SOW Attach M-Workscope Requirements.pdf
PDF 185 KB Posted
- Attached to
- B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
- Solicitation number
- FA8107-19-R-0002
About this file
This document contains a federal solicitation for the B-52 Commercial Engine Replacement Program engine contract and the workscope requirements attachment. The solicitation seeks proposals for an indefinite delivery indefinite quantity contract to provide 608 new commercial engines, additional spare engines, associated support, spares, support equipment and data to re-engine the B-52 bomber fleet. Proposals are due by July 22, 2020. The contract period of performance is contemplated to be up to 17 years, including a basic six-year period and multiple option periods. The workscope requirements attachment outlines the information to be included in reports for items sent to repair facilities, such as inspections performed, results, proposed repairs and conclusions.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 18, 2020
ATTACHMENT M
WORKSCOPE REQUIREMENTS
Block 4: Section I- Introduction to include:
a. Report from field of reason for removal of item
b. Condition of item on arrival at repair facility
c. Inspections performed on item by Task Number listed in applicable Technical Data
d. Results of inspections on item stating the electrical and physical test requirements and parameters which the item does not meet
e. Use photographic evidence to support non-conforming material
Section I-Summary to include:
a. Proposed repairs to be performed on item to return to serviceable condition by Task
Number
b. listed in the applicable Technical Data
c. Proposed Service Actions (Service Bulletins, Airworthiness Directives, etc.) to be performed on item during shop visit.
Section I Conclusions to include:
a. Actual repairs performed on item to return to serviceable condition by Task Number listed in the applicable Technical Data
b. The Draft version of the report to be completed through the Summary for approval by
Government before repairs are started
c. Copies to be sent to the PCO and Cognizant Engineering Authority with one retained by the Contractor with the item records