CERP_Schedule_06.04.20.pdf
PDF 164 KB Posted
- Attached to
- B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
- Solicitation number
- FA8107-19-R-0002
About this file
This document contains a federal solicitation for the B-52 Commercial Engine Replacement Program (CERP) engine contract along with the associated program schedule. The solicitation seeks proposals for an indefinite delivery indefinite quantity contract to provide 608 commercial engines to re-engine the B-52 bomber fleet. Proposals are due by July 22, 2020. The contract will have a basic period of six years with option periods extending to a total performance of up to 17 years. The contract will include program management, engineering support, rapid prototype engines, production engines, data packages, maintenance training and repair services on an as-needed basis. The Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base is the contracting agency. Award is estimated for June 2021. The solicitation is open to all responsible sources with the necessary qualifications.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1
Program Schedule Approved 4 June 2020
Rapid virtual Prototype Rapid physical Prototype Rapid Fielding/Production & Deployment Phase
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Decision Points
Airframe
Material
Engines/Installs
System Technical Reviews
Prototypes
Logistics
Testing
FY2035FY2024 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034FY2023FY2018 FY2019 FY2020 FY2021 FY2022
Rapid Prototype Dev 2
System Req't
Spiral 2 DP
MDD 804/ASP Production DP FOC
PCCA
Engine SS Engine ContractSS
IT-1: DE Model IT-2: Integration IT-3 IT-4 IT-5
Ground Test Ready
Flight Test Ready
Ready to
Field
IOT&E
AMAC
TEMP V1.0
vSP DP
Rapid Pro Dev 1
AWD
PTCTO
Provisioning
Depot Planning
/FTCTO
Source/Technical Data Dev
RPM0
RPM1
WST
Training Dev
OTA
IOC/FRP DP
FCA/SVR
vSP Ops Demo DP pSP Mod Install DP pSP Integrated
Test DP
Test Engine Deliveries
Physical Prototype DP
Production
DP
FRP
SFR
CDR TRR
Install
InstallvPPP vSP Inc 1 vSP Inc 2 pSP1 pSP2
PRR
SRR
PDR PCA
Kick-off
ITT's
Production
Program Schedule�Approved 4 June 2020�