About this file

This document is an Amendment (Amendment 0006) to Solicitation N4008525R3500 for a Design-Bid-Build (DBB) project for Energy Campus Infrastructure at the Philadelphia Navy Yard Annex. The amendment provides responses to final Pre-Proposal Inquiries (PPIs), updates the Wage Determination to PA20250003 07/11/2025, and includes site photos as attachments.

Key details include a maintained proposal due date of 31 July 2025 no later than 2:00 PM EDT. The project involves supporting a comprehensive test site in and around the B77 Complex at the Philadelphia Navy Yard, with work including pile supported foundations, concrete ductbanks, utilities, medium voltage switchgears, and a cooling tower. The amendment addresses specific technical questions related to groundwater dewatering, electrical feeder sizes, and provides site condition photographs to assist potential bidders in understanding the project requirements.

View the file

Other files

File Type Posted
N4008525R35000007CLEAN.pdf PDF
Amendment 0006 Energy Campus Site Photos 2of4.pdf PDF
Amendment 0006 Energy Campus Site Photos 1of4.pdf PDF
Amendment 0006 Energy Campus Site Photos 4of4.pdf PDF
Amendment 0006 Energy Campus Site Photos 3of4.pdf PDF
N4008525R3500 Amendment 0005 final.pdf PDF
Amendment 0005 3G010 - UTILITY COORDINATION AND SEQUENCE OF CONSTRUCTION.pdf PDF
Amendment 0005 02 61 13 - EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL.pdf PDF
Amendment 0005 DDG(X) WP3_Dwgs.pdf PDF
Amendment 0005 PS-77-001.0_SD2_PNY B77 POD_Shop Drawing Submittal.pdf PDF
Amendment 0005 CMT Services Group - Navy Yard - Additional Water Results.xlsx XLSX spreadsheet
N4008525R3500 Amendment 0004.pdf PDF
N4008525R3500 Amendment 0003.pdf PDF
Amendment 0003 Attachment 1.pdf PDF
DDG(X) WP3_Amendment 0003_Spec Section 22 25 00.pdf PDF
DDG(X) WP3_Amendment 0003_Spec Section 02 61 13.pdf PDF
DDG(X) WP3_Amendment 0003_Continuation Sheet.pdf PDF
DDG(X) WP3_Amendment 0003_Dwgs_Signed.pdf PDF
DDG(X) WP3_Amendment 0003_Spec Section 09 96 00.pdf PDF
Amendment 0003 ATTACHMENT G - PRICE SCHEDULE.pdf PDF
N4008525R3500 Amendment 0002.pdf PDF
Amendment 0002 Site-Visit Sign In Sheets.pdf PDF
Amendment 0001 Site Visit Information.pdf PDF
N4008525R3500 Amendment 0001.pdf PDF
ATTACHMENT G - PRICE SCHEDULE.pdf PDF
N4008525R3500 Drawings.pdf PDF
ATTACHMENT E - SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SPCD).pdf PDF
Solicitation - N4008525R3500 (final).pdf PDF
ATTACHMENT C - PAST PERFORMANCE QUESTIONAIRE (PPQ).pdf PDF
N4008525R3500 Specs.pdf PDF
ATTACHMENT H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
ATTACHMENT A - PRE-PROPOSAL INQUIRY (PPI) LOG.xlsx XLSX spreadsheet
ATTACHMENT D - HISTORICAL SMALL BUSINESS UTILIZATION.pdf PDF
ATTACHMENT F - SMALL BUSINESS SUBCONTRACTING PLAN.pdf PDF
ATTACHMENT B - CONSTRUCTION EXPERIENCE PROJECT DATA SHEET.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Created On:

23 Jul 2025, 14:42 PM Greenwich Mean Time

J 1 2

0006 23 Jul 2025 See Continuation Sheet WON 1808122 N40085

NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

MADISON TATEM, Email: madison.e.tatem.civ@us.navy.mil Telephone: 757- 341-0070

SCD: PAS:

N4008525R3500

16 Jun 2025

See Section G - Contract Administration Data

SOLICITATION NO. N4008525R3500 DESIGN-BID-BUILD (DBB), ENERGY CAMPUS INFRASTRUCTURE, PHILADELPHIA

NAVY YARD ANNEX (PNYA), PHILADELPHIA, PENNSYLVANIA

The proposal due date of 31 July 2025 NLT 2:00 PM EDT remains unchanged.

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Contract Description

SOLICITATION NO. N4008525R2641 DESIGN-BID-

BUILD (DBB), ENERGY CAMPUS

INFRASTRUCTURE AT THEPHILADELPHIA NAVY

YARD ANNEX (PNYA) IN PHILADELPHIA,

PENNSYLVANIAThe project will include supporting a larger effort to set up a comprehensive test site in and around the B77 Complex at the Philadelphia Navy Yard.

The work under this contract will provide pile supported foundations, concrete ductbanks, utilities, medium voltage switchgears, and a cooling tower. This project renovates/modernizes the north bay of Building 77H to provide a Land Based Test Site (LBTS) that will add test equipment foundations and utility infrastructure in support of a DDGX LBTS Energy Campus.

SOLICITATION NO. N4008525R2641 DESIGN-BID-

BUILD (DBB), ENERGY CAMPUS

INFRASTRUCTURE AT THE PHILADELPHIA

NAVY YARD ANNEX (PNYA) IN PHILADELPHIA,

PENNSYLVANIAThe project will include supporting a larger effort to set up a comprehensive test site in and around the B77 Complex at the Philadelphia Navy Yard.

The work under this contract will provide pile supported foundations, concrete ductbanks, utilities, medium voltage switchgears, and a cooling tower. This project renovates/modernizes the north bay of Building 77H to provide a Land Based Test Site (LBTS) that will add test equipment foundations and utility infrastructure in support of a DDGX LBTS Energy Campus.

N4008525R35000006

CONTINUATION SHEET

The purpose of this amendment is to provide the following:

1. Responses to final Pre-Proposal Inquiries (PPI’s)

2. Updated Wage Determination PA20250003 07/11/2025

3. Photos (see Attachments)

Pre-Proposal Inquiry Responses:

Amendment 0006 Attachments:

1. Amendment 0006 Energy Campus Site Photos 1of4

2. Amendment 0006 Energy Campus Site Photos 2of4

3. Amendment 0006 Energy Campus Site Photos 3of4

4. Amendment 0006 Energy Campus Site Photos 4of4

Question # Reference Question Government Response Page Section Paragraph

53 3C004

For bidding and schedule purposes, what is the approval time from submission of SECNAV 5512 to NAVFAC until NAVFAC's notification to the contractor of approval?

Dewatered groundwater must be treated and filtered prior to discharge. If discharging into a storm drain, conditions of the NPDES permit must be met.

Discharge into a sanitary sewer would require a groundwater discharge permit from PWD. Refer to drawings and specs and revised spec section 02 61 13 provided as part of Amendment 0005.

The bid documents indicate that ground water can be expected and that dewatering will be necessary. Drawing 3C004 - Erosion and Sediment Control Notes, contains multiple notes (#'s10, 29), indicate that all pumping should be done according to the procedure described within that plan, over undisturbed vegetated areas. During the site visit, it did not appear that there was a nearby vegetated area to pump water

to. Please advise where any water should be pumped to and if any groundwater that is encountered can be assumed to be clean or if it is contaminated? If assumed to be contaminated, please provide a test report documenting the contamination so that any filtration processes can be accounted for. It is anticipated that dewatering could be required to be established at the beginning of excavation and pile installation and remain ongoing until construction gets to an elevation above the water level. Is this a realistic assumption?

See response to PPI #53. In addition, there has been no groundwater testing on site, however ground water test results from inside building 77H are provided for reference.

Drawing 3E204 sheet keynote #10 calls for 4#2, 1#8 for the SA and SB panel feeders. The RTC panel schedule calls for 4#2/0, 1#4, which is correct?

(4) #2 & #8 AWG feeder size is correct. Revised sheet 3E204 provided with Amendment 0005.

97 Please provide pictures of the existing site conditions.

Provided with Amendment

WAGE DETERMINATION

"General Decision Number: PA20250003 07/11/2025

Superseded General Decision Number: PA20240003

State: Pennsylvania

Construction Type: Building

County: Philadelphia County in Pennsylvania.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 02/21/2025 2 03/07/2025 3 03/21/2025 4 05/30/2025 5 06/20/2025 6 07/04/2025 7 07/11/2025

ASBE0014-001 05/01/2025

Rates Fringes

Asbestos Workers/Insulator Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 60.84 48.38

BOIL0013-001 01/01/2025

Rates Fringes

BOILERMAKER......................$ 55.00 35.48

BRPA0001-006 05/01/2024

Rates Fringes

BRICKLAYER.......................$ 48.70 31.61

BRPA0001-008 05/01/2024

Rates Fringes

TILE SETTER......................$ 51.36 30.02

BRPA0001-011 05/01/2024

Rates Fringes

MASON - STONE....................$ 48.40 31.95

BRPA0001-015 05/01/2024

Rates Fringes

Pointer, caulker and cleaner.....$ 50.00 30.70

CARP0158-001 05/01/2024

Rates Fringes

Carpenter/Lather.................$ 54.13 29.78

CARP0219-005 05/01/2024

Rates Fringes

MILLWRIGHT.......................$ 53.54 36.94

CARP0251-001 05/01/2024

Rates Fringes

FLOOR LAYER: Carpet.............$ 55.07 31.33

CARP0474-004 05/01/2024

Rates Fringes

PILEDRIVERMAN....................$ 47.50 43.42

* ELEC0098-003 05/05/2025

Rates Fringes

ELECTRICIAN......................$ 70.97 46.13

ELEC0098-014 05/02/2022

Rates Fringes

ELECTRICIAN (Sound and Communication Technician) (Installation of Voice Data, IT Network, Wifi))...............$ 63.97 30.40

ELEV0005-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 71.85 38.435+a+b

FOOTNOTES FOR ELEVATOR MECHANICS:

A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

* ENGI0542-002 05/01/2025

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 54.52 34.49

GROUP 1a....................$ 57.52 35.38

GROUP 2.....................$ 54.27 34.42

GROUP 2a....................$ 57.29 35.29

GROUP 3.....................$ 50.18 33.22

GROUP 4.....................$ 49.88 33.13

GROUP 5.....................$ 48.16 32.62

GROUP 6.....................$ 47.17 32.33

FOOTNOTE: A. PAID HOLIDAYS: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day and Christmas Day

***TOXIC/HARARDOUS WASTE REMOVAL***

Add 20 per cent to basic hourly rate for all classifications

BOOM LENGTH PAY:

On all machines with booms, jibs, masts and leads, including tower cranes, 100 ft. from ground up, fifty cents ($.50) per hour additional will be paid for each increment of 25

ft. over 100 ft. On cranes with booms (including jibs, masts and leads) 200 ft. and over, two (2) operators will be required. When two (2) operators are employed, no Oiler will be required. Booms to be measured from the ground up.

Tower cranes calculated from ground up and out for purpose of boom pay.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Handling steel and stone in connection with erection, cranes doing hook work, any machine handling machinery, helicopters, concrete pumps building machines similar to the above, including remote, robotic or laser control equipment.

GROUP 1a: Machines handling steel, or the functional equivalent, and stone in connection with erection 15 ton and over factory rating; Cranes doing hook work 15 ton and over factory rating; Any machines handling machinery; HIgh Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 15 ton and over factory rating;

Concrete Pumps (Building) 120 feet of Boom length or less (200 yard pour or less); Machines similar to above, including remote, robotic or laser control equipment;

Equipment in this Wage Group that does not require an oiler.

GROUP 2: All types of cranes, All types of backhoes, Cableways, Draglines, Keystones, all types of shovels, Derricks, Pavers 21E and over, Trenching machines, Trench shovel, Gradalls, Front-End loaders, Boat Captain, Pippin type backhoes, Tandems scrapers, Towers type crane operation erecting, Dismantling, Jumping or Jacking, Drills (self-containes), (drillmaster type) forklift (20 ft. and over), Moter patrols (fine grade), Batch plant with mixer, Carryalls, Scraper, Trounapulls, Roller (Hith Grade Finishing), Spreaders (asphalt), Bulldozers and Tractors, Mechanic welder, Conveyor loaders (euclid-type wheel), Concrete pump, Milling Machines, Hoist with two towers, Building hoist double drum (unless used as a single drum), Mucking machines in tunnel, All auto grade and concrete finishing machines, Bundle pullers/extractors (tublar), bobcat. side broom, directional boring machines, vermeer saw type machines(other than than hand held tractor mounted hydro axe, chipper with boom, all) machine similar to the above including remote, robotic or laser control equipment.

GROUP 2a: Crawler backhoes and Crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; All types of cranes 15 ton and over factory rating; Cherry picker type machinery and equipment 15 ton and over factory rating; Concrete Pumps (Heavy/Highway); Machines similar to above, including remote, robotic or laser control equipment; Equipment in this Wage Group that does not require an oiler.

GROUP 3: Asphalt plant engineers, Well drillers, Ditch witch (small trencher), Motor patrols, Fine grade machines, Ten-ton roller (grade fill stone base), Concrete breaking machines, Guilloline only, Stump grinder, Conveyors (except building conveyors), Fork lift trucks of all types, High pressure boliers Elevator Operator (New Construction) Machine similar to the above,including remote, robotic or laser control equipment

GROUP 4: Seaman, Pulverzer form line grader, Farm tractors, road finishing, Concrete spreader, Power broom (self-contained), Seed spreader, Grease truck, toxic/hazardous wate removal rate 20 per cent added to all classifications and machiines similar to the above including remote, robotic or laser control equipment.

GROUP 5: Compressors pumps, Well point pumps, Welding machines Tireman, Power equipment, Maintenance engineer (power boats),Elevator Operators (Renovations) and machine similar to the above including remote, robotic or laser control equipment.

GROUP 6: Fireman, Oilers and deck hands (personnel boats), grease truck. Machines similar to the above including remote, robotic or laser control equipment.

IRON0401-002 07/01/2024

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 53.20 44.60

IRON0405-002 07/01/2025

Rates Fringes

IRONWORKER, REINFORCING..........$ 50.39 36.05

The following holidays shall be observed and when work is performed thereon it shall be paid for at twice the base rate: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Employees shall be off Christmas Eve Day and receive four hours pay.

Employees who have to work on Christmas Eve Day shall work four hours and be paid for eight hours pay for the holiday.

Any time worked beyond fours hours shall be paid at the double time rate plus the four hours holiday pay. To receive holiday pay, the employee must work the day before Christmas Eve and the first working day after Christmas Day.

IRON0405-004 07/01/2025

Rates Fringes

IRONWORKER (Rigger and Machinery Mover).................$ 46.86 36.05

The following holidays shall be observed and when work is performed thereon it shall be paid for at twice the base rate: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day. Employees shall be off Christmas Eve Day and receive four hours pay.

Employees who have to work on Christmas Eve Day shall work four hours and be paid for eight hours pay for the holiday.

Any time worked beyond fours hours shall be paid at the double time rate plus the four hours holiday pay. To receive holiday pay, the employee must work the day before Christmas Eve and the first working day after Christmas Day.

LABO0332-001 05/01/2025

Rates Fringes

LABORER

GROUP 1....................$ 39.10 26.69

GROUP 2....................$ 39.20 26.69

GROUP 3....................$ 39.25 26.69

GROUP 4....................$ 39.40 26.69

GROUP 5....................$ 39.45 26.69

GROUP 6....................$ 39.24 26.69

GROUP 7....................$ 40.38 26.69

GROUP 8....................$ 40.53 26.69

GROUP 9....................$ 40.68 26.69

GROUP 10....................$ 40.93 26.69

GROUP 11....................$ 39.50 26.69

LABORERS CLASSIFICATIONS

GROUP 1: Building site work; Stripping and dismantling concrete form work; loading, unloading, carrying and handling of all reinforced steel and steel mesh; handling lumber and other building materials; operating jackhammers, paving breakers and all other pneumatic tools; building scaffolds; raking, shoveling and tamping of asphalt;

spading and concrete pit work; grading; form pinning;

shoring; demolition except burners; laying conduits and ducts; sheathing; lagging; laying non-metallic pipe and caulking; all other types of laborers; pouring concrete;

operating vibrator; free air tunnels: miners.

GROUP 2: Power buggies; burners on demolition

GROUP 3: Wagon drill operator (single)

GROUP 4: Powdermen; wagon drill operator (multiple);

circular caisson excavation; underpinning excavation

GROUP 5: Caisson bottom man

GROUP 6: Yard workers

GROUP 7: Trackmen; brakemen; groutmen; bottom shaft men;

all other men in free air tunnels

GROUP 8: Form setters

GROUP 9: Miners bore driver; blasters; drillers; pneumatic shield operators

GROUP 10: Welders and burners

GROUP 11: Mason Tender

LABO0332-002 05/01/2025

Rates Fringes

LABORER (Asbestos Abatement, Toxic and Hazardous Waste Removal, Lead Based Paint Removal).........................$ 41.00 27.04

LABO0413-004 05/01/2024

Rates Fringes

Landscape Laborer Farm Tractor Driver, Hydroseeder Nozzleman and

Mulcher Nozzleman...........$ 30.28 23.62+A

FOOTNOTE:

A. PAID HOLIDAYS: Independence Day, Labor Day, and Thanksgiving Day.

MARB0001-003 05/01/2021

Rates Fringes

MARBLE FINISHER..................$ 25.10 20.75

TERRAZZO FINISHER................$ 27.03 20.58

TILE FINISHER....................$ 25.10 20.75

MARB0003-002 05/01/2021

Rates Fringes

MARBLE SETTER....................$ 44.90 30.75

TERRAZZO WORKER/SETTER...........$ 48.01 28.67

PAIN0021-001 05/01/2021

Rates Fringes

Painters:

Brush, Roller...............$ 41.24 28.10 Spray, Steel and Swing......$ 42.49 28.10

PAIN0021-012 05/01/2024

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 42.25 32.16

PAIN0252-001 06/01/2021

Rates Fringes

Window Tinter....................$ 25.02 13.06

PAIN0252-006 05/01/2022

Rates Fringes

GLAZIER..........................$ 46.09 34.83

PLAS0008-001 05/01/2022

Rates Fringes

PLASTERER........................$ 41.97 32.20

* PLAS0592-011 05/01/2025

CEMENT MASON/CONCRETE FINISHER...$ 48.70 32.46

PLUM0420-008 05/01/2024

Rates Fringes

Steamfitter......................$ 70.32 42.78

PLUM0690-002 05/01/2025

Rates Fringes

PLUMBER..........................$ 70.53 38.81

ROOF0030-001 05/01/2022

Rates Fringes

Roofers:

Composition.................$ 41.48 33.37+A Shingles....................$ 31.25 21.75+A Slate and Tile..............$ 34.25 21.75+A

FOOTNOTE (Composition Roofer only):

A. PAID HOLIDAY: Election Day

SFPA0692-001 01/01/2025

Rates Fringes

SPRINKLER FITTER.................$ 66.22 34.25

SHEE0019-008 05/01/2025

Rates Fringes

SHEET METAL WORKER...............$ 62.62 50.66

SHEE0019-023 07/15/2024

Rates Fringes

SHEET METAL WORKER (Sign Makers & Hangers)................$ 33.89 24.25

TEAM0107-001 05/01/2024

Rates Fringes

TRUCK DRIVER (BUILDING

CONSTRUCTION)

GROUP 1.....................$ 36.795 22.5495+a+b GROUP 2.....................$ 36.895 22.5495+a+b GROUP 3.....................$ 37.145 22.5495+a+b

TRUCK DRIVER (SITE

PREPARATION, PAVING AND

UTILITIES ON BUILDING

CONSTRUCTION)

GROUP 1.....................$ 36.14 21.555+a+b GROUP 2.....................$ 36.24 21.555+a+b GROUP 3.....................$ 36.49 21.555+a+b

TRUCK DRIVERS CLASSIFICATIONS (BUILDING CONSTRUCTION)

GROUP 1 - Stake body truck (single axle), 11/2 ton and under vehicles

GROUP 2 - Truck driver over 11/2 tons, dump trucks, tandem and batch trucks, semi-trailers, agitator mixer trucks and dumcrete type vehicle, asphalt distributors, farm tractors when used for transportation, stake body truck (tandem)

GROUP 3 - Euclid type, off-highway equipment - back or belly dump trucks and double-hitched equipment, straddle (ross) carrier, lowbed trailers

TRUCK DRIVERS CLASSIFICATIONS (SITE PREPARATION, PAVING AND

UTILITIES ON BUILDING CONSTRUCTION)

GROUP 1 - Stake body truck (single axle), dumpster

GROUP 2 - Dump trucks, tandem and batch trucks, semi-trailers, agitator mixer trucks, and dumpcrete type vehicles, asphalt distributors, farm tractor when used for transportation, stake body truck (tandem)

GROUP 3 - Euclid type, off-highway equipment or bell dump trucks and double hitched equipment, staddle (ross) carrier, low-bed trailers

FOOTNOTE:

a. PAID HOLIDAYS: Memorial Day, Independence Day, Labor Day, Thanksgiving Day and five personal holidays provided employee works at least one day in the three work days before and at least one day in the three work days after the said holiday. Emloyee earns a personal holiday every two months, provided employee has worked twenty-six day in each consecutive two month period, up to a maximum of five per calendar year. After 130 work days the employee is entitled to all five personal holidays.

b. PAID VACATION: Employee will earn one vacation day for every two months, provided employee has worked twenty-six day in each consecutive two month period, up to a maximum of five vacation days per calendar year. After 130 workdays the employee is entitled to all five days of vacation. Employees with 5 years of seniority, earn an additional week of vacation, accrued in the same way.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

(End of Summary of Changes)