ATTACHMENT G - PRICE SCHEDULE.pdf
PDF 96 KB Posted
- Solicitation number
- N4008525R3500
About this file
This document is a Price Schedule for the Naval Facilities Engineering Command's Design-Bid-Build (DBB) project for Energy Campus Infrastructure at the Philadelphia Navy Yard Annex. The price schedule includes multiple contract line items (CLINs) with detailed unit pricing for various construction activities, including base pricing for the entire DDG(X) Land Based Test Site (LBTS) Work Package 3, steel pipe piling installation, micropiling, and optional items for soil and debris removal.
The document outlines pricing for specific quantities of work, such as 21,650 vertical linear feet of steel pipe piling, 2,500 vertical linear feet of micropiling, and optional items like 500 tons of contaminated soil removal and 1,000 gallons of oily water disposal. The pricing structure allows for a base contract price plus potential additional costs for optional items. The government reserves the right to award optional line items within 365 calendar days after contract award, with the total contract completion date set at 530 calendar days after award. The evaluation of offers will include both the base pricing and potential option prices.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line Item
Description Quantity Unit Unit Price
Sub- Total
Total Price
0001 BASE PRICE: Total Price for the entire work for DDG(X) Land Based Test Site (LBTS) WP3 in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $_____
0001A Subtotal of Base Price for the entire work for DDG(X) Land Based Test Site (LBTS) WP3 in accordance with the drawings and specifications, but excluding work provided in another line item.
1 EA $_____
0001B Unit Price for providing steel pipe piling complete in accordance with the drawings and specifications, but excluding work provided in another line item.
21,650 VLF $_____ $_____
0001C Unit Price for providing steel pipe piling load test complete in accordance with the drawings and specifications, but excluding work provided in another line item.
2 EA $_____ $_____
0001D Unit Price for providing steel pipe pile driving analyzer (PDA) load test complete in accordance with the drawings and specifications, but excluding work provided in another line item.
10 EA $_____ $_____
0001E Unit Price for providing steel pipe piling pre-drilling complete in accordance with the drawings and specifications, but excluding work provided in another line item.
200 LF $_____ $_____
0001F Unit Price for providing micropiling complete in accordance with the drawings and specifications, but excluding work provided in another line item.
2,500 VLF $_____ $_____
0001G Unit Price for providing micropiling pre-production verification pile load test complete in accordance with the drawings and specifications, but excluding work provided in another line item.
2 EA $_____ $_____
0001H Unit Price for providing micropiling proof load test of production pile complete in accordance with the drawings and specifications, but excluding work provided in another line item.
2 EA $_____ $_____
0002 Option Item No. 1: Unit Price for removal and disposal of contaminated soils complete in accordance with the drawings and specifications, but excluding work provided in another line item. Quantity is in addition to what is included in the drawings and specifications.
500 TON $_____ $_____
0003 Option Item No. 2: Unit Price for removal and disposal of oily water complete in accordance with the drawings and specifications, but excluding work provided in another line item. Quantity is in addition to what is included in the drawings and specifications.
1000 Gal $_____ $_____
0004 Option Item No. 3: Unit Price for removal and disposal of asbestos containing pipe insulation in accordance with the drawings and specifications, but excluding work provided in another line item.
220 LF $_____ $_____
0005 Option Item No. 4: Unit Price for demolition, excavation, and disposal of buried concrete and debris greater than 1/2 cubic yard in size in accordance with the drawings and
600 CY $_____ $_____
TOTAL PRICE FOR CLINs 0001 - 0005 $___________________
GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Item 0001, and the extended total under Contract Line items 0002, through 0005. For CLINs 0002 through 0005, enter unit price and extended total in space provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for the option(s) (CLINs 0002 through 0012) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the option(s).
c. The Government reserves the unilateral right to award CLIN(s) 0002 through 0005 to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001. No provision is made for economic price adjustment. If Options are exercised, the contract completion date remains 530 calendar days after award of the contract.
d. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
e. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
f. If CLIN(s) 0002 through 0005 are exercised, additional bonding and consent of surety is required.
Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.
specifications, but excluding work provided in another line item.
File details come from the government source that posted it. Updated .