Attachment G-1596603dwg04of11_S-A-I-F-P-M.pdf
PDF 13 MB Posted
- Attached to
- Construction of P447 Explosive Railcar Yard
- Solicitation number
- N40085-20-R-0048
About this file
This solicitation is for a construction project at Naval Station Crane in Crane, Indiana. The project includes demolishing existing buildings and structures at the railcar site and constructing a new rail holding yard with associated site work. It also includes building a new operations building and storage building with loading ramp at the Defense Logistics Agency disposition site, along with concrete storage areas and utility infrastructure connecting to an existing building. The contractor will relocate an existing radiation detector from the railcar site to the disposition site. The solicitation seeks to award a firm-fixed-price contract for the design and construction of these facilities.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
PW DRAWING NO. PW7534
11/21/2019
:2 :0
A M
S0011
S
TR
U C
TU
R
AL
12805229
JPS MEL SAM
N O
TE
S S
YM
B O
LS
AN
D
AB
B R
EV
IA
TI
O N S
STRUCTURAL ABBREVIATIONS
JST JOIST
SPA SPACE
SOG SLAB ON GRADE
PROJ PROJECTION
PAF POWER ACTUATED FASTENER
MTL METAL
MEZZ MEZZANINE
MECH MECHANICAL
MANF MANUFACTURER
T/WALL TOP OF WALL
BLDG BUILDING
BOT BOTTOM
B/STL BOTTOM OF STEEL
BRG BEARING
CONT CONTINUOUS
CTRD CENTERED
DWL DOWEL
EXP EXPANSION
FND FOUNDATION
FTG FOOTING
ADDL ADDITIONAL
T/SLAB TOP OF SLAB
ALT ALTERNATE
BM BEAM
BOD BOTTOM OF DECK
BP BASE PLATE
c CAMBER (UPWARD)
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLR CLEAR COVER
CSJ CONSTRUCTION JOINT
DWG DRAWING
EA EACH
EE EACH END
EF EACH FACE
EL ELEVATION
ELEV ELEVATION
EQUIP EQUIPMENT
EW EACH WAY
FD FLOOR DRAIN
FF FAR FACE
FG FINISH GRADE
FV FIELD VERIFY
GALV GALVANIZED
GC GENERAL CONTRACTOR
GRTG GRATING
DIA DIAMETER
THK THICK
LG LONG
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
MIN MINIMUM
NA NOT APPLICABLE
NF NEAR FACE
NTS NOT TO SCALE
OC ON CENTER
OPNG OPENING
PC PIECE
PL PLATE
PSF POUNDS PER SQUARE FOOT
REINF REINFORCEMENT
RTU ROOF TOP UNIT
SEIJ SEALED EDGE ISOLATION JOINT
SEJ SEALED EDGE JOINT
SIM SIMILAR
TP TOP OF PILASTER
T&B TOP AND BOTTOM
TF TOP OF FOOTING
T/STL TOP OF STEEL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
W/ WITH
WWR WELDED WIRE REINFORCEMENT
AESS ARCHITECTURALLY EXPOSED STRUCTURAL STEEL
CONST CONSTRUCTION
DIM DIMENSION
EQ EQUAL
MAX MAXIMUM
MF MOMENT FRAME
REQ'D REQUIRED
WS WATERSTOP
HORZ HORIZONTAL
BF BRACED FRAME
MISC MISCELLANEOUS
ROOF LOAD
ZONE 2 ZONE 3
BUILDING TITLE DISTANCE "a"
ZONE 4
WALL LOAD
BUILDING WIND LOAD CRITERIA (COMPONENTS & CLADDING)
NOTE:
1. BUILDING WIND LOAD PRESSURES ILLUSTRATED IN THE SCHEDULE SHALL BE USED FOR
DESIGN OF COMPONENTS AND CLADDING ELEMENTS NOT EXPLICITLY DESIGNED WITHIN THESE
DOCUMENTS AND NOT SPECIFICALLY DESIGNED BY THE REGISTERED DESIGN PROFESSIONAL.
2. THE WIND LOADS NOTED ABOVE ARE BASED ON ZONES WHICH LOCATE SPECIFIC AREAS ON
THE ROOF AND WALL SURFACES. THESE ZONES ARE LOCATED AS NOTED BELOW (LOADS
BASED ON 10 SQ FEET TRIB AREA):
ZONE 1: TYPICAL ROOF SURFACE AREA NOT LOCATED WITHIN IN ZONE 2 OR 3.
ZONE 2: EDGES OF ALL ROOF SURFACES LOCATED WITHIN A DISTANCE "a" FROM ALL EDGES AND ROOF SURFACES LOCATED WITHIN A DISTANCE "a" FROM ALL ROOF PEAKS AND HIPS.
ZONE 3: CORNERS OF ALL ROOF SURFACES LOCATED WITHIN A DISTANCE "a" FROM EACH EDGE OF ROOF.
ZONE 4: TYPICAL WALL SURFACE AREA NOT LOCATED WITHIN ZONE 5 (EXCLUDES PARAPETS).
ZONE 5: CORNERS OF ALL WALL SURFACES LOCATED WITHIN A DISTANCE "a" FROM ALL CORNERS
(EXCLUDES PARAPETS).
3. THE LOADS INDICATED IN THE TABLE ABOVE SHALL ACT IN BOTH DIRECTIONS FOR WALLS
AND IN THE UPWARD DIRECTION FOR ROOFS.
4. UNITS FOR LOADS ARE IN POUNDS PER SQUARE FOOT.
5. LOADS INDICATED ARE FACTORED LOADS (LRFD) USING STRENGTH DESIGN METHOD.
OPERATIONS BUILDING 3629734929 3'-0"
ZONE 1
ROOF OVERHANG LOAD
ZONE 2 ZONE 3
ZONE 5
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
PW DRAWING NO. PW7534
11/21/2019
12" = 1'-0"
:2 :0
A M
S0021
S
TR
U C
TU
R
AL
12805230
JPS MEL SAM
N O
TE
S S
YM
B O
LS
AN
D
AB
B R
EV
IA
TI
O
C.2C.1
C.B
C.A
47' - 4"
S2011
B1
S2011
C1
S2011
A1
S2011
C3
A1
S5101
A1
S5101
A1
S5101
A1
S5101
8"
8" 8"
8"
SHEET NOTES
1. FOR STRUCTURAL GENERAL NOTES AND ABBREVIATIONS, SEE S0011 & S0021.
2. FOR TYPICAL DETAILS, SEE SHEETS S5011 THRU S5031.
3. TOP OF SLAB ON GRADE EL = 100'-0" TYPICAL UNO.
4. TOP OF FOOTING ELEVATION = 97'-0" TYPICAL UNO.
5. SEE S5021 FOR PEDESTAL SCHEDULE.
S.1
S.C
S.A
S.2 S.3 S.4 S.5 S.6 S.7 S.8 S.9 S.10 S.11
19' - 1 1/2" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
OPTION SCOPE
20' - 0"
OPTION SCOPE
19' - 1 1/2"
IF OPTION IS TAKEN
8" TO EDGE OF CONC
S.B
/2
/2
6 6 6 6 6 6 6 6
6 7
7 6 6 6 6 6 6 6 6 6
2' - 6"
2' - 6"
2'
6"
2' - 6"
2'
6"
2'
6"
2' - 6"
2' - 6"
2'
6"
2' - 6"
P3 P3 P3 P2 P3 P3 P3 P2 P2 P2
P2
P2P2P2 P2P2P2P2P2P2
P2P2
P2
P2
BRACED
FRAME
BRACED FRAME
BRACED
FRAME
BRACED
FRAME
8"
8"
8"
A2
S5101
A3
S5101
A2
S5101
A2
S5101
A3
S5101 A3
S5101
A2
S5101
A3
S5101
OPTION SCOPE
BASE BID7
OPTION SCOPE:
SHADED AREA DENOTES OPTION SCOPE AND INCLUDES
ASPECTS OF ARCHITECTURE, STRUCTURE, BUILDING
SYSTEMS, AND FINISHES BETWEEN GRIDLINE S.9 AND S.11.
DRAWINGS SHOW FINAL INTENT IF OPTION SCOPE IS
TAKEN. BASE BID DOES NOT INCLUDE OPTION SCOPE.
O P T I O N S C O P E
OF CONC
8" TO EDGE
FLOOR PLAN KEYNOTES
1/8" = 1'-0"
24'4' 8' 16'
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
GRAPHIC SCALE
PW DRAWING NO. PW7534
11/21/2019
As indicated
:2 :0
A M
S1011
S
TR
U C
TU
R
AL
12805231
JPS MEL SAM
B U
IL
D
IN
G
FO
U N D
AT
IO
N
P
LA
N S
1/4" = 1'-0"A1
FOUNDATION PLAN - OPERATIONS BUILDING
1/8" = 1'-0"C1
FOUNDATION PLAN - STORAGE BUILDING
N
N
1 4" SLAB ON GRADE, REINF PER TYPICAL DETAILS.
2 SLAB ON GRADE CONTROL JOINT, TYPICAL.
3 8" SLAB ON GRADE, REINF PER TYPICAL DETAILS.
4 SLOPE TO FLOOR DRAIN, ELEV = -5/8". SEE PLUMBING AND
ARCHITECTURAL FOR ADDITIONAL INFORMATION.
5 **OPTION** IF OPTION SCOPE IS TAKEN, STRUCTURE OF EAST WALL,
INCLUDING BUT NOT LIMITED TO COLUMNS, PEDESTALS, FOOTINGS, AND
BRACING, WILL SHIFT FROM GRID LINE S.9 TO S.11 AS SHOWN.
6 **OPTION** IF OPTION SCOPE IS TAKEN, COLUMN WILL SHIFT EAST AND BE
LOCATED ON GRID LINE S.9 AS SHOWN. OTHERWISE FOR BASE BID
COLUMN SHALL BE LOCATED TO THE WEST OF GRID LINE S.9.
PRELIMINARY FOOTING SCHEDULE
MARK WIDTH LENGTH THICKNESS REINFORCEMENT
4 4' - 0" 4' - 0" 1' - 0" (5)#5 EW T&B
6 6' - 0" 6' - 0" 1' - 0" (6)#5 EW T&B
7 7' - 0" 7' - 0" 1' - 0" (7)#5 EW T&B
1/4" = 1'-0"
2' 4' 8' 12'
SHEET NOTES
1. FOR STRUCTURAL GENERAL NOTES AND ABBREVIATIONS, SEE S0011 & S0021.
2. FOR TYPICAL DETAILS, SEE SHEETS S5011 THRU S5031.
3. SEE CIVIL FOR LOCATION OF CANOPY ON SITE AND GRADE ELEVATIONS.
4. COORDINATE WITH OTHER DISCIPLINE DRAWINGS FOR ADDITIONAL
INFORMATION NOT SHOWN.
5. SEE S5021 FOR PEDESTAL SCHEDULE.
6. ALL COLUMNS SHOWN AND SUPERSTRUCTURE BY PRE-ENGINEERED
MANUFACTURER. COORDINATE STRUCTURE CLEAR HEIGHT AND OTHER
INFORMATION WITH ARCHITECTURE DRAWINGS. COLUMN FOUNDATIONS
SHALL BE DESIGNED PER GENERAL NOTE 1.2.G FROM S0011.
7. SEE PLAN FOR LOCATIONS OF MOMENT FRAMES (MF).
CANOPY PLAN KEYNOTES
X.B
X.A
X.1 X.2 X.3
19' - 8" 19' - 8"
9'
4"
C1
S1021
P1 P1 P1
P1 P1 P1
4 4 4
4 4 4
39' - 4"
MFMF
MFMF
MF MF MF
X.B
3' -0
M
IN
6"
-1 2"
GRADE
SEE CIVIL
CANOPY COL &
ANCHORAGE
BY PEMB
DESIGNER
X.1 X.2 X.3X.A
A B
O V
E G
R A
D E
3'
0" M
IN
24"Ø COLUMN
ENCASEMENT, REINF
W/ (7) #5 AND #3 TIES
@ 12"oc, EMBED VERT
BARS 6" INTO
PEDESTAL W/ EPOXY
T/CONCRETE ELEV
SHALL MATCH AT
ALL CANOPY COL'S
FTG REINF,
SEE SCHEDULE
PEDESTAL REINF,
SEE SCHEDULE
NOTE:
GALV COLUMNS, BASE PLATES, ANCHOR RODS, WASHERS, AND NUTS
M
IN
9" E
M B
E D
1/4" = 1'-0"
2' 4' 8' 12'
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
GRAPHIC SCALE
PW DRAWING NO. PW7534
11/21/2019
As indicated
:2 :0
A M
S1021
S
TR
U C
TU
R
AL
12805232
JPS MEL SAM
C
AN
O P Y
FO
U N D
AT
IO
N
P
LA
N S
EC
TI
O N S
AN
D
D
ET
AI
LS
1/4" = 1'-0"
S2011
A1
FOUNDATION PLAN - CANOPY
N
1/2" = 1'-0"
S1021
C1
SECTION
1/2" = 1'-0"
1' 2' 4' 6'
PRELIMINARY FOOTING SCHEDULE
MARK WIDTH LENGTH THICKNESS REINFORCEMENT
4 4' - 0" 4' - 0" 1' - 0" (5)#5 EW T&B
6 6' - 0" 6' - 0" 1' - 0" (6)#5 EW T&B
7 7' - 0" 7' - 0" 1' - 0" (7)#5 EW T&B
1 COLUMN, BY THE PRE-ENGINEERED MANUFACTURER, TYP.
C.2C.1
C.B
C.A
S2011
B1
S2011
C1
S2011
A1
S2011
C3
B2
S5101
47' - 4"
K
K
K
K
K
K
K
5' - 8" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 5' - 8"
5/
8"
5/ 8"
B1
S5101
T/CMU = 116' - 0"
T/CMU = 112' - 0"
B1
S5101
B3
S5101
LOW PT SNOW
DRIFT = 20 PSF
HIGH PT SNOW
DRIFT = 31 PSF
5' - 0"
LOW PT SNOW
DRIFT = 20 PSF
HIGH PT SNOW
DRIFT = 31 PSF
5' - 0"
T/CMU = 115' - 4"
T/CMU = 114' - 8"
T/CMU = 115' - 4"
T/CMU = 114' - 8"
S
LO
P E
D
1:
HIGH PT SNOW
DRIFT = 25 PSF
LOW PT SNOW
DRIFT = 20 PSF
S P
S P
S P
S P
S P
S P
S P
SHEET NOTES
1. FOR STRUCTURAL GENERAL NOTES AND ABBREVIATIONS, SEE S0011 &
S0021.
2. FOR TYPICAL DETAILS, SEE SHEETS S5011 THRU S5031.
3. JOIST SEATS SHALL BE SLOPED AND/OR SKEWED AS REQ'D TO ACHIEVE
THE DESIGNATED ROOF SLOPE/ELEVATIONS INDICATED. ASSUMED JOIST
SEAT DEPTH AT CENTERLINE OF WALLS INDICATED AS FOLLOWS:
K-JOIST @ 1" PER FOOT ROOF SLOPE = 3 1/2" (HIGH END), 2 1/2" (LOW END)
4. ALL STEEL JOIST SEATS SHALL BE DESIGNED FOR A ROLLOVER FORCE =
1.5 KIPS (LRFD).
5. JOIST DESIGNATED AS "SP" SHALL BE DESIGNED FOR SNOW DRIFT.
6. BRACED FRAMES (BF) AND MOMENT FRAMES (MF) INDICATED ON PLAN.
7. THE STORAGE BUILDING IS A PRE-ENGINEERED METAL BUILDING WITH
SUPERSTRUCTURE, FLOOR SLAB, AND FOUNDATIONS DESIGNED BY THE
BUILDING MANUFACTURER. COORDINATE STRUCTURE CLEAR HEIGHT AND
OTHER INFORMATION WITH ARCHITECTURE DRAWINGS.
S.1
S.C
S.A
S.2 S.3 S.4 S.5 S.6 S.7 S.8 S.9 S.10 S.11
S.B
/2
/2
19' - 1 1/2" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
OPTION SCOPE
20' - 0"
OPTION SCOPE
19' - 1 1/2"
MF MF MF MF MF MF MF
MF
(OPTION SCOPE) MF
BF
BF
BF BF
MF MF MF MF
OPTION SCOPE:
SHADED AREA DENOTES OPTION SCOPE AND INCLUDES
ASPECTS OF ARCHITECTURE, STRUCTURE, BUILDING
SYSTEMS, AND FINISHES BETWEEN GRIDLINE S.9 AND S.11.
DRAWINGS SHOW FINAL INTENT IF OPTION SCOPE IS
TAKEN. BASE BID DOES NOT INCLUDE OPTION SCOPE.
O P T I O N S C O P E
ROOF PLAN KEYNOTES
1/4" = 1'-0"
2' 4' 8' 12'
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
GRAPHIC SCALE
PW DRAWING NO. PW7534
11/21/2019
As indicated
:2 :0
A M
S1211
S
TR
U C
TU
R
AL
12805233
JPS MEL SAM
B U
IL
D
IN
G
R O O F
FR
AM
IN
G
P
LA
N S
1/4" = 1'-0"A1
ROOF FRAMING PLAN - OPERATIONS BUILDING
1/8" = 1'-0"C1
ROOF FRAMING PLAN - STORAGE BUILDING
N
N
1 PROVIDE 1 1/2" X 20 GA ROOF DECK. SEE S-001 FOR ATTACHMENT
REQUIREMENTS.
2 PEMB MANUFACTURER SHALL DESIGN STRUCTURAL MEMBERS FOR
MISCELLANEOUS EQUIPMENT LOADS; INCLUDING BUT NOT LIMITED
TO SPRINKLER PIPING (TYP). SEE PLUMBING DRAWINGS FOR
INFORMATION.
3 SUPERSTRUCTURE BY PRE-ENGINEERED MANUFACTURER, TYP.
4 TO SUPPORT END OF BENT PLATE EXTEND BENT PLATE EDGE TO
DECK ANGLE ALONG CMU WALL AND WELD BENT PLATE TO DECK
ANGLE AT CORNER, TYP.
1/8" = 1'-0"
24'4' 8' 16'
1' - 0"
1'
0" 1'
0"
1'
0"
1'
0"
1' - 0" 16' - 0" 1' - 0"
18' - 0"
13' - 4" 13' - 4" 13' - 4" 6"
D3
S1221
D2
S1221
D1
S1221
D1
S1221
D1
S1221
D1
S1221
D1
S1221
B1
S1221
T/SLAB = 104' - 0"
SLOPE DNCJCJ 11
4 3 4
CSJ CSJ
T/SLAB
EL=99'-6"
T/SLAB
EL=100'-0"
C4
S1221
B5
S1221
C3
S1221
10' - 0" 39' - 6"
5' - 8" 6' - 4" 5' - 0" 1' - 0"
1'
0"
5'
0"
SLOPE DN
SLOPE
DN
T/SLAB
EL=99'-11"
T/SLAB
EL=99'-6"
T/SLAB
EL=99'-6"
T/SLAB
EL=99'-2"
GRADE
SEE CIVL
6"
SEE
FOR ADDL INFO
NOT SHOWN
/B1 S1221
T/SLAB EL =
SEE PLAN
9" 1' - 0" 9"
2' - 6"
1'
0"
B 1/
S
N O
TE
P E
R
#4@12"oc
(TYP UNO)
30"
30"
GUARDRAIL NOTE 2
/B1 S1221
TF EL =
PER SHT NOTES
GRADE
SEE CIVL
6"
SEE
FOR ADDL INFO
NOT SHOWN
/B1 S1221
T/SLAB EL =
SEE PLAN
9" 1' - 0" 9"
2' - 6"
1'
0"
TF EL =
PER SHT NOTES
#4@12"oc
(TYP UNO)
30"
30"
GUARDRAIL
SMOOTH DOWELS
1"Øx18" LG @ 12"oc
9" 1' - 0" 9"
2' - 6"
SEE
FOR ADDL INFO
NOT SHOWN
/B1 S1221
1'
0"
#4@12"oc
(TYP UNO)
24"
24"
T/SLAB EL =
SEE PLAN
TF EL =
PER SHT NOTES
9" 1' - 0" 9"
2' - 6"
GRADE
SEE CIVL
CONT (3)#5 (TYP FTG REINF UNO)
#4@12"oc EF (TYP WALL REINF UNO)
TF EL =
SEE PLAN
1 1/2"
1'
0"
#4@12"oc
(TYP UNO)
30"
30"
SLOPE DN 1/2"
N O
TE
1NOTE 2
NOTE 1
8" 4"
SLAB REINF
SEE PLAN (TYP)
#4@12"oc
(TYP UNO)
24"
24"
SMOOTH DOWELS
1"Øx18" LG @ 12"oc
9" 1' - 0" 9"
2' - 6"
1'
0"
PERIMETER PIPE, WRAP W/ FILTER FABRIC
T/SLAB EL =
SEE PLAN
NOTE 2
NOTES:
1. COORD DOCK LEVELER PIT DEPTH, WIDTH, & LENGTH WITH DOCK LEVELER MANF.
2. GALV L4x4x1/4 EMBED ANGLE W/ 1/2"Øx6" LG HD STUDS @ 12"oc, VERIFY
WITH DOCK LEVELER MANF.
3. COORD ADDITIONAL EMBED REQUIREMENTS WITH DOCK LEVELER MANF (TYP).
#4@12"oc
SLOPE DN
SHEET NOTES
1. FOR STRUCTURAL GENERAL NOTES AND ABBREVIATIONS, SEE S0011 & S0021.
2. FOR TYPICAL DETAILS, SEE SHEETS S5011 THRU S5031.
3. SEE CIVIL FOR LOCATION OF LOADING RAMP ON SITE AND GRADE
ELEVATIONS.
4. COORDINATE WITH OTHER DISCIPLINE DRAWINGS FOR ADDITIONAL
INFORMATION NOT SHOWN.
5. ALL BACKFILL SHALL BE COMPACTED GRANULAR FILL.
6. ALL CONCRETE REINFORCEMENT SHALL BE EPOXY COATED BARS, TYP UNO.
7. FOR DOCK LEVELER INFORMATION SEE ARCH.
8. TOP OF FOOTING EL = 97'-0", TYP UNO.
1'
6" 1'
6"
EQ EQ
CL
5"
VERT GALV PIPE 1 1/2 STD @ 48"oc
GALV PIPE 1 1/2 STD
SLAB
WALL
GALV PIPE 2 STD
AT PERMANENT RAILING
LOCATIONS, USE EPOXY
GROUT.
LOADING RAMP PLAN KEYNOTES
C4
S1221
GRADE
SEE CIVL
GUARDRAIL
(TYP)
SEE
FOR ADDL INFO
NOT SHOWN
/B1 S1221
T/STAIRS EL
SEE PLAN
1'
0"
9" 1' - 0" 9"
2' - 6"
9" 1' - 0" 9"
2' - 6"
TF EL =
PER SHT NOTES
C3
S1221 1' - 6"
#4@12"oc (TYP) 30"30"
#4@12"oc
CONT (2)#5
SEE
FOR ADDL INFO
NOT SHOWN
/B1 S1221
#4@12"oc 24"
24"
6' - 4"
R
IS
E
R S
1" 11"
TYP
1' - 0"
3" CLR
6"
1'
0"
3" 3"
FOR SAFETY
NOSING INFO SEE
ARCH (TYP)
TF EL =
PER SHT NOTES
1' - 0"
#4@12"oc
(TYP UNO)
30"
30"
T/SLAB EL =
SEE PLAN
SEE
FOR ADDL INFO
NOT SHOWN
/B1 S1221
1/4" = 1'-0"
2' 4' 8' 12'
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
GRAPHIC SCALE
PW DRAWING NO. PW7534
11/21/2019
As indicated
:2 :1
A M
S1221
S
TR
U C
TU
R
AL
12805234
JPS MEL SAM
LO
AD
IN
G
R
AM
P
P
LA
N S
EC
TI
O N S
D
ET
AI
LS
1/4" = 1'-0"A1
FOUNDATION PLAN - LOADING RAMP
1/2" = 1'-0"
S1221
D2
SECTION
1/2" = 1'-0"
S1221
D1
SECTION
1/2" = 1'-0"
S1221
D3
SECTION
1/2" = 1'-0"
S1221
B1
SECTION
1/2" = 1'-0"D4
TYP GUARDRAIL AT LOADING RAMP
1 8" SLAB ON GRADE. REINF WITH #6@12"OC EW AT SLAB, PLACE REINF
AT 1/3 SLAB DEPTH.
2 PERFORATED 4"Ø PERIMETER DRAINAGE PIPE
3 GALV GUARDRAIL, REMOVABLE.
4 4" DIAMETER WEEP HOLE LOCATION @ 2" ABOVE ADJACENT GRADE.
5 GALV GUARDRAIL, PERMANENT.
6 GALV RELEASABLE SAFETY CHAIN AT EACH HORZ GUARDRAIL PIPE.
7 PLACE (3) #3 X 4'-0" @ 3" SPACING IN TOP OF SLAB. LOCATE REINF 3"
FROM RE-ENTRANT CORNER.
8 PLACE (2) #4 @ 6" SPACING IN TOP OF SLAB. REINF CONFIGURATION
AND PLACEMENT SIMILAR TO DETAIL A1/S5021 SECTION 'A'.
N 0
1/2" = 1'-0"
1' 2' 4' 6'
1/2" = 1'-0"
S1221
C3
SECTION
1/2" = 1'-0"
S1221
C4
SECTION
1/2" = 1'-0"
S1221
B5
SECTION
Level 1
EL: 100' - 0"
C.2C.1
5_48 5_8 5_24 5_8 5_48
BOND BEAM (TYP)
R E
IN
F
P E
R T
Y P
D E
TA
IL
S
B O
N D
B E
A M
S A
T
"o c
M A
X
Level 1
EL: 100' - 0"
C.2 C.1
5_485_85_485_85_485_85_485_85_485_85_48
R E
IN
F
P E
R T
Y P
D E
TA
IL
S
B O
N D
B E
A M
S A
T
"o c
M A
X
BOND BEAM (TYP)
CMU WALL REINF, TYP
Level 1
EL: 100' - 0"
C.B C.A 5_48 5_8 5_48 5_8 5_48 5_8 5_48 5_8 5_48
R E
IN
F
P E
R T
Y P
D E
TA
IL
S
B O
N D
B E
A M
S A
T
"o c
M A
X
BOND BEAM (TYP)
CMU WALL REINF, TYP
8' - 0" 10' - 0"
Level 1
EL: 100' - 0"
C.BC.A
5_48 5_8 5_24 5_8 5_48
BOND BEAM (TYP)
R E
IN
F
P E
R T
Y P
D E
TA
IL
S
B O
N D
B E
A M
S A
T
"o c
M A
X
8' - 0"10' - 0"
SHEET NOTES
1. FOR STRUCTURAL GENERAL NOTES AND ABBREVIATIONS, SEE S0011 & S0021.
2. FOR TYPICAL DETAILS, SEE SHEETS S5011 THRU S5031.
3. SEE OTHER DISCIPLINE DRAWINGS FOR LOCATIONS AND DIMENSIONS OF WALL
PENETRATIONS. IF OTHER DISCIPLINES REQUIRE ADDITIONAL PENETRATIONS
NOT SHOWN, PROVIDE ADDITIONAL REINFORCING PER A1/S5031.
4. SEE PLAN FOR TOP OF FOOTING ELEVATIONS & BOTTOM OF DECK ELEVATIONS.
5. SEE A1/S5031 FOR ADDITIONAL REINFORCING AT JAMBS, HEADS, & SILL OF
OPENINGS.
6. ALL WALLS SHALL HAVE HORZ JOINT REINFORCING SPACED AT 16"oc TYP UNO.
7. ALL PARAPET WALLS SHALL HAVE HORZ JOINT REINFORCING SPACED AT 8"oc.
8. PROVIDE FOUNDATION DOWELS FOR CMU WALL REINFORCING MATCHING THE
SIZE AND SPACING OF THE CMU WALL REINFORCEMENT INDICATED. DOWELS
NOT SHOWN FOR CLARITY.
9. CONCRETE REINFORCING NOT SHOWN FOR CLARITY.
10. VERT REINFORCING INDICATED SHALL BE AT THE CENTER OF THE CMU WALL.
11. STEPPED BOND BEAM REINF SHALL BE LAP SPLICED PER THE LENGTH
INDICATED IN THE STRUCTURAL GENERAL NOTES.
12. ALL CMU WALLS ARE 8" NOMINAL WIDTH, TYPICAL UNO.
13. GROUT SOLID ALL CMU WALLS.
14. CMU WALL CONTROL JOINTS NOT REQUIRED AND SHALL NOT BE USED.
(X)X_XX
REBAR DESIGNATION NUMBER
REBAR SPACING
(@ XX INCHES O.C.)
LOAD BEARING CMU WALL REINFORCING LEGEND
INDICATES QUANTITY OF BARS IN ONE CELL,
1/2 EACH FACE (NOT SHOWN FOR LOCATIONS
W/ 1 BAR AT CENTER OF WALL)
1/4" = 1'-0"
2' 4' 8' 12'
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
GRAPHIC SCALE
PW DRAWING NO. PW7534
11/21/2019
As indicated
:2 :1
A M
S2011
S
TR
U C
TU
R
AL
12805235
JPS MEL SAM
B U
IL
D
IN
G
EL
EV
AT
IO
N S
1/4" = 1'-0"
S1011
A1
SOUTH ELEVATION
1/4" = 1'-0"
S1011
B1
NORTH ELEVATION
1/4" = 1'-0"
S1011
C1
WEST ELEVATION
1/4" = 1'-0"
S1011
C3
EAST ELEVATION
NOTE: CORNER BAR SIZE, SPACING AND LOCATION SAME AS HORZ
WALL REINF. SEE GENERAL NOTES FOR SPLICE LENGTH.
DOUBLE LAYER
LENGTH
SPLICE
L E
N G
T H
S P
L
IC
E
L E
N G
T H
S P
L
IC
E
STD HOOK
THESE BARS MAY BE
ELIMINATED
IF WALL REINF TERMINATES
IN STANDARD HOOK
WALL REINF
CORNER BARS
WALL REINF
NOTE: CORNER BAR SIZE, SPACING AND LOCATION SAME AS HORZ
WALL REINF. SEE GENERAL NOTES FOR SPLICE LENGTH.
SINGLE LAYER
LE
N
G
TH
S P
LI
C
E
LENGTH
SPLICE STD HOOK
LE
N
G
TH
S P
LI
C
E
BEND ALTERNATE CORNER BARS
IN OPPOSITE DIRECTIONS
WALL REINF
CORNER BARS
WALL REINF D
TOP OF FOOTING
FOOTING REINF
LENGTH
SPLICE
2D
HORIZONTAL WALL
REINF SEE WALL
SECTIONS FOR
SIZE AND SPACING
2' -0
M
A X
2'-0" MIN
LENGTH
SPLICE
LE
N
G
TH
S P
LI
C
E D
TOP OF
FOOTING
D
2D FOOTING DOWELS TO MATCH
VERTICAL WALL REINF SEE WALL
SECTIONS FOR SIZE AND SPACING
NOTES:
1. SEE GENERAL NOTES FOR SPLICE LENGTHS.
2. DIMENSION D = FOOTING DEPTH, REFER TO WALL AND
FOOTING SECTIONS.
3. SEE PLAN FOR LOCATION OF FOOTING STEPS.
4. FOOTING STEP DESIGNATIONS NOTED ON PLAN DO NOT
ILLUSTRATE THE TOTAL NUMBER OF STEPS REQUIRED. THE
TOTAL NUMBER OF STEPS REQUIRED SHALL BE PER THE
DETAIL CRITERIA AND TOP OF FOOTING ELEVATIONS NOTED.
NOTE: DO NOT LAP WWR THROUGH CONTROL
JOINTS OR CONSTRUCTION JOINTS.
CROSS WIRE
SPLICE LENGTH
8" MIN
T
1/ 2"
* AT EXPOSED SLABS ONLY
* TOOLED SLOT
*1/8" RADIUS
TOOLED EDGES * FILLER, SEE SPECS
KEYED JOINT
8"
1/
2"
3/ 4"
3/
4"
1 1/2"
"T
T/
T/
WIRE DOWELS TO CONT
CHAIR TO HOLD DOWEL
PERPENDICULAR TO JOINT
1" DIA x 18" LG SMOOTH
DOWEL @ 12" OC.
GREASE THIS END
SAW CUT SLOT,
PROVIDE FILLER AT
EXPOSED SLAB ONLY
SLAB REINF
9"
T/
1 1/2"1 1/2"
9"
3/4" 3/4"
"T
T/
1/ 2"
TOOLED SLOT
WIRE DOWELS TO CONT
CHAIR TO HOLD DOWEL
PERPENDICULAR TO JOINT
1" DIA x 18" LG SMOOTH
DOWEL @ 12" OC.
GREASE THIS END
1/8" RADIUS TOOLED EDGES
FOR EXPOSED SLAB ONLY
FILLER FOR EXPOSED
SLAB ONLY. SEE SPECS.
SLAB REINF
SLAB ON GRADE REINFORCEMENT
SLAB
THICKNESS
REINFORCEMENT, UNO MAXIMUM CONTROL JOINT
SPACING UNO
4" 6x6-W2.9xW2.9 12'-0"
8" #4 @ 14" EW 17'-6"
1. SUBGRADE SHALL BE PREPARED IN ACCORDANCE WITH RECOMMENDATIONS IN THE
GEOTECHNICAL ENGINEERING REPORT (SEE SPECIFICATIONS).
2. PROVIDE CONTROL JOINTS AT ALL SLABS ON GRADE PER SPACING CRITERIA NOTED
IN TABLE ABOVE.
3. VAPOR BARRIER REQUIRED ONLY AT SLABS AT INTERIOR OF BUILDING.
GRANULAR FILL BASE
COURSE THICKNESS
6"
6"
S E
E P
LA
N
S
LA
B T
H
IC
K N
E S
S
T"
VAPOR BARRIER
ASTM E1745 CLASS A
CLEAN GRANULAR AGGREGATE
FILL BASE COURSE
GENERAL FILL OR
EXISTING SOIL
REINF, SEE SCHEDULE
T/
S C
H E
D
S E
E
SAW CUT SLOT.
PROVIDE FILLER FOR
EXPOSED SLABS ONLY.
CUT EVERY OTHER BAR
OR WIRE BENEATH JOINT
1 1/2" x x x x
(1
/4
M
IN
1/
S
LA
B
T H
K
NOTE: SEE OTHER DISCIPLINE DWG'S FOR LOCATION OF EQUIPMENT PADS.
EDGE OF EQUIPMENT
SEE OTHER DISCIPLINE DWG'S
FOR SIZE OF PAD
TO BE BASED ON EQUIPMENT
ACTUALLY FURNISHED
#4@12"
#4
EQUIPMENT ANCHOR BOLTS,
REFER TO EQUIPMENT SHOP
DRAWINGS FOR TYPE, SIZE,
PROJECTION AND LOCATION
1'-0"
1' -0
2" C
LR
2" CLR
6"
4" MIN ALL SIDES#4@12"
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
PW DRAWING NO. PW7534
11/21/2019
As indicated
:2 :1
A M
S5011
S
TR
U C
TU
R
AL
12805236
JPS MEL SAM
TY
P
IC
AL
D
ET
AI
LS
NTSC1
CORNER BARS FOR WALL REINFORCEMENT
NTSC2
CORNER BARS FOR WALL REINFORCEMENT
NTSC3
ELEVATION OF CONTINUOUS WALL FOOTING
TRANSITION
NTSC5
WELDED WIRE FABRIC SPLICE
NTSA3
CONSTRUCTION JOINT (CSJ) AT 4" SLAB
NTSB1
CONTROL JOINT (CJ) @ 8" GRADE SLAB
NTSB4
CONSTRUCTION JOINT (CSJ) FOR GRADE SLAB AT 8"
SLAB
NTSA1
GRADE SLAB CONSTRUCTION
12" = 1'-0"B2
CONTROL JOINT (CJ) FOR GRADE AT 4" THICK
12" = 1'-0"A4
EQUIPMENT PAD (AT EXTERIOR)
1'-0"
8"
S E
E P
LA
N
1" DIA.X1'-6" LONG
SMOOTH DOWELS
@ 12" O.C.
(3 MINIMUM AT
MID-DEPTH)
T/SLAB EL.
SEE PLAN
METAL STAY IN
PLACE KEY FORM
1/4" WIDE X 1/2" DEEP
TOOLED JOINT. (FILL
WITH SEALANT AT
EXPOSED SLABS)
SEE CIVIL
#3@12"
2-#4
SECTION AT TYPICAL DOORS
NOTE:
1. FOR FOUNDATION WALL AND FOOTING INFORMATION NOT SHOWN, SEE
ADJACENT FOUNDATION SECTIONS (NOT AT DOOR) BEYOND.
2. REFERENCE ARCHITECTURAL/CIVIL FOR ADDITIONAL INFORMATION AT STOOPS.
3. AT ROLL UP DOOR SILL, SLOPE SLAB DOWN TOWARDS OUTSIDE OF BUILDING.
SEE ARCH DETAILS.
1" DIA. x 1'-6" LONG
SMOOTH DOWEL @
12" OC @ STOOPS (3
MIN. @ MID-DEPTH)
PRELIMINARY PEDESTAL SCHEDULE
PEDESTAL NOTES:
1. POUR PEDESTAL MONOLITHIC WITH FOUNDATION STEM WALL AT
STORAGE BUILDING. CONT HORZ REINFORCEMENT THROUGH
PEDESTAL .
2. TOP OF PEDESTAL EL = SEE PLAN.
3. WALLS NOT SHOWN ABOVE. SEE PLAN FOR WALLS.
P2
TYPE SIZE AND REINFORCEMENT
30"x30" WITH 16-#7 VERT WITH 90°HOOK INTO FOOTING, WITH #3 TIES IN SETS WITH 3 WITHIN TOP 5" AND AT 12" O.C.
THROUGHOUT
P3
TYPE P3TYPE P2
SEE SCHEDULE
S E
E S
C H
E D
U
LE
SEE SCHEDULE
S E
E S
C H
E D
U
LE
48"x30" WITH 22-#7 VERT WITH 90° HOOK INTO FOOTINGS, WITH #3 TIES IN SETS WITH 3 WITHIN TOP 5" AND AT 12" O.C.
THROUGHOUT
P1
28"x28" WITH 12-#7 VERT WITH 90°HOOK INTO FOOTING, WITH #3 TIES IN SETS WITH 3 WITHIN TOP 5" AND AT 12" O.C.
THROUGHOUT
TYPE P1
SEE SCHEDULE
S E
E S
C H
E D
U
LE
CJ OR CSJ
BLOCKOUT FOR
COLUMN WITH FELT
AT JOINT AND TOOLED
EDGE TO MATCH SLAB
CONTROL JOINT (AT
EXPOSED SLAB FILL
WITH SEALANT)
COLUMN
BASE PLATE
CJ OR CSJ
NOTE: DETAIL SIMILAR AT PERIMETER COLUMN.
2" (TYP)
(EDGE
BASEPLATE)
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
PW DRAWING NO. PW7534
11/21/2019
As indicated
:2 :1
A M
S5021
S
TR
U C
TU
R
AL
1280537
JPS MEL SAM
TY
P
IC
AL
D
ET
AI
LS
NTSA1
ADDITIONAL REINFORCING AT DOORS
NTS
SCHEDULE - PEDESTAL
B1
12" = 1'-0"A2
COLUMN ISOLATION JOINT AT INTERIOR COLUMN
OPNG'S, UNO
24" TYP @ ALL
LINTEL
BAR (2
BARS)
BOTTOM
LINTEL BAR
(2 BARS)
VERT JAMB
BARS
BOND BEAM
REINF
LINTEL
BARS (4
BARS)
VERT JAMB BARS (2 BARS
@ 8"o.c. EACH SIDE)
LINTEL BARS
(4 BARS TOTAL)
LINTEL BARS
(2 BARS)
LINTEL BARS
(2 BARS)
LINTEL BARS
(4 BARS TOTAL)
VERT JAMB
BARS (2 BARS
@ 8"o.c. EACH
SIDE)
FOUNDATION
DOWELS TYP.
MINIMUM REINFORCEMENT AROUND CMU OPENINGS
OPENINGS 24" OR LESS IN EITHER
DIRECTION FOR STRUCTURAL
PARTITIONS & EXTERIOR WALLS AND
FOR ALL OPENINGS IN NON-
STRUCTURAL PARTITIONS.
OPENINGS WHICH EXCEEDS 24" BUT
NOT MORE THAN 48" IN EITHER
DIRECTION FOR STRUCTURAL
PARTITIONS & EXTERIOR WALLS.
OPENINGS WHICH EXCEED 48"
WIDTHS FOR STRUCTURAL
PARTITIONS & EXTERIOR WALLS.
NOTES:
1. TYPICAL WALL REINFORCING NOT SHOWN FOR CLARITY.
2. TYPICAL LINTEL/BOND BEAM BARS EQUAL 2-#5 @ 8" CMU.
3. VERTICAL JAMB REINF SHALL MATCH TYP WALL REINF.
4. TYPICAL BOND BEAMS NOT SHOWN FOR CLARITY.
5. ONLY SOLID BOTTOM LINTEL BLOCK UNITS WILL BE ALLOWED OVER
DOORS/WINDOWS.
ADDITIONAL VERT JAMB
BARS WHEN OPNG WIDTH
IS GREATER THAN 16"
#3@8" o.c.
180 DEGREE
HK. T & B
INTERSECTION
EXTERIOR WALL
INTERMEDIATE
BOND BEAMS AS
INDICATED ON
REINF
ELEVATIONS
OPNG'S
16" MIN FROM CONTROL JOINT (CJ)
CONTINUE HORZ BOND BEAM
REINF THROUGH CJ.
ROOF DIAPHRAGM BOND
BEAM W/ CONT BOND
BEAM REINF.
TOP OF PARAPET BOND
BEAM W/ CONT BOND
BEAM REINF.
DELETE
BOND BEAM
WHEN PIER
IS LESS
THAN 16" IN
WIDTH
LINTEL
REINF
#3 TIES
IN MORTAR
JOINTS (IN
ALL PIERS
LESS THAN
36" IN WIDTH).
FOUNDATION
DOWEL- MATCH
VERTICAL BAR SIZIE
AND SPACING
TYPICAL REINFORCED CMU DETAILS
PROVIDE REINF
@ ENDS OF ALL
WALLS
NOTE 4
PROVIDE CONT. PREFORMED
GASKET @ JOINT, INTERRUPT
GASKET @ REINF. SHOWN
VERT BARS (2 BARS @
8"o.c. EACH SIDE)
STANDARD
HOOKS TYP
TYPICAL CONTROL JOINT TYPICAL WALL PIER
TYPICAL WALL
REINFORCING
SEE WALL REINFORCING
ELEVATIONS
AND SECTIONS & DETAILS
NOTES;
1. PROVIDE STANDARD HOOK FOR ALL BOND BEAM REINF AT ENDS OR CORNERS OF WALLS. HOOK HORIZ
REINF AROUND VERT REINF.
2. PROVIDE CONTROL JOINT (CJ) SPACING AT NON-LOADBEARING CMU WALLS AT A DISTANCE EQUAL TO THE LESSER OF 25'-0" OR 1.5 TIMES THE WALL HEIGHT TYP UNO. CONTROL JOINTS NOT REQUIRED AT
LOAD-BEARING CMU WALLS, SEE S2011 SERIES DRAWING.
3. STOP HORZ JOINT REINF ON EITHER SIDE OF CJ.
4. PROVIDE 3/4"DIAMETER x 16" LONG SMOOTH DOWEL @ 24" O.C. AT CONTROL JOINTS, GREASE ONE END.
5. NON-LOAD BEARING CMU WALLS SHALL BE REINFORCED WITH #5@48" O.C. AND GROUTED AT
REINFORCED CELLS ONLY.
6. STOP INTERMEDIATE BOND BEAM REINF. @ C.J. PROVIDE STANDARD HOOK AROUND VERT. REINF.
7. ALL LOAD BEARING CMU WALLS SHALL BE GROUTED SOLID. SEE WALL ELEVATIONS ON S2011 SERIES
DRAWING FOR LOAD BEARING WALL REINFORCING.
PLAN VIEW
TYPICAL WALL REINF
VERTICAL REINF AT
CORNERS AND ENDS
OF ALL WALLS
BOND BEAM REINF
BOND BEAM REINF
BOND BEAM REINF
PROVIDE
STANDARD
HOOKS TYPICAL
LA
P
S P
LI
C
E T
Y P
IC
A
L S
E E
G E
N E
R A
L N
O
TE
S
PROVIDE STANDARD
HOOKS TYPICAL
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
PW DRAWING NO. PW7534
11/21/2019
NTS
:2 :1
A M
S5031
S
TR
U C
TU
R
AL
12805238
JPS MEL SAM
TY
P
IC
AL
D
ET
AI
LS
NTSA1
TYPICAL CMU DETAILS
NTSA3
BOND BEAM CORNER BARS AT CMU WALL
INTERSECTIONS
C.1
11" 8" 11"
2' - 6"
1'
0"
1' - 0"
GRADE
SEE CIVL
T/SLAB = 100' - 0"
CONT (3)#5
CONT (4)#4
#5@16"oc
ALT HK
TF EL =
SEE PLAN
2'
3"
DWL, MATCH SIZE &
SPA OF CMU REINF
8"
C.2 C.A C.B
INSULATION, SEE ARCH.
FOR UNDERSLAB INSULATION SEE ARCH.
#5@24"oc
7 5/8"
C.1
T/CMU EL =
SEE PLAN
C.2
CMU REINF
BOND BM (TYP)
CONT L3 1/2x3 1/2x1/4
W/ 5/8"Ø EXP
ANCHORS @ 16"oc
C.B
T/CMU EL =
SEE PLAN
CMU WALL, VERT REINF
NOT SHOWN FOR CLARITY
BOND BM (TYP) CONT BENT PL
3 1/2x3 1/2x1/4 W/ 5/8"Ø EXP ANCHORS @ 16"oc
CMU SOAP AS REQ'D
AT JOIST POCKET
3/16
EA
JST
1/8 3
1/8 3
PL5/8"x5"x10" W/ (2) 3/4"Øx9" LG HD STUDS
JOIST POCKET
JOIST BRG EL =
113'-9 3/4"
4"
1/ 2"
4"
C.A
BOND BM (TYP)
3/16
EACH
JST
1/8 3
1/8 3
PL5/8"x5"x10" W/ (2) 3/4"Øx9" LG HD STUDS
JOIST BRG
EL = 112'-0"
7"
3"
MIN
4"
CONT BENT PL 5"x1/4
1/
2"
4"
JST BRG
S.C
1' - 6"
8"
GRADE
SEE CIVL
1CONT (3)#4 T&B
CONT (2)#4 EF
#4@12"oc
FOR UNDERSLAB
INSULATION SEE ARCH
T/SLAB = 100' - 0"
SLAB REINF
S.11S.A S.1
WALL PANEL
BY PEMB MANF
CONN BY PEMB DESIGNER.
DESIGNER SHALL COORD &
CONSIDER THE CONCRETE REINF
WHEN DESIGNING THE CONNECTION.
B/FTG= 97' - 0"
S.C
8"
GRADE SEE CIVL
CONT WALL REINF
THRU PEDESTAL
PEDESTAL REINF
SEE SCHEDULE
FOR UNDERSLAB
INSULATION SEE ARCH
SLAB REINF
S.11S.A S.1WALL PANEL
BY PEMB MANF
COL & ANCHORAGE BY PEMB
DESIGNER. PROVIDE SLAB
HAIRPIN REINF AS REQUIRED
PER THE FINAL DESIGN.
CONN BY PEMB DESIGNER.
DESIGNER SHALL COORD &
CONSIDER THE COL BP,
ANCHORAGE, AND CONCRETE
REINF WHEN DESIGNING THE
CONNECTION.
TF EL =
SEE PLAN
T/SLAB = 100' - 0"
FTG REINF
SEE SCHEDULE
1'
0"
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
PW DRAWING NO. PW7534
11/21/2019
As indicated
:2 :1
A M
S5101
S
TR
U C
TU
R
AL
12805239
JPS MEL SAM
S
EC
TI
O N S
AN
D
D
ET
AI
LS
1/2" = 1'-0"
S1011
A1
SECTION
3/4" = 1'-0"
S1211
B1
SECTION
3/4" = 1'-0"
S1211
B2
SECTION
3/4" = 1'-0"
S1211
B3
SECTION
1/2" = 1'-0"
S1011
A2
SECTION
1/2" = 1'-0"
S1011
A3
SECTION
ARCHITECTURAL DIMENSIONING
UNLESS OTHERWISE NOTED ALL
EXTERIOR DIMENSION STRINGS ARE
TO THE FINISH FACE OF WALL
(EITHER FROM COLUMN CENTER
LINES OR OPENINGS IN WALL)
UNLESS OTHERWISE NOTED LOCATE
THE EDGE OF DOOR JAMBS 4 INCHES
OFF OF THE FINISHED FACE OF
ADJACENT GYPSUM BOARD
PARTITION AND 8" AT CMU PARTITION
UNLESS OTHERWISE NOTED ALL
DIMENSION STRINGS ARE TO THE
FINISH FACE OF WALL OR
PARTITION
4. DO NOT SCALE DRAWINGS - FOLLOW WRITTEN DIMENSIONS ONLY.
5. TYPICALLY, DIMENSIONS ARE TO CENTER OF COLUMNS, FACES OF
FINISHED WALL OR PARTITION SURFACE OR TO EDGE OF OPENINGS.
6. COORDINATE DIMENSIONS INDICATED IN THESE DRAWINGS WITH
FABRICATION OF ALL SYSTEMS AND ASSEMBLIES. COORDINATE
DIMENSIONS INDICATED WITH ACTUAL FIELD CONDITIONS. REPORT ANY
INCONSISTENCIES TO THE CONTRACTING OFFICER PRIOR TO
PROCEEDING WITH WORK.
7. "NOM" AS USED IN THESE DOCUMENTS IS THE ABBREVIATION FOR
"NOMINAL" - MEANING THAT ACTUAL MANUFACTURED, ASSEMBLED FOR
INSTALLED DIMENSIONS MAY VARY SLIGHTLY FROM WHAT IS INDICATED.
8. "EQ" AS USED IN THESE DOCUMENTS IS THE ABBREVIATION FOR "EQUAL"
- MEANING THAT THE DIMENSIONS ON A STRING ARE INTENDED TO BE OF
EQUAL LENGTH.
9. " +/- " OR "VERIFY" AS USED IN THESE DOCUMENTS MEANS THAT FOR
EXISTING CONDITIONS THE DIMENSIONS MUST BE VERIFIED IN THE FIELD
BY THE CONTRACTOR AND FOR NEW CONDITIONS THE ACTUAL
DIMENSION AS CONSTRUCTED MAY BE ADJUSTED SLIGHTLY TO
ACCOMMODATE OTHER FACTORS.
10. "MIN" AS USED IN THESE DOCUMENTS IS THE ABBREVIATION FOR
"MINIMUM" - MEANING THAT THE CONDITION IS SLIGHTLY ADJUSTABLE
BUT MAY NOT VARY TO A DIMENSION OR QUALITY LESSER THAN THAT
INDICATED.
11. "MAX" AS USED IN THESE DOCUMENTS IS THE ABBREVIATION FOR
"MAXIMUM" - MEANING THAT THE CONDITION IS SLIGHTLY ADJUSTABLE
BUT MAY NOT VARY TO A DIMENSION OR QUALITY GREATER THAN THAT
INDICATED.
12. "CLEAR" AS USED IN THESE DOCUMENTS MUST MEAN THAT THE
DIMENSION IS NOT ADJUSTABLE WITHOUT THE WRITTEN APPROVAL OF
THE CONTRACTING OFFICER OR ENGINEER. CLEAR DIMENSIONS ARE
TYPICALLY TO FINISH FACE.
13. "ALIGN" AS USED IN THESE DOCUMENTS MUST MEAN TO ACCURATELY
LOCATE THE FINISHED FACES TO BE IN THE SAME PLANE.
14. ROUGH OPENING ("RO") DIMENSIONS SHOWN ON THESE DRAWINGS ARE
NOMINAL OR MODULAR DIMENSIONS. ACTUAL DIMENSIONS MAY VARY
DEPENDING ON THE TYPE OF BUILDING ELEMENT BEING DIMENSIONED.
1.
2.
3.
ARCHITECTURAL ABBREVIATIONS
ABA ARCHITECTURAL BARRIERS ACT
ACP ACOUSTICAL CEILING PANEL
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
APC ACOUSTICAL PANEL CEILING
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION AND AIR
CONDITIONING ENGINEERS
ASTM AMERICAN SOCIETY OF TESTING AND
MATERIALS
AV AUDIO VISUAL
AWP ACOUSTIC WALL PANEL
BD BOARD
BLDG BUILDING
BOT BOTTOM
CFCI CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
DIA DIAMETER
DWG DRAWING
E EAST
EA EACH
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
EQ EQUAL
EXP EXPOSED
EXT EXTERIOR
EXTG EXISTING
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF&E FURNITURE, FIXTURES AND
EQUIPMENT
FIN FINISH
FLR FLOOR
GA GAGE OR GAUGE
GALV GALVANIZED
GFGI GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
GFCI GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GYP GYPSUM
HT HEIGHT
HORIZ HORIZONTAL
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
IT INFORMATION TECHNOLOGY
JAN JANITOR
LAM LAMINATE
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
N/A NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
OA OVERALL
OC ON CENTER
OH OPPOSITE HAND
OPP OPPOSITE
PLAM PLASTIC LAMINATE
PTD PAINTED
RCP REFLECTED CEILING PLAN
REF REFERENCE
REQ'D REQUIRED
RM ROOM
RO ROUGH OPENING
SCHED SCHEDULE
SIM SIMILAR
SPEC SPECIFICATION(S)
SQ SQUARE
SF SQUARE FOOT
STC SOUND TRANSMISSION CLASS
STL STEEL
STOR STORAGE
T TREAD
TELECOM TELECOMMUNICATIONS
THK THICK OR THICKNESS
TBD TO BE DETERMINED
TOS TOP OF SLAB
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
VERT VERTICAL
VIF VERIFY IN FIELD
WD WOOD
WR WATER RESISTANT
WWF WELDED WIRE FABRIC
YD YARDS
MATERIAL LEGEND
STEEL
THERMAL
INSULATION
(BATT)
THERMAL
INSULATION
(RIGID)
GYPSUM BOARD
CONCRETE
EARTH
GRANULAR FILL
ACOUSTICAL
PANEL CEILING
WOOD ROUGH
CMU
WOOD BLOCKING,
SHIM
PARTICLEBOARD
OR PLYWOOD
GLASS
CARPET
SOLID SURFACE
MATERIAL
1. IF AT ANY TIME THE CONTRACTOR DISCOVERS A CONDITION WHICH
CONFLICTS WITH THE DRAWINGS AND/OR SPECIFICATION OF THIS
PROJECT OF IF THE CONTRATOR DISCOVERS AN UNCLEAR OR
LISLEADING DIRECTIVE IN THESE DOCUMENTS, THE CONTRACTOR SHALL
IMMEDIATELY BRING THE ISSUE TO THE ATTENTION OF THE
CONTRACTING OFFICER REPRESENTATIVE.
2. REFER TO STRUCTURAL FOR LOAD BEARING WALLS, COLUMN SIZE, AND
FOUNDATION INFORMATION.
3. COORDINATE ALL PARTITION / WALL MOUNTED EQUIPMENT NOT
INDICATED ON THE DRAWINGS WITH THE CONTRACTING OFFICER PRIOR
TO INSTALLATION.
4. NOTES AND DETAILS ON DRAWINGS TAKE PRECEDENCE OVER GENERAL
NOTES AND TYPICAL DETAILS. WHERE NO SPECIFIC DETAILS ARE
INDICATED, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE
PROJECT.
5. EQUIPMENT LOCATIONS INDICATED ON ARCHITECTURAL DRAWINGS ARE
FOR REFERENCE ONLY. COORDINATE EQUIPMENT LOCATIONS WITH
UTILITIES INDICATED ON CIVIL, MECHANICAL, PLUMBING, FIRE
PROTECTION, ELECTRICAL, AND INTERIORS DRAWINGS.
6. WHILE CARE HAS BEEN TAKEN TO COORDINATE MECHANICAL AND
ELECTRICAL PENETRATIONS WITH ARCHITECTURAL WORK, CONTRACTOR
IS RESPONSIBLE FOR FRAMING MODIFICATIONS AND PATCHING
REQUIRED WHETHER SPECIFICALLY SHOWN OR NOT.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR THE
GENERAL INTENDED LAYOUTS OF MECHANICAL, ELECTRICAL, CABLE
TRAY, FIRE SUPPRESSION SYSTEMS AS THEY OCCUR WITHIN THE FINISH
CEILING SYSTEM.
8. PROTECT INSTALLED FLOOR FINISHES FROM DIRECT CONTACT BY MEANS
OF COVERING FOR DURATION OF CONSTRUCTION.
ARCHITECTURAL GENERAL NOTES ARCHITECTURAL SYMBOLS
EXTERIOR WINDOW / LOUVER TAG
DOOR TAG
PARTITION TYPE TAG
(FIRST DIGIT INDICATES HOURLY FIRE RATING)
1A
TOILET ACCESSORY DESIGNATION
W1
(SD)
F
RAT
FACP
FSA
K
REFER TO FIRE ALARM LEGEND, F0011
APPLICABLE CODES AND STANDARDS
REFERENCED CODES AND STANDARDS
THE PROJECT WILL COMPLY WITH ALL FEDERAL REQUIREMENTS INCLUDING,
BUT NOT LIMITED TO, THE FOLLOWING:
• UFC 3-101-01, ARCHITECTURE
• UFC 3-110-03, ROOFING
• UFC 3-120-01, DESIGN: SIGN STANDARDS
• UFC 3-120-10, INTERIOR DESIGN
• UFC 3-190-06, PROTECTIVE COATINGS AND PAINTS
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
PW DRAWING NO. PW7534
11/21/2019
:0 :4
P M
A0011
AR
C H
IT
EC
TU
R
AL
12805240
LV JE DF
N O
TE
S S
YM
B O
LS
AN
D
AB
B R
EV
IA
TI
O N
NONE
F
FACP
K
RAT
F
A2011
C1
A2011
C4
A2011
B1
A2011
B4
OPEN OFFICE
O-101
KITCHENETTE
O-102
MEN
O-104
WOMEN
O-105
UTILITY
O-106
CONFERENCE
O-108
C.A
C.B
C.1 C.2
CORRIDOR
O-103
47' - 4"
4'
8"
M .O
4'
0"
M .O
4'
0" 4'
0"
A4011 A3
A4
A1
A4011 B1
O -1
O -1
O -1
O -1
5'
5" 9'
2"
TELECOM
O-109
2' - 7" 5' - 2" 17' - 6"
7' - 2" 1' - 2" 7' - 2" 6' - 9"
O -1
O-106
A4011 B3
M.O.
3' - 4" 1' - 4"
M.O.
6' - 0" 14' - 0"
M.O.
4' - 0" 7' - 4"
A L
IG
N
0A0A
0A
0A
0D0C
0D
0A
0A
0D
0A
3'
0"
(US)
9' - 11"
0E0E
1' - 0"
4' - 0"
6"
1' - 0"
A1
A3011
A3
A3011
B2
A4011B1 B2
FSA
OPP
HAND
A2021
D1
A2021
C1
A2021
B1
A2021
C3
A1
A5021
S.1 S.2 S.3 S.4 S.5 S.6 S.7 S.8 S.9 S.10 S.11
S.A
S.C
STORAGE
S-101
FIRE RISER
S-104
LOCKABLE STOR
S-103
S.B
S-102c
S -1 b
S-102b S-101c S-101d S-101e S-101f
S -1 a S-102d S-102e
S -1 a
S -1
4' - 3" 18' - 9" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 18' - 3" 12' - 0" 8' - 3" 10' - 0" 6' - 3"
3' - 2"
A4011
B4
3" 10' - 6"
7'
0"
9 12
3'
1/
8"
4" TYP.
16' - 0" TYP.
4" TYP.
1'
6"
5'
5" 4"
T Y
P
T Y
P
TYPICAL
EQ EQ
A5111
B1 10' - 0" 9' - 3" 10' - 0" 7' - 9"
OPTION SCOPE:
SHADED AREA DENOTES OPTION SCOPE AND INCLUDES
ASPECTS OF ARCHITECTURE, STRUCTURE, BUILDING
SYSTEMS, AND FINISHES BETWEEN GRIDLINE S.9 AND S.11.
DRAWINGS SHOW FINAL INTENT IF OPTION SCOPE IS
TAKEN. BASE BID DOES NOT INCLUDE OPTION SCOPE.
B1
A3011
C1
A3011
TYP.
TYP
84' - 0" 2' - 1"
O P T I O N S C O P E
TYP
1' - 6"
S -1 g
1'
0"
A
LI
G N
FINISH FACE
10 1/2" TO EXTERIOR
STORAGE
S-102
FACE, IF OPTION IS TAKEN
10 1/2" TO EXTERIOR FINISH
FINISH FACE
10 1/2" TO EXTERIOR
F
IN
IS
H
F A
C E
/2
T O
E X
T E
R
IO
R F
IN
IS
H F
A C
E
/2
T
O E
X T
E R
IO
R
160' - 10 1/2" 39' - 1 1/2"
13 13
1' - 0"
3'
6"
FLOOR PLAN KEYNOTES
FLOOR PLAN GENERAL NOTES
1. ALL INTERIOR GYSPUM BOARD FURRING OVER CMU WALLS ARE
TYPE '0B' UNLESS OTHERWISE NOTED. REFER TO SHEET A7011 FOR
PARTITION TYPES.
1/4" = 1'-0"
2' 4' 8' 12'
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
GRAPHIC SCALE
PW DRAWING NO. PW7534
11/21/2019
As indicated
:0 :5
P M
A1011
AR
C H
IT
EC
TU
R
AL
12805241
LV JE DF
FL
O O R
P
LA
N S
1/4" = 1'-0"A1
OPERATIONS BUILDING FLOOR PLAN
1/8" = 1'-0"C1
STORAGE BUILDING FLOOR PLAN
1/8" = 1'-0"
24'4' 8' 16'N
N
20 MONITOR AND WALL BRACKET (GFGI) IN RECESSED WALL OPENING -
REFER TO D1/A4121 FOR MOUNTING AND BLOCKING DETAIL
21 **OPTION** IF OPTION SCOPE IS TAKEN EXPAND BUILDING AS SHOWN, TO
INCLUDE OPTION SCOPE. BUILDING TO EXPAND WEST FROM GRIDLINE
S.9 TO S.11. BASE BID DOES NOT INCLUDE OPTION SCOPE AREA
22 **OPTION** IF OPTION SCOPE IS TAKEN PROVIDE MAN DOOR WITH
EGRESS HARDWARE
23 **OPTION** IF OPTION SCOPE IS TAKEN, PROTECTION RAIL TO MAINTAIN
RELATIONSHIP AND LOCATION ALONG WEST WALL AT GRID LINE S.11
24 **OPTION** IF OPTION SCOPE IS TAKEN, STRUCTURE OF EAST WALL,
INCLUDING BUT NOT LIMITED TO COLUMNS AND BRACING, WILL SHIFT
FROM GRID LINE S.9 TO S.11 AS SHOWN. REFER TO STRUCTURAL
DRAWINGS FOR MORE INFORMATION
25 **OPTION** IF OPTION SCOPE IS TAKEN, ADD NEW OVERHEAD COILING
DOOR
1 EXTERIOR BOLLARD - REFER TO B5 / A5111
2 END GUARD LOCATION - REFER TO D5/A7011
3 FIRE EXTINGUISHER CABINET (FIRE EXTINGUISHER IS GFGI) - REFER TO
C1/A4111
5 MOP SINK - REFER TO PLUMBING AND A1 / A4111
7 48" X 36" SURFACE WALK-OFF MAT (GFGI)
8 FLOOR DRAIN / CLEAN-OUT, SLOPE FLOOR TO DRAIN - REFER TO
PLUMBING DRAWINGS
9 METAL LINER PANEL TO 10'-0" AFF (TYPICAL ALL SIDES)
10 PAINTED STRIPING 'SAFETY YELLOW'
11 GROMMET IN COUNTERTOP - REFER TO D5 / A4111, COORDINATE
LOCATION WITH EQUIPMENT
12 PROTECTION RAIL - REFER TO A3 / A4121
13 BRACE FRAME - REFER TO STRUCTURAL
14 PAPER TOWEL DISPENSER (T-H) - REFER TO D1 / A4011
15 FIRE DEPARTMENT LOCK BOX
16 MULTI-FUNCTION COPIER - SHOWN FOR REFERENCE ONLY
17 MECHANICAL EQUIPMENT
18 PLASTIC PANEL
19 HOSE BIB - REFER TO PLUMBING
X.A
X.B
X.1 X.2 X.3
STEEL COLUMN
1' - 0" 1' - 0"1' - 0" 1' - 0"
LINE OF CANOPY OVERHEAD
A5111
B1
40' - 0"
NOTE:
REFER TO STRUCTURAL FOR ADDITIONAL DIMENSIONS
A4
A5021
OUTLET TO SPLASHBLOCK -
DRAIN TO THE WEST
DOWNSPOUT ATTACHED TO
POST / COLUMN SUPPORT
DOWNSPOUT ELBOW TO GUTTER SHOWN DASHED
X.A
X.B
X.1 X.2 X.3
S
LO
P E
: 1
METAL ROOFING PANEL (MRP-2)
A4
A5021
GUTTERDOWNSPOUT TO SPLASHBLOCK
10"
X.A
X.B
X.1 X.2 X.3
NOTE:
MINIMUM CLEAR HEIGHT 12' - 0" ABOVE GRADE
A1021
C4
STEEL PIPE GUARDRAIL - REFER TO STRUCTURAL
CONCRETE LOADING RAMP AND CURB -
REFER TO STRUCTURAL
CONCRETE LANDING PAD - REFER TO STRUCTURAL
LEVELER
A3
A1021
VARIES + 4' - 0"
ALIGN
A
LI
G N
3/8" SIDE OF PIT TO
SIDE OF BUMPER
6" PROJECTION
2'-0"
(2) LAMINATED
BUMPERS PER
OPENING
3/4" DIAMETER
EXPANSION
ANCHOR BOLTS -
(2) THUS
11"
GRADE
TRUCK RESTRAINT
DOCK BUMPER
(TYP EA SIDE) -
REFER TO C5/A1021
GUARDRAIL - REFER
TO STRUCTURAL
SAFETY CHAIN
7' - 0"
8'
0"
3' - 6"
8' - 0"
OF DOCK
NOTE: DOCK LEVELER NOT
INDICATED FOR CLARITY
DOCK BUMPER
(TYP EA SIDE) -
REFER TO C5 / A1021
NOTE: VERIFY ALL DIMENSIONS WITH
DOCK LEVELER MANUFACTURER
PRIOR TO CONSTRUCTION
S
LO
P E
TRUCK RESTRAINT
B4
A1021
CURB AND GUARDRAIL
WHERE OCCURS
CANOPY EXTERIOR FINISH SCHEDULE
3'
6"
EQ EQ
MAX4' - 0" OC,
NOTE: ALL STEEL PIPE
RAILING AND GUARDRAILS
SHALL BE SHOP PRIMED
AND FIELD PAINTED
PROVIDE NON-SLIP NOSING AT TREAD, TYPICAL
GUARDRAIL, REFER TO STRUCTURAL
CONCRETE STAIR AND LANDING AT RAMP,
REFER TO STRUCTURAL
CONCRETE STOOP AT RAMP STAIR,
REFER TO STRUCTURAL
1 1/2" DIAMETER GALV PIPE HANDRAIL
1' - 0"
2'
1' - 6"
B5
A1021
BOLLARD - REFER TO B5 / A5111
5/8" STEEL BAR PICKETS @ 4" O.C.
1 1/2" OUTSIDE DIAMETER
CONTINUOUS ALUMINUM PIPE
HANDRAIL
SCHEDULE 40 STEEL, TOP PIPE RAIL
SCHEDULE 80 STEEL PIPE POST
NOTE:
ALL STEEL PIPE RAILING AND
GUARDRAILS SHALL BE SHOP
PRIMED AND FIELD PAINTED
ALUMINUM BRACKET BOLTED
TO STEEL POST
MIN.
1 1/2"
3"
2'
0"
0 6" 1'
3" = 1'-0"
3"
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
PW DRAWING NO. PW7534
11/21/2019
As indicated
:0 :5
P M
A1021
AR
C H
IT
EC
TU
R
AL
12805242
LV JE DF
C
AN
O P Y P
LA
N S
AN
D
LO
AD
IN
G
R
AM
P
1/4" = 1'-0"A1
CANOPY FLOOR PLAN
1/4" = 1'-0"D1
CANOPY ROOF PLAN
1/4" = 1'-0"B1
CANOPY REFLECTED CEILING PLAN
N
N
N
1/8" = 1'-0"B3
LOADING RAMP PLAN
1/2" = 1'-0"
1' 2' 4' 6'
3" = 1'-0"C5
BUMPER DETAIL
1/2" = 1'-0"B4
LOADING RAMP ELEVATION
1/2" = 1'-0"
A1021
C4
DOCK LEVELER PLAN
A1021
A1021
N
1/4" = 1'-0"
2' 4' 8' 12'
1/8" = 1'-0"
24'4' 8' 16'
GRAPHIC SCALE
1/4" = 1'-0"
A1021
A3
SECTION AT LOADING RAMP
PRODUCT FINISH COLOR
STANDING SEAM METAL ROOF (MRP-2) PREFINISHED METALSPAN, FLUROPON COATING POLAR
WHITE 431R813
BOLLARD PAINT SAFETY YELLOW
STEEL COLUMNS PAINT SHERWIN WILLIAMS, INTELLECTUAL GRAY,
SW7045
1 1/2" = 1'-0"
A1021
DETAIL AT HANDRAIL
P
S P
S P
S P
S
P CO
S P
S P
M
S P
CO
C.A
C.B
C.1 C.2
UTILITY
O-106
WOMEN
O-105
MEN
O-104
KITCHENETTE
O-102
OPEN OFFICE
O-101
CONFERENCE
O-108
CORRIDOR
O-103
TELECOM
O-109
D5
A4121
REFLECTED CEILING PLAN KEYNOTES
REFLECTED CEILING PLAN LEGEND
ACOUSTICAL PANEL CEILING (ACP)
GYPSUM BOARD CEILING
WALL MOUNT FIRE ALARM - STROBE / SPEAKER
FIRE ALARM - STROBE / SPEAKER
FIRE ALARM - STROBE
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
LIGHTING FIXTURES, REFER TO ELECTRICAL
OCCUPANCY SENSOR, CEILING MOUNTED, MULTI-
DIRECTIONAL
EXIT SIGN (ARROW INDICATES DIRECTIONAL SIGN, DARKEN
AREA DENOTES LIGHTED FACE)
SMOKE DETECTOR
CARBON MONOXIDE DETECTOR
JUNCTION BOX
CO
J
REFLECTED CEILING PLAN GENERAL NOTES
1. THE CEILINGS MUST BE INSTALLED IN CONSIDERATION OF SEISMIC
DESIGN CATEGORY "C".
2. REFER TO PLUMBING, MECHANICAL, ELECTRICAL, FIRE SUPPRESSION,
FIRE ALARM AND TELECOMMUNICATION DRAWINGS FOR ALL VENTS,
SPRINKLER HEADS, GRILLES, REGISTERS, DIFFUSERS, DUCTS, LIGHTS,
DETECTORS, ETC AND COORDINATE SAME AS REQUIRED.
3. COORDINATE ALL STRUCTURAL, PLUMBING, MECHANICAL, FIRE
SUPPRESSION, AND ELECTRICAL WORK WITH CEILING HEIGHTS AND
ARCHITECTURAL WORK. WHERE CONFLICTS IN DEVICES OCCUR,
COORDINATE FINAL LOCATIONS WITH CONTRACTING OFFICER.
4. EXTEND ALL PARTITIONS TO BOTTOM OF ROOF DECK (TYPICAL) UNLESS
OTHERWISE NOTED.
5. REFER TO ROOM FINISH SCHEDULE ON A6011 FOR CEILING MATERIALS,
FINISHES, AND HEIGHTS.
6. ALL CEILING MOUNTED OR RECESSED ITEMS SHOWN OR NOT, ON
REFLECTED CEILING PLANS, SUCH AS SPRINKLER HEADS, SPEAKER,
GRILLES, LIGHTS, ETC. MUST BE CENTERED IN THE LAY-IN PANELS. AT
GYPSUM BOARD CEILINGS, INSTALL IN A CONSISTENT PATTERN.
7. NOTIFY CONTRACTING OFFICER OF ALL ITEMS NOT SHOWN ON
REFLECTED CEILING PLAN AND LOCATE PER CONTRACTING OFFICER
DIRECTION.
8. IF MECHANICAL / ELECTRICAL / PLUMBING REQUIRE AN ACCESS PANEL IN
A GYPSUM BOARD CEILING, COORDINATE LOCATION WITH CONTRACTING
OFFICER.
9. GRID LAYOUT AND LOCATION OF LIGHT FIXTURES AND DIFFUSERS ON
THE ARCHITECTURAL REFLECTED CEILING PLANS GOVERN OVER
ELECTRICAL AND MECHANICAL DRAWINGS. WHERE NO REFLECTED
CEILING PLAN IS INCLUDED IN THE ARCHITECTURAL SERIES, INDIVIDUAL
DISCIPLINE DOCUMENTS WILL HAVE GOVERNANCE.
10. REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURES TYPE AND
SIZE.
11. ALL CEILING PENETRATIONS MUST BE TREATED AS PERIMETER
CLOSURES AND MUST ALLOW A MINIMUM OF 3/8" CLEARANCE BY USE OF
SUITABLE ESCUTCHEONS OR CLOSURE DETAILS.
ROOMS WHICH DO NOT HAVE NOTED STARTING POINT(S)
OR DIMENSIONS ON REFLECTED CEILING PLANS SHALL BE
SIMILAR TO LAYOUTS A, C, OR D.
LAYOUTS SHOWN ARE INTENDED TO BE DIAGRAMMATIC
AND CAN BE APPLIED TO LARGER OR SMALLER ROOMS AND
TO DIFFERENT PANEL SIZES AND TYPES.
NOTES:
ASYMMETRICAL ROOM
ON TWO AXES
A TYPICAL ROOM WITH
SYMMETRICAL PANELS
B
TYPICAL 24" x 24" CEILING PANELS
ROOM WITH SPECIFIC
LOCATION OF GRID
ASYMMETRICAL ROOM
ON ONE AXIS
C D
TYPICAL 24" x 24" CEILING PANELS
1.
2.
STABILIZER BARS AT
UNRESTRAINED CEILINGS
FULL PANEL EXCESS
E X
C E
S S
F U
LL
P
A N
E
LS
F U
LL
P
A N
E
LS
EQUAL EQUAL
CUT AS
DIRECTED
C U
T A
S D
IR
E
C T
E D
E Q
U A
L F
U
LL
P A
N E
LS
E
Q U
A L
EQUAL FULL EQUAL
1/4" = 1'-0"
2' 4' 8' 12'
C
B
D
N62473-18-D-5801
1596603
N
AV
AL
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M
AN
D
M
ID
AT
LA
N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
PM/DM BHD/PJB
BRANCH MANAGER
CHIEF ENG/ARCH EA
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
A/E INFO
D E P A R T M E N T
O F
T H E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N
AV
AL
ST
AT
IO
N
N O R
FO
LK
VA
C R
AN
E, IN
D
IA
N A
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
S
YM
D E S C R
IP
TI
O N
D
AT
E
AP
P R
C
AA
A
EX
P
LO
S
IV
E R
AI
LC
AR
H O
LD
IN
G
YA
R D
(P
SEAL
501 North Broadway Saint Louis, MO 63102
(314) 335-4000
M
ID
LA
N T C I C O R E
A
C
B
D
A
DATE
N
AV
AL
S U P P O R T
AC
TI
VI
TY
C R
AN
E
FIRE PROTECTION
DRAWFORM REVISION: 31 JANUARY 2017
GRAPHIC SCALE
PW DRAWING NO. PW7534
11/21/2019
As indicated
:0 :5
P M
A1111
AR
C H
IT
EC
TU
R
AL
12805243
LV JE DF
R
EF
LE
C
TE
D
C
EI
LI
N G
P
LA
N
1/4" = 1'-0"A1
OPERATIONS BUILDING REFLECTED CEILING PLAN
31 EXPOSED TO STRUCTURE ABOVE, TYPICAL
32 GUTTER
34 LIGHT COVE
59 DOWNSPOUT
ROOF PLAN KEYNOTES
S.1 S.2 S.3 S.4 S.5 S.6 S.7 S.8 S.9 S.10 S.11
S.A
S.C
S.B
S
LO
P E
: 1
200' - 0"
B1
A3011
C1
A3011
OPTION SCOPE:
SHADED AREA DENOTES OPTION SCOPE AND INCLUDES
ASPECTS OF ARCHITECTURE, STRUCTURE, BUILDING
SYSTEMS, AND FINISHES BETWEEN GRIDLINE S.9 AND S.11.
DRAWINGS SHOW FINAL INTENT IF OPTION SCOPE IS
TAKEN. BASE BID DOES NOT INCLUDE OPTION SCOPE.
O P T I O N S C O P E
2'
0"
2' - 0" 2' - 0"
5859 59 59 59 5960
C.A
C.B
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .