CERP_Schedule_06.04.20.pdf

PDF 164 KB Posted

Attached to
B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
Solicitation number
FA8107-19-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

This document contains a federal solicitation for the B-52 Commercial Engine Replacement Program (CERP) engine contract along with the associated program schedule. The solicitation seeks proposals for an indefinite delivery indefinite quantity contract to provide 608 commercial engines to re-engine the B-52 bomber fleet. Proposals are due by July 22, 2020. The contract will have a basic period of six years with option periods extending to a total performance of up to 17 years. The contract will include program management, engineering support, rapid prototype engines, production engines, data packages, maintenance training and repair services on an as-needed basis. The Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base is the contracting agency. Award is estimated for June 2021. The solicitation is open to all responsible sources with the necessary qualifications.

View the file

Other files for this federal contract opportunity

Other files attached to B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract, newest first.
File Type Posted
RFP QA 2.pdf PDF
RFP QA 1.pdf PDF
Appendix D-B-52 CERP Pricing Matrix-10June2020-Protected.xlsx XLSX spreadsheet
List of Attachments (Amend1).pdf PDF
FA810719R0002_______0001.pdf PDF
B-52 CERP JandA Redacted.pdf PDF
CDRLs A046 thru A081 15 May 2020.pdf PDF
CDRLs A001 thru A020 15 May 2020.pdf PDF
SOW Attach L-Safety Report.pdf PDF
SOW Attach K-AMT Engine Report.pdf PDF
SOW Attach S-Engineering Data for Provisioning.pdf PDF
CDRLs A108 thru A127 15 May 2020.pdf PDF
SOW Attach Z-Trip Report Template.docx DOCX document
SOW Attach N-Shop Visit Report.pdf PDF
SOW Attach F-IPC-IPB.pdf PDF
Appendix I-Rights In Data.docx DOCX document
Appendix E-Addendum to FAR 52.212-1.pdf PDF
SOW Attach P-LHI Checklist Questionnaire.pdf PDF
CDRLs A083 thru A107 15 May 2020.pdf PDF
Appendix B-CDRL Data Rights List.pdf PDF
Appendix H-Base Index Report.pdf PDF
Appendix D-Pricing Matrix-Protected.xlsx XLSX spreadsheet
SOW Attach J-AMT Engine Plan.pdf PDF
Appendix F-Addendum to FAR 52.212-2.pdf PDF
Appendix A-SOW CERP Engine Contract.pdf PDF
SOW Attach R-Provisioning Technical Documentation.pdf PDF
Limited Distribution Document Request Instructions.docx DOCX document
Appendix C-DD Form 254.pdf PDF
SOW Attach Y-CEMS Requirements.pdf PDF
SOW Attach A-Acronym List.pdf PDF
List of Attachments.pdf PDF
SOW Attach H-DOP ELMP Template.pdf PDF
CDRLs A021 thru A045 15 May 2020.pdf PDF
SOW Attach E-Manual Requirements.pdf PDF
SOW Attach O-FFP Inspection and Repair.pdf PDF
SOW Attach M-Workscope Requirements.pdf PDF
SOW Attach D-NRE Exclusion List.pdf PDF
FA810719R0002.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1

Program Schedule Approved 4 June 2020

Rapid virtual Prototype Rapid physical Prototype Rapid Fielding/Production & Deployment Phase

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Q

Decision Points

Airframe

Material

Engines/Installs

System Technical Reviews

Prototypes

Logistics

Testing

FY2035FY2024 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034FY2023FY2018 FY2019 FY2020 FY2021 FY2022

Rapid Prototype Dev 2

System Req't

Spiral 2 DP

MDD 804/ASP Production DP FOC

PCCA

Engine SS Engine ContractSS

IT-1: DE Model IT-2: Integration IT-3 IT-4 IT-5

Ground Test Ready

Flight Test Ready

Ready to

Field

IOT&E

AMAC

TEMP V1.0

vSP DP

Rapid Pro Dev 1

AWD

PTCTO

Provisioning

Depot Planning

/FTCTO

Source/Technical Data Dev

RPM0

RPM1

WST

Training Dev

OTA

IOC/FRP DP

FCA/SVR

vSP Ops Demo DP pSP Mod Install DP pSP Integrated

Test DP

Test Engine Deliveries

Physical Prototype DP

Production

DP

FRP

SFR

CDR TRR

Install

InstallvPPP vSP Inc 1 vSP Inc 2 pSP1 pSP2

PRR

SRR

PDR PCA

Kick-off

ITT's

Production

Program Schedule�Approved 4 June 2020�

File details come from the government source that posted it. Updated .