This solicitation requests proposals for an indefinite delivery indefinite quantity contract to provide 608 commercial jet engines, spare engines, support, spares, equipment and data to re-engine the B-52 bomber fleet. Proposals are due by July 22, 2020. The contract will have a basic period of six years with the option to extend to a total of 17 years. The contract will include firm fixed price and time and materials contract line items for program management, field support representatives, engineering studies, non-recurring engineering, rapid prototype and production engines, data, installation and removal services, maintenance, repair, and overhaul. The estimated value is to be determined. The solicitation is open to all responsible sources and is intended as a competitive commercial acquisition under FAR Part 12 with a justification to limit sources to qualified vendors. The place of performance will be at contractor and government facilities including Tinker Air Force Base.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 18, 2020
ATTACHMENT N
SHOP VISIT REPORT REQUIREMENTS
Block 4: Section I- Introduction to include:
a. Report from field of reason for removal of item
b. Condition of item on arrival at repair facility
c. Inspections performed on item by Task Number listed in applicable Technical Data
d. Results of inspections on item stating the electrical and physical test requirements and parameters which the item does not meet
e. Use photographic evidence to support non-conforming material.
Section I-Summary to include:
a. Price and repair time to return item to serviceable condition; Proposed and actual repairs performed on item to return to serviceable condition
b. A list of all complied service actions
c. A list of any replaced serialized component
Section I Conclusions to include:
a. Actual repairs performed on item to return to serviceable condition by Task Number listed in the applicable Technical Data
b. Results of performance tests following repair completion