SOW Attach K-AMT Engine Report.pdf
PDF 8 KB Posted
- Attached to
- B-52 CERP Commercial Engine Replacement Program (CERP) Engine Contract Federal contract opportunity
- Solicitation number
- FA8107-19-R-0002
About this file
This document contains a solicitation for a federal contract opportunity along with an attachment related to engine testing requirements. The solicitation seeks proposals for an indefinite delivery/indefinite quantity contract to provide 608 commercial jet engines to re-engine the B-52 bomber fleet. Proposals are due by July 22, 2020. The contract would have a basic period of six years with option periods extending to 17 years total. The contract would include program management, engine support at multiple locations, engineering studies, rapid prototype and production engines, data packages, maintenance, repair, and training. Pricing includes firm-fixed-price and time-and-materials contract line items. The attachment provides additional requirements for engine test reports, including sections on test methodology, instrumentation, performance tracking, calibrations, test dates and milestones, pre-test analyses, benchmark performance levels, and conclusions with recommendations. The soliciting agency is the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 18, 2020
ATTACHMENT K
ACCELERATED MISSION TEST ENGINE REPORT
Additional tailoring to DID DI-MISC-80508B:
Section I- Introduction to include:
a. Component tested
b. Condition of item on arrival at repair facility
c. Total accumulated cycles at arrival
d. Test Plan methodology
e. Location
f. Instrumentation required
g. Performance tracking requirements
h. Full performance power calibrations
i. Dates of test(s)
j. Summary of pre-test analyses and predictions
k. Benchmark component performance levels and levels of deterioration
l. Hot time targets
m. Estimated engine operability figures of merit
n. Head-room targets for compression system component stability checks
o. Thrust levels at beginning
p. Completion of each major AMT milestone
Section I-Summary to include:
a. Summary of results of tests at each major AMT milestone
b. Photographs
c. Graphs
d. Measurements
Section I Conclusions to include:
a. Recommendations for a Structural Maintenance Plan
b. Updates or recommendations for life limit review
c. Any new identified distressed modes
d. Recommended items for further review
File details come from the government source that posted it. Updated .