SOW Attach L-Safety Report.pdf
PDF 108 KB Posted
- Attached to
- B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
- Solicitation number
- FA8107-19-R-0002
About this file
This document contains a solicitation for the B-52 Commercial Engine Replacement Program engine contract. The Air Force is seeking to acquire 608 new commercial engines to re-engine the B-52 bomber fleet through an indefinite delivery indefinite quantity contract with a potential period of performance of up to 17 years. The contract will include program management, field support representatives, engineering studies, prototype and production engines, spare parts, support equipment, data, maintenance, repair, and training. Proposals are due by July 22, 2020. The contract is anticipated to be awarded in June 2021 to qualify vendors. Pricing will include firm-fixed-price, time-and-materials, and not-separately-priced CLINs. The solicitation is designated NAICS code 336412 with a size standard of 1,500 employees.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 18, 2020
ATTACHMENT L
SAFETY REPORT
Block 4: 2. Format. The SAR shall be presented in the style as defined in Propulsion Center of
Excellence's (PCoE) Best Practice (BP) 99-06E (see SOW Attachment X – Flight Safety Risk
Management Process), AFMAN 20-116, and Mil-Std-882E. The Contractor shall provide a narrative and the method by which the safety issue was discovered.
3.2.b. A brief historical summary of the safety and reliability of the affected system/component driving the risk.
3.4.a. Description of methodology to accomplish the risk analysis (e.g. Weibull, Monte Carlo, Log Normal).
3.4.b. The resulting determined Baseline Risk as measured against the NRIFSD and ERLOA events thresholds established in AFMAN 20-116.
3.5.a. A recommended solution/mitigation to reduce the baseline risk to an acceptable level in accordance with the NRIFSD and ERLOA events thresholds established in AFMAN 20-116. The solution/mitigation shall concentrate on an integrated systems engineering approach to provide a revised product that eliminates the failure conditions experienced in field operational usage.
Interim, Corrective Action, Target, and Cumulative risk shall be identified. The results shall further be presented in the format identified in PCoE BP 99-06E Appendix B.