Solicitation 29 May 2020.pdf
PDF 804 KB Posted
- Attached to
- Construction of P447 Explosive Railcar Yard
- Solicitation number
- N40085-20-R-0048
About this file
This document is a solicitation for the construction of a P447 Explosive Railcar Holding Yard at Naval Station Crane in Crane, Indiana. The project includes demolishing existing buildings and rail tracks at the Railcar Site and constructing a new rail holding yard with associated site work. It also involves building a new operations building and storage building with loading ramp at the Defense Logistics Agency Disposition site, along with extending fiber infrastructure and relocating an existing radiation detector. Proposals are due by June 30, 2020. The award will be a firm fixed-price contract. The solicitation is set aside for small businesses and has subcontracting goals for small disadvantaged businesses, women-owned small businesses, HUBZone small businesses, veteran-owned small businesses, and service-disabled veteran-owned small businesses. The Navy is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design-Bid-Build, Construction of P447 Explosive Railcar Holding Yard, Crane, Indiana.
MICHELLE A. CORSINO 757-341-0216
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-May-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 Jun 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N4008520R0048 96
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4008520R0048
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
P447 Explosive Railcar Holding Yard
FFP
FOB: Destination
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
TABLE OF CONTENTS
1. GENERAL
2. BASIS FOR AWARD
3. EVALUATION FACTORS FOR AWARD
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PRE-PROPOSAL INQUIRIES (PPIs)
5. ATTACHMENTS:
Will be located on beta.SAM.gov under additional documents
1. GENERAL OVERVIEW
DESIGN-BID-BUILD, P447 EXPLOSIVE RAILCAR HOLDING YARD, CRANE, INDIANA
1.1 This solicitation is being issued as Full and Open Competition
1.2 In accordance with DFARS 236.204, The Magnitude of Construction for this Project is between $10,000,000 and $25,000,000.
1.3 NAICS Code: 236220 and the size standard is $39,500,000.
1.4 This solicitation is formatted as a Request for Proposal according to FAR Part 15.
This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government.
1.5 Contractor Performance Information: Contractor’s performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work, the contractor is required to provide the government with the name, phone number and email address of the “Contractor’s
Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriated system. It is the contractor’s responsibility to keep this contract information current.
1.6 BETA.SAM.GOV WEBSITE: All attachments, drawings, and specifications will be posted on beta.SAM.gov at https://beta.sam.gov. Amendments will be posted directly to the website. Additionally, other postings will be made to the website, such as the Pre-Proposal
Inquiries (PPI) log, drawings, etc. Postings to the website, DO NOT generate an automated email to offerors. It is the offeror’s responsibility to check beta.SAM.gov periodically to see if additional postings have been made.
2. BASIS FOR AWARD
2.1 The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest priced, technically acceptable offer.
2.2 As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR
15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
2.3 The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.
2.4 In order to permit efficient competition, the Navy will utilize the following methodology. Proposals will initially be screened for price and placed in order (lowest price to highest price). The Navy will then evaluate the technical factors of the lowest priced proposal. If the lowest priced proposal is not found to be technically acceptable then the next lowest price proposal shall be evaluated. If that proposal is also not found to be technically acceptable, then the process described will be conducted again as many times as necessary, until such time as the
Government identifies a technically acceptable proposal. Accordingly, under this methodology, the technical factors of some proposals may not be evaluated by the Navy. If discussions are deemed necessary by the Contracting Officer, all proposals will be evaluated (both technical and price) for the purpose of establishing a competitive range.
2.5 An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.
3. EVALUATION FACTORS FOR AWARD
3.1 The solicitation requires the evaluation of price and the following non-price factors.
Factor 1 - Corporate Experience
Factor 2 - Safety
Factor 3 - Management Approach and Schedule
Factor 4 – Past Performance
The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
3.2 Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price:
(1) Solicitation Submittal Requirements:
Price shall be submitted on the Price Proposal Form included in the solicitation. Offeror shall submit one marked “Original”, and one copy each in a separate package with the following characteristics:
Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, DUNS, cage code, point of contact (POC), POC phone number, and POC email address;
Completed SF 1442 signed with all amendments acknowledged;
Price Proposal Form;
Copy of Representation and Certifications and proof of registration in System for Award Management (SAM);
Confirmation of filing of Veterans' Employment and Training (VETS) VETS-
4212 for the 2017 filing cycle.
Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee.
Amount shall be at least 20 percent of the proposed price, but shall not exceed
$3Million, whichever is less.
Responsibility Determination information (see below)
Small Business Subcontracting Plan (see below)
In the event of a discrepancy between the original and copies, the original version of the proposal will govern. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
Furthermore, any price information within the technical proposal (non-price proposal) will not be considered. Likewise, any technical/non-price information within the price proposal will not be considered.
RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate tab, the offeror shall provide the following information in the price proposal package:
1. One (1) signed bank reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The
Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
3. Description of offeror’s facilities and equipment.
4. Other offeror’s work presently under contract.
SMALL BUSINESS SUBCONTRACTING PLAN INFORMATION - reference FAR 52.219-9
Alt II and DFARS 252.219-7003).
NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting plan goals and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
SB 40%
SDB 5%
HUBZone SB 3%
WOSB 9%
SDVOSB 3%
Small businesses identified by name shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with DFARS 252.219-
7003(e).
See the Small Business Subcontracting Plan Template (Attachment E) for format.
Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the
Contracting Officer. No certificate of destruction will be issued.
(2) Basis of Evaluation:
The Government will evaluate price based on the total price. Total price consists of the entire work, in accordance with the drawings and specifications. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) Non-Price Factors:
The offeror shall submit one (1) original, marked “Original”, and four (4) copies, marked
“Copy”, each in a separate three ring binder with the following:
Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Phone
Number, and Email Address;
8 ½ x 11 paper, 12-point font;
Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated; and
Submit price and non-price binders on one CD-ROM. In case of variation, the original hard copy proposal takes precedence over electronic or copies.
(1) Factor 1, Corporate Experience:
(i) Solicitation Submittal Requirements:
Submit a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects (similar in size, scope, and complexity to the
RFP). For purposes of this evaluation, a relevant project is further defined as follows:
New Construction Size/Scope/Complexity: New construction of a commercial or industrial facility, such as, but not limited to, a distribution center, warehouse, production, or operation facility with a final construction cost of $5,000,000 or greater.
Renovation projects will not be considered relevant;
- Note: Additions comprised of a new footprint will only be considered New
Construction for the purposes of this evaluation if the new footprint meets the above Size/Scope/Complexity. Offerors shall ensure the project description clearly identifies whether the project is new construction or an addition comprised of a new footprint, provides the square footage and final construction cost, and addresses how the project meets the
Size/Scope/Complexity requirements.
Site Work Size/Scope/Complexity: Site work involving earthwork (excavation, fill, and grading), paving (concrete, asphalt, aggregate, sidewalks), drainage (storm drain structures, storm sewer piping, detention, and bioretention basins), utilities (water, sanitary, sewer), erosion and sediment control; and
Railroad Track Construction Size/Scope/Complexity: Railroad track construction involving new tracks to meet standards requirements of the American Railway
Engineering and Maintenance-of-Way Association (AREMA) and installation of turnout packages with at least 1000 LF of track construction.
To be considered relevant, a project must demonstrate at least one of the
Size/Scope/Complexities listed above. To be deemed Acceptable for this Factor, each project submitted is not required to demonstrate experience with all three of the
Size/Scope/Complexities listed above; but collectively, the submitted projects must demonstrate experience with all three Size/Scope/Complexities.
If the Offeror does not have relevant Railroad Track Construction experience meeting the
Size/Scope/Complexity requirements above, a maximum of two (2) projects demonstrating the
Railroad Track Construction Size/Scope/Complexity may be submitted by proposed subcontractors. The Offeror must provide a letter of commitment from the proposed subcontractor and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract. Subcontractor experience will not be considered for the other
Size/Scope/Complexities. For the remaining projects, the offeror must have been the prime contractor. Offerors are still limited to a total of five (5) projects.
Projects submitted for the offeror shall be completed within the past ten (10) years of the date of issuance of this RFP. Projects completed outside of this window will be considered “Not
Relevant” and cannot be used to demonstrate experience with any elements of work discussed under the Size/Scope/Complexities.
A project is defined as a construction project performed under a single task order or contract.
For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a task order as a project. Projects which are not complete as of the date of issuance of this RFP shall not be considered by the SSEB.
The attached Construction Experience Project Data Sheet (Attachment C) is MANDATORY and
SHALL be used to submit project information. Except as specifically requested, the
Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed two (2) double-sided pages (or four (4) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for this project, including specific descriptions of those features. Projects that are not sufficiently described so as to demonstrate compliance with the above Size, Scope, and Complexity requirements may be deemed not relevant.
If the offeror is a Joint Venture (JV), relevant project experience shall be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Experience submitted for one of the
Offeror’s Joint Venture members in which the Joint Venture member was a partner in a different
Joint Venture entity may be submitted to demonstrate relevant project experience. If projects are submitted for the Joint Venture members, the project description shall include information that demonstrate the meaningful involvement of all parties of the Joint Venture (JV). Offerors are still limited to a total of five (5) projects combined. For a JV, the offeror shall submit the signed
JV agreement. For 8(a) Mentor-Protégé Joint Venture, the offeror shall submit the signed and
U.S. Small Business Administration (SBA) approved Mentor-Protégé agreement.
If the Offeror is proposing as a single corporate entity (i.e. not as a Joint Venture), the Offeror may submit relevant project experience it performed as a partner in a previous Joint
Venture. Offerors are still limited to a total of five (5) projects.
If an offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. If an offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member company and the proposal does not clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract, the project will be considered “Not Relevant”.
(ii) Basis of Evaluation:
The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing relevant construction as defined in the solicitation submittal requirements. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. The
Government will only review five (5) projects total. Any projects submitted in excess of the five
(5) for Corporate Experience will not be considered. An offeror that does not submit a minimum of two (2) relevant projects as defined above will receive a rating of “Unacceptable” and will not be eligible for award.
(2) Factor 2, Safety:
The offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR, DART and TRC Rates shall not be submitted for subcontractors.)
(a) Experience Modification Rate (EMR): Include three previous complete calendar years’
(2017, 2018, and 2019) worth of data. This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the factor submission.
(b) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: Submit three previous complete calendar years’ worth of data (2017, 2018, and 2019). If an offeror cannot submit an OSHA DART rate, for any year, the offeror must affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART rate data negatively must be addressed as part of this factor submission.
(c) Total Recordable Case (TRC) Rate: Submit three previous complete calendar years’ (2017, 2018, and 2019) worth of data. If an offeror cannot submit TRC rates, for any year, affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the TRC rate data negatively must be addressed as part of this factor submission.
(d) Technical Approach for Safety: The technical approach to safety narrative shall be limited to one (1) double-sided page (or two (2) singled-sided pages), and must address all items below.
1. The offeror shall describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.
2. The offeror shall describe the safety management system that will be used to oversee the safety compliance and performance of self-performed and subcontractor performed work.
3. The offeror shall describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.
4. The offeror shall describe the methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
Note: The narrative shall be limited to one (1) double-sided page (or two (2) singled-sided pages). For a partnership or joint venture, the submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Safety narratives for joint ventures may be up to two (2) double-sided pages (or four
(4) single-sided pages) in length.
(ii) Basis of Evaluation: The evaluation will collectively consider the following:
Experience Modification Rate (EMR)
OSHA Days Away from Work, Restricted Duty, or Job Transfer
(DART)
Total Recordable Case (TRC) Rates
Offeror Technical Approach to Safety
Other sources of information available to the Government
(a) Experience Modification Rate (EMR): For the three previous complete calendar years the offeror will submit EMR. If no EMR exists, the offeror may submit an insurance company-provided equivalent rate explaining why not. If an insurance company-provided equivalent rate is provided, it will be treated the same as an EMR. Any extenuating circumstances that affected the EMR and negative trends should be addressed as part of this selection factor. The board will evaluate the EMR to determine if the offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
(b) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rates: For the three previous complete calendar years (2017, 2018, and 2019) the offeror will submit their
OSHA DART, as defined by the U.S. Department of Labor, Occupational Safety and Health
Administration. If unable to submit OSHA DART rates, affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART rate data and negative trends should be addressed as part of this element. The board will evaluate the OSHA DART rates to determine if the offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
(c) Total Recordable Case (TRC) Rates: For the three previous complete calendar years (2017, 2018, and 2019), the offeror will submit their TRC, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If unable to submit TRC rates, affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the
TRC rate data and negative trends should be addressed as part of this element. The board will evaluate the TRC rates to determine if the offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
(d) Technical Approach to Safety: The offeror will describe their plan to evaluate their safety performance and that of potential subcontractors. Also, describe any innovative methods that the offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The
Safety Narrative shall be limited to two pages. The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
(e) Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System
(CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor
Performance Assessment Reporting System (CPARS) and other related databases.
The Government is seeking to determine that the offeror has consistently demonstrated a commitment to safety and that the offeror plans to properly manage and implement safety procedures for its self-performed work and the work of its sub-contractors. The Government will evaluate the offeror’s overall safety management system, safety performance record, and the offeror’s methodology of qualifying, evaluating, selecting and overseeing its subcontractors.
The Government’s sources of information for evaluating safety will include, but are not limited to: OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS) database, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment
Reporting System (CPARS), and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The
Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project and the specific management practices that will be in place for providing deliberate safety program management and mishap prevention support.
(3) Factor 3, Management Approach and Schedule:
Submit a narrative work plan and Critical Path Method (CPM) project schedule to describe your approach to managing the project and ensuring adherence to the project bid schedule. Both the schedule and narrative must address the execution of the base work and all options, as defined in the RFP. The narrative shall not exceed five (5) double-sided (or ten (10) single-sided) 8-1/2" x
11" pages. The schedule shall be on 11" x 17" pages and in an Adobe PDF file. There is no page limit for the CPM schedule.
The narrative work plan shall address major elements of work and demonstrate understanding of the scope, major milestones, technical complexities, and the sequenced construction schedule needed to achieve the work as identified in the RFP.
The project schedule shall illustrate the offeror's ability to achieve the contract completion date delineated in the RFP (775 calendar days) by identifying the overall completion time for this project, as well as key milestones and sequences as required to complete construction.
The schedule shall be based on a contract award date of 30SEP2020*.
* This date is only for the purposes of this evaluation and not intended to indicate the actual or planned date of award.
(ii) Basis of Evaluation
Offerors will be evaluated on the extent to which they demonstrate a clear understanding of the requirements of the RFP. A schedule that proposes contract duration longer than indicated in the
RFP will be rated “Unacceptable”.
(4) Factor 4, Past Performance:
IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED
WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the
Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror to submit to the client for each project the offeror includes in its proposal for Factor 1 – Corporate
Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS
IS AVAILABLE.
IF A CPARS EVALUATION IS NOT AVAILABLE, the offeror must ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror must complete and submit with the proposal the first page of the PPQ (Attachment D) with contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Michelle Corsino, via email at michelle.a.corsino@navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal
PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the
Government from utilizing previously submitted PPQ information in the past performance evaluation.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System
(PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror. It is the responsibility of the offeror to provide accurate points of contact for each identified contract and current telephone numbers and/or email addresses.
Offerors are highly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Corporate Experience. Offerors mailto:michelle.a.corsino@navy.mil are also highly encouraged to address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance award or additional information submitted will not be considered.
(ii) Basis of Evaluation:
The evaluation focuses on how well the offeror performed on the relevant projects submitted under Factor 1 – Corporate Experience and past performance on other projects currently documented in known sources. Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity
Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance may include, but is not limited to:
- A pattern of successful completion of tasks;
- A pattern of deliverables that are timely and of good quality;
- A pattern of cooperativeness and teamwork with the Government at all levels
(task managers, contracting officers, auditors, etc.); and
- Recency of tasks performed that are identical to, similar to, or related to the task at hand
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “Acceptable”.
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT:
1.) Conference call will be held on a separate day prior to the date of the site visit. A short technical narrative can be provided during this conference call rather than at the site visit.
2.) Conference Line Number: 301-909-7350 or DSN 312-723-7350;
Participant Code: 68233049
3.) Site visit date and time will be included in a future amendment. Each contractor will be allowed a 45 minute walk through. Please select one of the following times and submit to Nicholas Kocher at nicholas.kocher@navy.mil, indicating which time you will be attending: The government is limiting the number of personnel on –site at any given time, so the contractors may not get their 1 st choice on site visit times.
8:30 - 9:15
9:30 - 10:15
10:30 - 11:15
11:30 - 12:15
12:30 - 1:15
1:30 - 2:15
2:30 – 3:15
4.) There will be a sign-in sheet on the hood of the government vehicle. Please utilize your own pen to sign in.
5.) The site visit is for contractors to visit sites. No narrative by the government or guided tour is planned for the site visit. All questions shall be in writing.
6.) Please only attend during your allotted time and do not extend your stay. We are attempting to minimize the number of personnel on-site at once.
7.) Practice social distancing.
8.) Masks are required.
9.) Recommend bringing a flashlight
10.) The government cannot allow the contractor to use government owned portable ladders.
11.) Gate Passes:
NSA CRANE VISISTORS CENTER / CRANE GATE ENTRY / PASS PICKUP
INFORMATION
Note that visitors must have a CAC badge, NCAC badge, a DBIDS badge that is registered for access to NSA Crane, or a pre-arranged day (paper) pass to be considered for entry to NSA Crane for the site visit.
Those visitors that have pre-arranged a day paper pass will need to stop at the
NSA Crane visitors center to pick-up their day gate passes the day of the site visit.
Visitors must leave NSA Crane through the Crane Gate and must deposit the paper gate pass in the box located at the Gate when leaving the installation.
Visitor entry through other gates is prohibited. After the passes are received then the visitors can proceed to the Crane Gate and present the pass to the gate guards.
Contact information for the Crane Gate Visitors Center is below:
Phone: 812-854-1213 or 812-854-4521.
Normal Working Hours are: Monday through Friday 0600-1430
Location: located on Indiana Highway 558, approximately one mile east of US
Route 231
Address: NSA Crane Visitor's Center is located on the left at 103 Furlong Street
Crane, IN 47522
Paper Gate Pass Process Overview
All visitors that do not have a CAC badge or a DBIDS badge (enabled specifically for NSA Crane) will need to submit a SECNAV 5512 form with all fields
*legibly* filled out to the project site visit coordination point of contact a minimum of 4 business days prior to their 1st requested site visit. The forms will be utilized by the NSA Crane visitor’s center to perform a background check. Attached to this document is a blank copy of the 5512 form.
Along with the sending the 5512, the following information shall be sent by the contractor to the project point of contact:
1.) Start Date of Visit
2.) End date of visit
3.) Purpose of Visit
4.) Buildings visited
The visitors need to be aware of the following:
a.) Fill out SECNAV 5512/1 form b.) Show valid identification (per SECNAV 5512/1 form requirements) c.) Show current proof of insurance and vehicle registration (Rental agreement if rented vehicle) d.) They will undergo a criminal background check e.) Entry and Exit is only through the Crane gate f.) Upon final departure, the pass is to be placed in the box provided at the Crane gate
12.) Photographs will not be allowed at site visit
4.2 PROPOSAL SUBMISSION INSTRUCTIONS: In response to this Request for
Proposal, the complete proposal shall include the Non-Cost/Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor and as follows:
4.2.1 All proposals shall be mailed or hand carried to the following address:
Naval Facilities Engineering Command, Mid-Atlantic, ACQ22
Attn: Michelle Corsino, Contract Specialist
9324 Virginia Avenue Building Z-140, Room 225
Norfolk, VA 23511-3624
4.2.2 Hand Carried Proposals: Offerors who would like to hand deliver their proposal and who do not currently have a valid badge issued by the Department of Defense
(DoD) to enter Naval Station Norfolk must do the following:
- Submit the completed one day pass request PDF document (form SEC-
NAV_5512_1_11787 (Attachment B) NO LESS THAN 10 BUSINESS
DAYS prior to the proposal due date. The pass request is uploaded in beta.SAM.gov. The request form shall be completed in its entirety and sent to
Michelle Corsino at michelle.a.corsino@navy.mil. Note that Item 25, BASE
SPONSER’S NAME should include the following name and telephone number: Michelle Corsino (75) 341-0216. This request is separate from the site visit request. The PDF document is uploaded with this solicitation under
Additional Documents.
- Present the following information at the pass office: Two forms of ID (i.e.
Valid Driver’s License and (one of the following) US Social Security Card or
Birth Certificate), Current Vehicle Registration and/or Rental Car Contract, Current State Safety Inspection, Current Proof of Insurance
Naval Station Norfolk Pass & ID Office is located in Bldg. CD9 at 9040 Hampton Boulevard across from Gate 5. All potential offerors must adhere to this notice in order to avoid delay in submitting your proposal. The level of security at the Naval Station Norfolk may change at any time. As the level of security heightens, the amount of time required to gain access to the Naval
Station also increases. Early arrival is advised. To verify identity, visitors MUST present a second form of identification at the pass office from the list of A or B Documents found at http:www.uscis.gov/i-9-central/acceptable-documents.
Submission of a pass request form is no guarantee you will be able to get on the base. If for any reason you get to the gate and are not allowed onto the base (even if you have submitted a request form), you will need to find another way to get your proposal delivered. Government personnel may not be able to sponsor you on base to deliver your proposal. Ultimately, it is the contractor's responsibility to ensure timely proposal submission to the specified location. Due to heightened security, it is recommended that you allow sufficient time to get into the building and turn in your proposal. The submitted pass request only allows access on the proposal due date.
If the proposal due date is extended, the Government will revise the date on the pass request.
Submission of a new pass request form is not necessary. If any other information listed on a submitted pass request form changes, a new pass request form with the updated information must be submitted.
4.2.3 The Price Proposal and the Non-Cost/Price Proposal shall be submitted in separate 3-ring binders. All pages shall be numbered and binders shall be appropriately tabbed, conforming to the proposal submittal requirements’ structure for each evaluation factor. Price and Non-Cost/Price Proposals must be submitted in sealed envelopes/boxes. Any pricing information included in the
Non-Cost/Price Proposal will not be considered. Similarly, any Non-Cost/Price information included in the Price Proposal will not be considered. Proposals shall be labeled “PRICE PROPOSAL OR NON-COST/PRICE PROPOSAL FOR RFP
N40085-20-R-0048, ATTN: MICHELLE CORSINO; DO NOT OPEN IN MAIL
ROOM”.
4.2.4 PROPOSALS SUBMITTED IN RESPONSE TO THIS REQUEST FOR
PROPOSAL MUST BE RECEIVED NO LATER THAN THE DATE AND
TIME SPECIFIED IN BLOCK 13A OF THE SF1442.
Proposals not received by the time and date specified shall be treated in accordance with FAR 52.215-1 “Instructions to Offerors-Competitive
Acquisition” and may be rejected.
4.3 PRE-PROPOSAL INQUIRIES (PPIs): All inquiries must be submitted in writing and received by the Contract Specialist fourteen (14) calendar days prior to the solicitation closing date in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI’s submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to Michelle Corsino at michelle.a.corsino@navy.mil. Use of the PPI Log template is required.
5. ATTACHMENTS
Attachment A – Pre-Proposal Inquiry Form
Attachment B – SECNAV_5512_1_11787-One Day Past Request
Attachment C – Construction Experience Project Data Sheet
Attachment D – Past Performance Questionnaire
Attachment E – Small Business Subcontracting Plan mailto:michelle.a.corsino@navy.mil
Attachment F – Price Proposal Form
Attachment G– Drawings and Specs
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018
52.214-34 Submission Of Offers In The English Language APR 1991
52.214-35 Submission Of Offers In U.S. Currency APR 1991
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
52.217-5 Evaluation Of Options JUL 1990
52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
9.7 6.9
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from
Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Crane, Indiana
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .