Appendix D-B-52 CERP Pricing Matrix-10June2020-Protected.xlsx

XLSX spreadsheet 110 KB Posted

Attached to
B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
Solicitation number
FA8107-19-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

This federal solicitation seeks proposals for a new indefinite delivery/indefinite quantity supply contract to provide 608 commercial jet engines, spare engines, support, equipment, and data to re-engine the B-52 bomber fleet over 17 years. The contract will include program management, field service representative support at multiple bases, engineering studies, rapid prototype and production engines, non-recurring engineering, data, inspection and repair services, removal and installation, maintenance, training, repair, and over and above requirements. Proposals are due July 22, 2020 with contract award anticipated in June 2021. Pricing will be fixed price or firm fixed price for many items and time and materials for engineering studies, repair, and other requirements.

View the file

Other files for this federal contract opportunity

Other files attached to B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract, newest first.
File Type Posted
RFP QA 2.pdf PDF
RFP QA 1.pdf PDF
List of Attachments (Amend1).pdf PDF
FA810719R0002_______0001.pdf PDF
CERP_Schedule_06.04.20.pdf PDF
B-52 CERP JandA Redacted.pdf PDF
CDRLs A046 thru A081 15 May 2020.pdf PDF
CDRLs A001 thru A020 15 May 2020.pdf PDF
SOW Attach L-Safety Report.pdf PDF
SOW Attach K-AMT Engine Report.pdf PDF
SOW Attach S-Engineering Data for Provisioning.pdf PDF
CDRLs A108 thru A127 15 May 2020.pdf PDF
SOW Attach Z-Trip Report Template.docx DOCX document
SOW Attach N-Shop Visit Report.pdf PDF
SOW Attach F-IPC-IPB.pdf PDF
Appendix I-Rights In Data.docx DOCX document
Appendix E-Addendum to FAR 52.212-1.pdf PDF
SOW Attach P-LHI Checklist Questionnaire.pdf PDF
CDRLs A083 thru A107 15 May 2020.pdf PDF
Appendix B-CDRL Data Rights List.pdf PDF
Appendix H-Base Index Report.pdf PDF
Appendix D-Pricing Matrix-Protected.xlsx XLSX spreadsheet
SOW Attach J-AMT Engine Plan.pdf PDF
Appendix F-Addendum to FAR 52.212-2.pdf PDF
Appendix A-SOW CERP Engine Contract.pdf PDF
SOW Attach R-Provisioning Technical Documentation.pdf PDF
Limited Distribution Document Request Instructions.docx DOCX document
Appendix C-DD Form 254.pdf PDF
SOW Attach Y-CEMS Requirements.pdf PDF
SOW Attach A-Acronym List.pdf PDF
List of Attachments.pdf PDF
SOW Attach H-DOP ELMP Template.pdf PDF
CDRLs A021 thru A045 15 May 2020.pdf PDF
SOW Attach E-Manual Requirements.pdf PDF
SOW Attach O-FFP Inspection and Repair.pdf PDF
SOW Attach M-Workscope Requirements.pdf PDF
SOW Attach D-NRE Exclusion List.pdf PDF
FA810719R0002.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Calculation Methodology B-52 Commercial Engine Replacement Program

CLIN DESCRIPTION Calculation Methodology

Engine Program Management
XX01Program ManagementThe proposed unit price per year is multiplied by the evaluation quantity per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX02FSR Support - Barksdale AFB
XX03FSR Support - Minot AFB
XX04FSR Support - Installation Location
XX05Program Management TBN Per OccurrenceNOT EVALUATED
XX06Travel and Per Diem - To Be Negotiated (TBN) Per Occurrence - Applied from Travel G&A Rates for Travel on Row 161The proposed Travel G&A rate per year is multiplied by the Evaluation Travel Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX07Engineering Studies - TBN Per Occurrence - Applied from Engineering Fixed Hourly Labor Rates on Row 150The proposed Engineering Fixed Hourly Labor Rate per year is multiplied by the Evaluation Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX08Reserved
Rapid Prototype Engines (B-52 Configuration)
XX09Rapid Prototype Engines - 18 Mo DeliveryOfferors shall enter a proposed unit price for each quantity range for each year as applicable. The weighted average unit price is calculated by multiplying the proposed unit price for each range by the applicable weighting (percentage) for each range and then the results of each range are added together to establish the weighted unit price (for each year).

The weighted unit price per year is multiplied by the TPP evaluation quantity for each applicable year to establish an extended total price for each year. The sum of the extended total price of all years equals the TPP for the CLIN. The weighted average unit price is for evaluation purposes only. The government will pay the proposed unit price of the applicable quantity range in the year engines are ordered.

XX10Non-Recurring Engineering - Modify COTS Engine to B-52 ConfigurationOfferors shall enter a proposed unit price for each applicable year. The SubCLIN unit price is calculated by averaging all proposed unit prices per SubCLIN per year. The straight average unit price is multiplied by the TPP evaluation quantity of 1 (one) to establish an extended total price for each SubCLIN. For these SubCLINs, the TPP is the same as the extended total price. The straight average unit price is for evaluation purposes only. SubCLINs XX10AA-XXAE will only be purchased once and the government will pay the proposed unit price of the year purchased.
XX10AANon-Recurring Engineering - Systems Requirements Review (SRR)
XX10ABNon-Recurring Engineering - Preliminary Design Review (PDR)
XX10ACNon-Recurring Engineering - Critical Design Review (CDR)
XX10ADNon-Recurring Engineering - Test Readiness Review (TRR)
XX10AENon-Recurring Engineering - Airworthiness Certification Criteria Report
XX11Rapid Prototype Instrumented Engines - 18 Mo DeliveryOfferors shall enter a proposed unit price for each quantity range for each year as applicable. The weighted average unit price is calculated by multiplying the proposed unit price for each range by the applicable weighting (percentage) for each range and then the results of each range are added together to establish the weighted unit price (for each year).

The weighted unit price per year is multiplied by the TPP evaluation quantity for each applicable year to establish an extended total price for each year. The sum of the extended total price of all years equals the TPP for the CLIN. The weighted average unit price is for evaluation purposes only. The government will pay the proposed unit price of the applicable quantity range in the year engines are ordered.

Production Engines (B-52 Configuration - up to 8 ordering periods)
XX12Production Engines - LRIP 12 Mo DeliveryOfferors shall enter a proposed unit price for each quantity range for each year as applicable. The weighted average unit price is calculated by multiplying the proposed unit price for each range by the applicable weighting (percentage) for each range and then the results of each range are added together to establish the weighted unit price (for each year).

The weighted unit price per year is multiplied by the TPP evaluation quantity for each applicable year to establish an extended total price for each year. The sum of the extended total price of all years equals the TPP for the CLIN. The weighted average unit price is for evaluation purposes only. The government will pay the proposed unit price of the applicable quantity range in the year engines are ordered.

XX13Production Engines - LRIP 18 Mo Delivery
XX14Production Engines - FRP 18 Mo Delivery
XX15Reserved
XX16Non-Recurring Engineering - TBN Per Occurrence - Applied from Engineering Fixed Hourly Labor Rates on Row 150The proposed Engineering Fixed Hourly Labor Rate per year is multiplied by the Evaluation Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX17Spares Parts - TBN Per Occurrence - Applied from OEM Material Handling Rates on Row 160The proposed OEM Material Handling Rate per year is multiplied by the Evaluation Material Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
Support / Test Equipment / Tooling
XX18Support / Test Equipment / Tooling - FFP Pricing at Support Equipment Tab (Insert total Price for each year from Support Equipment Tab)The proposed unit price per year is multiplied by the proposed Estimated Quantity for each year as applicable in the Support Equipment tab. The total price per year is entered into the B52 CERP tab and multiplied by a quantity of 1 (one) per year to establish the extended total price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX19Support/Test Equipment/Tooling - TBN Per Occurrence (Not Pre-Priced on Support Equipment Tab) - Applied from proposed Subcontractor Material Handling Rates on Row 159The proposed Subcontractor Material Handling Rate per year is multiplied by the Evaluation Material Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX20Transportation/ Misc. Shipping - TBN Per Occurrence - Applied from proposed Transportation/Misc. Shipping G&A Rates on Row 162The proposed Transportation/Misc. Shipping Ceiling G&A rate per year is multiplied by Evaluation Transportation/Shipping Misc. Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
Data (Not Separately Priced)
XX21Data
Data (Separately Priced)
XX22Data (Separately Priced) - TBN Per Occurrence - Applied from Engineering Fixed Hourly Labor Rates on Row 150The proposed Engineering Fixed Hourly Labor Rate per year is multiplied by the Evaluation Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX23Depot Level ProvisioningOfferors shall enter a proposed unit price for each applicable year. The separately priced data CLIN unit price is calculated by averaging all proposed unit prices per CLIN per year. The straight average unit price is multiplied by the TPP evaluation quantity of 1 (one) to establish an extended total price for each CLIN. For these CLINs, the TPP is the same as the extended total price. The straight average unit price is for evaluation purposes only. CLINs XX23-XX32 will only be purchased once and the government will pay the proposed unit price of the year purchased.
XX24Depot Product Drawings/Models/Schematics
XX25Depot Peculiar Support Equipment
XX26Depot Level Spares
XX27Depot Engine Build-Up Manuals
XX28Depot Component Maintenance Manuals
XX29Depot Engine Standard Practices Manuals
XX30Commercial Tech Data Package (TDP)
XX31Lead-the-Fleet/Analytical Condition Inspection (LtF/ACI)
XX32Accelerated Mission Test (AMT)
Inspection and Repair
Inspection/Test
XX33Receiving InspectionThe proposed unit price per year is multiplied by the evaluation quantity per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX34Tear-Down and Inspect
XX35Diagnostic Test Cell Run
XX36Acceptance Test Cell Run
XX37Reserved
Removal
XX38Removal - Quick Engine ChangeThe proposed unit price per year is multiplied by the evaluation quantity per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX39Removal - Gearbox
XX40Removal - Fan/Low Pressure Compressor
XX41Removal - High Pressure Compressor
XX42Removal - Combustor
XX43Removal - Low Pressure Turbine
XX44Removal - High Pressure Turbine
XX45Reserved
Installation
XX46Install - Quick Engine ChangeThe proposed unit price per year is multiplied by the evaluation quantity per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX47Install - Gearbox
XX48Install - Fan/Low Pressure Compressor
XX49Install - High Pressure Compressor
XX50Install - Combustor
XX51Install - Low Pressure Turbine
XX52Install - High Pressure Turbine
XX53Reserved
Disassemble/Assemble
XX54Disassemble- Assemble - GearboxThe proposed unit price per year is multiplied by the evaluation quantity per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX55Disassemble - Assemble - Fan/Low Pressure Compressor
XX56Disassemble - Assemble - High Pressure Compressor
XX57Disassemble - Assemble - Combustor
XX58Disassemble - Assemble - Low Pressure Turbine
XX59Disassemble - Assemble - High Pressure Turbine
XX60Change Handedness Configuration
XX61Reserved
XX62Disassemble - Assemble - Top Half of EngineThe proposed unit price per year is multiplied by the evaluation quantity per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX63Reserved
XX64Reserved
XX65Reserved
XX66Reserved
XX67Reserved
XX68Reserved
Repair To Be Negotiated - Per Occurrence
XX69Repair Labor/Material - LRUs - TBN Per Occurrence - Applied from Subcontractor Material Handling Fixed Rates on Row 159The proposed Subcontractor Material Handling Rate per year is multiplied by the Evaluation Material Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX70Repair Labor Maintenance - TBN Per Occurrence - Applied from Maintenance Fixed Hourly Labor Rates on Row 147The proposed Maintenance Fixed Hourly Labor Rate per year is multiplied by the Evaluation Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX71Repair Labor - Engineering - TBN Per Occurrence -Applied from Engineering Fixed Hourly Labor Rates on Row 150The proposed Engineering Fixed Hourly Labor Rate per year is multiplied by the Evaluation Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX72CFT Maintenance - TBN Per Occurrence - Applied from Field Team Maintenance Fixed Hourly Labor Rates on Row 153The proposed Field Team Support Maint. Fixed Hourly Labor Rate per year is multiplied by the Evaluation Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX73CFT Engineering - TBN Per Occurrence - Applied from Field Team Engineering Fixed Hourly Labor Rates on Row 154The proposed Field Team Support Eng. Fixed Hourly Labor Rate per year is multiplied by the Evaluation Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX74Repair Materials - TBN Per Occurrence - Applied from OEM Material Handling Rates on Row 160The proposed OEM Material Handling Rate per year is multiplied by the Evaluation Material Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX75Repair Shipping - TBN Per Occurrence - Applied from Transportation/Misc. Shipping Rates on row 162The proposed Transportation/Misc. Shipping Ceiling G&A rate per year is multiplied by Evaluation Transportation/Shipping Misc. Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
Training
XX76Maintenance TrainingThe proposed unit price per year is multiplied by the evaluation quantity per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX77Follow-On Maintenance Training
XX78Reserved
O&A - To Be Negotiated Per Occurrence
XX79O&A Repair Labor Maintenance - TBN Per Occurrence - Applied from Maintenance Fixed Hourly Labor Rates on Row 147The proposed Maintenance Fixed Hourly Labor Rate per year is multiplied by the Evaluation Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX80O&A Repair Materials - TBN Per Occurrence - Applied from OEM Material Handling Rates on Row 160The proposed OEM Material Handling Rate per year is multiplied by the Evaluation Material Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX81O&A Transportation/Shipping - TBN Per Occurrence - Applied from Transportation/Misc. Shipping Rates on row 162The proposed Transportation/Misc. Shipping Ceiling G&A rate per year is multiplied by Evaluation Transportation/Shipping Misc. Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX82O&A Travel - TBN Per Occurrence - Applied from Travel G&A Rates on Row 161The proposed Travel G&A rate per year is multiplied by the Evaluation Travel Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the TPP for the CLIN.
XX83Reserved
Rates
Maintenance Fixed Hourly Rate*Proposed Rates applied to applicable CLINs
Maintenance Overtime Rate*
Maintenance Premium Rate*
Engineering Fixed Hourly Rate**
Engineering Overtime Rate**
Engineering Premium Rate**
Field Team Maintenance Fixed Hourly Rate***
Field Team Engineering Fixed Hourly Rate***
Field Team Maintenance Overtime Rate***
Field Team Engineering Overtime Rate***
Field Team Maintenance Premium Rate***
Field Team Engineering Premium Rate***
Subcontractor Material Handling Rate
OEM Material Handling Rate
Travel G&A Rate
Transportation/Misc. Shipping G&A Rate
Total Proposed Price (TPP)The extended total amount of all CLINs will be added to establish the Total Proposed Price

Appendix D RFP FA8107-19-R-0002

&ASource Selection Information See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLYPage &P of &N

B52 CERP

Offeror:Input Offeror Name
Instructions: Offeror's shall provide proposed unit prices in the yellow highlighted cells in Columns E - U. The remaining cells are password protected and shall not be changed or manipulated. Refer to the Calculation Methodology tab for details on how each CLIN is calculated for establishing the TPP.FINAL - APPENDIX D PRICING MATRIX
B-52 Commercial Engine Replacement Program

10 June 2020

CLINContract TypeDESCRIPTIONUnit of IssueProposed Unit PriceEvaluation QuantitiesExtended Totals
Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12Year 13Year 14Year 15Year 16Year 17Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12Year 13Year 14Year 15Year 16Year 17Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12
20212022202320242025202620272028202920302031203220332034203520362037
Engine Program Management
XX01FFPProgram ManagementMonthly1212121212121212121212121212121212$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX02FFPFSR Support - Barksdale AFBMonthly1212121212121212121212$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX03FFPFSR Support - Minot AFBMonthly1212121212121212121212$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX04FFPFSR Support - Installation LocationMonthly121212121212121212121212$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX05TBN (FFP)Program Management TBN Per OccurrenceEA
XX06TBN (FFP)Travel and Per Diem - To Be Negotiated (TBN) Per Occurrence - Applied from Travel G&A Rates for Travel on Row 161EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 20,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00
XX07TBN (FFP)Engineering Studies - TBN Per Occurrence - Applied from Engineering Fixed Hourly Labor Rates on Row 150EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 01001001001001001005005005005005001,0001,0001,0001,0001,0001,000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX08FFPReserved
Rapid Prototype Engines (B-52 Configuration)BEQ for Engine Ordering Only for CLIN XX09
XX09FFPRapid Prototype Engines - 18 Mo DeliveryEA0660000
See Note 8 for Engine Ordering ProceduresQty Range 1-12 / 0.55 Weighting0.55
Qty Range 13-50 / 0.30 Weighting0.30
Qty Range 51 or greater / 0.15 Weighting0.15BEQ for Calculation of the TPP Only for CLIN XX09
Weighted Average Unit Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 01661111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX10FFPNon-Recurring Engineering - Modify COTS Engine to B-52 Configuration
XX10AAFFPNon-Recurring Engineering - Systems Requirements Review (SRR)EA$ - 0$ - 0
Average Unit Price SubCLIN XX10AA$0.001$0.00
XX10ABFFPNon-Recurring Engineering - Preliminary Design Review (PDR)EA$ - 0$ - 0$ - 0
Average Unit Price SubCLIN XX10AB$0.001$0.00
XX10ACFFPNon-Recurring Engineering - Critical Design Review (CDR)EA$ - 0$ - 0$ - 0$ - 0
Average Unit Price SubCLIN XX10AC$0.001$0.00
XX10ADFFPNon-Recurring Engineering - Test Readiness Review (TRR)EA$ - 0$ - 0$ - 0$ - 0
Average Unit Price SubCLIN XX10AD$0.001$0.00
XX10AEFFPNon-Recurring Engineering - Airworthiness Certification Criteria ReportEA$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price SubCLIN XX10AE$0.001$0.00
XX11FFPRapid Prototype Instrumented Engines - 18 Mo DeliveryEABEQ for Engine Ordering Only for CLIN XX11
See Note 8 for Engine Ordering ProceduresQty Range 1-12 / 0.70 Weighting0.700440000
Qty Range 13 or greater / 0.30 Weighting0.30BEQ for Calculation of the TPP Only for CLIN XX11
Weighted Average Unit Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 01441111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Production Engines (B-52 Configuration - up to 8 ordering periods)
XX12FP/EPAProduction Engines - LRIP 12 Mo DeliveryEABEQ for Engine Ordering Only for CLIN XX12
See Note 8 for Engine Ordering ProceduresQty Range 1-26 / 0.30 Weighting0.30000440000
Qty Range 27-78 / 0.40 Weighting0.40
Qty Range 79 or greater / 0.30 Weighting0.30BEQ for Calculation of the TPP Only for CLIN XX12
Weighted Average Unit Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0111441111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX13FP/EPAProduction Engines - LRIP 18 Mo DeliveryEABEQ for Engine Ordering Only for CLIN XX13
See Note 8 for Engine Ordering ProceduresQty Range 1-26 / 0.30 Weighting0.30000052000
Qty Range 27-78 / 0.40 Weighting0.40
Qty Range 79 or greater / 0.30 Weighting0.30BEQ for Calculation of the TPP Only for CLIN XX13
Weighted Average Unit Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0111152111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX14FP/EPAProduction Engines - FRP 18 Mo DeliveryEA
See Note 8 for Engine Ordering ProceduresQty Range 1-44 / 0.20 Weighting0.20BEQ for Engine Ordering Only for CLIN XX14
Qty Range 45-102 / 0.35 Weighting0.3500007094102102100660000
Qty Range 103-142 / 0.35 Weighting0.35
Qty Range 143 or greater / 0.10 Weighting0.10BEQ for Calculation of the TPP Only for CLIN XX14
Weighted Average Unit Price$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 011117094102102100661111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX15FP/EPAReserved
XX16TBN (FFP)Non-Recurring Engineering - TBN Per Occurrence - Applied from Engineering Fixed Hourly Labor Rates on Row 150EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0320320320320320800800800360320320$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX17TBN (FFP)Spare Parts - TBN Per Occurrence - Applied from OEM Material Handling Rates on Row 160EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 1,000,000$ 1,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 5,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000.00$ 1,000,000.00$ 5,000,000.00$ 5,000,000.00$ 5,000,000.00$ 5,000,000.00$ 1,000,000.00$ 1,000,000.00$ 1,000,000.00$ 1,000,000.00$ 1,000,000.00
Support / Test Equipment / Tooling
XX18FFPSupport / Test Equipment / Tooling - FFP Pricing at Support Equipment Tab (Insert total Price for each year from Support Equipment Tab)EA1111111111111111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX19TBN (FFP)Support/Test Equipment/Tooling - TBN Per Occurrence (Not Pre-Priced on Support Equipment Tab) - Applied from proposed Subcontractor Material Handling Rates on Row 159EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 25,000$ 25,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 25,000.00$ 25,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00
XX20TBN (FFP)Transportation/ Misc. Shipping - TBN Per Occurrence - Applied from proposed Transportation/Misc. Shipping G&A Rates on Row 162EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00
Data (Not Separately Priced)
XX21NSPDataLO
Data (Separately Priced)
XX22TBN (FFP)Data (Separately Priced) - TBN Per Occurrence - Applied from Engineering Fixed Hourly Labor Rates on Row 150EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 05050505050501001007550502002002001007550$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX23FFPDepot Level ProvisioningEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX23$0.001$0.00
XX24FFPDepot Product Drawings/Models/SchematicsEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX24$0.001$0.00
XX25FFPDepot Peculiar Support EquipmentEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX25$0.001$0.00
XX26FFPDepot Level SparesEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX26$0.001$0.00
XX27FFPDepot Engine Build-Up ManualsEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX27$0.001$0.00
XX28FFPDepot Component Maintenance ManualsEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX28$0.001$0.00
XX29FFPDepot Engine Standard Practices ManualsEA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX29$0.001$0.00
XX30FFPCommercial Tech Data Package (TDP)EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX30$0.001$0.00
XX31FFPLead-the-Fleet/Analytical Condition Inspection (LtF/ACI)EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX31$0.001$0.00
XX32FFPAccelerated Mission Test (AMT)EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Average Unit Price CLIN XX32$0.001$0.00
Inspection and Repair
Inspection/Test
XX33FFPReceiving InspectionEA111111212121818182424242424$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX34FFPTear-Down and InspectEA111111212121818182424242424$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX35FFPDiagnostic Test Cell RunEA111111212121818182424242424$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX36FFPAcceptance Test Cell RunEA111111212121818182424242424$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX37FFPReserved
Removal
XX38FFPRemoval - Quick Engine ChangeEA111118881212121616161616$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX39FFPRemoval - GearboxEA111116669991212121212$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX40FFPRemoval - Fan/Low Pressure CompressorEA111119991414141818181818$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX41FFPRemoval - High Pressure CompressorEA111116669991212121212$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX42FFPRemoval - CombustorEA1111144466688888$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX43FFPRemoval - Low Pressure TurbineEA11111222288816161616$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX44FFPRemoval - High Pressure TurbineEA11111222288816161616$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX45FFPReserved
Installation
XX46FFPInstall - Quick Engine ChangeEA111118881212121616161616$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX47FFPInstall - GearboxEA111116669991212121212$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX48FFPInstall - Fan/Low Pressure CompressorEA111119991414141818181818$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX49FFPInstall - High Pressure CompressorEA111116669991212121212$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX50FFPInstall - CombustorEA1111144466688888$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX51FFPInstall - Low Pressure TurbineEA11111222288816161616$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX52FFPInstall - High Pressure TurbineEA11111222288816161616$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX53FFPReserved
Disassemble/Assemble
XX54FFPDisassemble- Assemble - GearboxEA1111133355566666$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX55FFPDisassemble - Assemble - Fan/Low Pressure CompressorEA111117771010101414141414$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX56FFPDisassemble - Assemble - High Pressure CompressorEA1111155577799999$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX57FFPDisassemble - Assemble - CombustorEA1111144466688888$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX58FFPDisassemble - Assemble - Low Pressure TurbineEA11111222288816161616$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX59FFPDisassemble - Assemble - High Pressure TurbineEA11111222288816161616$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX60FFPChange Handedness ConfigurationEA1111111111111111$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX61FFPReserved
XX62FFPDisassemble - Assemble - Top Half of EngineEA111111212121818182424242424$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX63Reserved
XX64Reserved
XX65Reserved
XX66Reserved
XX67Reserved
XX68Reserved
Repair To Be Negotiated - Per Occurrence
XX69TBN (FFP)Repair Labor/Material - LRUs - TBN Per Occurrence - Applied from Subcontractor Material Handling Fixed Rates on Row 159EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 160,000$ 160,000$ 160,000$ 160,000$ 160,000$ 960,000$ 960,000$ 960,000$ 1,440,000$ 1,440,000$ 1,440,000$ 1,920,000$ 1,920,000$ 1,920,000$ 1,920,000$ 1,920,000$ 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$ 960,000.00$ 960,000.00$ 960,000.00$ 1,440,000.00$ 1,440,000.00$ 1,440,000.00
XX70TBN (FFP)Repair Labor Maintenance - TBN Per Occurrence - Applied from Maintenance Fixed Hourly Labor Rates on Row 147EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 040404040402004006009009009001,2001,2001,2001,2001,200$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX71TBN (FFP)Repair Labor - Engineering - TBN Per Occurrence -Applied from Engineering Fixed Hourly Labor Rates on Row 150EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 04040404040969696144144144192192192192192$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX72TBN (FFP)CFT Maintenance - TBN Per Occurrence - Applied from Field Team Maintenance Fixed Hourly Labor Rates on Row 153EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 040404040408080808080808080808080$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX73TBN (FFP)CFT Engineering - TBN Per Occurrence - Applied from Field Team Engineering Fixed Hourly Labor Rates on Row 154EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 020202020204040404040404040404040$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX74TBN (FFP)Repair Materials - TBN Per Occurrence - Applied from OEM Material Handling Rates on Row 160EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 360,000$ 360,000$ 360,000$ 540,000$ 540,000$ 540,000$ 720,000$ 720,000$ 720,000$ 720,000$ 720,000$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 360,000.00$ 360,000.00$ 360,000.00$ 540,000.00$ 540,000.00$ 540,000.00
XX75TBN (FFP)Repair Shipping - TBN Per Occurrence - Applied from Transportation/Misc. Shipping Rates on row 162EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 12,000$ 12,000$ 12,000$ 18,000$ 18,000$ 18,000$ 24,000$ 24,000$ 24,000$ 24,000$ 24,000$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 18,000.00$ 18,000.00$ 18,000.00
Training
XX76FFPMaintenance TrainingEA111$ - 0$ - 0$ - 0
XX77FFPFollow-On Maintenance TrainingEA111$ - 0$ - 0$ - 0
XX78FFPReserved
Over & Above - To Be Negotiated Per Occurrence
XX79TBN (FFP)O&A Repair Labor Maintenance - TBN Per Occurrence - Applied from Maintenance Fixed Hourly Labor Rates on Row 157EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 040404040404848487272729696969696$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX80TBN (FFP)O&A Repair Materials - TBN Per Occurrence - Applied from OEM Material Handling Rates on Row 160EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 60,000$ 60,000$ 60,000$ 90,000$ 90,000$ 90,000$ 120,000$ 120,000$ 120,000$ 120,000$ 120,000$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 60,000.00$ 60,000.00$ 60,000.00$ 90,000.00$ 90,000.00$ 90,000.00
XX81TBN (FFP)O&A Transportation/Shipping - TBN Per Occurrence - Applied from Transportation/Misc. Shipping Rates on row 162EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 6,000$ 6,000$ 6,000$ 9,000$ 9,000$ 9,000$ 12,000$ 12,000$ 12,000$ 12,000$ 12,000$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 6,000.00$ 6,000.00$ 6,000.00$ 9,000.00$ 9,000.00$ 9,000.00
XX82TBN (FFP)O&A Travel - TBN Per Occurrence - Applied from Travel G&A Rates on Row 161EA1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000$ 6,000$ 6,000$ 6,000$ 6,000$ 6,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 6,000.00$ 6,000.00$ 6,000.00$ 6,000.00$ 6,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00
XX83TBN (FFP)Reserved
Rates (See Notes 1-7 Below)
Maintenance Fixed Hourly Rate*Labor Rate
Maintenance Overtime Rate*Labor Rate
Maintenance Premium Rate*Labor Rate
Engineering Fixed Hourly Rate**Labor Rate
Engineering Overtime Rate**Labor Rate
Engineering Premium Rate**Labor Rate
Field Team Maintenance Fixed Hourly Rate***Labor Rate
Field Team Engineering Fixed Hourly Rate***Labor Rate
Field Team Maintenance Overtime Rate***Labor Rate
Field Team Engineering Overtime Rate***Labor Rate
Field Team Maintenance Premium Rate***Labor Rate
Field Team Engineering Premium Rate***Labor Rate
Subcontractor Material Handling RateSubcontractor Material Handling Rate1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000
OEM Material Handling RateOEM Material Handling Rate1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000
Travel G&A RateG&A Rate for Travel1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000
Transportation/Misc. Shipping G&A RateG&A Rate for Transportation / Misc. Shipping1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000

Note 1: All unit prices are rounded to the nearest dollar, Labor rates are rounded to two (2) decimal places. All pricing submitted by Offeror's should be proposed in then-year (TY$) dollars. Total $ 20,000.00 $ 1,210,000.00 $ 1,210,000.00 $ 5,210,000.00 $ 5,210,000.00 $ 5,210,000.00 $ 6,463,000.00 $ 2,453,000.00 $ 2,438,000.00 $ 3,137,000.00 $ 3,137,000.00 $ 3,137,000.00 $ 3,836,000.00 $ 3,836,000.00 $ 3,836,000.00 $ 3,836,000.00 $ 3,836,000.00 $ 58,015,000.00

Note 2: Subcontractor Material Handling, OEM Material Handling, Travel G&A, and Transportation/Misc. Shipping G&A rates are rounded to four (4) decimal places and should be entered as follows: if the proposed G&A is 12.25% then the contractor should input as 1.1225 in the pricing matrix.

Note 3: OEM Material Handling Rate should include all cash and trade discounts, rebates, allowances, credits, salvage, commissions, and other benefits as applicable - if the offeror is proposing a discount to their commercial catalog prices then it should be entered as follows: if there is a 5% discount would be entered as 0.9500, if no discount is proposed it would be entered as 1.0000

Note 4: Subcontractor Material Handling Rate should be proposed sufficiently to ensure adequate coverage of all costs related to subcontractor/material handling. If the subcontractor MHR is 8.75% then it should be entered as 1.0875 in the pricing matrix.

Note 5: While fixed hourly labor rates are being used for evaluation purposes, the proposed overtime or premium rates may be required during the life of the contract and will be utilized and applied as applicable. $ 58,015,000.00 Cross Check

Note 6: All rates should be proposed sufficiently to ensure adequate coverage of all labor costs, all indirect costs, including G&A, COM, and so forth as well as prime and subcontractor profit in every contract out-year

Note 7: Quantities in Appendix D, Pricing Matrix, are notional, and actual quantities will vary during contract performance based on funding availability and program constraints.

Note 8: Engine Ordering Procedures (Applicable to CLINs XX09, XX11, XX12, XX13, and XX14 If during a year, a quantity is ordered and subsequently an additional quantity is ordered during the same year, the new quantity ordered will use the quantity range produced by adding the original quantity to the new quantity.

Example based on CLIN XX12:

In year 7 the government orders a quantity of 24 (first order), within the same year the government places a second order for a quantity of 8, resulting in a cumulative quantity of 32. Therefore, the first order unit price is based on the unit price applicable from the quantity range of 1-26 and the second order is based on the unit price applicable from the quantity range of 27-78.

*Maintenance Labor (wrap rate). Fully burdened and loaded. Includes all Maintenance labor categories needed to accomplish O&A and TBN tasks.
**Engineering Labor (wrap rate). Fully burdened and loaded. Includes all Engineering labor categories needed to accomplish TBN tasks.0
***Field Team Labor (wrap rate). Fully burdened and loaded. Includes all Field Team labor categories needed to accomplish CFT tasks.0
0

Appendix D RFP FA8107-19-R-0002

B-52 CERPSource Selection Information See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLYPage &P of &N

Support Equipment

Offeror Name:Input Offeror Name
INSTRUCTIONS:
Insert Description of item (Column C), Unit Price per Year (Columns F-U), Quantity per Year (Columns X-AM), there are pre-populated formulas in columns AP-BE to calculate the extended totals for each item per year (unit price x quantity). Insert the Total Price for each year (this should be the total of all items per year in columns AP-BE) on Row 58 (CLIN XX18) on the "B52 CERP Tab. For example, the current totals on the "Support Equipment" tab are shown on Row 142 so Column AP/Row 142 total would be entered on "B52 CERP" tab on Column F/Row 58.
Note 1: The total amounts in "Row 142" may change to another row, based on the number of items included for each offeror's specific approach.
Note 2: Proposed pricing is not required for Year 1 for CLIN XX18.
Note 3: Provide the Support Equipment quantity and pricing to support a single engine in any handed (left-right) position on the B-52 aircraft. The Government will use this information to determine the total Support Equipment need for the B-52 Fleet of 76 aircraft and the bases that the Support Equipment will be sent to.
CLINContract TypeDESCRIPTIONUnit of IssueProposed Unit PriceEvaluation Quantities - See Note 3 under InstructionsExtended Totals
Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12Year 13Year 14Year 15Year 16Year 17Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12Year 13Year 14Year 15Year 16Year 17Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 11Year 12
20212022202320242025202620272028202920302031203220332034203520362037
Support / Test Equipment / Tooling
XX18FFPSupport / Test Equipment / Tooling - FFP Pricing at Support Equipment Tab (Insert total Price for each year from Support Equipment Tab to "B52 CERP" Tab Row 58)EA
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
XX18FFP$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .