Solicitation - N4008525R3500 (final).pdf
PDF 263 KB Posted
- Solicitation number
- N4008525R3500
About this file
This is a Request for Proposal (RFP) for a Design-Bid-Build (DBB) construction contract for the Energy Campus Infrastructure project at the Philadelphia Navy Yard Annex. The solicitation, issued by the Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic, seeks a contractor to provide comprehensive infrastructure improvements, including pile supported foundations, concrete ductbanks, utilities, medium voltage switchgears, and a cooling tower. The project will renovate the north bay of Building 77H to create a Land Based Test Site (LBTS) that will add test equipment foundations and utility infrastructure in support of a DDGX Energy Campus.
The contract is a firm-fixed-price construction contract with a total contract duration of 530 calendar days, including 15 days for bond approval. The project has an interim completion milestone of November 15, 2026, for specific work near transformer and platform foundations. The solicitation is unrestricted and open to full and open competition, with a NAICS code of 236220 and a size standard of $45 million. The government will evaluate proposals based on factors including experience, management approach, safety, past performance, and small business utilization, with technical factors being approximately equal to price in importance. Proposals are due on July 17, 2025, at 2:00 PM local time, with a bid guarantee of 20 percent of the total proposed price required.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
N4008525R3500
Section 00 00 00 - Procurement and Contracting Requirements
Work Package 3 - Energy Campus
Defense Priorities Allocation System (DPAS) Priority Rating: DO-C2 Date: 16 Jun 2025
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
BASE PRICE: Total Price for the entire work for DDG(X) Land Based Test Site (LBTS) WP3 in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option Item No. 1: Unit Price for removal and disposal of contaminated soils complete in accordance with the drawings and specifications, but excluding work provided in another line item. Quantity is in addition to what is included in the drawings and specifications.
Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option Item No. 2: Unit Price for removal and disposal of oily water complete in accordance with the drawings and specifications, but excluding work provided in another line item. Quantity is in addition to what is included in the drawings and specifications.
Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option Item No. 3: Unit Price for removal and disposal of asbestos containing pipe insulation in accordance with the drawings and specifications, but excluding work provided in another line item.
Pricing Arrangement: Firm Fixed Price
1 Project
Option Line Item
Option Item No. 4: Unit Price for demolition, excavation, and disposal of buried concrete and debris greater than 1/2 cubic yard in size in accordance with the drawings and specifications, but excluding work provided in another line item.
Pricing Arrangement: Firm Fixed Price
1 Project
Section 00 20 00 - Instructions for Procurements
FAR Clauses Incorporated by Full Text
52.236-27 Site Visit (Construction). (Alternate I) (Feb 1995) Alternate I (Feb 1995)
Alternate I . If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of (Feb 1995) the basic provision:
(b) An organized site visit has been scheduled for-
See Section 00 21 00
Section 00 21 00 - Instructions
FAR Clauses Incorporated by Full Text
52.233-2 Service of Protest. (Sep 2006)
Service of Protest (Sept 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from John Bishop, Contracting OfficerNAVFAC Mid-Atlantic, Contracting Division, Construction and Design
. (CON 21)9324 Virginia Avenue, Bldg. Z140, Room 216, Norfolk, VA 23511
(b) The copy of any protest shall be received in the office designated above within oneday of filing a protest with the GAO.
(End of provision)
52.252-1 Solicitation Provisions Incorporated by Reference. (Feb 1998)
Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acq.osd.mil/dpap/dars/dfarspgi/current/________
(End of provision)
52.252-5 Authorized Deviations in Provisions. (Nov 2020)
Authorized Deviations in Provisions (Nov 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any (48 CFR Chapter ) provision with an authorized deviation is indicated by the addition of FAR and DFARS 1 and 2 "(DEVIATION)" after the name of the regulation.
(End of provision)
Section 00 21 16 - Instructions to Proposers
TABLE OF CONTENTS
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.2 GENERAL OVERVIEW OF CONTRACT
2. BASIS FOR AWARD
3. EVALUATION FACTORS FOR AWARD
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PRE-PROPOSAL INQUIRIES (PPIs)
4.4 CONTRACT OPPORTUNITIES
5. INCORPORATION OF TECHNICAL PROPOSALS
6. ATTACHMENTS: LOCATED ON CONTRACT OPPORTUNITIES UNDER ATTACHMENTS
6.1 ATTACHMENT A - PRE-PROPOSAL INQUIRY (PPI) LOG
6.2 ATTACHMENT B - CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
6.3 ATTACHMENT C - PAST PERFORMANCE QUESTIONAIRE (PPQ)
6.4 ATTACHMENT D - HISTORICAL SMALL BUSINESS UTILIZATION
6.5 ATTACHMENT E - SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SPCD)
6.6 ATTACHMENT F - SMALL BUSINESS SUBCONTRACTING PLAN
6.7 ATTACHMENT G - PRICE SCHEDULE
6.8 ATTACHMENT H - PIEE VENDOR ACCESS INSTRUCTIONS
1. GENERAL
GENERAL OVERVIEW OF PROCUREMENT PROCESS
This solicitation is being issued as UNRESTRICTED FOR FULL AND OPEN COMPETITION.
The NAICS Code for this procurement is 236220 and the Size Standard is $45M.
This acquisition will be advertised utilizing FAR Part 15 - Contracting by Negotiation resulting in a Firm-Fixed Price (FFP) Contract for Construction Services.
In accordance with DFARS 236.204, the estimated magnitude of construction is between $25,000,000 and $100,000,000.
GENERAL OVERVIEW OF THE CONTRACT
The general intent of this solicitation is to award a Fixed Price Construction Contract for Design-Bid-Build (DBB), Energy Campus Infrastructure at the Philadelphia Navy Yard Annex (PNYA) in Philadelphia, Pennsylvania.
The project will include supporting a larger effort to set up a comprehensive test site in and around the B77 Complex at the Philadelphia Navy Yard.
The work under this contract will provide pile supported foundations, concrete ductbanks, utilities, medium voltage switchgears, and a cooling tower.
This project renovates/modernizes the north bay of Building 77H to provide a Land Based Test Site (LBTS) that will add test equipment foundations and utility infrastructure in support of a DDGX LBTS Energy Campus.
2. BASIS FOR AWARD
The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value--the proposal most advantageous to the Government, price and other factors considered.
As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
As stated in the solicitation, all technical factors, when combined, are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined, are approximately equal to price.
Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the Deficiency is corrected through discussions, if held. An Unacceptable rating in any of the non-cost/price factors will result in an overall rating of "Unacceptable" for the non-cost/price factors, unless corrected through discussions, if held. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board's assessment of the identified Weakness(s) and the associated risk to successful contract performance resulting from the Weakness(s). This assessment must provide the rationale for proceeding to award without discussions.
3. EVALUATION FACTORS FOR AWARD
The solicitation requires the evaluation of price and the following non-cost/price factors:
Factor 1 - Experience Factor 2 - Management Approach & Schedule Factor 3 - Safety Factor 4 - Past Performance Factor 5 - Small Business Utilization
The distinction between Experience and Past Performance is that Experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past Performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance of the non-cost/price evaluation factors is the technical factors (Factors, 1, 2, 3, and 5) are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4).
When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors' non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal's superiority to the Government. Award will be made to the responsible Offeror whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
Basis of Evaluation and Submittal Requirements for Each Factor.
The offeror shall submit one (1) electronic copy via PIEE, to include the submittal requirements identified below. The Price and Non-price proposals shall be submitted in separate files and submitted in Portable Document Format (PDF). In addition, non-price/technical information included in the price proposal will not be considered; likewise, price information included in the non-price/technical proposal will not be considered. All required proposal documents shall be submitted in accordance with FAR 15.208.
Offeror shall provide a cover page with solicitation number, solicitation title, Offeror name, address, phone number, fax number, Unique Entity Identifier (UEI), CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and POC email address with its proposal.
Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated. Information submitted beyond any of the page limits below will not be considered.
Note: If proposing as a Joint-Venture (JV), please submit the POC, UEI, and CAGE Code for each JV partner.
(a) Price:
(1) Solicitation Submittal Requirements:
All submissions shall include the following:
Executed SF1442. Offeror shall insert its company name and address in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442. In addition, offeror shall provide a cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, Unique Identifier Number (UEI), CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and POC email address, with its proposal.
Completed Price Proposal Form that includes all CLINs. The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line items numbers (CLINs). Pricing information is not required to be completed under Section 00 10 00 - Solicitation Contract Form in
SF 1442.
Bid bond (SF-24). Offeror shall submit a Bid Guarantee in accordance with FAR 52.228-1, Bid Guarantee. A bid bond (SF-24) shall be at least 20 percent of the total proposed price for project but shall not exceed $3M. The bid bond shall be in the name of the offeror identified on the SF1442.
System for Award Management (SAM) registration. Offeror shall provide a copy of Representation and Certifications and proof of registration in System for Award Management (SAM) and ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and
Certifications are complete and updated for this procurement. If a Representation or Certification required by Section 00 45 00 of the RFP is not provided in SAM, include the representation or certification in your price proposal. The Contracting Officer and/or Contract Specialist will verify the Offeror's registration in SAM only at time of submission of an offer and at the time of contract award, unless an exemption applies under FAR 4.1102 (a).
FAPIIS. Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete, as required by FAR 52.209-7, Information Regarding Responsibility Matters.
VETS-4212 registration. Confirmation of filing of Veterans' Employment and Training (VETS) VETS-4212 for the 2023/2024 filing cycle, if the offeror is required to submit. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, http://www.dol.gov/vets/vets4212.htm. An email confirmation of submission can be requested and received by the offeror from the DOL website and submitted in the price proposal. If the offeror is not required to submit a report to VETS-4212, include a brief statement and justification explaining why the offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS- 4212 report and to request an email confirmation of submission.
Small Business Subcontracting Plan (Reference FAR 52.219-9 ALT II and DFARS 252.219-7003).
In accordance with FAR 19.7, all other than small businesses shall submit a Small Business Subcontracting Plan (SBSP) utilizing the template provided as Attachment G. Acceptability of the SBSP will be considered a responsibility matter. The SBSP will not be evaluated or rated by the SSEB but reviewed by a Small Business Professional/Authorized Representative and the Contracting Officer for acceptability. The SBSP shall be negotiated and/or accepted within the time specified by the Contracting Officer. Failure to negotiate an acceptable subcontracting plan within the time limit prescribed by the Contracting Officer will render the offeror ineligible for award of the contract. The SBSP will be incorporated into the resulting contract.
NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging, small business subcontracting goals for this acquisition consistent with efficient and effective performance of the contract. These targets are based on a percentage of total planned subcontract dollars. These goals will be incorporated into the solicitation.
Small Business (SB) 40% Small Disadvantaged Business (SDB) 5% Women Owned Small Business (WOSB) 9% HubZone SB 3% Service-Disabled Veteran-Owned Small Business (SDVOSB) 5%
The SBSP shall be consistent with the commitments offered in the Small Business Utilization and Participation factor. In accordance with DFARS 215.304(c)(i), when an evaluation assesses the extent that small businesses are specifically identified in proposals, those small businesses considered in the evaluation shall be listed in the SBSP.
Please note that SBSP goals and the participation rates provided in the Small Business Participation Commitment Document (SBPCD) WILL NOT be the same. The participation rates within the SBPCD are provided as percentages of the total contract value; subcontract plan goals are provided as a percentage of planned subcontracting dollars. While the percentages will differ, the types of products/services identified in the SBSP, should be the same as those products/services identified in the SBPCD. Likewise, the planned small business subcontract dollars in the SBSP will be equal to (or in some cases greater than) the extent of small business participation identified in the SBPCD.
Bank Reference. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror's firm has a line of credit, provide information on how many figures the offeror can borrow against the line of credit (i.e. medium 6 figures - exact line of credit is not required).
Financial Statements. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working /operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies.
Facilities and Equipment. Provide a description of offeror's facilities and equipment.
Other Work. Provide a list of offeror's other work presently under contract.
(2) Basis of Evaluation:
The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section M of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s).
Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
Although required to be submitted with offeror's price proposal, Items 3 through 11 above will not be evaluated as part of the price proposal. This information will be utilized by the Government in the responsibility determination and for considering responsiveness to the solicitation requirements.
(b) Non-cost/price Factors:
The offeror shall submit one (1) electronic copy via PIEE, to include the submittal requirements identified below. The Price and Non-price proposals shall be submitted in separate files and submitted in Portable Document Format (PDF). In addition, non-price/technical information included in the price proposal will not be considered; likewise, price information included in the non-price/technical proposal will not be considered. All required proposal documents shall be submitted in accordance with FAR 15.208.
Offeror shall provide a cover page with solicitation number, solicitation title, Offeror name, address, phone number, fax number, Unique Entity Identifier (UEI), CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and POC email address with its proposal.
Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated. Information submitted beyond any of the page limits below will not be considered.
Note: If proposing as a Joint-Venture (JV), please submit the POC, UEI, and CAGE Code for each JV partner. (not sure if I need to have this under non price factors as well)
(1) Factor 1, Experience:
(i) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
Construction Experience:
Submit a minimum of two (2) up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience as a prime contractor on relevant projects that are similar in size, scope, and complexity to the RFP. The Government will not consider more than five (5) projects and will review only the first five (5) projects if more are submitted.
For purposes of this evaluation, a relevant project is further defined as:
Size: Projects demonstrating a final construction cost of $15,000,000 or greater. Note: Final construction price is defined as the final price of the project to include the Award Price as adjusted by any and all modifications issued during performance.
Scope: New Construction of foundations and utility infrastructure supporting industrial equipment.
Complexity: In addition to meeting the above Size and Scope, each submitted project does not require demonstrated experience with all of the following elements, but, collectively, the submitted relevant projects must cumulatively demonstrate experience with all of the following elements:
-Experience with new construction of a steel frame utility support bridge or other freestanding steel frame structure.
-Experience with new construction of underground ductbank installation.
-Experience with installation of medium voltage electrical equipment and cabling.
-Experience with new construction of pile supported concrete foundations.
Note: To be relevant, a project must meet the above Size and Scope, as well as the below requirements on recency. Each relevant project need not demonstrate one or all of the Complexity elements. However, the Offeror's relevant projects shall, cumulatively, demonstrate experience with all of the elements listed under "Complexity". All elements do not have to be included under one relevant project, experience may be demonstrated collectively through all relevant projects submitted meeting Size and Scope.
Subcontractor experience will not be considered. Additionally, experience of the offeror while performing as a subcontractor will not be considered.
Projects submitted for the offeror shall have been be completed within the past ten (10) years from the date of issuance of this RFP. Projects which are not complete as of the date of issuance of this RFP will be considered "Not Relevant". Additionally, projects completed prior to ten (10) years from the date of issuance of this RFP will be considered "Not Relevant." Note: Complete is defined as beneficial occupancy date (BOD), acceptance by the customer, or other similar industry standard.
For all submitted projects, ensure that the project description clearly addresses how the project meets the required timeframe as well as the above Size, Scope, and Complexity requirements and clearly provides the total construction cost. The absence of any such information or information that does not clearly address the requirements may result in the project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor if the minimum requirements are not met.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a task order as a project. The submission of a multiple award and/or indefinite delivery/indefinite quantity type contract as a whole will be considered Not Relevant.
The attached Construction Experience Project Data Sheet is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider submissions via any other medium. Information on additional pages beyond the limit will not be considered when reviewing the project.
If the offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. If a project was performed by a JV, and not all partners from that JV are on the JV proposed for this contract, the offeror shall clearly demonstrate how its work on that project met the above Size, Scope, and Complexity requirements, as well as timeframe and what portion of the work was performed by the JV member offering on this contract and shall not include work performed by the JV as a whole. The JV member proposed for this contract shall specifically address field work performed by that JV member including field staffing and direct field work oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percentage of employees provided for the overall contract by the JV members as well as the overall percentage of work performed by the JV member. The offeror shall also submit a SIGNED copy of the Joint Venture agreement indicating the proposed participation of each Joint Venture member. Offerors are still limited to a total of five (5) projects combined.
For a JV, the offeror shall submit a signed JV agreement. For an 8(a) Mentor-Protege Joint Venture, the offeror shall submit the signed SBA Mentor- Protege Approval Letter and signed JV agreement.
If an offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the Project Data Sheet shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in order for the experience information of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The Project Data Sheet shall state specific commitments of technical resources (e.g., personnel, management, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies shall commit to the performance of this contract. In particular, the Project Data Sheet shall clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The Project Data Sheet shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the offeror in performance of the contract. Vague commitments to support are likely insufficient; rather, they must demonstrate intent/manner of actual performance on the contract action being solicited. As noted above, the Offeror MAY NOT utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor.
(ii) Basis of Evaluation:
The basis of evaluation will include the offeror's demonstrated experience and depth of experience in performing relevant construction projects as defined in the above solicitation submittal requirements. The assessment of the offeror's relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects total. Any projects submitted in excess of the five (5) for Corporate Experience will not be considered. If the offeror submits more than five projects, the Government will consider only the first five (5) projects submitted.
An offeror that does not submit a minimum of two (2) relevant projects as defined above will be assigned a Deficiency and receive a rating of UNACCEPTABLE. An offeror with an UNACCEPTABLE rating in any Factor will not be eligible for award.
Proposals from JV offerors demonstrating relevant project experience for each JV partner may be more favorably considered than proposals from JV offerors that only demonstrate relevant experience of one JV partner.
Proposals that demonstrate all required Complexity elements in a single relevant project may be considered more favorably
(2) Factor 2, Management Approach & Schedule
(i) Solicitation Submittal Requirements:
Submit the following documentation, as detailed throughout this factor, in order to describe your approach to managing the project, and risk, and ensuring adherence to the project schedule.
1) Management Approach
2) Critical Path Schedule
The offeror shall submit a narrative and schedule for this factor. The narrative shall not exceed ten (10) pages, 8-1/2" x 11" size. Provide the schedule, documenting any multiple critical paths, in 11" x 17" pages and in an Adobe PDF file. There is no page limit to the schedule.
1. Management Approach
Provide a written work plan that addresses major elements of work, project risks, and space planning and usage.
The narrative shall include, but not limited to:
-Provide a narrative describing the proposed approach to management, for both subcontractors and your workforce, to ensure schedule adherence, early detection and correction of problems and the execution of the base price and all options, as referenced in the RFP.
-Identify activities that may affect the project timeline, including other/off site work activities.
-Describe how your firm will handle technical complexities with: long lead-time equipment delivery and installation, site utility work to include grading, installation of deep pile foundations, and work in and around a congested site and other ongoing construction projects in the vicinity.
-Describe how your firm will handle unforeseen problems with: material deliveries, subcontractor progress, weather, re-work, differing site conditions, and inspections relating to the subject project.
Critical Path Schedule
The schedule shall include, but not limited to:
-Provide a detailed Critical Path Method (CPM) construction schedule that illustrates your ability to achieve the schedule and meet all the requirements of the RFP including Milestones identified in Spec 01 14 00 Work Restrictions Section 1.2 Special Scheduling Requirements:
-Milestone 2 - A total contract duration of 530 calendar days, including 15 days for bond approval.
-Milestone 1 - An interim completion date of 15 NOV 2026 for all work within five feet of the AUX and FIT transformer foundations and all work within five feet of the e-house and platform foundations.
-The overall completion time for this project as stated in the RFP. Any proposed duration shorter than the RFP requirements will be incorporated into the contract award.
-Milestones which demonstrate an understanding of the work (including shop drawing submittals & reviews).
-Provide the summary level schedule, documenting any multiple critical paths, in 11" x 17" pages and in an Adobe PDF file. There is no page limit on the summary level schedule.
(ii) Basis of Evaluation
1. Management Approach - Offerors will be evaluated on the extent to which they demonstrate a clear understanding of the above solicitation submittal requirements for this factor. An offeror's narrative work plan that identifies areas of risk in logistics and resource management and provides a comprehensive contingency plan that addresses mitigation of any identified risks with potential solutions may be considered more favorably than those that do not.
2. Schedule - Offerors will be evaluated on the extent to which they demonstrate a clear understanding of the above requirements. A schedule that proposes a realistic and feasible contract duration shorter than the required duration indicated in the RFP may be considered more favorably than those that do not.
(3) Factor 3, Safety
(i) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative as described further below. For a partnership, joint venture, the Offeror shall submit separate DART, TCR for the specified five (5) CY for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.
NOTE: DART and TCR shall not be submitted for subcontractors.
DART Rate: Submit five (5) previous complete calendar years' [CY2023, CY2022, CY2021, CY2020, and CY2019] worth of data (not an overall average). If the Offeror has no DART rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable/detailed explanation is required, that includes any corrective actions taken for improvement.
-Dart cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.
-Calculation of DART rate: Multiply the total number of DART cases by 200,000, and then divide by the number of employee labor hours worked.
DART RATE=(Number of DART Incidents x 200,000)/(Total Number of Enployee Labor Hours Worked)
TCR Rate: Submit five (5) previous complete calendar years' [CY2024, 2023, 2022, 2021, and 2020] worth of data (not an overall average). If the Offeror has no TCR rate, for any year, affirmatively state so and explain why. Should a negative trend occur above moderate risk levels, an acceptable /detailed explanation is required, that includes any corrective actions taken for improvement.
-TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.
-Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000, and then divide by the number of employee labor hours worked.
TCR RATE=(Number of TCR Incidents x 200,000)/(Total Number of Enployee Labor Hours Worked)
Technical Approach for Safety: Submit a narrative that addresses the following:
-Describe the Offeror's approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
-Describe the evaluation process used to select potential subcontractors.
-Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout the performance of the contract (to include their own in-house workforce).
-The Technical Approach to Safety narrative shall be limited to two (2) pages.
The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC's Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
Basis of Evaluation:
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the Offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
-Missing data without an explanation is considered a Deficiency.
-Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a Strength.
-An increasing DART rate trend could be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
-This chart correlates the DART rate to the level of risk:
Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above moderate risk levels require the Offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
-Missing data without an explanation is considered a Deficiency.
-Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) would indicate a Strength.
-An increasing TCR rate trend could be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
-This chart correlates the TCR rate to the level of risk:
Risk TCR Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater than 6.0
The Technical Approach to Safety Narrative. To determine the degree to which the Offeror:
-Describes a viable SMS that addresses elements; such as Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
-Describes a methodical process of evaluating subcontractor's safety performance in their selection process.
-Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.
-The Technical Approach to Safety narrative shall be limited to two (2) pages. Information on pages beyond this will not be considered.
The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC's Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
(4) Factor 4, Past Performance
Solicitation Submittal Requirements:
Recent, relevant projects are determined within the requirements for Factor 1, Experience.
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1. The offeror shall include all completed CPARS evaluations (interim and final) for a project. If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project submitted for Factor 1, Corporate Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A
COMPLETED CPARS IS AVAILABLE.
If a CPARS evaluation is not available, completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment), which will provide contract and client information for the respective project(s). Offerors should ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Madison Tatem, via email at madison.e.tatem.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors are highly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 -Experience. Additionally, offerors are highly encouraged to address any adverse past performance issues. Such explanations shall not exceed four (4) pages in total. Information beyond this page limitation will not be considered.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS) using all CAGE/Entity Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
IMPORTANT: It is the responsibility of the offeror to provide accurate points of contact for each identified contract and current telephone numbers and/or email addresses. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified.
The Government reserves the right to contact references for verification or additional information. The Government's inability to contact any of the offeror's references or the references' unwillingness to provide the information requested may affect the Government's evaluation of this factor.
A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as an Attachment.
(ii) Basis of Evaluation:
This evaluation focuses on how well the offeror performed on the projects submitted under Factor 1 -Experience and past performance on other relevant projects currently documented in known sources. The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in Contractor's performance. In the case of Offerors for which there is no information on past performance, or where past performance information is not available or so sparse that no meaningful assessment can be performed, the Offeror may not be evaluated favorably or unfavorably and will instead receive a "Neutral" rating (See FAR 15.305(a)(2)(iv)). The Government may determine that a "Substantial Confidence" or "Satisfactory Confidence" past performance rating is worth more than a "Neutral Confidence" past performance rating in a best value tradeoff as long as the determination is consistent with stated selection criteria.
The Government will consider the degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., CPARS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:
- A pattern of successful completion of tasks;
- A pattern of deliverables that are timely and of good quality;
- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and
- Recency of tasks performed that are identical to, similar to, or related to the task at hand.
(5) Factor 5, Small Business Utilization and Participation:
It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to Small Business (SB) concerns, including Small Disadvantaged Business (SDB), Woman-Owned Small Business (WOSB), Historically Underutilized Business Zone Small Business (HUBZone SB), Veteran-Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), and other small business concerns. Further, it is the policy of the Government that such concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance.
This Factor assesses both the historical achievements in utilizing small business concerns and…
This is the start of the file's text. The full file is on GovTribe.