DDG(X) WP3_Amendment 0003_Spec Section 02 61 13.pdf

PDF 46 KB Posted

Attached to
N4008525R3500 Design-Bid-Build (DBB), Energy Campus Infrastructure at the Philadelphia Navy Yard Annex (PNYA) in Philadelphia, Pennsylvania
Solicitation number
N4008525R3500
Issued by

About this file

This is a detailed technical specification (Section 02 61 13) for excavation and handling of contaminated material for the DDG(X) LBTS WP3: E-Campus project. The specification outlines comprehensive requirements for managing contaminated soil and groundwater, including mercury-contaminated groundwater known to be present at the site. Key provisions include:

Contractors must develop a detailed Work Plan within 30 calendar days of notice to proceed, covering excavation methods, equipment, dewatering, storage of contaminated materials, and spill contingency procedures. The specification requires precise measurement and disposal protocols, including weighing contaminated materials, sampling liquid for heavy metals and pH, obtaining necessary permits, and transporting contaminated soil by licensed haulers to licensed disposal sites. Contractors must submit a Closure Report within 14 calendar days of project completion, documenting all activities, including excavation logs, sample collection data, test results, manifests, and progress photographs. Payment will be calculated per ton of contaminated material and per gallon of oily water, with unit prices inclusive of handling, excavation, storing, sampling, testing, permitting, and disposal.

View the file

Other files

File Type Posted
N4008525R35000007CLEAN.pdf PDF
Amendment 0006 Energy Campus Site Photos 2of4.pdf PDF
Amendment 0006 Energy Campus Site Photos 1of4.pdf PDF
AMENDMENT 0006.pdf PDF
Amendment 0006 Energy Campus Site Photos 4of4.pdf PDF
Amendment 0006 Energy Campus Site Photos 3of4.pdf PDF
Amendment 0005 DDG(X) WP3_Dwgs.pdf PDF
Amendment 0005 PS-77-001.0_SD2_PNY B77 POD_Shop Drawing Submittal.pdf PDF
Amendment 0005 CMT Services Group - Navy Yard - Additional Water Results.xlsx XLSX spreadsheet
N4008525R3500 Amendment 0005 final.pdf PDF
Amendment 0005 3G010 - UTILITY COORDINATION AND SEQUENCE OF CONSTRUCTION.pdf PDF
Amendment 0005 02 61 13 - EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL.pdf PDF
N4008525R3500 Amendment 0004.pdf PDF
N4008525R3500 Amendment 0003.pdf PDF
Amendment 0003 Attachment 1.pdf PDF
DDG(X) WP3_Amendment 0003_Spec Section 22 25 00.pdf PDF
DDG(X) WP3_Amendment 0003_Continuation Sheet.pdf PDF
Amendment 0003 ATTACHMENT G - PRICE SCHEDULE.pdf PDF
DDG(X) WP3_Amendment 0003_Dwgs_Signed.pdf PDF
DDG(X) WP3_Amendment 0003_Spec Section 09 96 00.pdf PDF
N4008525R3500 Amendment 0002.pdf PDF
Amendment 0002 Site-Visit Sign In Sheets.pdf PDF
Amendment 0001 Site Visit Information.pdf PDF
N4008525R3500 Amendment 0001.pdf PDF
ATTACHMENT G - PRICE SCHEDULE.pdf PDF
N4008525R3500 Drawings.pdf PDF
ATTACHMENT E - SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SPCD).pdf PDF
ATTACHMENT F - SMALL BUSINESS SUBCONTRACTING PLAN.pdf PDF
ATTACHMENT B - CONSTRUCTION EXPERIENCE PROJECT DATA SHEET.pdf PDF
Solicitation - N4008525R3500 (final).pdf PDF
ATTACHMENT C - PAST PERFORMANCE QUESTIONAIRE (PPQ).pdf PDF
N4008525R3500 Specs.pdf PDF
ATTACHMENT H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
ATTACHMENT A - PRE-PROPOSAL INQUIRY (PPI) LOG.xlsx XLSX spreadsheet
ATTACHMENT D - HISTORICAL SMALL BUSINESS UTILIZATION.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDG(X) LBTS WP3: E-Campus 1733372

SECTION 02 61 13

EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02/10, CHG 1: 02/21

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D5434 (2012) Field Logging of Subsurface Explorations of Soil and Rock

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926 Safety and Health Regulations for Construction

1.2 BASIS FOR BIDS AND PAYMENT

1.2.1 Unit Price Oily Water

For oily water, payment will be at the contract unit price per gallon multiplied by the total gallon of oily water disposed offsite. The unit pricing shall include handling, dewatering, temporary storing, sampling, testing, permitting and disposing of oily water.

1.2.2 Measurement Oily Water

Tanker trucks will be required to be measured at the disposal facility to determine the volume of liquid being disposed. Submit waste manifest tickets. This information will be used to determine the volume of liquid disposed and it will be used as the basis for payment.

1.2.3 Unit Price Contaminated Material

Payment will be at the contract unit price per ton multiplied by the total tonnage of material disposed offsite. The unit pricing shall include handling, excavating, temporary storing and stockpiling, sampling, testing, permitting and disposing of contaminated soil media.

1.2.4 Measurement Contaminated Material

Dump trucks will be required to be weighed at a weigh station (once fully loaded with material and once empty) to determine the weight of material being disposed. Submit dump truck weight tickets. This information will be used to determine the weight of material disposed and it will be used

SECTION 02 61 13 Page 1

Powell, Sean Callout Discharge water will be required to be measured during dewatering activity to determine the volume of liquid treated.

Powell, Sean Line

Powell, Sean Line

Powell, Sean Line

Barnhart, Michael Callout Lump Sum Price for Contaminated Water

Barnhart, Michael Line

Barnhart, Michael Callout Measurement for Contaminated Water

Barnhart, Michael Line

Barnhart, Michael Callout contaminated

Barnhart, Michael Line as the basis for payment.

1.3 DESCRIPTION OF WORK

The work consists of excavation and temporary storage of contaminated soil if found on site.

In addition, liquid collected from ground water inside utility manholes, vaults, or excavations shall be sampled and tested in accordance with federal, state, and local agency regulations. Obtain permit from PWD before discharging the liquid into the City sewer system.

Submit a Work Plan as specified below. Notify the Contracting Officer within 24 hours, and before excavation, if contaminated material is discovered that has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered. Required sampling and chemical analysis for contaminated soil shall be conducted in accordance with this Section.

1.3.1 Scheduling

Notify the Contracting Officer 7 calendar days prior to the start of excavation of contaminated material. The Contractor shall be responsible for contacting regulatory agencies in accordance with the applicable reporting requirements.

1.3.2 Work Plan

Submit a Work Plan within 30 calendar days after notice to proceed. No work at the site, with the exception of site inspections and surveys, shall be performed until the Work Plan is approved. Allow 30 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. At a minimum, the Work Plan shall include:

a. Schedule of activities.

b. Method of excavation and equipment to be used.

c. Shoring or side-wall slopes proposed.

d. Dewatering plan.

e. Storage methods and locations for liquid and solid contaminated material.

f. Borrow sources and haul routes.

g. Decontamination procedures.

h. Spill contingency plan.

1.3.3 Other Submittal Requirements

Submit separate cross-sections of each area before and after excavation and after backfilling, test results, and the Closure Report within 14 calendar days of work completion at the site.

SECTION 02 61 13 Page 2

Barnhart, Michael Callout The work also consists of installation of treatment system for dewatering contaminated groundwater

1.4 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Work Plan; G

SD-06 Test Reports

Closure Report; G

1.5 REGULATORY REQUIREMENTS

1.5.1 Permits and Licenses

Obtain required federal, state, and local permits for excavation and storage of contaminated material. Permits shall be obtained at no additional cost to the Government.

PART 2 PRODUCTS

2.1 SPILL RESPONSE MATERIALS

Provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials shall be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of materials and contaminants being handled.

2.2 BACKFILL

Refer to Section 31 00 00 EARTHWORK for requirements.

PART 3 EXECUTION

3.1 EXISTING STRUCTURES AND UTILITIES

No excavation shall be performed until site utilities have been field located. Take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without approval from the Contracting Officer.

3.2 CONTAMINATED MATERIAL REMOVAL

3.2.1 Excavation

Areas shall be excavated to the depth and extent shown on the drawings and not more than 0.2 ft beyond the depth and extent shown on the drawings unless directed by the Contracting Officer. Excavation shall be performed in a manner that will limit spills and the potential for contaminated material to be mixed with uncontaminated material. An excavation log

SECTION 02 61 13 Page 3 describing visible signs of contamination encountered shall be maintained for each area of excavation. Excavation logs shall be prepared in accordance with ASTM D5434.

3.2.2 Shoring

If workers must enter the excavation, it shall be evaluated, shored, sloped or braced as required by EM 385-1-1 and 29 CFR 1926 section 650.

3.2.3 Dewatering

Surface water shall be diverted to prevent entry into the excavation.

Dewatering shall be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements can be met.

3.3 SAMPLING

3.3.1 Sampling of Stored Material

Submit test reports for sampling of stored material.

3.3.2 Sampling Liquid

Liquid collected from excavations shall be sampled for heavy metals, oil, PH and shall meet the Philadelphia Water Department (PWD) Regulation for discharge into the City's sanitary sewer. Obtain permit from PWD before discharge.

Liquid with contaminant levels that exceed regulation levels shall be treated offsite. Analyses for contaminated liquid to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility.

Documentation of all analyses performed shall be furnished to the Contracting Officer. Additional sampling and analysis to the extent required by the approved offsite treatment, storage or disposal (TSD) facility receiving the material shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government.

3.4 BACKFILLING

See Section 31 00 00 EARTHWORK.

3.5 DISPOSAL REQUIREMENTS

Offsite disposal of contaminated material shall be in accordance with Federal, State, and local agency regulation. Contaminated soil shall be transported by a licensed hauler and disposed at a licensed disposal site.

3.6 CLOSURE REPORT

Submit Closure Report within 14 calendar days of completing work at the site. The report shall be labeled with the contract number, project name, location, date, name of general Contractor. The Closure Report shall include the following information as a minimum:

a. A cover letter signed by a responsible company official certifying that all services involved have been performed in accordance with the terms and conditions of the contract documents and regulatory

SECTION 02 61 13 Page 4

Powell, Sean Line

Powell, Sean Line

Barnhart, Michael Callout Mercury contaminated groundwater is known to be present at the site. Treatment of dewatered groundwater is required.

Barnhart, Michael Callout Influent and effluent groundwater to the treatment system shall be tested regularly to confirm contaminants are not being discharged.

requirements.

b. A narrative report including, but not limited to, the following:

(1) site conditions, ground water elevation, and cleanup criteria;

(2) excavation logs;

(3) field screening readings;

(4) quantity of materials removed from each area of contamination;

(5) quantity of water/product removed during dewatering;

(6) sampling locations and sampling methods;

(7) sample collection data such as time of collection and method of preservation;

(8) sample chain-of-custody forms; and

(9) source of backfill.

c. Copies of all chemical and physical test results.

d. Copies of all manifests and land disposal restriction notifications.

e. Copies of all certifications of final disposal signed by the responsible disposal facility official.

f. Waste profile sheets.

g. Scale drawings showing limits of each excavation, limits of contamination, known underground utilities within 50 feet of excavation, sample locations, and sample identification numbers.

On-site stockpile, storage, treatment, loading, and disposal areas shall also be shown on the drawings.

h. Progress Photographs. Color photographs shall be used to document progress of the work. A minimum of four views of the site showing the location of the area of contamination, entrance/exit road, and any other notable site conditions shall be taken before work begins.

After work has been started, activities at each work location shall be photographically recorded daily. Photographs shall be a minimum of 3 by 5 inches and shall include:

(1) Soil removal and sampling.

(2) Dewatering operations.

(3) Unanticipated events such as spills and the discovery of additional contaminated material.

(4) Contaminated material/water storage, handling, treatment, and transport.

(5) Site or task-specific employee respiratory and personal protection.

SECTION 02 61 13 Page 5

(6) Fill placement and grading.

(7) Post-construction photographs. After completion of work at each site, take a minimum of four views of each excavation site.

A digital version of all photos shown in the report shall be included with the Closure Report.

-- End of Section --

SECTION 02 61 13 Page 6

File details come from the government source that posted it. Updated .