DDG(X) WP3_Amendment 0003_Spec Section 22 25 00.pdf
PDF 804 KB Posted
- Solicitation number
- N4008525R3500
About this file
This document is a detailed technical specification (Section 23 25 00) for chemical treatment of water for mechanical systems, specifically for a cooling tower system. The specification outlines comprehensive requirements for a water treatment system, including precise chemical treatment parameters, equipment specifications, and quality control measures.
Key details include mandating a chemical treatment system for cooling water with specific limits: Phosphonate/Polymer treatment type, Puckorius Index of 4 minimum, Langelier Index of 4 maximum, Total Dissolved Solids not exceeding 5000 ppm, and pH between 7.5-8.5. The system must include chemical feed pumps, tanks, injection assemblies, water meters, timers, and a control panel. Contractors must provide daily operational testing, monthly quality assurance testing, and corrosion coupon testing. The specification also requires a prefabricated, insulated enclosure for the chemical treatment tanks, with detailed structural and electrical requirements, and includes a five-year warranty provision for the enclosure.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDG(X) LBTS WP3: E-Campus 1733372
SECTION 23 25 00
CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
05/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B40.100 (2022) Pressure Gauges and Gauge Attachments
ASTM INTERNATIONAL (ASTM)
ASTM D596 (2001; R 2018) Standard Guide for Reporting Results of Analysis of Water
ASTM D2688 (2015; E 2016) Standard Test Method for Corrosivity of Water in the Absence of Heat Transfer (Weight Loss Methods)
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2021) Motors and Generators
1.2 SUMMARY
This section covers the provisions and installation procedures necessary for a complete and totally functional water system(s) chemical treatment.
Provide and install the system with all necessary System Components, Accessories, Piping Components, and Supplemental Components/Services.
Cooling Tower system is an open, evaporative heat exchange, process cooling water system, subject to evaporation, drift, and regular blowdown. The system will have regular monitoring of water chemistry and automatic dispensing.
The proposed chemical treatment system must not include any materials or chemicals which are not approved by the NSWCPD, including both the presence of the chemical and the ability to discharge to the sanitary sewer system.
Provide pre-fabricated, insulated enclosure at chemical treatment tanks with lockable double door entrance.
1.3 GENERAL REQUIREMENTS
1.3.1 Structural Performance
Pre-fabricated insulated enclosure must be structurally sound and capable of withstanding the effects of self-weight gravity loads, and the loads listed in the following paragraph. Submit structural calculations signed
SECTION 23 25 00 Page 1
2 July 20252 July 2025 and sealed by a registered professional engineer.
1.3.1.1 Design Loads
Design and construct to the requirements of UFC 3-301-01, Structural Engineering.
a. Use Risk Category II.
b. Superimposed Dead Load
Include an additional dead load of 10 psf to roof loads, other than the weight of the enclosure. Wall framing must be capable of supporting an additional point load of 25 lbs at wall face to account for shelves or equipment.
c. Wind Loads
Wind loads, including components and cladding and main wind force resisting systems, must be in accordance with UFC 3-301-01. Use Exposure Category D.
d. Wind Uplift Resistance
Design for wind uplift resistance in accordance with UFC 3-301-01.
e. Deflection Limits
Deflection limits must be in accordance with UFC 3-301-01.
f. Thermal Movements
Provide cladding systems that allow for thermal movements resulting from the maximum change (range) in ambient and surface temperatures, 120 degrees F ambient and 180 degrees F material surfaces, preventing buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base engineering calculations on the surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Prefabricated Insulated Enclosure; G
SD-03 Product Data
Water Treatment System; G
Water Analysis; G
Spare Parts
SECTION 23 25 00 Page 2
2 July 2025
Field Instructions
Tests; G
Training Course; G
Prefabricated Insulated Enclosure; G
SD-04 Samples manufacturer's Color Charts And Chips; G
SD-05 Design Data
Structural Calculations; G
SD-06 Test Reports
Cooling Water QA Tests
SD-10 Operation and Maintenance Data
Water Treatment System
SD-11 Closeout Submittals
Prefabricated Insulated Enclosure Warranty
1.5 MAINTENANCE MATERIAL SUBMITTALS
Submit spare parts data for each different item of material and equipment specified, after approval of the detail drawings, not later than 2 months prior to the date of beneficial occupancy. Include a complete list of parts and supplies, with source of supply, with the data.
1.6 QUALITY CONTROL
1.6.1 Safety
Ensure moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to operating personnel are insulated, fully enclosed, guarded, or fitted with other types of safety devices. Install safety devices so that proper operation of equipment is not impaired.
1.6.2 Drawings
Because of the small scale of the drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. Carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions.
1.7 DELIVERY, STORAGE, AND HANDLING
Protect all equipment delivered and placed in storage from the weather, humidity and temperature variations, dirt and dust, or other contaminants.
SECTION 23 25 00 Page 3
1.8 PREFABRICATED INSULATED ENCLOSURE WARRANTY
Furnish manufacturer's no-dollar-limit warranty for the prefabricated insulated enclosure system. The warranty period is to be no less than 10 years from the date of acceptance of the work and be issued directly to the Government. The warranty must provide that if within the warranty period, the enclosure system shows evidence of deterioration resulting from defective materials or workmanship, correcting of any defects is the responsibility of the metal building system manufacturer.
Repairs that become necessary because of defective materials and workmanship while metal building system is under warranty are to be performed within 32 hours after notification, unless additional time is approved by the Contracting Officer. Failure to perform repairs within 32 hours of notification will constitute grounds for having emergency repairs performed by others and will not void the warranty.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
a. Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacturing of such products, that are of a similar material, design and workmanship and that have been in satisfactory commercial or industrial use for two years' prior to bid opening.
b. Include in the two-year use all applications of equipment and materials under similar circumstances and of similar size. Ensure the two years' experience has been satisfactorily completed by a product which has been sold or is offered for sale on the commercial market through advertisements, manufacturer's catalogs, or brochures.
Products having less than a two-year field service record are acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown.
c. All products are required to be supported by a service organization.
Submit a certified list of qualified permanent service organizations for support of the equipment, including their addresses and qualifications. These service organizations are required to be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
d. The selected service organization provides the chemicals required, the concentrations required, and the water treatment equipment sizes and flow rates required for the operating conditions described in Paragraph 1.2. The company provides all chemicals required for the cooling water systems and fills the systems with chemicals to the levels specified. The chemical is required to meet the requirements of this specification as well as the recommendations from the manufacturers of the cooling tower. Acid treatment chemicals are not allowed to be used.
2.1.1 Water Analysis
Conditions of make-up water to be supplied to the cooling tower and
SECTION 23 25 00 Page 4 process cooling water systems reported in accordance with ASTM D596 are as follows:
Date of Sample _____
Temperature _____ degrees F
Silica (SiO 2) _____ ppm
Insoluble _____ ppm
Iron, total (Fe) _____ ppm
Aluminum (Al) _____ ppm
Calcium (Ca) _____ ppm
Magnesium (Mg) _____ ppm
Carbonate (HCO 3) _____ ppm
Sulfate (SO 4) _____ ppm
Chloride (Cl) _____ ppm
Nitrate (NO 3) _____ ppm
Turbidity _____ ntu pH _____ ppm
Residual Chlorine _____ ppm
Total Alkalinity _____ ppm
Non-Carbonate Hardness _____ ppm
Total Hardness _____ ppm
Dissolved Solids _____ ppm
Conductivity _____ Micromho/cm
Ensure that the conditions are compatible with Philadelphia Water Company supply for Building 77H at NSWCPD.
2.2 EQUIPMENT
2.2.1 Nameplates
Provide a nameplate for each major component of equipment that includes the manufacturer's name, address, type or style, and catalog or serial number securely attached to the item of equipment. Provide nameplates for:
a. Pump(s)
SECTION 23 25 00 Page 5
b. Pump Motor(s)
c. Water Treatment Controller(s)
2.2.2 Electrical Work
Ensure all electrical equipment, motors, motor efficiencies, and wiring complies with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Provide electrical motor driven equipment specified complete with motors, motor starters, and controls. Provide electrical characteristics and enclosure types as shown, and unless otherwise indicated, provide all motors of 1 horsepower and above with open, drip-proof, or totally enclosed fan cooled enclosures, high efficiency type. Perform field wiring in accordance with manufacturer's instructions. Each motor is required to conform to NEMA MG 1 and be of sufficient size to drive the equipment at the specified capacity without exceeding the nameplate rating of the motor.
Provide continuous duty motors with the enclosure specified. Provide motor starters complete with thermal overload protection and other appurtenances necessary for the motor control indicated. Furnish motors with a magnetic across-the-line or reduced voltage type starter as required by the manufacturer. Furnish motor starters with NEMA 1 enclosures. Provide manual or automatic control and protective or signal devices required for the operation specified and any control wiring required for controls and devices specified, but not shown.
2.2.3 Gauges
Provide gauges that conform to ASME B40.100 , Class 1, 2, or 3, Style X, Type I or III as required, 4-1/2 inches in diameter with phenolic or metal case.
2.3 COMPONENTS
2.3.1 Cooling Water Treatment Systems
The use of chemical-treatment products containing hexavalent chromium (Cr) is prohibited. Treat the water to be used in the cooling water systems to maintain the conditions recommended by this specification as well as the recommendations from the manufacturers of the of the cooling tower.
Chemicals are required to meet all required federal, state, and local environmental regulations for the treatment of condenser-side heat exchangers, cooling towers and direct discharge to the sanitary sewer.
Provisions should be made to effectively dose, monitor and control a water treatment program to include (1) inhibitor and biocide injection (2) water sampling, (3) corrosion coupon sampling, and (4) effective bleed and control points.
2.3.1.1 Cooling Tower Water Limits
Meet the following cooling tower water limits, unless dictated differently by the cooling tower or chiller manufacturer's recommendations:
Treatment type Phosphonate/Polymer
Puckorius Index 4 minimum
SECTION 23 25 00 Page 6
Langelier Index 4 maximum
Total Dissolved Solids 5000 ppm maximum
Calcium Hardness 1200 ppm maximum
Silica 150 ppm maximum pH 7.5 - 8.5
For treated cooling tower water, minimize blowdown until the first of one of the top 5 limits is reached. Specific requirements for treatment chemicals and levels are listed below in paragraphs dealing with large systems (capacities greater than 50 tons).
2.3.1.2 Chemical Treatment for Large Systems
For cooling systems with capacities greater than 50 tons provide one of the three following chemical treatments with the limits indicated. The zinc and molybdate in the last two treatments help to meet the maximum corrosion requirements in waters that tend to be more corrosive. Maintain biocides to control bacteria below 10,000 colony forming units per milliliter.
a. Phosphonate Type Treatment
Phosphate 3-5 ppm
Polymer 3-4 ppm
TT 1-2 ppm
Biocides as required
b. Zinc-Phosphonate Type Treatment
Phosphate 3-5 ppm
Polymer 3-4 ppm
Zinc 1-2 ppm
TT 1-2 ppm
Biocides as required
c. Zinc-Molybdate Type Treatment
Phosphate 3-5 ppm
SECTION 23 25 00 Page 7
Polymer 3-4 ppm
Molybdate 10-15 ppm
Zinc 2-3 ppm
TT 1-2 ppm
Biocides as required
2.3.1.2.1 General Requirements
Provide a water treatment system capable of automatically feeding chemicals and bleeding the system to prevent corrosion, scale, and biological formations. Submit 6 complete copies, at least 5 weeks prior to the purchase of the water treatment system, of the proposed water treatment plan including a layout; control scheme; a list of existing make-up water chemistry, including the items listed in paragraph Water Analysis; a list of treatment chemicals to be added; the proportion of chemicals to be added; the final treated water control levels; and a description of health, safety and environmental concerns for handling the chemicals plus any special ventilation requirements. Automatic chemical feed systems must automatically feed chemicals into the cooling water based on makeup water rate. Use electrical signals from a water meter on the makeup water line to control the output of chemical feed pumps. Set the system initially manually based on the water analysis of the make-up water. Submit 6 complete copies of operating and maintenance manuals for the step-by-step water treatment procedures. Include in the manuals all testing procedures used in determining water quality.
2.3.1.2.2 Chemical Feed Pumps and Tanks
a. Furnish chemical feed pumps and tanks as a package with the pumps mounted on and piping connected to the tank. Furnish chemical feed pumps must be of the positive displacement diaphragm type. Furnish all pump cylinders, plungers, ball check valves, and check valve bodies made of corrosion resistant materials suitable for the chemicals being pumped. Ensure the cylinders of the provided pumps are replaceable for increased or reduced pressure or capacity ranges.
Drive motors shall be 110 volt, single phase and shall have drip-proof enclosures.
b. Provide pumps with a flow rate adjustable from 0 to 100 percent while in operation. The volumetric accuracy of the pumps is required to be within one percent over the range indicated. Ensure pump capacities are adjustable by positioning crank pin with micrometer setscrews.
Divide stroke length scale in percentage graduations engraved on scale. Ensure the discharge pressure of pumps is not less than 1.5 times the line pressure at the point of connection. Provide the pumps with a pressure relief valve and a check valve mounted in the pump discharge. Control the pump by an external controller/timer receiving signals from the makeup water meter.
c. Provide chemical tanks as shown. The tanks shall be constructed of materials compatible with the chemicals to be stored in the tank with a hinged cover and mounted on legs. Tanks shall have filling and drain connections and gauge glass. Each tank shall be furnished with
SECTION 23 25 00 Page 8 one pump, mounted and piped with black iron pipe and fittings, with suction strainer and stainless steel screen, and with 1/2 inch relief valve with steel body and stainless steel trim. Tank bottom shall be dished concave to a radius equal to the diameter of the tank.
Motor-driven agitator shall be provided. The tanks shall have sufficient capacity to require recharging only once per 14 days during normal operation. once per 30 days during normal operation.
d. Provide containment basins as shown on the drawings and accompanying ramps with platforms. Containment basins shall have adequate volume capacity to contain the full contents of the largest tank located within the basin footprint. Ramps/platforms must be configured and sized to allow servicing and tank removal/replacement. Top of ramp/platform must be roughly equal to the top of the containment basin.
2.3.1.2.3 Chemical Injection Assembly
Provide an injection assembly at each chemical feed point. Locate the injection assembly downstream of recirculating pumps and upstream of the condenser. Construct the injection assemblies of stainless steel. Locate the discharge of the assemblies in the cooling water piping as recommended by the manufacturer. Include with each assembly a shutoff valve and check valve at the point of entrance into the cooling water line.
2.3.1.2.4 Water Meter
Provide water meters with an electric contacting register and remote accumulative counter. Install the meter within the make-up water line, as indicated.
2.3.1.2.5 Timers
Provide timers which are of the automatic reset, adjustable type, and are electrically operated. Ensure the timers are designed to work with the contacting head water meters. Include the water meter cable with the timer. Ensure timers control operation of the chemical feed pumps and are suitable for a 120 volt current. Locate the timers within the water treatment control panel.
2.3.1.2.6 Bleed (Blowdown) Line
Control the flow through the bleed line by a conductivity meter and probe installed to measure the conductivity of the cooling water. Provide a high and low set point on the conductivity meter above which the meter opens a solenoid valve on the bleed line. Locate the bleed line attachment to the cooling water piping downstream of the recirculating pumps and upstream of the chemical injection point. Extend the bleed line to the nearest drain for continuous discharge.
2.3.1.2.7 Control Panel
Provide a NEMA 12 control panel enclosure suitable for surface mounting.
Construct the panel of stainless steel with a hinged door and lock.
Include a laminated plastic nameplate identifying each of the following functions:
(1) Main power switch and indicating light
(2) MAN-OFF-AUTO selector switch
SECTION 23 25 00 Page 9
(3) Indicating lamp for bleed-off valve
(4) Indicating lamp for each chemical feed pump
(5) Set point reading for each timer
2.3.1.2.8 Chemical Piping
Construct the piping and fittings of schedule 80 PVC suitable for the water treatment chemicals.
2.3.1.2.9 Sequence of Operation
Add chemicals based upon sensing the make-up water flow rate and activating appropriate timers. Provide a separate timer for each chemical. Control the blow down based upon the conductivity of the cooling water. Control the injection of the chemical required for biological control with a timer that can be manually set for proper chemical feed.
The water treatment company is required to determine and set a timer set points, blow down rates, and chemical pump flow rates.
2.3.1.2.10 Test Kits
Provide one test kit of each type required to determine the water quality as outlined within the operation and maintenance manuals.
2.3.2 Supplemental Components/Services
Ensure drain and makeup water piping complies with the requirements of Section 22 00 00 PLUMBING, GENERAL PURPOSE. Connect drains to sanitary sewer systems by means of an indirect waste connection.
2.4 Prefabricated Insulated Enclosure
2.4.1 Enclosure Dimensions
Provide Clear Inside dimensions of 14'-0" Long x 6'-0" Wide x 8'-0" High.
Coordinate size of enclosure with chemical treatment shop drawings.
2.4.2 Flooring
4 inch thick floor panels with cam lock mechanism for panel assembly.
High density extruded polystyrene foam (R28) laminated between sheets of:
exterior 26 gauge steel; interior 26 gauge galvalume steel & 1/2" FRT plywood & Snap lock PVC floor tile with cove base and adhesive, grey.
Steel skid: powder coated with fork lift slots and (4) lifting brackets.
2.4.3 Walls & Roof
4 inch thick, wall and ceiling panels, and cam lock mechanisms for panel assembly. High density extruded polystyrene foam (R26) laminated between sheets of 26 gauge galvanized steel - tan exterior/white interior stucco embossed finish. Provide manufacturer's color charts and chips.
2.4.4 Roofing
Thermoplastic single ply PVC roof system and 6" tan termination bar & fasteners.
SECTION 23 25 00 Page 10
2.4.5 Openings
Double Door (8' W x 7' H) & Frame, 26 Ga including threshold, weatherseal, stainless steel hinges, drip cap & passage lever/lever door deadbolt Coordinate installation of accessories through prefabricated metal building. Cut openings that are sized properly for all through wall penetrations and seal to a weathertight condition.
Contractor to install intake/exhaust storm louvers. Provide 12 x 8 intake steel storm louver & 10 x 8 exhaust steel storm louver. Coordinate location with mechanical drawings and pre-fabricated metal panels.
2.4.6 Electric Baseboard Heater
Provide 1,500 watt electric baseboard heater with thermostat. Heater voltage must be 208/240 V. Provide 48" long white enclosure constructed of minimum 0.0329-inch thick steel with removable front cover, end caps and baked enamel finish in manufacturer's standard color.
Factory-packaged units constructed according to UL 499, UL 1030, UL 1278 and UL 2021. Provide electrical components, devices and accessories listed and labeled as defined in NFPA 70, by a qualified testing agency and marked for intended location and application.
Nickel-chromium-wire heating element enclosed in metallic sheath mechanically bonded to fins, with high-temperature cutout and sensor running the full length of the element. Element supports shall eliminate thermal expansion noise.
2.4.7 Electrical
a. Electrical Service: Provide a 200-amp, 120/240-volt, single-phase, three-wire panelboard with spaces for 42 circuit breakers at the prefabricated insulated enclosure. Coordinate mounting location inside of enclosure with chemical treatment equipment. Mount panelboard enclosure on ½” Fire Retardant Treated Reinforced Plywood. Provide panelboard with required branch circuit breakers (quantities and ratings) to serve chemical treatment equipment, electric baseboard heat, receptacles and lighting. Provide HACR type circuit breakers for all HVAC and plumbing equipment circuits.
b. Receptacles: Provide ten (1) duplex NEMA 5-20R wall receptacles. Each receptacle must have a 4”x4” outlet box with ¾”-knockouts and device plate cover.
c. Lighting: Provide two (2) LED 4’-0” long lighting fixture rated for use in a cooler/freezer. Lighting must be Kason Model #1810LC4000. Provide one manual single-pole toggle switch in a 2”x4” outlet box with ¾”-knockouts.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy, before performing any work.
3.2 INSTALLATION
Provide all chemicals, equipment and labor necessary to bring all system waters in conformance with the specified requirements. Perform all work in accordance with the manufacturer's published diagrams, recommendations, SECTION 23 25 00 Page 11 and equipment warranty requirements.
3.2.1 Piping
Fabricate all connections between dissimilar metals using dielectric unions.
3.2.2 Prefabricated Insulated Enclosure
Move Prefabricated Enclosure into place after the manufacturer has delivered to site. Coordinate location with mechanical equipment. Site enclosure prior to placing mechanical equipment. Create openings in enclosure for pipe penetrations and louvers and create weathertight seals around all new penetrations.
3.3 TRAINING COURSE
Submit a schedule, at least 2 weeks prior to the date of the proposed training course, that identifies the date, time, and location for the training. Conduct a training course for the operating staff as designated by the Contracting Officer. The training period shall consist of a total 4 hours of normal working time and start after the system is functionally completed but prior to final acceptance tests. Submit field instructions, at least 2 weeks prior to construction completion, including equipment layout, wiring and control diagrams, piping, valves and control sequences, and typed condensed operation instructions. The condensed operation instructions shall include preventative maintenance procedures, methods of checking the system for normal and safe operation, and procedures for safely starting and stopping the system. The posted instructions shall be framed under glass or laminated plastic and posted where indicated by the Contracting Officer. The field instructions shall cover all of the items contained in the Operation and Maintenance Manuals as well as demonstrations of routine maintenance operations.
3.4 FIELD QUALITY CONTROL
3.4.1 Tests
If the waters of the mechanical systems are not in conformance with the specified requirements or in accordance with manufacturer's recommendations, the contractor is required to direct the water treatment company to take corrective action to achieve compliance. Perform daily operational tests in the directed frequencies to maintain required control to prevent corrosion, scaling and damage to equipment during operation.
Submit test schedules, at least 2 weeks prior to the start of related testing, for the cooling water quality tests. Identify the date, time, frequency and collection location for each test within the schedules.
3.4.2 Cooling Water Quality Tests
3.4.2.1 Tests for Large Systems (daily)
Daily, for cooling systems with a capacity larger than 50 tons, ensuring the following items are recorded.
pH _____
Total Alkalinity (as CaCO3) _____ ppm
SECTION 23 25 00 Page 12
2 July 20252 July 2025
Conductivity _____ micromho/cm
Phosphate _____ ppm
Zinc, if used (Zn) _____ ppm
Molybdate, if used (Mo) _____ ppm
3.4.3 Quality Assurance Testing
Conduct QA testing periodically by an independent water treatment lab/consultant to verify to managers that the mechanical and water treatment systems are being maintained properly. Provide the QA evaluation reports to the government COR.
3.4.3.1 Cooling Water QA Tests
Submit test reports in bound 8-1/2 by 11 inch booklets. Within the reports, identify the chemical composition of the water. Also include in the reports a comparison of the manufacturer's or chemical vendor's recommended operating conditions for the cooling tower and condenser in relation to the actual condition of the water. Document any required corrective actions undertaken within the report.
a. For cooling systems with capacities greater than 50 ton, analyze the cooling water a minimum of once a month for a period of one year by the water treatment company. Ensure the analysis includes the following information recorded in accordance with ASTM D596.
Date of Sample _____
Temperatures (before & after condenser) _____ & _____ degrees F pH _____
Silica (SiO2) _____ ppm
Iron (total, as Fe(2)O(3)) _____ ppm
Copper (Cu) _____ ppm
Calcium Hardness(CaCO3) _____ ppm
Total Hardness (as CaCO3) _____ ppm
Chloride (Cl) _____ ppm
Total Alkalinity (as CaCO3) ppm
Conductivity micromho/cm
Total Dissolved Solids _____ ppm
Phosphonate (as PO4) _____ ppm
Zinc (if used) (Zn) _____ ppm
Molybdate (if used) (Mo) _____ ppm
SECTION 23 25 00 Page 13
Tolyltriazole (TT) _____ ppm
Biocide _____ ppm
Bacteria colony count _____ colonies/mL
Makeup water pH ppm
Makeup water Iron _____ ppm
Makeup water Silica _____ ppm
Makeup water Calcium Hardness ppm
Makeup water Total Hardness ppm
Makeup water Total Alkalinity ppm
Makeup water Chloride (Cl) ppm
Makeup water Conductivity _____ micromho/cm
Written evaluation summary
3.4.4 Corrosion Testers
Install corrosion coupon and rack systems to verify corrosion control in the systems. Install testers or coupons in flowing system water through a sidestream or rack system. Test both mild steel and copper metal samples in the corrosion testers in accordance with ASTM D2688. Replace and analyze samples every 3 months. Rates of corrosion less than 3 mpy for steel and 0.2 mpy for copper are acceptable. Install corrosion testers on the piping systems of the following systems:
Cooling water loop
3.5 INSPECTIONS
3.5.1 Inspection General Requirements
Thirty days after project completion, inspect the cooling tower and condenser for problems due to corrosion, scale, and biological growth. If the cooling tower and condenser are found not to conform to the manufacturer's recommended conditions, and the water treatment company recommendations have been followed; instruct the water treatment company to provide all chemicals and labor for cleaning or repairing the equipment as required by the manufacturer's recommendations.
3.6 ONE-YEAR INSPECTION REPORT FOR COOLING WATER
At the conclusion of the one year period, inspect the cooling tower for
SECTION 23 25 00 Page 14 problems due to corrosion, scale, and biological growth. If the equipment is found not to conform to the manufacturers recommended conditions, and the water treatment company recommendations have been followed; the water treatment company shall provide all chemicals and labor for cleaning or repairing the equipment as required by the manufacturer's recommendations.
3.7 PREFABRICATED INSULATED ENCLOSURE
3.7.1 Manufacturer's Warranty
Submit all manufacturers' signed warranties to Contracting Officer prior to final commissioning and acceptance.
3.7.2 Contractor's Warranty For Installation
Submit warranty for installation to the Contracting Officer prior to final commissioning and acceptance.
CONTRACTOR'S FIVE YEAR NO PENAL SUM WARRANTY
FOR
PREFABRICATED INSULATED ENCLOSURE
FACILITY DESCRIPTION:________________________________________________________
BUILDING NUMBER:_____________________________________________________________
CORPS OF ENGINEERS CONTRACT NUMBER:__________________________________________
CONTRACTOR
CONTRACTOR:__________________________________________________________________
ADDRESS:_____________________________________________________________________
POINT OF CONTACT:____________________________________________________________
TELEPHONE NUMBER:____________________________________________________________
OWNER
OWNER:_______________________________________________________________________
ADDRESS:_____________________________________________________________________
POINT OF CONTACT:____________________________________________________________
TELEPHONE NUMBER:____________________________________________________________
CONSTRUCTION AGENT
CONSTRUCTION AGENT:__________________________________________________________
ADDRESS:_____________________________________________________________________
POINT OF CONTACT:____________________________________________________________
SECTION 23 25 00 Page 15
TELEPHONE NUMBER:____________________________________________________________
SECTION 23 25 00 Page 16
CONTRACTOR'S FIVE YEAR NO PENAL SUM WARRANTY
FOR
PREFABRICATED INSULATED ENCLOSURE
(continued)
THE METAL BUILDING SYSTEM INSTALLED ON THE ABOVE NAMED BUILDING IS WARRANTED
FOR A PERIOD OF FIVE (5) YEARS AGAINST WORKMANSHIP AND
MATERIAL DEFICIENCIES, WIND DAMAGE AND STRUCTURAL FAILURE WITHIN PROJECT
SPECIFIED DESIGN LOADS, AND LEAKAGE. THE METAL BUILDING SYSTEM COVERED
UNDER THIS WARRANTY INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING:
FRAMING AND STRUCTURAL MEMBERS, ROOFING AND SIDING PANELS AND SEAMS,
INTERIOR OR EXTERIOR GUTTERS AND DOWNSPOUTS, ACCESSORIES, TRIM, FLASHINGS
AND MISCELLANEOUS BUILDING CLOSURE ITEMS SUCH AS DOORS AND WINDOWS (WHEN
FURNISHED BY THE MANUFACTURER), CONNECTORS, COMPONENTS, AND FASTENERS, AND
OTHER SYSTEM COMPONENTS AND ASSEMBLIES INSTALLED TO PROVIDE A WEATHERTIGHT
SYSTEM; AND ITEMS SPECIFIED IN OTHER SECTIONS OF THESE SPECIFICATIONS THAT
BECOME PART OF THE METAL BUILDING SYSTEM.
ALL MATERIAL AND WORKMANSHIP DEFICIENCIES, SYSTEM DETERIORATION CAUSED BY
EXPOSURE TO THE ELEMENTS OR INADEQUATE RESISTANCE TO SPECIFIED SERVICE
DESIGN LOADS, WATER LEAKS AND WIND UPLIFT DAMAGE MUST BE REPAIRED AS
APPROVED BY THE CONTRACTING OFFICER.
ALL MATERIAL DEFICIENCIES, WIND DAMAGE, STRUCTURAL FAILURE AND LEAKAGE
ASSOCIATED WITH THE METAL BUILDING SYSTEM COVERED UNDER THIS WARRANTY MUST
BE REPAIRED AS APPROVED BY THE CONTRACTING OFFICER.
THIS WARRANTY COVERS THE ENTIRE COST OF REPAIR OR REPLACEMENT, INCLUDING ALL
MATERIAL, LABOR, AND RELATED MARKUPS. THE ABOVE REFERENCED WARRANTY
COMMENCED ON THE DATE OF FINAL ACCEPTANCE ON {_____} AND WILL REMAIN IN
EFFECT FOR STATED DURATION FROM THIS DATE.
SIGNED, DATED, AND NOTARIZED (BY COMPANY PRESIDENT)
(Company President) (Date)
SECTION 23 25 00 Page 17
FOR
PREFABRICATED INSULATED ENCLOSURE
(continued)
THE CONTRACTOR HEREBY SUPPLEMENTS THIS WARRANTY WITH WRITTEN WARRANTIES FROM
THE MANUFACTURER AND/OR INSTALLER OF THE METAL BUILDING SYSTEM, WHICH IS
SUBMITTED ALONG WITH THE CONTRACTOR'S WARRANTY. HOWEVER, THE CONTRACTOR IS
ULTIMATELY RESPONSIBLE FOR THIS WARRANTY AS OUTLINED IN THE SPECIFICATIONS
AND AS INDICATED IN THIS WARRANTY.
EXCLUSIONS FROM COVERAGE
1. NATURAL DISASTERS, ACTS OF GOD (LIGHTNING, FIRE, EXPLOSIONS, SUSTAINED
WIND FORCES IN EXCESS OF THE DESIGN CRITERIA, EARTHQUAKES, AND HAIL).
2. ACTS OF NEGLIGENCE OR ABUSE OR MISUSE BY GOVERNMENT OR OTHER
PERSONNEL,INCLUDING ACCIDENTS, VANDALISM, CIVIL DISOBEDIENCE, WAR, OR DAMAGE
CAUSED BY FALLING OBJECTS.
3. DAMAGE BY STRUCTURAL FAILURE, SETTLEMENT, MOVEMENT, DISTORTION, WARPAGE,
OR DISPLACEMENT OF THE BUILDING STRUCTURE OR ALTERATIONS MADE TO THE
BUILDING.
4. CORROSION CAUSED BY EXPOSURE TO CORROSIVE CHEMICALS, ASH OR FUMES
GENERATED OR RELEASED INSIDE OR OUTSIDE THE BUILDING FROM CHEMICAL PLANTS,
FOUNDRIES, PLATING WORKS, KILNS, FERTILIZER FACTORIES, PAPER PLANTS, AND THE
LIKE.
5. FAILURE OF ANY PART OF THE BUILDING SYSTEM DUE TO ACTIONS BY THE OWNER
WHICH INHIBIT FREE DRAINAGE FROM THE ROOF, GUTTERS AND DOWNSPOUTS; OR
CONDITIONS WHICH CREATE PONDING WATER ON THE ROOF OR AGAINST THE BUILDING
SIDING.
6. THIS WARRANTY APPLIES TO THE METAL BUILDING SYSTEM. IT DOES NOT INCLUDE
ANY CONSEQUENTIAL DAMAGE TO THE BUILDING INTERIOR OR CONTENTS WHICH IS
COVERED BY THE WARRANTY OF CONSTRUCTION CLAUSE INCLUDED IN THIS CONTRACT.
7. THIS WARRANTY CANNOT BE TRANSFERRED TO ANOTHER OWNER WITHOUT WRITTEN
CONSENT OF THE CONTRACTOR AND THIS WARRANTY AND THE CONTRACT PROVISIONS TAKE
PRECEDENCE OVER ANY CONFLICTS WITH STATE STATUTES. REPORTS OF LEAKS AND
BUILDING SYSTEM DEFICIENCIES MUST BE RESPONDED TO WITHIN 48 HOURS OF RECEIPT
OF NOTICE BY TELEPHONE OR IN WRITING FROM EITHER THE OWNER, OR CONTRACTING
OFFICER. EMERGENCY REPAIRS, TO PREVENT FURTHER ROOF LEAKS, MUST BE
INITIATED IMMEDIATELY; A WRITTEN PLAN MUST BE SUBMITTED FOR APPROVAL TO
REPAIR OR REPLACE THIS SSSMR SYSTEM WITHIN SEVEN CALENDAR DAYS. ACTUAL WORK
FOR PERMANENT REPAIRS OR REPLACEMENT MUST BE STARTED WITHIN 30 DAYS AFTER
RECEIPT OF NOTICE, AND COMPLETED WITHIN A REASONABLE TIME FRAME. IF THE
CONTRACTOR FAILS TO ADEQUATELY RESPOND TO THE WARRANTY PROVISIONS, AS STATED
SECTION 23 25 00 Page 18
FOR
PREFABRICATED INSULATED ENCLOSURE
(Exclusions from Coverage Continued)
POST A FRAMED COPY OF THIS WARRANTY IN THE MECHANICAL ROOM OR OTHER APPROVED
LOCATION DURING THE ENTIRE WARRANTY PERIOD.
-- End of Section --
SECTION 23 25 00 Page 19
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 23 25 00 Page 20
| FRONT COVER |
| PROJECT TABLE OF CONTENTS |
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS |
| 00 01 15 - LIST OF DRAWINGS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 CONTRACT DRAWINGS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 WORK COVERED BY CONTRACT DOCUMENTS |
| 1.2.1 Project Description |
| 1.2.2 Location |
| 1.3 OCCUPANCY OF PREMISES |
| 1.4 EXISTING WORK |
| 1.5 LOCATION OF UNDERGROUND UTILITIES |
| 1.5.1 Notification Prior to Excavation |
1.6 SALVAGE MATERIAL AND EQUIPMENT
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 14 00 - WORK RESTRICTIONS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 SPECIAL SCHEDULING REQUIREMENTS |
| 1.3 CONTRACTOR ACCESS AND USE OF PREMISES |
| 1.3.1 Activity Regulations |
| 1.3.1.1 Subcontractors and Personnel Contacts |
| 1.3.1.1.1 Citizenship Requirements |
| 1.3.1.1.2 Application for Contractor Identification Badges |
| 1.3.1.1.3 General Access Requirements and Restrictions |
| 1.3.1.2 Personnel Entry Approval |
| 1.3.1.3 No Smoking Policy |
| 1.3.2 Working Hours |
| 1.3.3 Work Outside Regular Hours |
| 1.3.4 Occupied and Existing Buildings |
| 1.3.5 Utility Cutovers and Interruptions |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 14 00A - AUTHORIZATION REQUEST FOR OPERATION OF NON-GOVERNMENT PEDs |
| 01 14 00B - NSWCPD ACCESS AND MOVEMENT SOP |
| 01 14 00C - 5512_8 NSWCPD VISITORS REQUEST |
| 01 14 00D - SECNAV-FORM-5512-1 |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 EARNED VALUE REPORT |
| 1.3.1 Data Required |
| 1.4 CONTRACT MODIFICATIONS |
| 1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT |
| 1.5.1 Content of Invoice |
| 1.5.2 Submission of Invoices |
| 1.5.3 Final Invoice |
| 1.6 PAYMENTS TO THE CONTRACTOR |
| 1.6.1 Obligation of Government Payments |
| 1.6.2 Payment for Onsite and Offsite Materials |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 30 00 - ADMINISTRATIVE REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 MINIMUM INSURANCE REQUIREMENTS |
| 1.3 SUPERVISION |
| 1.3.1 Superintendent Qualifications |
| 1.3.2 Minimum Communication Requirements |
| 1.3.3 Duties |
| 1.3.4 Non-Compliance Actions |
| 1.4 PRECONSTRUCTION MEETING |
| 1.4.1 Attendees |
| 1.5 FACILITY TURNOVER PLANNING MEETINGS Red Zone Meetings |
| 1.5.1 Red Zone Checklist |
| 1.5.2 Meetings |
| 1.6 PARTNERING |
| 1.6.1 Facilitated Formal Partnering |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 31 23.13 20 - ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM |
| PART 1 GENERAL |
| 1.1 CONTRACT ADMINISTRATION |
| 1.2 USER PRIVILEGES |
| 1.2.1 eCMS Subcontractor Users |
| 1.2.2 Users with Multiple Roles |
| 1.2.3 Loss of Privilege |
| 1.3 SUBMITTALS |
| 1.4 SYSTEM REQUIREMENTS AND CONNECTIVITY |
| 1.4.1 General |
| 1.4.2 Contractor Personnel List |
| 1.5 SECURITY CLASSIFICATION |
| 1.5.1 Markings on CUI Documents |
| 1.6 eCMS UTILIZATION |
| 1.6.1 Restricted Information |
| 1.6.2 Naming Convention for Files |
| 1.6.3 RFIs Module |
| 1.6.4 Submittals Module |
| 1.6.5 Submittal Packages Module |
| 1.6.6 Communications Module |
| 1.6.7 Issues Module |
| 1.6.8 Meeting Minutes Module |
| 1.6.9 Potential Change Items Module |
| 1.6.10 Daily Report Module |
| 1.6.11 Punchlists Testing Logs Legacy |
| 1.6.12 Punch Lists Module |
| 1.6.13 FWD UltraLean COAR RFP Module |
| 1.6.14 Non-Compliance Notices NCN Module |
| 1.6.15 Checklists |
| 1.6.15.1 Partnering Team Health Survey Checklist |
| 1.6.16 Flysheets |
| 1.6.17 eCMS Outage |
| 1.6.18 User Account Activity |
1.7 QUALITY ASSURANCE
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 31 23.13 20A - MIDLANT ECMS PROCEDURES DEC 2023 |
| 01 31 23.13 20B - PDC POLICY 2023-01 ECMS PROCEDURES |
| 01 32 17.00 20 - COST-LOADED NETWORK ANALYSIS SCHEDULES NAS |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.2 SCHEDULE REQUIREMENTS PRIOR TO THE START OF WORK |
| 1.2.1 Preliminary Scheduling Meeting |
| 1.2.2 Project Baseline Schedule |
| 1.2.3 Integrated Master Schedule IMS Meeting |
| 1.3 WEEKLY LOOK AHEAD SCHEDULE |
| 1.3.1 Weekly CQC Coordination and Production Meeting |
| 1.3.2 Weekly Look Ahead Schedule Requirements |
| 1.4 MONTHLY NETWORK ANALYSIS |
| 1.4.1 Monthly Network Analysis Updates |
| 1.4.2 As-Built Schedule |
| 1.5 CORRESPONDENCE AND TEST REPORTS |
| 1.6 ADDITIONAL SCHEDULING REQUIREMENTS |
| 1.7 SUBMITTALS |
| 1.8 SOFTWARE |
| 1.9 DESIGNATED PROJECT SCHEDULER |
| 1.9.1 Qualifications |
| 1.9.2 Duties |
| 1.10 NETWORK SYSTEM FORMAT |
| 1.10.1 Schedule Activity Properties and Level of Detail |
| 1.10.1.1 Activity Identification and Organization |
| 1.10.1.2 Activity Logic |
| 1.10.1.3 Longest Path Activity Baseline Limitation |
| 1.10.1.4 Assigned Calendars |
| 1.10.1.5 Activity Categories |
| 1.10.1.5.1 Pre-construction Activities |
| 1.10.1.5.2 Procurement Activities |
| 1.10.1.5.3 Government Activities |
| 1.10.1.5.4 Construction Quality Management CQM Activities |
| 1.10.1.5.5 Construction Activities |
| 1.10.1.5.6 Turnover and Closeout Activities |
| 1.10.1.5.7 Commissioning Activities |
| 1.10.1.6 Contract Milestones and Constraints |
| 1.10.1.6.1 Project Start Date Milestones |
| 1.10.1.6.2 Pre-Construction Meeting Milestone |
| 1.10.1.6.3 Preconstruction Submittals Finish Milestone |
| 1.10.1.6.4 Contractor Mobilization Finish Milestone |
| 1.10.1.6.5 NAVFAC Red Zone - Facility Turnover Planning Meeting Milestones |
| 1.10.1.6.6 Substantial Completion Milestone |
| 1.10.1.6.7 DD-1354 Finish Milestone |
| 1.10.1.6.8 Projected Completion Milestone |
| 1.10.1.6.9 Contract Completion Date CCD Milestone |
| 1.10.1.6.10 Additional Milestones |
| 1.10.1.7 Work Breakdown Structure & Activity Code |
| 1.10.1.7.1 Work Breakdown Structure WBS |
| 1.10.1.7.2 Responsibility Code |
| 1.10.1.7.3 Activity Category Code |
| 1.10.1.7.4 Drawing Code |
| 1.10.1.7.5 Additional Activity Codes |
| 1.10.1.8 Adverse Weather Lost Work Days |
| 1.10.1.9 Anticipated Restricted Delays |
| 1.10.1.10 Cost Loading |
| 1.10.1.10.1 Cost Loading Activities |
| 1.10.1.10.2 Partial Payment |
| 1.10.2 Schedule Software Settings and Restrictions |
| 1.10.3 Required Tabular Reports and Native P6 XER Files |
| 1.11 CONTRACT MODIFICATION |
| 1.11.1 Time Impact Analysis TIA |
1.12 PROJECT FLOAT
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.1.1 Submittal Descriptions SD |
| 1.1.2 Approving Authority |
| 1.1.3 Work |
| 1.2 SUBMITTALS |
| 1.3 SUBMITTAL CLASSIFICATION |
| 1.3.1 Government Approved G |
| 1.3.2 For Information Only |
| 1.4 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL |
| 1.5 PREPARATION |
| 1.5.1 Transmittal Form |
| 1.5.2 Identifying Submittals |
| 1.5.3 Submittal Format |
| 1.5.3.1 Format of SD-01 Preconstruction Submittals |
| 1.5.3.2 Format for SD-02 Shop Drawings |
| 1.5.3.2.1 Drawing Identification |
| 1.5.3.3 Format of SD-03 Product Data |
| 1.5.3.3.1 Product Information |
| 1.5.3.3.2 Standards |
| 1.5.3.3.3 Data Submission |
| 1.5.3.4 Format of SD-04 Samples |
| 1.5.3.4.1 Sample Characteristics |
| 1.5.3.4.2 Sample Incorporation |
| 1.5.3.4.3 Comparison Sample |
| 1.5.3.5 Format of SD-05 Design Data |
| 1.5.3.6 Format of SD-06 Test Reports |
| 1.5.3.7 Format of SD-07 Certificates |
| 1.5.3.8 Format of SD-08 Manufacturer's Instructions |
| 1.5.3.8.1 Standards |
| 1.5.3.9 Format of SD-09 Manufacturer's Field Reports |
| 1.5.3.10 Format of SD-10 Operation and Maintenance Data O&M |
| 1.5.3.11 Format of SD-11 Closeout Submittals |
| 1.5.4 Source Drawings for Shop Drawings |
| 1.5.4.1 Source Drawings |
| 1.5.4.2 Terms and Conditions |
1.5.5 Electronic File Format
| 1.6 QUANTITY OF SUBMITTALS |
| 1.6.1 Number of SD-02 Shop Drawing Copies |
| 1.6.2 Number of SD-03 Product Data Copies |
| 1.6.3 Number of SD-04 Samples |
| 1.6.4 Number of SD-05 Design Data Copies |
| 1.6.5 Number of SD-06 Test Report Copies |
| 1.6.6 Number of SD-07 Certificate Copies |
| 1.6.7 Number of SD-08 Manufacturer's Instructions Copies |
| 1.6.8 Number of SD-09 Manufacturer's Field Report Copies |
| 1.6.9 Number of SD-10 Operation and Maintenance Data Copies |
| 1.6.10 Number of SD-11 Closeout Submittals Copies |
| 1.7 INFORMATION ONLY SUBMITTALS |
| 1.8 PROJECT SUBMITTAL REGISTER AND DATABASE |
| 1.8.1 Submittal Management |
| 1.8.2 Preconstruction Use of Submittal Register |
| 1.8.3 Contractor Use of Submittal Register |
| 1.8.4 Approving Authority Use of Submittal Register |
| 1.8.5 Action Codes |
| 1.8.5.1 Government Review Action Codes |
1.8.6 Delivery of Copies
| 1.9 VARIATIONS |
| 1.9.1 Considering Variations |
| 1.9.2 Proposing Variations |
| 1.9.3 Warranting that Variations are Compatible |
| 1.9.4 Review Schedule Extension |
| 1.10 SCHEDULING |
| 1.10.1 Reviewing, Certifying, and Approving Authority |
| 1.10.2 Constraints |
| 1.10.3 QC Organization Responsibilities |
| 1.11 GOVERNMENT APPROVING AUTHORITY |
| 1.11.1 Review Notations |
| 1.12 DISAPPROVED SUBMITTALS |
| 1.13 APPROVED SUBMITTALS |
| 1.14 APPROVED SAMPLES |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 33 00A - SUBMITTAL REGISTER |
| 01 35 26 - GOVERNMENTAL SAFETY REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Site Safety and Health Officer SSHO |
| 1.2.1.1 Level One SSHO |
| 1.2.1.2 Level Two SSHO |
| 1.2.1.3 Level Three SSHO |
| 1.2.1.4 Alternate SSHO |
| 1.2.2 Competent Person CP |
| 1.2.3 Qualified Person QP |
| 1.3 SUBMITTALS |
| 1.4 PUBLIC HEALTH EMERGENCIES |
| 1.5 MONTHLY EXPOSURE REPORTS |
| 1.6 CONTRACTOR SAFETY SELF-EVALUATION CHECKLIST |
| 1.7 REGULATORY REQUIREMENTS |
| 1.7.1 Subcontractor Safety Requirements |
| 1.7.1.1 Experience Modification Rate EMR |
| 1.7.1.2 OSHA Days Away from Work, Restricted Duty, or Job Transfer DART |
| 1.8 SITE QUALIFICATIONS, DUTIES, AND MEETINGS |
| 1.8.1 Site Safety and Health Officer SSHO |
| 1.8.1.1 Qualifications of SSHO |
| 1.8.1.2 Duties of SSHO |
| 1.8.1.3 Safety Meetings |
| 1.8.2 Roles and Responsibilities of Prime Contractor and SSHO |
| 1.8.3 Additional Requirements |
| 1.8.4 Contract Site Safety And Health OfficersSSHOs Minimum |
| 1.8.5 Competent Person for Confined Space Entry |
| 1.8.6 Preconstruction Conference |
| 1.9 ACCIDENT PREVENTION PLAN APP |
| 1.9.1 Accident Prevention Plan APP |
| 1.9.2 Names and Qualifications |
| 1.9.3 Plans |
| 1.9.3.1 Lead, Cadmium, and Chromium Compliance Plan |
| 1.9.3.2 Asbestos Hazard Abatement Plan |
| 1.9.3.3 Site Safety and Health Plan |
| 1.9.3.4 Site Demolition Plan |
1.9.4 Methane Mitigation Plan MMP
| 1.10 ACTIVITY HAZARD ANALYSIS AHA |
| 1.10.1 AHA Management |
| 1.10.2 AHA Signature Log |
| 1.11 SITE SAFETY REFERENCE MATERIALS |
| 1.12 EMERGENCY MEDICAL TREATMENT |
| 1.13 NOTIFICATIONS AND REPORTS |
| 1.13.1 Accident Notification |
| 1.13.2 Accident Reports |
| 1.13.3 LHE Inspection Reports |
| 1.13.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and |
| 1.14 HOT WORK PERMIT |
| 1.14.1 Permit and Personnel Requirements |
| 1.14.2 Work Around Flammable Materials |
| 1.15 CONFINED SPACE ENTRY REQUIREMENTS |
| 1.15.1 Rescue Procedures and Coordination with Local Emergency Responders |
| 1.16 CONSTRUCTION INDOOR AIR QUALITY IAQ MANAGEMENT PLAN |
| 1.16.1 Requirements During Construction |
| 1.16.1.1 Control Measures |
| 1.16.1.2 Moisture Contamination |
1.16.2 Requirements After Construction
1.17 SEVERE STORM PLAN
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 CONSTRUCTION AND OTHER WORK |
| 3.1.1 Worksite Communication |
| 3.1.2 Hazardous Material Use |
| 3.1.3 Hazardous Material Exclusions |
| 3.1.4 Unforeseen Hazardous Material |
| 3.2 UTILITY OUTAGE REQUIREMENTS |
| 3.3 OUTAGE COORDINATION MEETING |
| 3.4 CONTROL OF HAZARDOUS ENERGY LOCKOUTTAGOUT |
| 3.4.1 Safety Preparatory Inspection Coordination Meeting with the |
| 3.4.2 Lockout/Tagout Isolation |
| 3.4.3 Lockout/Tagout Removal |
| 3.5 FALL PROTECTION PROGRAM |
| 3.5.1 Fall Protection Equipment and Systems |
| 3.5.1.1 Additional Personal Fall Protection Measures |
| 3.5.1.2 Personal Fall Protection Equipment |
| 3.6 EQUIPMENT |
| 3.6.1 Use of Explosives |
| 3.7 ELECTRICAL |
| 3.7.1 Electrical Work |
| 3.7.2 Qualifications |
| 3.7.3 Arc Flash |
| 3.7.4 Grounding |
| 3.7.5 Testing |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 ORDERING INFORMATION |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 00 - QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 PAYMENT |
| 1.3 SUBMITTALS |
| 1.4 GENERAL REQUIREMENTS |
| 1.5 QUALITY CONTROL QC PROGRAM REQUIREMENTS |
| 1.5.1 Meetings |
| 1.5.1.1 Quality Control Plan Meeting |
| 1.5.1.2 Coordination and Mutual Understanding Meeting |
| 1.5.1.2.1 Purpose |
| 1.5.1.2.2 Coordination of Activities |
| 1.5.1.2.3 Attendees |
1.5.1.3 Quality Control QC Meetings
| 1.5.2 Contractor Quality Control CQC Plan |
| 1.5.2.1 Content of Contractor Quality Control CQC Plan |
| 1.5.3 Acceptance of the Quality Control QC Plan |
| 1.5.4 Preliminary Construction Work Authorized Prior to Acceptance |
| 1.5.5 Notification of Changes |
| 1.5.6 Special Inspections |
| 1.6 QUALITY CONTROL QC ORGANIZATION |
| 1.6.1 Personnel Requirements |
| 1.6.2 Quality Control QC Manager |
| 1.6.2.1 Duties |
| 1.6.2.2 Qualifications |
| 1.6.2.3 Construction Quality Management Training |
| 1.6.3 Organizational Changes |
| 1.6.4 Alternate Quality Control QC Manager Duties and Qualifications |
| 1.6.5 Commissioning |
| 1.6.5.1 Certificate of Readiness |
1.6.6 Special Inspector and Special Inspector of Record
| 1.7 SUBMITTAL AND DELIVERABLES REVIEW AND APPROVAL |
| 1.8 THREE PHASES OF CONTROL |
| 1.8.1 Preparatory Phase |
| 1.8.2 Initial Phase |
| 1.8.3 Follow-Up Phase |
| 1.8.4 Additional Preparatory and Initial Phases |
| 1.8.5 Notification of Three Phases of Control for Off-Site Work |
| 1.8.6 Deficiency/Rework Items List |
| 1.9 TESTING |
| 1.9.1 Accreditation Requirements |
| 1.9.2 Laboratory Accreditation Authorities |
| 1.9.3 Capability Check |
| 1.9.3.1 Onsite Laboratory |
| 1.9.4 Test Results |
| 1.9.5 Test Reports and Monthly Summary Report of Tests |
| 1.10 COMPLETION INSPECTIONS |
| 1.10.1 Punch-Out Inspection |
| 1.10.2 Pre-Final Inspection |
| 1.10.3 Final Acceptance Inspection |
| 1.11 QUALITY CONTROL QC CERTIFICATIONS |
| 1.11.1 Contractor Quality Control CQC Report Certification |
| 1.11.2 Completion Certification |
| 1.11.3 Invoice Certification |
| 1.12 DOCUMENTATION AND INFORMATION FOR THE CONTRACTING OFFICER |
| 1.12.1 Construction Documentation |
| 1.12.2 Quality Control Activities |
| 1.12.3 Verification Statement |
| 1.12.4 Quality Control Validation |
| 1.12.5 Testing Plan and Log |
| 1.12.6 As-Built Drawings |
| 1.13 NOTIFICATION ON NON-COMPLIANCE |
| 1.14 DELIVERY, STORAGE, AND HANDLING |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 35 - SPECIAL INSPECTIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GENERAL REQUIREMENTS |
| 1.3 DEFINITIONS |
| 1.3.1 Continuous Special Inspections |
| 1.3.2 Perform |
| 1.3.3 Observe |
| 1.3.4 Special Inspector SI |
| 1.3.5 Associate Special Inspector ASI |
| 1.3.6 Third Party |
| 1.3.7 Special Inspector of Record SIOR |
| 1.3.8 Contracting Officer |
| 1.3.9 Quality Control QC Manager |
| 1.3.10 Structural Engineer of Record SER |
| 1.3.11 Statement of Special Inspections SSI |
| 1.3.12 Schedule of Special Inspections SSI |
| 1.3.13 Definable Feature of Work DFOW |
| 1.4 SUBMITTALS |
| 1.5 SPECIAL INSPECTOR QUALIFICATIONS |
| 1.5.1 Steel Construction and High Strength Bolting |
| 1.5.1.1 Special Inspector |
| 1.5.1.2 Associate Special Inspector |
| 1.5.2 Welding Structural Steel |
| 1.5.2.1 Special Inspector |
| 1.5.2.2 Associate Special Inspector |
| 1.5.3 Nondestructive Testing of Welds |
| 1.5.3.1 Special Inspector |
| 1.5.3.2 Associate Special Inspector |
| 1.5.4 Concrete Construction |
| 1.5.4.1 Special Inspector |
| 1.5.4.2 Associate Special Inspector |
| 1.5.5 Verification of Site Soil Condition, Fill Placement and Load-Bearing |
| 1.5.5.1 Special Inspector |
| 1.5.5.2 Associate Special Inspector |
| 1.5.6 Deep Foundations |
| 1.5.6.1 Special Inspector |
| 1.5.6.2 Associate Special Inspector |
1.5.7 Special Inspector of Record SIOR
| PART 2 PRODUCTS |
| 2.1 SPECIAL INSPECTION OF FABRICATED ITEMS |
| PART 3 EXECUTION |
| 3.1 RESPONSIBILITIES |
| 3.1.1 Special Inspector of Record |
| 3.1.2 Quality Control Manager |
| 3.1.3 Special Inspectors |
3.2 DEFECTIVE WORK
| 01 45 35A - SI_SCHEDULE |
| 01 45 35B - STATEMENT_OF_SPECIAL_INSPECTIONS |
| 01 50 00 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 CONSTRUCTION SITE PLAN |
| 1.4 BACKFLOW PREVENTERS CERTIFICATE |
| 1.4.1 Backflow Tester Certificate |
| 1.4.2 Backflow Prevention Training Certificate |
| 1.5 DOD CONDITION OF READINESS COR |
| 1.6 CYBERSECURITY DURING CONSTRUCTION |
| 1.6.1 Contractor Computer Equipment |
| 1.6.1.1 Operating System |
| 1.6.1.2 Anti-Malware Software |
| 1.6.1.3 Passwords and Passphrases |
| 1.6.1.4 Contractor Computer Cybersecurity Compliance Statements |
| 1.6.2 Temporary IP Networks |
| 1.6.2.1 Network Boundaries and Connections |
| 1.6.3 Government Access to Network |