SOW Attach J-AMT Engine Plan.pdf
PDF 113 KB Posted
- Attached to
- B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
- Solicitation number
- FA8107-19-R-0002
About this file
This document contains a statement of work attachment for an engine test plan and the related federal contract opportunity solicitation. The statement of work attachment provides details on the test plan, including test series goals and objectives, instrumentation requirements, and risk mitigation procedures.
The related federal contract opportunity is a solicitation from the Air Force Materiel Command Lifecycle Management Center to provide 608 new commercial jet engines to re-engine the B-52 bomber fleet. Offerors must submit proposals by July 22, 2020. The award is an indefinite delivery/indefinite quantity contract with a basic six-year period of performance and option periods totaling up to 17 years. The contract will include program management, engine production, data, installation and removal services, repair labor, and transportation. Pricing includes both firm-fixed-price and time-and-materials contract line items. The minimum requirement is completion of the first year of program management. The solicitation was issued on May 19, 2020, and the anticipated contract award date is June 2021.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 18, 2020
ATTACHMENT J
ACCELERATED MISSION TEST ENGINE PLAN
Additional tailoring to DID DI-NDTI-80566A:
4.1 – ADD
g. Date
h. Revision
i. Document Markings (ITAR, export Controlled etc). Ensure entire document is marked appropriately”
4.2 through 4.9.13 replace with the following:
4.2. Table of Contents
a. Contents
b. List of Figures
c. List of Tables
d. Appendices
4.3. Introduction. Consists of an overview of the program, brief history of previous testing, objectives of the test plan, including flow diagrams, milestones, personnel participation, locations, schedules, and security measures to be observed. The plan shall include the following:
4.9. Master test list/matrix. Lists all tests to be accomplished. A listing for each location shall be provided including duration, by test objective/series and total test time. Each listing shall include the following:
4.9.1. Test description. Name and brief description of the test to be performed.
Detailed Test Plan Descriptions:
a. Provide description and details for each series.
b. Series Goals and Objectives.
c. Series Success Criteria.
d. Trending of life-limited and non-life limited parts
e. Field Monitoring and Inspection system considerations
f. Highlight test series risks and procedures
g. Instrumentation required, for each series, to meet objectives successfully and ensure engine safety.
h. Engine Health system data capture comparison
i. Health check points performed.
4.10. Test Article Description
a. Configuration overview (description)
b. Major Component Information (PN, SN, MRB)
4.11. Operating Limits
4.12. Special test equipment. List all special test equipment required to be supplied, designed or fabricated for use on the program as follows:
a. Description
March 18, 2020
b. Nomenclature
c. Operating Instructions, if required for use.
4.13. Instrumentation. Indicates the type and data acquisition rates that will be required.
Identify the number and type of parameters to be records
a. Overview
b. Special Instrumentation Systems
c. Instrumentation Range & Limits
d. Criteria for signal conditioning and filtering
e. Parameter Orientation Layout.
4.14. Test Risk Mitigation
a. Identification
b. Analysis
c. Mitigation
d. Review Process & Coordination Procedures.