SOW Attach M-Workscope Requirements.pdf

PDF 185 KB Posted

Attached to
B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
Solicitation number
FA8107-19-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

This document contains a federal solicitation for the B-52 Commercial Engine Replacement Program engine contract and the workscope requirements attachment. The solicitation seeks proposals for an indefinite delivery indefinite quantity contract to provide 608 new commercial engines, additional spare engines, associated support, spares, support equipment and data to re-engine the B-52 bomber fleet. Proposals are due by July 22, 2020. The contract period of performance is contemplated to be up to 17 years, including a basic six-year period and multiple option periods. The workscope requirements attachment outlines the information to be included in reports for items sent to repair facilities, such as inspections performed, results, proposed repairs and conclusions.

View the file

Other files for this federal contract opportunity

Other files attached to B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract, newest first.
File Type Posted
RFP QA 2.pdf PDF
Appendix D-B-52 CERP Pricing Matrix-10June2020-Protected.xlsx XLSX spreadsheet
List of Attachments (Amend1).pdf PDF
RFP QA 1.pdf PDF
FA810719R0002_______0001.pdf PDF
CERP_Schedule_06.04.20.pdf PDF
B-52 CERP JandA Redacted.pdf PDF
CDRLs A046 thru A081 15 May 2020.pdf PDF
CDRLs A001 thru A020 15 May 2020.pdf PDF
SOW Attach L-Safety Report.pdf PDF
SOW Attach K-AMT Engine Report.pdf PDF
SOW Attach S-Engineering Data for Provisioning.pdf PDF
CDRLs A108 thru A127 15 May 2020.pdf PDF
SOW Attach Z-Trip Report Template.docx DOCX document
Appendix D-Pricing Matrix-Protected.xlsx XLSX spreadsheet
SOW Attach J-AMT Engine Plan.pdf PDF
Appendix F-Addendum to FAR 52.212-2.pdf PDF
SOW Attach N-Shop Visit Report.pdf PDF
SOW Attach F-IPC-IPB.pdf PDF
Appendix I-Rights In Data.docx DOCX document
Appendix E-Addendum to FAR 52.212-1.pdf PDF
SOW Attach P-LHI Checklist Questionnaire.pdf PDF
CDRLs A083 thru A107 15 May 2020.pdf PDF
Appendix B-CDRL Data Rights List.pdf PDF
Appendix H-Base Index Report.pdf PDF
Appendix A-SOW CERP Engine Contract.pdf PDF
SOW Attach R-Provisioning Technical Documentation.pdf PDF
Limited Distribution Document Request Instructions.docx DOCX document
Appendix C-DD Form 254.pdf PDF
SOW Attach Y-CEMS Requirements.pdf PDF
SOW Attach A-Acronym List.pdf PDF
List of Attachments.pdf PDF
SOW Attach H-DOP ELMP Template.pdf PDF
CDRLs A021 thru A045 15 May 2020.pdf PDF
SOW Attach E-Manual Requirements.pdf PDF
SOW Attach O-FFP Inspection and Repair.pdf PDF
SOW Attach D-NRE Exclusion List.pdf PDF
FA810719R0002.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 18, 2020

ATTACHMENT M

WORKSCOPE REQUIREMENTS

Block 4: Section I- Introduction to include:

a. Report from field of reason for removal of item

b. Condition of item on arrival at repair facility

c. Inspections performed on item by Task Number listed in applicable Technical Data

d. Results of inspections on item stating the electrical and physical test requirements and parameters which the item does not meet

e. Use photographic evidence to support non-conforming material

Section I-Summary to include:

a. Proposed repairs to be performed on item to return to serviceable condition by Task

Number

b. listed in the applicable Technical Data

c. Proposed Service Actions (Service Bulletins, Airworthiness Directives, etc.) to be performed on item during shop visit.

Section I Conclusions to include:

a. Actual repairs performed on item to return to serviceable condition by Task Number listed in the applicable Technical Data

b. The Draft version of the report to be completed through the Summary for approval by

Government before repairs are started

c. Copies to be sent to the PCO and Cognizant Engineering Authority with one retained by the Contractor with the item records

File details come from the government source that posted it. Updated .