SOW Attach D-NRE Exclusion List.pdf
PDF 398 KB Posted
- Attached to
- B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
- Solicitation number
- FA8107-19-R-0002
About this file
This document contains a federal contract opportunity solicitation and related non-recurring engineering exclusion list. The solicitation seeks proposals for an indefinite delivery indefinite quantity contract to provide 608 commercial jet engines, spare engines, support equipment, and data to replace engines on the B-52 bomber fleet. Key details include a response due date of July 22, 2020, with contract award anticipated for June 2021. Pricing will consist of firm-fixed-price, time and materials, and cost-plus-fixed-fee contract line items. The scope of work includes engine procurement, integration, testing, maintenance, training, and technical data packages. Excluded from the non-recurring engineering list are tasks related to aircraft modification and flight testing that require B-52 hardware or aircraft use. The soliciting agency is the Department of the Air Force Materiel Command Lifecycle Management Center located at Tinker Air Force Base.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engine NRE Tasks CERP Engine
Contract
CERP Integration
Contracts
CERP Engine design/development to comply with Engine Procurement Spec Yes No
CERP Engine controls design/development to comply with Engine
Procurement Spec (FADEC, Software, Sensors & Actuators, etc.)
Yes No
Aircraft/Engine Interface Definition/Collaboration and Development No Yes
Develop/Incorporate collaborated Engine Interfaces into CERP Engine
Design Yes No
Engine Build-Up Kit (Aircraft and QEC hardware) definition No Yes
CERP Engine Manual revision/development (including Installation, Maintenance, Operations Manuals) produced/delivered Yes No
Air Force Tech Data Creation (including Installation, Maintenance, Operations Manuals) No Yes
CERP Engine testing (including cell / ground testing, Altitude testing, Accelerated Mission Testing & Flying Test Bed) needed to deliver CERP
Engine (Rapid Prototype) capable of achieving Military Flight Release (MFR) to begin/resume B-52 integration/test/certification activities
(Note: Rapid Prototype CERP Engines may be delivered to USAF prior to completion of P-MTC Engine Certification)
Yes No
Integrated Aircraft Testing and any Engine Testing requiring use of B-52 aircraft and/or B-52 aircraft hardware (whether existing or new design built for test purposes) No Yes
Engine Tech Support during aircraft modification No Yes Engine Tech Support during B-52 Flight Test Yes Yes Engine Tech Support during USAF fielded use Yes No
NRE Requirement location
Attachment D: Non-Recurring Engineering Exclusion List - 12 May 2020
File details come from the government source that posted it. Updated .