 6.7 Electrical Distribution Equip.xlsx XLSX spreadsheet
A07 TE 9.3 Specific Operator Maintenance Requirements.xlsx XLSX spreadsheet
A07 TE 4.15 Fire Alarm Systems.xlsx XLSX spreadsheet
A07 TE 7.20 Stormwater Observation Report.pdf PDF
A07 TE 1.7 Government Furnished Facilities.pdf PDF
A07 TE 4.13 Electrical System Equipment.xlsx XLSX spreadsheet
A07 TE 10.2 Bridge Operating Procedures (SOP).pdf PDF
A07 TE 5.6 Recreational Areas and Playgrounds AFH.pdf PDF
A07 TE 4.18 Playground Equipment.pdf PDF
A07 Att 1 Definitions Acronyms and Regulations.pdf PDF
A07 Att 6 Facility Maint Horizontal.pdf PDF
A07 TE 4.4 Eye Washes and Safety Showers.pdf PDF
A07 TE 4.7 List of Air Compressors.xlsx XLSX spreadsheet
A07 Att 7 Water Wastewater Stormwater Ops and Maint.pdf PDF
A07 TE 4.9 Hot Water Tanks.pdf PDF
A07 TE 7.3 Unidirectional Flushing Plan.pdf PDF
A07 TE 5.5 Off Post Housing Adequacy Checklist.pdf PDF
A07 DRAFT Pricing Matrix 12 May 2020.xlsx XLSX spreadsheet
A07 TE 5.8 Change of Occupancy Checklist Pest Control.pdf PDF
A07 TE 4.11 Oil Water Separator List.xlsx XLSX spreadsheet
A07 TE 8.2 Food Handling Establishments.xlsx XLSX spreadsheet
A07 TE 7.10 Water Distribution Valves.pdf PDF
A07 TE 1.4 RIA Spill Prevention Contingency and Countermeasure Plan 2017.pdf PDF
A07 TE 7.6 Major Components of Sanitary Sewer System.pdf PDF
A07 TE 7.21 RIA Flood Emergency Plan 2018.pdf PDF
A07 TE 6.5 Electrical Distribution.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A07 Te 6.4 Sign Replacement Requirements

A07 Te 6.4 Sign Replacement Requirements 1

TE 6.4 SIGN REPLACEMENT REQUIREMENTS

Sign Replacement Requirements

Newly installed or replaced signs shall meet the following requirements:

- All hardware shall be corrosion resistant, using nylon washers against sign face.

- Sign posts shall be square, 2”x2”x12’, 14 gauge full punched galvanized steel.

Perforated posts shall have 7-16” diameter holes on 1” centers that run the full length of the post.

- All sleeves shall be installed to a forty eight inch (48”) depth.

- Sign post anchor sleeves shall be 2.25”x2.25”x4’, 12 gauge thickness, with full punch holes, and have galvanized finish.

- In rock locations, rock shall be drilled until forty eight inch (48”) depth is obtained.

The bottom twenty-four inches (24”) of rock-drilled holes shall be grouted after sleeves are installed.

- Sign post sleeves shall protrude between 1.5 and 2.5 inches out of ground once completely installed. Material matching surrounding material shall be used to backfill hole.

- All signs installed shall bear a weatherproof installation date sticker (available from most sign manufacturers) attached to back of sign.

File details come from the government source that posted it. Updated .